Loading...
HomeMy WebLinkAboutSP202200018 Checklist 2022-07-15SPECIAL USE PERMIT CHECKLIST for �0FAL PREAPP202200045 St. Paul's Ivy Preschool 18-Sec. 12.2.2(7) Child Day Center 1 ['7 RGINZP After the mandatory pre -application meeting, county staff will mark this checklist appropriately so that it is clear to the applicant the information from Section 33.4 (c) Staff Contact: that must be submitted with the official application Rebecca Ragsdale rragsdale@albemarle.org Required Provided with for application SECTION 33.4(c) application? (Applicant) (County X Staff) X YES NO X X A narrative of the project proposal, including its public need or benefit; X X A narrative of the proposed project's consistency with the comprehensive plan, including the land use plan and the master plan for the applicable development area; X X A narrative of the proposed project's impacts on environmental features. X X A narrative that addresses the impacts of the proposed development on public transportation facilities, public safety facilities, public school facilities, and public parks. X X One or more maps showing the proposed project's regional context and existing natural and manmade physical conditions; -GIS can be used to provide this. X X A conceptual plan showing, as applicable: You may use GIS for the Concept Plan X X 1) the street network, including circulation within the project and connections to existing and proposed or planned streets within and outside of the project; SPECIAL USE PERMIT CHECKLIST 09-2020 Page 1 of 3 2) typical cross -sections to show proportions, scale and streetscape/cross-sections/circulation; X X 3) the general location of pedestrian and bicycle facilities as applicable X X 4) building envelopes; X X 5) parking envelopes; 6) public spaces and amenities; 7) areas to be designated as conservation and/or preservation areas; 8) conceptual stormwater detention facility locations; 9) conceptual grading; Other special studies or documentation, if applicable, and any other information identified as necessary by the county on the pre -application comment form. X X - The conceptual plan should show the proposed pick-up and drop-off loop, parking areas for the proposed use, any outdoor play areas that will be used by the proposed use, and identify any changes that may be made to the site (as applicable). - Include floor plan of proposed classrooms, other areas to be used for the preschool - Include in the narrative whether there will be any overlap with the proposed use and any existing church functions/activities, proposed enrollment, number of employees, ages, and hours of operation. - Include estimated trip generation - The zoning ordinance requires the following for parking: Child day center one space per ten children enrolled in the major class or shift plus one space per employee. In addition, a pick-up and drop-off area shall be provided on the site For reference, here is a link to the special use permit application: https://www.albemarle.ore/government/community-development/apply-for/plann ing-and-site-development/special-us e-permits-so Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist as required for application. SPECIAL USE PERMIT CHECKLIST 09-2020 Page 2 of 3 914efissa &Z and g(fison 7{retfow Signature of person completing this checklist Melissa Kelly/Allison Kretlow Print Name 7/15/2022 Date 912-228-0224/434-529-0439 Daytime phone number of Signatory SPECIAL USE PERMIT CHECKLIST 09-2020 Page 3 of 3