HomeMy WebLinkAboutWPO202200031 Checklist 2022-07-18Albemarle County Engineering
Erosion and Sediment Control Plan checklist for plan reviewers
January 24, 2022 (Use the latest checklist from the Team Services engineering forms site)
An erosion and sediment control plan is a document which illustrates the measures used to control erosion
and sedimentation during construction. All measures follow the Virginia Erosion and Sediment Control
Handbook.
Reference key:
[Square Brackets] are County Code references, {Curved Brackets} are policy references, and (regular
parenthesis) are explanatory. Links to reference documents are provided where possible.
Application information:
V/ Completed WPO application and fees, with owners signature [County Code 18-32.4.3.2,
18-32.3.9, 17 Article II] Erosion Control plans require a Water Protection Ordinance
(WPO) application and original owner's signature. No review is provided without
application, owner signature(s) and fees. This is true even for revisions. It is important
that the owner be aware of comments and resubmittals, and this is the county assurance.
NA Copies of federal and state permits for any wetland or stream disturbance (Army Corps,
VDEQ, etc) [17-604, 18-32.1.2, 14-311].
VSMP:
NA SWPPP, PPP, SWMP approvals obtained where necessary. In most cases, the erosion
control plan will not be submitted independently, but will be part of a Stormwater
Pollution Prevention Plan (SWPPP). Unless exempt, it will be approved with the SWPPP.
Title information:
Project title. Titles should be appropriate. It should be an erosion control plan, not a
stormwater plan, or site plan, etc. In some cases a WPO package will contain a
stormwater plan and a mitigation plan, but they should be on separate sheets with keys
and page titles. Mitigation plans require a separate review and fee.
V/ Professional seal, with original signature and date for professionally prepared plans.
V Content: The erosion control plan must not contain information regarding permanent
improvements that do not also appear on other plans. Erosion control plans are temporary
documents that are discarded after projects are complete.
Existing conditions plan view information:
V accurate current existing topography at the time of submittal, including all existing site
features, and any recent disturbances, all at a legible scale
V date and source of the topographic information: All topography should be at least visually
field verified by the designer within the last year
NA WPO stream buffer limits; 100' from stream or contiguous wetland, 200-11 from
reservoirs, or floodplain limit if greater.
NA No buffter disturbances without WPO Program Authority approval and a mitigation
plan.
NA floodplain limits (floodway and floodway fringe), including 100-yr flood limits for any
channel with a drainage area of 50+ acres and floodplain designation.
NA Floodplain undisturbed. Disturbances require a Special Use Permit or Floodplain
Development Permit.
Albemarle County
Engineering E&SC Plan Checklist
Page 2 of 4
NA all existing easements (access, drainage, sight, sanitary easements, etc.) with deed book
references, locations and dimensions
NA all critical slopes (typically shaded)
NA Zoning Ordinance buffers shown and protected undisturbed. Disturbances require
Planning approval of a waiver.
Proposed plan view information:
Grading:
V proposed topography at minimum 2' contour intervals — tied into existing contours, as
well as all proposed site features. (Sites with less than 6' of grade change should consider
using smaller contour intervals.) These should agree with other final plans.
V/ proposed slopes are all 2:1 (horizontal: vertical) or flatter {Design Manual, Section 81
NA proposed slopes steeper than 3:1 have low maintenance (not grass) ground cover
specified on the plan {Design Manual, Section 81
V/ existing critical slopes are not disturbed, unless a waiver or exemption has been granted
for the disturbance. [18-4.2, 14-304]
NA Retaining Wall Plans approved. Any walls supporting roads or necessary infrastructure
require engineered plans (not generic manufacturer's details) and computations. {Design
Manual, Section 81 This will also be required where walls are close to property lines and
there is the danger of affecting neighboring property, either during construction, with
later failures, or with pedestrian or vehicle safety.
V/ final contour shapes and slopes ensure no undrained pockets or stagnant pools
Narrative:
V/ narrative and project title (Narratives are now optional, and not reviewed by the County,
other than noting whether they are not seriouly in error, like a boilerplate with another
County's name on it.)
V project description
existing site conditions description
V adjacent areas description
V off -site areas description including any off -site areas for borrow, waste or other
disturbance.
NA special use permit for cut greater than 50,OOOcy in RA zoning
soils descriptions
_X County erosion control notes
stormwater runoff considerations: this can refer to the stormwater management
plan
NA sediment basin design computations summary for each sediment basin
NA sediment trap design computation summary for each sediment trap
Erosion and sediment control measures:
V limits of clearing and grading encompassing all disturbances, entrances, staging and
parking areas, areas where sediment laden runoff will cross, or any construction related
activities. This must match any landscaping and conservation plans submitted with site
plans
NA a construction entrance (CE) draining to a sediment trap (ST) or sediment basin (SB)
NA dust control symbols (DC)
V/ temporary and permanent seeding symbols (TS, PS)
Albemarle County
Engineering E&SC Plan Checklist
Page 3 of 4
NA existing drainage divides
NA existing vegetation, with trees to be saved located by drip lines. This must match any
landscaping and conservation plans.
V protection provided for all stages/phase of construction.,from initial land clearing to
anal grades and hardscapes. This is our most important item. Plans which show only
inlet protection on proposed drainage systems, which are only possible to install upon
completion of grading, should be denied without further review.
V no erosion control measures in the way of construction access or grading Diversion
dikes or silt fence are not placed in the middle of the site, or through access or grading.
Sediment traps are not under or on top of fill material or held up by retaining walls.
Construction entrances are not on fill, etc. Grading cannot occur without perimeter
controls. If the concept for site protection is not adequate in this regard, further review of
the plan may not be possible.
V existing soil boundaries are shown with labels. Areas already disturbed are indicated,
with constructed fill depth or cut noted.
NA critical erosion areas are identified; areas of constructed slopes, areas near property lines
NA adjacent off -site disturbances are shown with erosion control facilities
V a stockpile location.
NA where cut or fill balances have a 10,000 cubic yard deficit or more, plans should not be
approved without a waste area identified. This must be on -site, or on another approved
and permitted site. (Inspectors will confirm this during pre -construction meeting.)
V a staging and parking area, or other construction related areas
NA diversion dikes are used to direct drainage to traps and basins
NA silt fence is not used across contours in place of diversion dikes.
V silt fence is limited to areas of sheet flow with `/4 acre per 100-ft of level on -grade silt
fence. Plans showing only silt fence, without sediment trapping measures, should not be
approved unless they meet this criteria and fill dirt is minimal.
NA all swales and low points at the perimeter of the site have a sediment trap or basin. Silt
fence in swales is typically not adequate. Check dams do not substitute for traps. If the
concept for site protection is not adequate in this regard, further review of the plan may
not be possible.
NA temporary slope drains (TSD) or diversions are provided to prevent discharge over
disturbed or fill slopes
NA inlet protection (IP) on all inlets
NA culvert inlet protection (CIP) on all culvert inlets
NA outlet protection (OP) on all outlets
NA all watercourses are protected and encroachments minimized
NA stream crossing (USC, SC) and diversions are provided at all stream crossings.
NA adequate channels (MS-19) provided for each outfall (see Design Manual for minimum
content).
NA all traps and basins are shown with proposed contours. Simple boxes or symbols are not
sufficient, in most cases, to determine layout or bond amounts.
For each trap;
NA drainage area is 3 acres or less
NA sized for total drainage area, including those for in -line upstream facilities
NA wet storage is 67 cy or more
NA dry storage is 67 cy or more
NA wet storage is 4-ft deep or less
Albemarle County
Engineering E&SC Plan Checklist
Page 4 of 4
NA wet storage side slope is 1:1 or flatter
NA dry storage side slope is 2:1 or flatter
NA stone weir is 6ft per acre of drainage area
NA embankment and stone weir height is 5-ft maximum from outside toe
NA embankment top width is adequate (see table 16 reference)
NA 2:1 length:width ratio for flow path
For each basin; (GB 3.14)
NA sized for total drainage area, including those for in -line upstream facilities
NA wet storage is 67 cy or more
NA dry storage is 67 cy or more
NA wet storage side slope is 1:1 or flatter
NA dry storage side slope is 2:1 or flatter
NA embankment 15' high or less from downstream toe
NA principle and emergency spillways sized per handbook requirements
NA embankment has 1' freeboard during 25-yr storm with emergency spillway
NA embankment has 2' freeboard during 25-yr storm without emergency spillway
NA trash rack / anti -vortex device specified per handbook requirements
NA riser anchor size specified per floatation computation
NA dewatering device sized for 6+hr drawdown of dry storage: 3" dia. minimum
NA safety fence and signs stating "danger, quick sand, do not enter" provided if near any
residential properties, or public access
NA structures and embankment match permanent design for facilities to be converted to
permanent stormwater management facilities
NA embankment top width is adequate (see Design Manual reference details)
NA 2:1 length:width ratio for flow path. If necessary, baffles specified only on temporary
structures (p.III-79). Baffles must extend to bottom of basins. Baffle design during
construction is a hassle so should be properly dimensioned during design if possible.
Details:
NA a paved construction entrance detail (see Design Manual reference details) for projects in
the development areas over 10 acres
NA a typical section for each temporary channel or diversion, referenced from the plan
sheets. Existing ground should be shown at the maximum cross -slope on the plan.
NA details and copies of Program Authority permissions for any variances.
Mass or Early Grading:
NA mass grading Planning approval. (This is also called rough or early grading plans which
contain only approximate finished grades and culverts necessary to grade) Mass grading can only
be permitted within planned developments where a concept grading plan was approved with the
rezoning. The agent (Director of Planning) needs to formally determine that the grading plan is
in general conformity with the approved rezoning plan. Otherwise, an initial site plan needs to be
approved prior to issuance of a grading permit. Issuance of a grading permit at the initial site
plan stage, as apposed to after final plan approval, requires specific approval from the County
Engineer.