Loading...
HomeMy WebLinkAboutSUB202200120 Review Comments Easement Plat 2022-07-18County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT Easement Plat Review Project title: Glenbrook Phase 1113 Easement Plat Project file number: SUB-2022-00120 Plan preparer: Roudabush, Gale & Assoc., Inc. [bjam ison@roudabush.com] Owner or rep.: Glenbrook LLC [alan@riverbenddev.com] Plan received date: 22 June 2022 Date of comments: 18 July 2022 Reviewer: Matt Wentland Brian, We have reviewed the plat and have the following comments: Engineering 1. Engineering has no objections to the plat. Planning - Mariah Gleason 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434-296-5832 WWW.ALBEMARLE.ORG 1. [14-302(A)(4-5), 14-303(L)] Easements. Provide width dimension(s) for all existing easements. 2. [14-303(D)] Acreage. a. Identify TMP 56K1-A2 (Open Space) on the plat map. b. Provide the acreage of each existing lot. 3. [14-312] Existing buildings. Albemarle County GIS indicates there might be a building on TMP 561<1-183. If any buildings are within 50 feet of the revised public drainage easement, please locate them on the plat map. 4. [14-303(H)] Monuments. Identify the material of all permanent reference monuments. 5. [Comment] Reminder that revised plats must include the original date of drawing and the revision date(s) of each subsequent version of the plat. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: Engineering Review Comments Page 2 of 2 After approval, plans will need be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.al bemarle.org/government/com munity-development/apply-for/engi neering-applications If you have any questions or concerns, please contact me either by email (mwentland@albemarle.org) or by phone at 434-296-5832 ext. 3458. Sincerely, Matt Wentland, P.E. Civil Engineer II File: SUB202200120 Glenbrook Phase 1113 Easement Plat review comments 07-18-22.docx