HomeMy WebLinkAboutSP202200021 Plan - Submittal (First) 2022-07-188 1 7 1 6 1 5 DOMINION ENERGY VIRGINIA SITE PREPARATION PERFORMANCE SPECIFICATIONS 4 1 2 RESPONSIBLE LAND DISTURBER DESIGNATION 2 1 PREFACE IT IS THE INTENT OF THESE SPECIFICATIONS TO HAVE A COMPLETELY PREPARED SITE FOR THE CONSTRUCTION OF AN ELECTRICAL FACILITY AT THE COMPLETION OF THE "WORK" AS INDICATED ON THE DRAWINGS, SPECIFICATIONS, OR OTHER DOCUMENTS PROVIDED. THE REGULATIONS OF ALL LOCAL, STATE, OR FEDERAL GOVERNMENTAL BODIES HAVING JURISDICTION OVER D THE WORKING AREAS SHALL BE OBSERVED AT ALL TIMES. ANY SPECIFICATIONS OR INSTRUCTIONS APPEARING ON THE DRAWINGS SHALL HAVE PRECEDENCE OVER THE WRITTEN SPECIFICATIONS WHICH APPEAR HEREIN. IN THE EVENT THAT A DISCREPANCY OR OMISSION HAS OCCURRED, DOMINION ENERGY VIRGINIA SHALL BE CONSULTED FOR RESOLUTIONS. ALL "WORK" SHALL BE PERFORMED IN A MANNER CONSISTENT WITH THE BEST PRACTICES OF THE TRADES INVOLVED. ALL "WORK" SHALL BE PERFORMED WITHIN THE LIMITS OF THE PROPERTY / RIGHTS -OF -WAY SHOWN ON THE DRAWINGS. THE CONTRACTOR WILL RECOGNIZE AND ABIDE BY ALL TERMS AND CONDITIONS OF PERMITS, EASEMENTS, AND AGREEMENTS RELATING TO THE PROJECT. CLEARING AND GRUBBING LIMITS FOR CLEARING AND/OR GRUBBING SHALL BE AS DEFINED ON THE DRAWINGS. CLEARING SHALL CONSIST OF REMOVAL AND DISPOSAL OF BRUSH, DOWNED TIMBER, LOGS, STANDING TREES AND SNAGS, OTHER GROWTH AND ANY ITEMS THAT WOULD INTERFERE WITH CONSTRUCTION OPERATIONS. GRUBBING SHALL CONSIST OF REMOVAL AND DISPOSAL OF STUMPS, BURIED LOGS, ROOTS GREATER THAN 1/2 " DIAMETER, AND ANY OTHER ORGANIC MATERIAL BELOW THE GROUND SURFACE. ALL CLEARED AREAS WILL BE GRUBBED UNLESS OTHERWISE NOTED. DISPOSAL OF CLEARED/GRUBBED MATERIAL BY BURNING SHALL ONLY BE USED WHEN WRITTEN APPROVAL IS OBTAINED FROM LOCAL AUTHORITIES AND DOMINION ENERGY VIRGINIA. OTHERWISE, DISPOSAL SHALL BE OUTSIDE THE LIMITS OF DOMINION ENERGY VIRGINIA CONTROLLED LAND. TOPSOIL ALL TOPSOIL AND SURFACE SOILS CONTAINING ORGANIC MATERIAL SHALL BE REMOVED FROM THE GRUBBED AREA. TOPSOIL SHALL BE STOCKPILED FOR FUTURE USE IN APPROVED LOCATIONS UNLESS OTHERWISE SHOWN ON THE DRAWINGS. C TOPSOIL SHALL NOT BE USED AS, OR MIXED WITH, FILL MATERIAL IN THE CONSTRUCTION OF EARTH EMBANKMENTS UNLESS OTHERWISE SHOWN ON THE DRAWINGS. TOPSOIL MATERIAL USED AS A SURFACE DRESSING SHALL BE REASONABLY FREE OF CINDERS, DEBRIS, AND STONES. UNSUITABLE AND EXCESS TOPSOIL MATERIAL SHALL BE DISPOSED OFFSITE. EARTHWORK EXCAVATION: EXCAVATION SHALL BE ACCOMPLISHED BY CUTTING ACCURATELY TO THE CROSS SECTIONS, GRADES, AND ELEVATIONS SHOWN ON THE DRAWINGS. SOFT, UNSTABLE, OR OTHERWISE UNSATISFACTORY MATERIALS ENCOUNTERED AT THE REQUIRED GRADES SHALL BE REMOVED AS DIRECTED AND REPLACED WITH APPROVED, PROPERLY COMPACTED MATERIAL. COMMON EXCAVATION SHALL INCLUDE ALL MATERIAL WHICH CAN BE REMOVED BY COMMON EARTH EXCAVATION EQUIPMENT, OTHER THAN SOLID ROCK OR BOULDERS AND DETACHED PIECES OF ROCK, EACH EXCEEDING 2 CUBIC YARDS IN VOLUME. ROCK EXCAVATION SHALL BE MATERIAL WHICH REQUIRES THE USE OF PNEUMATIC HAMMERS AND/OR EXPLOSIVES FOR REMOVAL. SITE PREPARATION: IF EARTHWORK OPERATIONS ARE PERFORMED DURING WET SEASONS, CONTRACTOR SHALL AVOID OPERATING EQUIPMENT ON SATURATED SOILS. ANY WET SUBGRADE AREAS WHICH RECEIVE COMPACTED FILL SHALL BE DRAINED AND ALLOWED TO DRY. THE EXPOSED SUBGRADES OF THE BUILDING PAD AND ROADBEDS SHALL BE PROOFROLLED TO DETECT UNSUITABLE SOIL CONDITIONS. PROOFROLLING SHALL BE DONE AFTER A SUITABLE PERIOD OF DRY WEATHER TO AVOID DEGRADING THE SUBGRADE. PROOFROLLING SHALL BE PERFORMED WITH A HEAVILY LOADED DUMP TRUCK OR WITH SIMILAR APPROVED CONSTRUCTION EQUIPMENT. B SOFT MATERIALS ENCOUNTERED SHALL BE COMPLETELY EXCAVATED AND REPLACED WITH APPROVED FILL MATERIALS. I A SUBSTATION EQUIPMENT LAYOUT SCALE 1 "=60' EMBANKMENT: EMBANKMENT WORK SHALL CONSIST OF THE PLACEMENT AND COMPACTION OF FILL MATERIAL ABOVE THE NATURAL GROUND OR OTHER SURFACE IN CONFORMANCE WITH THE DRAWINGS. MATERIALS: APPROVED SOILS USED IN COMPACTED FILLS SHALL BE FREE OF DEBRIS AND FIBROUS ORGANIC MATERIAL. FROZEN MATERIAL WILL NOT BE PERMITTED IN THE FILL. SATISFACTORY MATERIALS SHALL COMPRISE THOSE CLASSIFIED IN ACCORDANCE WITH THE UNIFIED SOIL SYSTEM, ASTM D-2487 AS GW, GP, SW, SP, SM, AND SC. THESE MATERIALS SHALL POSSESS A MAXIMUM DRY DENSITY OF 100 #/CU.FT. OR GREATER REFERENCED TO ASTM D-698 STANDARD PROCTOR. SOILS SHALL HAVE A LIQUID LIMIT LESS THAN 40 PERCENT AND A PLASTICITY INDEX LESS THAN 15. OTHER MATERIALS, WHEN APPROVED BY ENGINEERING, MAY BE PERMITTED IN FILL AREAS. UNSATISFACTORY SOILS INCLUDE THOSE CLASSIFIED AS PT, OH OR OL, CH, MH, CL AND ML, AS REFERENCED TO ASTM D-2487. COMPACTION: COMPACTION EQUIPMENT SHALL CONSIST OF VIBRATORY OR TAMPING ROLLERS, SHEEPSFOOT ROLLER, PNUEMATIC-TIRED ROLLERS, THREE -WHEEL POWER ROLLERS, WALK BEHIND VIBRATORY ROLLERS, VIBRATORY PLATE OR OTHER APPROVED EQUIPMENT WELL SUITED TO THE SOIL BEING COMPACTED. APPROVED FILL MATERIAL SHALL BE PLACED IN UNIFORM HORIZONTAL LIFTS OF APPROXIMATELY 8" DEPTH (LOOSE MEASUREMENT), EXCEPT FOR ROAD MATERIALS ABOVE SUBGRADE ELEVATION AND THE UPPER 12" OF BUILDING PADS WHICH REQUIRE 6" LIFTS. WHERE WALK BEHIND ROLLERS AND VIBRATORY PLATE COMPACTORS ARE USED, THE LIFT THICKNESS SHALL NOT EXCEED 4". GENERALLY, FILLS SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698), WITH MOISTURE CONTENT RANGING BETWEEN LESS THAN 3 PERCENT UP TO THE OPTIMUM AS DETERMINED BY THE PROCTOR DENSITY TEST. THE UPPER 12" OF ROADBEDS AND CONTROL ENCLOSURE BUILDING PADS REQUIRE 98 PERCENT COMPACTION REFERENCED TO ASTM D-698, WITH MOISTURE CONTENT MAINTAINED WITHIN 2 PERCENT OF THE OPTIMUM. EACH SUCCESSIVE LIFT WILL BE PLACED ON FIRM APPROVED SUBGRADE OR COMPACTED FILL. WHERE PREVIOUS LIFTS ARE FOUND TO BE UNACCEPTABLE, THE AREA WILL BE SCARIFIED, AERATED OR MOISTENED, RECOMPACTED OR REMOVED, AND REPLACED AS REQUIRED. DRAINAGE: THE FILL SURFACE SHALL BE ADEQUATELY MAINTAINED DURING CONSTRUCTION. THE SURFACE SHALL BE SLOPED TO ACHIEVE SUFFICIENT DRAINAGE, AND TO PREVENT WATER FROM PONDING ON THE FILL. IF PRECIPITATION IS EXPECTED WHILE FILL CONSTRUCTION IS TEMPORARILY HALTED, THE SURFACE SHALL BE ROLLED WITH RUBBER -TIRED OR STEEL -DRUMMED EQUIPMENT TO IMPROVE SURFACE RUNOFF. FOR PLACEMENT DURING OR AFTER DIFFICULT WEATHER CONDITIONS, WET OR FROZEN MATERIAL SHALL BE REMOVED. FINISHED GRADE TOLERANCES: THE TOP OF EARTHWORK FOR SUBSTATION PAD AND ROADWAY TRAVEL AREAS SHALL BE WITHIN 0.10 FT. ABOVE OR BELOW THE THEORETICAL GRADE. EARTH SLOPES: EXCAVATED SLOPES STEEPER THAN 3:1 SHALL BE ROUGH GRADED IN A MANNER TO PROVIDE HORIZONTAL RIDGES AND GROOVES HAVING AN AVERAGE DEVIATION NO GREATER THAN 0.75 FT. FROM THE THEORETICAL LINE OF THE TYPICAL CROSS SECTION. EXCAVATED SLOPES 3:1 OR FLATTER SHALL BE UNIFORMLY FINISHED AND SHALL NOT DEVIATE FROM THE THEORETICAL PLANE SURFACE BY MORE THAN 0.50 FT. EMBANKMENT SLOPES STEEPER THAN 3:1 SHALL BE ROUGH GRADED IN A MANNER TO PROVIDE HORIZONTAL RIDGES AND GROOVES NOT MORE THAN 0.50 FT. FROM THE THEORETICAL LINE OF THE TYPICAL CROSS SECTION. EMBANKMENT SLOPES 3:1 OR FLATTER SHALL BE UNIFORMLY FINISHED AND SHALL NOT DEVIATE FROM THE THEORETICAL PLANE SURFACE BY MORE THAN 0.50 FT. ROCK SLOPES: SHALL NOT DEVIATE FROM A PLANE SURFACE BY MORE THAN 2.0 FT. AND SHALL NOT DEVIATE FROM THEIR THEORETICAL LOCATION BY MORE THAN 2.0 FT. MEASURED ALONG ANY LINE PERPENDICULAR TO THE THEORETICAL SLOPE LINE. MATERIALS / INSTALLATION VDOT: ITEMS REFERENCED TO THE VIRGINIA DEPARTMENT OF TRANSPORTATION SHOWN ON THE DRAWINGS SHALL CONFORM TO THE REQUIREMENTS OF THEIR LATEST STANDARDS AND SPECIFICATIONS. MANUFACTURERS' ITEMS: ITEMS REFERENCED TO SPECIFIC MANUFACTURERS OR BRAND NAMES SHALL BE SUBJECT TO ANY RECOMMENDATIONS OR LIMITATIONS PERTAINING TO THEIR INSTALLATION OR USE. REQUESTS FOR SUBSTITUTIONS MUST BE APPROVED BY ENGINEERING. SUFFICIENT INFORMATION REGARDING REQUESTS MUST BE RECEIVED BY ENGINEERING 10 DAYS IN ADVANCE OF APPROVAL. SUBSTATION GENERAL EQUIPMENT LEGEND O SECURITY FENCE O EQUIPMENT ACCESS ROAD ALL EXISTING AND PROPOSED GRADES SHOWN ON THIS SITE PLAN ARE DIRT GRADES. PROJECT DESCRIPTION: THIS PROJECT PROVIDES FOR THE INSTALLATION OF AIR CORE SERIES REACTOR ON LINE 2054 AT \HOLLYMEADE SUBSTATION. THE SUBSTATION WILL BE EXPANDED TO PROVIDE SPACE FOR NEW EQUIPMENT. NEW PERIMETER FENCING WILL BE INSTALLED TO MATCH THE EXISTING STATION FENCE. AN INTERNAL SEPARATION FENCE MUST ALSO BE INSTALLED TO PROHIBIT PERSONNEL AND /EQUIPMENT APPROACH TO REACTORS WHILE ENERGIZED. 8 1 7 1 6 1 5 THE PERSON IDENTIFIED BELOW IS DESIGNATED AS THE RESPONSIBLE LAND DISTURBER WHO WILL BE IN CHARGE OF AND RESPONSIBLE FOR CARRYING OUTTHE LAND DISTURBING ACTIVITY ASSOCIATED WITH THIS PROJECT. THIS PERSON MEETS THE APPLICABLE REQUIREMENTS OF VIRGINIA CODE SECTION 10.1-563 AND 10.1-566 BY VIRTUE OF THE FOLLOWING: ✓ RESPONSIBLE LAND DISTURBER CERTIFICATE DCR CERTIFICATION FOR COMBINED ADMINISTRATOR, ADMINISTRATOR, PLAN REVIEWER, INSPECTOR, OR CONTRACTOR. VIRGINIA PROFESSIONAL ENGINEER, LAND SURVEYOR, LANDSCAPE ARCHITECT, OR ARCHITECT. RESPONSIBLE LAND DISTURBER CONTACT INFORMATION: NAME (SIGNATURE) DATE NAME (PRINT) DAVID K. PERRY CERTIFICATION / REGISTRATION NUMBER RLD07424 COMPANY DOMINION ENERGY MAILING ADDRESS 10900 NUCKOLS ROAD GLEN ALLEN, VA 23060 TELEPHONE (804) 257-4631 FAX E-MAIL David. K.PerrvPDominioneneray.com THIS DESIGNATION MAY ONLY BE CHANGED BY A PLAN COVER SHEET REVISION THAT MUST BE SUBMITTED TO THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) FOR VERIFICATION AND APPROVAL. THE FOLLOWING INFORMATION MUST BE SUBMITTED TO DEQAT LEAST TWO (2) WEEKS IN ADVANCE OF THE COMMENCEMENT OF LAND DISTURBING ACTIVITIES. NOTIFICATIONS SHALL BE SENT BY EMAIL TO standardsandspecs@deq.virginia.gov is PROJECT NAME OR PROJECT NUMBER (INCLUDING ANY ASSOCIATED CGP PERMIT NUMBER); ii: PROJECT LOCATION (INCLUDING NEAREST INTERSECTION, LATITUDE & LONGITUDE, ACCESS POINT); iii: ON -SITE PROJECT MANAGER NAME AND CONTRACT INFORMATION; iv: RESPONSIBLE LAND DISTURBER (RLD) NAME AND CONTACT INFORMATION; v: PROJECT DESCRIPTION; vi: ACREAGE OF DISTURBANCE FOR PROJECT, vii: PROJECTSTARTAND FINISH DATE; viii: ANY VARIANCES/EXEMPTIONS/WAIVERS ASSOCIATED WITHTHIS PROJECT PLEASE CONTACT DOMINION PERMITTING (C.J. LINDEMANN) AT 804.771.6408TO SETUP A PRE -CONSTRUCTION MEETING. DRAWING LIST 1 OF 24 COVER SHEET, SPECIFICATIONS/GENERAL NOTES 2 OF 24 OVERALL SITE PLAN 3 OF 24 EROSION & SEDIMENT CONTROL GENERAL NOTES & NARRATIVE 4 OF 24 EROSION & SEDIMENT CONTROL MINIMUM STANDARDS AND DETAILS 5 OF 24 EROSION & SEDIMENT CONTROL DETAILS EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN (1 6 OF 24 OF 3) EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN (2 7 OF 24 OF 3) EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN (3 8 OF 24 OF 3) 9 OF 24 SITE PLAN (1 OF 3) 10 OF 24 SITE PLAN (2 OF 3) 11 OF 24 SITE PLAN (3 OF 3) 12 OF 24 FENCE PLAN 13 OF 24 GRADING & DRAINAGE PLAN (1 OF 2) 14 OF 24 GRADING & DRAINAGE PLAN (2 OF 2) 15 OF 24 GRADING SECTIONS AND PROFILES (1 OF 3) 16 OF 24 GRADING SECTIONS AND PROFILES (2 OF 3) 17 OF 24 GRADING SECTIONS AND PROFILES (3 OF 3) 18 OF 24 CONSTRUCTION DETAILS 19 OF 24 STORMWATER NARRATIVE 20 OF 24 WATER QUALITY 21 OF 24 STORMWATER MANAGEMENT DRAINAGE AREA MAPS & ROUTING DIAGRAMS 22 OF 24 STORMWATER MANAGEMENT PRE -DEVELOPED 1-, 2- AND 10-YR ROUTING 23 OF 24 STORMWATER MANAGEMENT POST -DEVELOPED 1-, 2- AND 10-YR ROUTING 24 OF 24 CALCULATIONS SURVEY DRAWING LIST 1 OF 1 TOPOGRAPHIC SURVEY FOR PROPOSED HOLLYMEADE SUBSTATION EXPANSION 0 3 SITE LOCATION VINCINITY MAP SCALE 1 "=500' GENERAL SITE INFORMATION OWNER: VIRGINIA ELECTRIC & POWER COMPANY ADDRESS: 3317 WORTH CROSSING, CHARLOTTESVILLE, VA 22911 MAGISTERIAL DISTRICT: RIVANNA LAT. - LONG.: LAT: 38' 07' 40.176" N LONG: 78' 269.232" W ZONING: R-1 and R-15 PARCEL ID: 03200-00-00-03700 USE: ELECTRICAL SUBSTATION PARCEL ACREAGE: 6.72 ACRES WATER AND SEWER: NONE PROPOSED WETLANDS IMPACTS: N/A LAND DISTURBANCE: 2.90 ACRES EXISTING TREE CANOPY 3.45 ACRES COVERAGE: PROPOSED TREE CANOPY 2.85 ACRES COVERAGE: PARKING: NONE PROPOSED OR EXISTING PROPOSED BUILDINGS: NONE PROPOSED (PRE-FAB ENCLOSURE) OFFSITE LAND TEMPORARY FOR CONSTRUCTION ACCESS. ANY OFFSITE LAND DISTURBANCE: DISTURBING ACTIVITY ASSOCIATED WITH THIS PROJECT MUST HAVE AN APPROVED EROSION AND SEDIMENT CONTROL PLAN. LAND DISTURBANCE CONTACT DEQ TWO (2) WEEKS PRIOR TO ANY LAND DISTURBING PERMIT: ACTIVITY. SEE DETAILS IN THE RESPONSIBLE LAND DISTURBER DESIGNATION BLOCK ON THIS SHEET FOR DETAILS. VIRGINIA STORMWATER REQUIRED PRIOR TO ANY LAND DISTURBANCE. AN APPROVED MANAGEMENT VSMP MUST BE ACCOMPANIED WITH A STORMWATER PROGRAM PERMIT POLLUTION PREVENTION PLAN (SWPPP) PRIOR TO (VSMP): CONSTRUCTION. THIS PROPERTY IS LOCATED IN ZONE "X" (AREAS DETERMINED TO BE OUTSIDE THE 0.2%ANNUAL CHANCE FLOODPLAIN) AS SHOWN FLOODPLAIN: ON FEMA PANEL #51003CO145D EFFECTIVE DATE: FEBRUARY 4, 2005. NO FLOODPLAIN LINES SHOWN ON PROPERTY. REVISIONS y gal consultants REV DATE DESCRIPTION .00 Dominion 500-0 Energy PRELIMINARY SITE AND GRADING PLAN nRAFT H . ES TAT EXPAN ON ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE I NTS PROJECT I NAME DATE SHEET: OO I DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY R220236-00-0( 2 1 IN C 3 A 9 Lc 7 OVERALL SITE PLAN OHE UGE UGE - UGT - - - UGT - UFO UFO C CTV CTV - 7 A 3 EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS EDGE OF PUBLICLY AVAILABLE LIDAR EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE / EXISTING FENCE LINE / PROPOSED FENCE LINE / EXISTING OVERHEAD ELECTRIC I / EXISTING UNDERGROUND ELECTRIC EXISTING UNDERGROUND TELEPHONE — EXISTING FIBER OPTIC 1 I J EXISTING TELECOMMUNICATION LINE EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER L � TREELINE PROPOSED ACCESS ROAD CENTERLINE, EXISTING RIP RAP EXISTING INLET EXISTING CULVERT EDGE OF EXISTING DITCH LIMIT OF DISTURBANCE PROPOSED STORM SEWER 7 I I\\ 1 / 1 II / II II / / / / / / 6 5 1 II 11 / 1 / / 1 I / 1 I / I I / I I w 4 j I . z //\�\ \\ / Tirqr— // / •--� _ - TV TV PROPOSED RETAINING WALL \ fI // �� \ \\ } / // �—\ate= _ \ / / /••• / • • \ PARCEL 0, FORESTt / AREA FORESTL/ / ASS \ / D.B. 7 4 / / I / I / / I 6 5 A 4 2 3 / / I I / 1 I I I II I I II I �I I • II PROPOSED LEVEL SPREADER SCALE: 1" = 50' 50 0 50 2 1 NOTES: 1. REFER TO "TOPOGRAPHIC SURVEY AND COMPILED BOUNDARY, COUNTY OF ALBEMARLE, VIRGINIA" FOR SURVEY INFORMATION. REVISIONS REV DATE DESCRIPTION Dominion Energy gai co�ltants OVERALL SITE PLAN RAFT HOT"ME E S TAT EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1"=50' PROJECTI NAME DATE SHEET: DESIGNER PROJECT ENGINEER DRAWII 1 00j APPROVED BY R22 g w 1 0 C 3 A 0 7 [. 5 4 1 2 2 1 10 x L•' A EROSION AND SEDIMENTATION CONTROL NOTES - DOMINION ENERGY VIRGINIA 1. CONTRACTOR SHALL HAVE AVAILABLE A COPY OF THE LATEST VERSION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF ALL CONTROL DEVICES. THESE DEVICES SHALL MEET OR EXCEED THE HIGHER OF THE REQUIREMENTS COVERED IN THIS HANDBOOK OR THE CONTROLLING AUTHORITY. 2. EROSION AND SEDIMENT CONTROL DEVICES, AS SHOWN ON THE PLAN, SHALL BE INSTALLED AS THE FIRST STEP OF THE GRADING PROCESS. 3. TEMPORARY DEVICES SHALL BE REPAIRED OR REPLACED IMMEDIATELY IF THEY CEASE TO FUNCTION AS INTENDED. TEMPORARY CONTROLS SHALL BE REMOVED WHEN AREAS ABOVE THEN BECOME STABILIZED TO THE SATISFACTION OF THE PLAN APPROVING AUTHORITIES. 4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO KEEP SURROUNDING DRAINAGE BEDS FREE OF SILT CAUSED BY EROSION DURING CONSTRUCTION. 5. NO DISTURBED AREA SHALL REMAIN DENUDED FOR LONGER THAN 7 DAYS, EXCEPT THOSE CONTINUOUSLY BEING WORKED OR BUILT UPON. 6. ELECTRIC POWER, TELEPHONE, AND GAS SUPPLY TRENCHES ARE TO BE COMPACTED, SEEDED, AND MULCHED WITHIN 7 DAYS AFTER BACKFILL. ALL EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. 7. THE SITE STONE IS PART OF THE PERMANENT STABILIZATION OF THE SITE. IT SHALL BE APPLIED AS SOON AS PRACTICAL AFTER FOUNDATION INSTALLATIONS ARE COMPLETE. 8. TEMPORARY OR PERMANENT SEEDING SHALL BE ACCOMPLISHED WITHIN 7 DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SUBSTATION LOT. 9. TOPSOIL SHALL BE APPLIED IN 2-6 INCH LAYERS ON AREAS ROUGHENED USING STANDARD ROUGHENING PROCEDURES. ALL AREAS DESIGNATED TO BE SEEDED SHALL BE TOPSOILED WHEN SUFFICIENT MATERIAL IS AVAILABLE. 10. UNLESS OTHERWISE NOTED, ALL DITCHES AND OTHER GRASS LINED WATER WAYS SHALL BE LIMED, FERTILIZED, SEEDED, AND STABILIZED WITH EXCELSIOR BLANKET (CURLEX) IMMEDIATELY AFTER CONSTRUCTION. 11. TEMPORARY AND PERMANENT SEEDING SHALL CONFORM TO THE LATEST SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. * GENERAL SPECIFICATIONS FOLLOW: 12. REFER TO SHEET 5 FOR TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS. GENERAL EROSION AND SEDIMENTATION CONTROL NOTES - VESCH ES-1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS 9VAC25-840 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. ES-3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. ES-4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON SITE AT ALL TIMES. ES-5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES-6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES-7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. ES-8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. ES-9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. PROJECT DESCRIPTION: THE PURPOSE OF THIS PROJECT IS FOR THE INSTALLATION OF AIR CORE SERIES REACTORS ON LINE 2054 AT HOLLYMEADE SUBSTATION AT 3317 WORTH CROSSING, CHARLOTTE, VA. THE PROPERTY IS ZONED R1 AND R15 RESIDENTIAL. THE SITE AREA IS 2.90 ACRES WITH 1.42 EXISTING IMPERVIOUS ACRES. THE PROPOSED INSTALLATION WILL COMPRISE OF 0.77 ACRES OF ADDITIONAL IMPERVIOUS SURFACE AND 2.90 ACRES OF LAND DISTURBANCE. THIS PROPERTY IS WITHIN THE SOUTH FORK RIVANNA RIVER WATERSHED. (HUC 020802040203, VA 6TH ORDER JR08). EXISTING CONDITIONS: THE EXISTING SITE AREA CONSISTS MAINLY OF GRAVEL SURFACE DUE TO THE EXISTING SUBSTATION AND THE GRAVEL ACCESS ROAD TO THE WEST. THE AREA SURROUNDING THE SUBSTATION CONSISTS MAINLY OF GRASSY AREAS AND PATCHES OF WOODED AREAS ENCOMPASSING THE SUBSTATION. THE TERRAIN IS RELATIVELY FLAT UNTIL IT DROPS OFF TO AN EXISTING POND SOUTH AND EAST OF THE SUBSTATION. ADJACENT PROPERTIES: THIS SITE IS BOUND BY FIFTEEN (15) PROPERTIES, WHERE FOUR (5) ARE ZONED R-15 (RESIDENTIAL), ONE (1) IS ZONED R-4 (RESIDENTIAL), EIGHT (8) ARE PLANNED RESIDENTIAL DEVELOPMENTS, AND THE LAST IS A PLANNED RESIDENTIAL SHOPPING CENTER. OFF -SITE AREAS: THERE WILL BE NO OFF SITE DISTURBANCE. // /// /// / 2[� i \II \I \ 1 r �� \ \ / \ 1-7 l I Nl i�/^ � / \N \ / SOILS MAP SCALE 1 "=200' SOILS: THE FOLLOWING THREE (3) SOIL TYPES ARE IDENTIFIED WITHIN THE SITE DEVELOPMENT AREA: 1) 27B ELIOACK LOAM, 2 TO 7 PERCENT, HYDROLOGIC SOIL GROUP (HSG) B, k=1.98. 2) 28C3 ELIOACK CLAY LOAM, 7 TO 15 PERCENT, HYDROLOGIC SOIL GROUP (HSG) B, k=1.98; 3) 34C GLENELG LOAM, 7 TO 15 PERCENT, HYDROLOGIC SOIL GROUP (HSG) B, k=1.98. CRITICAL EROSION AREAS: THERE ARE NO ENVIRONMENTALLY SENSITIVE AREAS WITHIN THE LIMITS OF DISTURBANCE STRUCTURAL PRACTICES 1. SAFETY FENCE - 3.01 2. CONSTRUCTION ENTRANCE - 3.02 3. SILT FENCE - 3.05 4. STORM DRAIN INLET PROTECTION - 3.07 VEGETATIVE PRACTICES 1. TOPSOIL - 3.30 2. TEMPORARY SEEDING - 3.31 3. PERMANENT SEEDING - 3.32 4. MULCHING-3.35 5. SOIL STABILIZATION BLANKETS AND MATTING - 3.36 6. DUST CONTROL - 3.39 MANAGEMENT STRATEGIES 1. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBLE. 2. TEMPORARY SEEDING OR OTHER STABILIZATION WILL FOLLOW SEVEN (7) DAYS AFTER GRADING. 3. AREAS WHICH ARE NOT TO BE DISTURBED WILL BE CLOSELY MARKED BY FLAGS, SIGNS, ETC. 4. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. 5. AFTER ACHIEVING ADEQUATE STABILIZATION, THE TEMPORARY EROSION AND SEDIMENT CONTROLS WILL BE CLEANED AND REMOVED. PERMANENT STABILIZATION ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISH GRADING. SEEDING SHALL BE APPLIED IN ACCORDANCE WITH STANDARD AND SPECIFICATION 3.32, PERMANENT SEEDING. MULCH WILL BE USED IN ALL SEEDED AREAS AFTER SEED, FERTILIZER, AND LIME HAVE BEEN APPLIED. STORMWATER MANAGMENT HOLD FOR FINAL SUBMITAL MAINTENANCE IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL. THE FOLLOWING MEASURES WILL BE CHECKED AND MITIGATED ACCORDINGLY. SAFETY FENCE - 3.01 SAFETY FENCE SHALL BE CHECKED REGULARLY FOR WEATHER -RELATED OR OTHER DAMAGE. ANY NECESSARY REPAIRS MUST BE MADE IMMEDIATELY. CARE SHOULD BE TAKEN TO SECURE ALL ACCESS POINTS (GATES) AT THE END OF EACH WORKING DAY. ALL LOCKING DEVICES MUST BE REPAIRED OR REPLACED AS NECESSARY. CONSTRUCTION ENTRANCE - 3.02 A CONSTRUCTION ENTRANCE WILL BE INSTALLED AT THE SITE FOR VEHICLE INGRESS AND EGRESS TO REDUCE THE AMOUNT OF SEDIMENT TRANSPORTED ONTO PAVED PUBLIC FACILITIES AND ROADS BY VEHICULAR TRAFFIC OR RUNOFF. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED FOLLOWING VESCH STANDARD 3.02. SILT FENCE - 3.05 SILT FENCE BARRIERS SHALL BE INSTALLED DOWNSLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT -LADEN RUNOFF FROM SHEET FLOW AS INDICATED ON THE E&SC PLANS. ALL MAINTENANCE PRACTICES SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.05. STORM DRAIN INLET PROTECTION - 3.07 STORM DRAIN INLETS SHALL BE PROTECTED DURING CONSTRUCTION BY SILT FENCE, FILTERING, SEDIMENT -LADEN WATER BEFORE ENTERING STORM NETWORK. ALL MAINTENANCE PRACTICES SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.07. TOPSOILING - 3.30 AREAS OF THE SITE MAY REQUIRE TOPSOILING TO PROVIDE A SUITABLE GROWTH MEDIUM FOR VEGETATION STABILIZATION. A TEMPORARY TOPSOIL STOCKPILE SHALL BE INSTALLED AS SHOWN ON SHEET 7. TOPSOILING PLACEMENT AND INSTALLATION SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.30. TEMPORARY SEEDING - 3.31 CERTAIN AREAS OF THE SITE WILL BE ROUGH GRADED AS A FIRST STAGE OF CONSTRUCTION. FINISH GRADING WILL OCCUR NEAR PROJECT COMPLETION. THESE AREAS SHALL BE SEEDED TEMPORARILY WITH FAST GERMINATING GRASSES TO REDUCE EROSION POTENTIAL. DIVERSIONS, FILL DIVERSIONS, DIVERSION DIKES AND THE SEDIMENT BASIN EMBANKMENT SHALL ALSO RECEIVE TEMPORARY SEEDING. TEMPORARY SEEDING APPLICATIONS SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.31. PERMANENT SEEDING - 3.32 IMMEDIATELY FOLLOWING FINISH GRADING, PERMANENT VEGETATION SHALL BE APPLIED IN ACCORDANCE TO THE GUIDELINES IN THE VESCH STANDARD 3.32 (PIEDMONT AREA) AND PER THE E&SC DETAILS IN THIS PLAN. PERMANENT SEEDING APPLICATIONS SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.32. MULCHING - 3.35 IN AREAS THAT REQUIRE SUPPLEMENTAL EROSION CONTROL TO PROMOTE GROWTH OF VEGETATION OR TO REDUCE VELOCITIES FROM OVERLAND FLOW, MULCH MAY BE USED AS AN ALTERNATIVE. ANY MULCH APPLICATIONS SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.35. SOIL STABILIZATION BLANKETS AND MATTING - 3.36 SOIL STABILIZATION BLANKETS AND MATTING MAY BE USED AS AN ALTERNATIVE TO TEMPORARY AND PERMANENT SEEDING OR IN CRITICAL AREAS WITH STEEP CUT OR FILL SLOPES. BLANKET AND MATTING STABILIZATION MAY BE USED PER THE DIRECTION OF THE E&SC INSPECTOR. ANY BLANKET AND MATTING APPLICATION SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.36. DUST CONTROL - 3.39 DUST CONTROL APPLICATIONS MAY BE EMPLOYED WHEN SURFACE AND AIR MOVEMENT OF DUST RESULTING FROM CONSTRUCTION BECOMES AN ISSUE. DUST CONTROL APPLICATIONS SHALL FOLLOW THE GUIDELINES SET IN VESCH STANDARD 3.39. CONSTRUCTION SEQUENCE 1. FLAG THE LIMITS OF DISTURBANCE SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN PRIOR TO A PRE -CONSTRUCTION MEETING WITH CERTIFIED PERSONNEL AS IT PERTAINS TO THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS AND IN ACCORDANCE WITH THE ANNUAL STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT (TE VEP 8000). A PRE -CONSTRUCTION MEETING WITH THE CONTRACTOR, PROJECT MANAGER, AND CERTIFIED EROSION AND SEDIMENT CONTROL INSPECTOR WILL BE SCHEDULED BY DOMINION. 2. DURING THE PRE -CONSTRUCTION MEETING, THE CERTIFIED EROSION AND SEDIMENT CONTROL INSPECTOR SHALL CHECK THE FLAGGING DESIGNATING THE LIMITS OF DISTURBANCE. 3. INSTALL THE CONSTRUCTION ENTRANCE. 4. INSTALL ALL OTHER PERIMETER DEVICES SUCH AS SILT FENCE. 5. CLEAR, GRUB AND REMOVE VEGETATION AS INDICATED IN THE EROSION AND SEDIMENT CONTROL PLAN ONCE ALL EROSION CONTROL DEVICES ARE FUNCTIONING AND IN PLACE. 6. PLACE AS NEEDED TEMPORARY TOPSOIL STOCKPILE AND PROTECT WITH SILT FENCE AND TEMPORARY SEEDING. 7. FILL THE SITE PER THE GRADING SHOWN IN THE GRADING AND DRAINAGE PLAN. ENSURE SURFACE ROUGHENING IS APPLIED TO 3:1 FILL SLOPES. 8. APPLY TEMPORARY SEEDING TO ANY DISTURBED AREAS THAT REMAIN DORMANT FOR MORE THAN SEVEN (7) DAYS. 9. PERFORM FINAL SITE GRADING AS SHOWN ON PLANS. 10. INSTALL A FOUR (4) INCH THICK LAYER OF VDOT #57 STONE COURSE AGGREGATE SITE STONE, TWELVE (12) INCH THICK VDOT No. 21A O P CT D B SAC UC�R E CC SS GADS AN HOLD FOR FINAL SUBMITAL SUBSTATION SECURITY FENCE PER SHEET 7 AND THE DETAILS SHOWN ON SHEET 020 APPLY PERMANENT SEEDING TO REMAINING GRADED AREAS NOT STABILIZED BY STON C VE . 11. NO EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REMOVED UNTIL THE SITE IS DEEMED STABILIZED AND PER THE APPROVAL OF THE CERTIFIED EROSION AND SEDIMENT CONTROL INSPECTOR. TOTAL DISTURBED AREA: 2.90 ACRES Ij;kvA REVISIONS DATE I DESCRIPTION Dominion Energy y galconsultan[s EROSION & SEDIMENT CONTROL HOTEMIlEAT)E S3MTATIT5I'9 EXPANAON ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT NAME DATE SHEET: 003 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY R220236-00-000-00-C-003 10 Le L A 0 7 6 1 5 M 3 2 1 7 0 5 VIRGINIA EROSION AND SEDIMENT CONTROL MINIMUM STANDARDS 11 2 2 I 0 C 7 0 MINIMUM STANDARDS THIS SECTION IDENTIFIES THE MINIMUM EROSION AND SEDIMENT STANDARDS THAT THE PROJECT NEEDS TO MEET ACCORDING TO VIRGINIA'S EROSION AND SEDIMENT CONTROL LAW AND REGULATIONS (4VAC50-30-40). MINIMUM STANDARD 1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 14 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR AND PROVIDED AS THE SITE IS BROUGHT TO GRADE. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS HAVE BEEN INCLUDED AS A VEGETATIVE MEASURE. REFER TO E&SC PLANS AND DETAILS. MINIMUM STANDARD 2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: POTENTIAL STOCKPILE AREAS ARE TO BE KEPT ON -SITE AND WITHIN THE LIMITS OF DISTURBANCE UNDER THE CONTROL OF EROSION AND SEDIMENT CONTROL MEASURES. MINIMUM STANDARD 3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: PERMANENT SEEDING WILL BE PROVIDED ON ANY DENUDED AREA ONCE THE SITE HAS BEEN BROUGHT TO FINAL GRADE. MINIMUM STANDARD 4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: IN ACCORDANCE WITH THE CONSTRUCTION SEQUENCE SILT FENCE SHALL BE INSTALLED PRIOR TO MASS GRADING OR UP GRADIENT LAND DISTURBANCES. MINIMUM STANDARD 5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: DAMS OR OTHER EARTHEN MEASURE SHALL BE STABILIZED IN ACCORDANCE WITH MINIMUM STANDARD 1. MINIMUM STANDARD 6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A.THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. ❑ APPLICABLE M NOT APPLICABLE PROJECT COMPLIANCE: N/A B.SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: ANY FILL SLOPE THAT MAY ERODE WILL BE MONITORED AND ADDITIONAL STABILIZATION WILL BE ADDED IF NEEDED. MINIMUM STANDARD 8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: INADEQUATE DRAINAGE SHALL BE CORRECTED PRIOR TO STABILIZATION. MINIMUM STANDARD 10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. M APPLICABLE ❑ NOTAPPLICABLE PROJECT COMPLIANCE: CULVERT INLET AND INLET PROTECTION TO BE INSTALLED. REFER TO E&SC PLANS AND DETAILS. MINIMUM STANDARD 11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 14. ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. ❑ APPLICABLE M NOTAPPLICABLE PROJECT COMPLIANCE: N/A MINIMUM STANDARD 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: ALL REGULATIONS PERTAINING TO TRENCHING WILL BE MET AND FOLLOWED ON THIS SITE. MINIMUM STANDARD 17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: SEDIMENT TRANSPORTED ONTO PAVED PARKING FACILITIES AND PUBLIC ROADS WILL BE REMOVED AT THE END OF EACH WORK DAY. IN ADDITION, A CONSTRUCTION ENTRANCE WILL BE USED AS SHOWN ON THE APPROVED EROSION AND SEDIMENT CONTROL PLANS. MINIMUM STANDARD 18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES WILL BE REMOVED AFTER 30 DAY OF FINAL SITE STABILIZATION OR AFTER THE TEMPORARY DEVICES ARE NO LONGER NEEDED. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES WILL BE REMOVED AFTER 30 DAY OF FINAL SITE STABILIZATION OR AFTER THE TEMPORARY DEVICES ARE NO LONGER NEEDED UPON THE APPROVAL OF THE CERTIFIED EROSION AND SEDIMENT CONTROL INSPECTOR. MINIMUM STANDARD 19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASE IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA: A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL FOR THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2)(A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANK, - AND (B) ALL PREVIOUSLY CONSTRUCTED MAN MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS AND (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE THE APPLICANT SHALL: (1) IMPROVE THE CHANNEL TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR BANKS; OR (2) IMPROVE THE PIPE SYSTEM TO A CONDITION WHERE THE TEN YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; OR (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE PLAN APPROVING AUTHORITY TO PREVENT DOWNSTREAM EROSION. D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENT. E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT OF THE SUBJECT PROJECT. F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION HE SHALL OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITY AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. H. ALL ONSITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. J. IN APPLYING THESE STORMWATER RUNOFF CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS, AND OTHER WATERS OF THE STATE. M APPLICABLE ❑ NOT APPLICABLE L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (1) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (11) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (111) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. ❑ APPLICABLE M NOT APPLICABLE M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES ARE IN ACCORDANCE WITH 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS. ❑x APPLICABLE ❑ NOT APPLICABLE N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATIONS SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF SUBDIVISION 19 OF THIS SUBSECTION. M APPLICABLE ❑ NOT APPLICABLE PROJECT COMPLIANCE: SEE SWM NARRATIVE ON SHEET 15 FOR SWM CALCULATIONS. REVISIONS REV I DATE I DESCRIPTION .00 Dominion Energy y gaiconsultants EROSION & SEDIMENT CONTROL HOTETMEAT)E S3MTATIT5r9 EXPANAON ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECT NAME DATE SHEET: 004 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY R220236-00-000-00-C-00 IN C 3 0 8 1 7 6 1 5 4 1 3 2 I 7 0 5 0 2 2 1 0 C 7 A 1992 3.01 SAFETY FENCE PERSPECTIVE VIEW PERSPECTIVE VIEW PLASTIC FENCE Source: Adapted from Conwed Plastics and VDOT Road and Brame Standards TE VEP 8000-17-00 3 PERSPECTIVE V'IE`A4' METAL FENCE Ph de 3.011 1992 3.05 CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A CX 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. fi'IM FLOW 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 4" 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. FLOP G i SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. Source: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, Sherwood and Wyant 3 III - 25 Plate 3.05-2 7 STONE CONSTRUCTION ENTRANCE - 3.02 70' MIN. le' B A MIN. EXISTING GROUND EXISTING 12' 10, MIN.• MIN. PAVEMENT VDOT • 1 COARSE AGGREGATE B A 10 M IN. i MRSHRRCK POSITIVE DRAINAGE TO IF REOUIRED SEDIMENT TRAPPING DEVICE MUST EXTEND FLLL WIDTH OF INGRESS AND PLAN VIEW EGRESS OPERAr10N EXISTING EXISTING 70' MIN. PAVEMENT GROUND y 3' FILTER CLOTH 6" MIN. MOUNTABLE BERM ELEVATION 12' MIN. 3' MIN. l 3" MIN. FILTER CLOTH SECTION A — A 6• - 7" REINFORCED CONCRETE SECTION B — g DRAIN SPACE 00 00 TE VEP 8000-17-00 4 1992 TABLE 3.31-C TEMPORARY SEEDING PLANT MATERIALS, SEEDING RATES, AND DATES TABLE 3,32-D SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA Total Lbs. Per Acre Minimum Care Lawn Commercial or Residential 175-2001bs. Kentucky 31 or Turf -Type Tall Fescue 95-100% - Improved Perennial Ryegrass 0-5% - Kentucky Bluegrass 0-5%d EMI'gh-Maintenance Lawn 200-250 lbs. - Kentucky 31 or Turf -Type Tall Fescue 100% General Slope (3:1 or less) - Kentucky 31 Fescue 128 lbs. - Red Top Grass 21bs. - Seasonal Nurse Crop * 20 lbs. 150 lbs. Low -Maintenance Slope (Steeper than 3:1) - Kentucky 31 Fescue 108 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop * 201bs. Crownvetch ** 20lbs. 150 lbs. * Use seasonal nurse crop in accordance with seeding dates as stated below: February 16ththrough April ...................... Annual Rye May 1st through August 15th ..................... Foxtail Millet August 16th through October ...................... Annual Rye November through February 15th ................... Winter Rye ** Substitute Sericea lespedeza for Crownvetch east of Farmville, Va. (May through September use hulled Sericea, all other periods, use unhulled Sericea). If Flatpea is used in lieu of Crowavetch, increase rate to 30 lbs./acre. All legume seed must be properly inoculated. Weeping Lovegrass may be added to any slope or low -maintenance mix during warmer seeding periods; add 10-20 lbs./acre in mixes. RATE NORTHa SOUTHb PLANT FSEEDING 3/1 511 8115 2/15 511 9(1 SPECIES CHARACTERISTICS Acre IODO 0 to to to to to to 4130 9115 1111 4190 911 IU15 OATS 3 bu. (up to 100 lbs., 2lba. X - - X - - Use spring varieties (e.g., Noble). (Avena salsa4va) not less than 50 lbs.) RYEa 21,m (up to 130 lbs., 2.51ba. X - X X - X Use for late fall seedings, winter Secale c.r.1 not less daus 50 lbs.) cover. Tolerates cold and low moisture. GERMAN MILLET SO lbs. approx. I lb. - X - - X - Warm -season annual. Dies at first (Safaris italics frost. May he added to summer mixes. ANNUAL RYEGRASS` 60 lbs. 1'A lbs. X - X X - X May be added in mixes. will Lo( lium multi-florum) mow out of most stands. WEEPING 15 IN. 5% M. - X - - X - Warm -season Perennial. May bunch. Tolerates hot, dry slopes LOVEGRASS and acid, infertile soils. May be (Erasrosns curvala added to mixes. KOREAN 25 lbs. approx. 1'h X X - X X - Warm m season annual legue. LESPEDEZA` ]ba. Tolerates wid soils. May be ( ti ulacea added to mixes. a Northern Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2. b Southern Piedmont and Coastal Plain. e May be used as a cover crop with spring seeding. d May be used as a cover crop with fall seeding. X May be planted between these data. - May W be planted between these dates. 0 5 N III - 303 1992 1992 TABLE 3.35-A ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES: MULCHES: NOTES: Per Acre Per 1000 sq. ft. Straw or Hay 1k - 2 tons 70 - 90 lbs. Free from weeds and coarse (Minimum 2 matter. Must be anchored. tons for Spread with mulch blower winter cover) or by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 15001bs. winter cover or during hot, dry periods.* Apply as slurry. Corn Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6- lengths. Air-dried. Do not use in fine turf areas. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 lbs nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. 1-2 cu. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 20001bs./ac. or 45 lbs./1000 sq. ft. Source: Va. DSWC SILT FENCE DROP INLET PROTECTION 2 X 4' WOOD FRAME DROP INLET WITH GRATE N Ima IN \\\ S FRAME GATHER EXCESS VAT CORNERS PERSPECTIVE VIEWS ELEVATION OF STAKE AND FABRIC ORIENTATION SPECIFIC APPLICATION DETAIL A THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE I THAN 5%) WHERE THE INLET SHEET OR OVERLAND FLOWS (NOT NLET DRAINS A RELATIVELY FLAT AREA (SLOPE NO GREATER EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS IN STREET OR HIGHWAY MEDIANS. Source: N.C. Erosion and Sediment Control Planning and Design Manual, 1988 0 III - 35 3 3.07 Plate 3.07-1 III - 353 3.35 yREVISIONS gaiconsultants REV DATE DESCRIPTION Dominion Energy EROSION & SEDIMENT CONTROL RES T S H EATAT EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECTI NAME DATE SHEET: OO5 DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY R220236-00-OC 2 1 0 C 3 A J Le L U 8 7 6 5 V 4 2 2 1 EROSION & SEDIMENT CONTROL AND DEMOLITION PLAN (2 OF 3) NO. KEY SYMBOL TITLE EXISTING MAJOR CONTOURS o I I I \\ I \ \ \ \ \ \ / \ \ \ \ \\ ��\\ �// /// I I EXISTING MINOR CONTOURS w I \ PROPOSED MAJOR CONTOURS I Lu I PARCEL /D' \ I 032✓0-01-00-01600 \ yF N/F 1422DECATURDR/VE \ \ P/I/%/A/ RC//BI/E� LD/'/ --WJ=/ M\---_AR6--_//\€ 032J SA ---\ \—G/OO_ D\—_--W—/N '1IIIIIj--' / — \ \\ \__ \\ \— \— \\— —•\\° — U\ G \F _ \ — \\1--I I L---F—_II— -- - � _\ y//F11I =I��\ I\ ILII�\� I \ \�P�AO—R— C-- —E—L_ \D -01- Z 01-8)-060032✓0 060ECA14340ECATUROR/€/—\ E t\°\—II\ �\''N)ooI I�I \ I \ I�I `\ \,I I I1 \ I )I\/1 \ J I \I1°/� \ \\I 1 I— \ \\\�\I N\\ \�°\�I \ \ II9\ �II\I—�\ l\�\—\— \ \�•\\ \— \ \`/ ( \ I \ \\—\\-\\\ \//\°\ N\/ \\�- \\/� \ I\ 11 / \ II\ \ /\\I\'— -\ /\\ • \I�\I Il\I1� \ I II / \ I\ / `I II I I\ I\\ 1 \I\ I I\\II \ II\ IIIIII\I\ I \ II\ \ I III j II I / / I EDGE OF P U BLIC L Y AV A ILA B LE L �1IDj A R TEVENM BRIANLOHNES& PROPOSED MINOR CONTOURS ORLAUR/EDALE \ 10MIFERLOHNES NIFLQ RCEEXISTING ADJACENT PROPERTY LINE ✓0032-02-00 \ ESTESPARKpHASE2 OPEN SgACE EXISTING SITE PROPERTY LINE FORESTLAKES N/F COMMJN/TY PARCEL /D' N/F ASSOC/A7YON/NC EXISTING FENCE LINE 032✓0-01-015 N/F PARCEL O' ROR RE>4160ECATUOE 032✓0 O-0001900 1440DECATURDR/✓ECASEYROB/NSo3aCo>-0o-0>700 PROPOSED FENCE LINE REKO /GARASH% 1428DEATUROR/VE TOPHERNGOC R/CKBOBYMATF£N& HOANG NEETHAEL/ZABEfEXISTING OVERHEAD ELECTRIC MAIL EXISTING UNDERGROUND ELECTRIC E — G — EXISTING UNDERGROUND TELEPHONE �� 3n�oUFO EXISTING FIBER OPTIC EXISTING TELECOMMUNICATION LINE 510 EDGE OF EXISTING GRAVEL 30n IPROPOSED SUBSTATION PAD — — — — — — — — — — — — — --------------30n — — _ — — — — — —BOn EXISTING EDGE OF WATER 3E)non -- — — — — — — — — — — — — — — 3on-3�n— L TREELINE �awo _ �\3H0 3H0 3H0 3H0 PROPOSED ACCESS ROAD CENTERLINE REMOVE EXISTING CULVERT EXISTING RIP RAP CLEAR AND GRUB TREES EXISTING INLET PROPOSED SPREADER PROPOSED GATE EXISTING CULVERT EDGE OF EXISTING DITCH x—x x xxLIMIT OF DISTURBANCE \ EXISTING TO BE REMOVED o CE 3.02 CONSTRUCTION ENTRANCE 3.05 X SILT FENCE 3.07 STORM DRAIN INLET PROTECTION 3.30 ° TOPSOILING 3.32 PERMANENT SEEDING ° \j 3.35 MULCHING �� I I \ REMOVE EXISTING FENCE OE REVISIONS ONE gaimnsWfan[s OH EXISTING \ TELECOMMUNICATION LINE TO BE RELOCATED SNo B 00-0400 TURDRIVE UFO UFOW �J E�wur ONt < REV DATE DESCRIPTION °NE I I SF P.O Dominion oN� Energy UFO UFUFO U O ui Op UGE UGE ° EROSION & SEDIMENT CONTROL AND UG UGE- 0 ON�E NP N(AGE , ON MATCHLINE SHEET 008 — — — — — — E— //�'/ j �l I I xl lill I II IIII HG EA ES TAT EXPAN ON O� 30 3HO 3HO 3H0 yam/ / I I _III I II I ALBEMARLE COUNTY VIRGINIA \ I — — OPERATIONAL REGION B/M No. SCALE 1"=20' \ UFO \ / / / I , II\\ PROJECT NAME DATE SHEET: / // / I SCALE: 1 = 20 DESIGNER 007 / ° / / / / / I PROJECT ENGINEER DRAWING: / \ I I—— — _ _ _ _ / / I 20 0 20 40 APPROVED BY 20236-00-000-00-C-006-0 8 7 6 5 4 3 2 1 10 Le I A 8 1 7 1 6 1 5 \1/ 4 1 2 2 SITE PLAN (2 OF 3) 1 Le Ll o \/ Lu I PARCEL ID.-- 032✓0-01-00-01600\ N/F W I I 1422 DECATUROR/VE\ \ IVIF \ PARCEL /D. PARCEL /D. ZMAR/SA GOODWIN \ _ I \ 032✓0-01-00.01800 \ \ 032✓0.01-00-01400 I \ '06 DECATURORNE J I I \ 14bRANLTUROR/VE 'TEVENM MALONE = \ \ BR/ANLOHNES & JENNIFERL OHNES \ \ \ ORLAUR/EDALE I I \\ \\ \ \ \ \ \\ \ / N/F l \ \ I I I \ \ \ I \ \ \ \\ \ \ \ I 032ARCEL P0-02-00 OOCO \ \ \ \ \ I I I \ \ \ \ I ESTESPARK HASE2 \ \ \ I I \ \ \ \ \ \ I OPENS ACE \ \ I — FOREST�AKES N/F I \ \ \ \ \ \ \ \ \ \ \ COMM�{N/TY \ \ \ � \ PARCEL /D' \ \ I \ N/F \ \ \ \ ASSOC/A7'/ON/NC \ I \ I032✓0-01-00-01ga � \ — — \ PARCEL /D.' \ u \ \ \ I 1 \ \ >4160ECATUROR VE \ PARCEL /D \ — 032✓0.Of-00-01900 CASEYROB/NSOht& I 03NnOf-00-01700 \ \ 1440DECATURDRIVE — \ \ \ \ \ \ \ IRE/KO /GARASH/` _ 1 _ f428DEC.4TU MR/VE \ I \ — — &HR/STOPHERNGOC --_I R/CKBOBYMATAEW& `i---------- \\— \ `NG� NEETHA EL/ZABEhHUAKIL ---- — •— — —_— �__— \ _ /. / _ \ I_ L� --------_-- — son aon I / — — — —aon — / \\ \ \ 1 1 1 1 I ----------------- ------- BO 1 — — _ — — — — aon — — — 3E)n -------------------- _ _--- \— H �-----------\— — — \ 3Ho 3 O 3HO _ — 3H0 / /\/ 4 \ \ \ 5 \ \ PROPOSED LEVEL SPREADER / � 500.11 499.29 p \\ PROPOSED 14' ACCESS ROAD (TYP.) 000 ' �o I I \lJJI \ \ \ �\-/ 0 I I \\ I\\�r\ ) I I z I I I I OHE / I \ UGE I / OVA I I 011 \ \ I I LLI oHE o P I 1 I 1 I 1 \ 1 I I I I g I w o T o "moo g I o"I _UI I oI b I I 493.35FO UFO p I I dI II III j 11 °NE 00- I I II I II I I I j I I I o — UFO UFO UFO U O ON 4E UF0—\ I - _ I U UGE UGF UGE 7 ° .01. °N� ° UG _Jill n O MATCHLINE SHEET 011 I I E,—_ I uGE I 1 1 1 II I I T ° \ °� // 1 1 I II II III �\ 310 3H0 31H0 3H0 I \ UFO ' /' / ,/ I i SCALE: 1" = 20' e 9 495.00 — — — `y ' / 492.59 20 0 20 40 8 7 6 5 4 3 c — UGE — — — — UGT — — — UFO UFO UGE UGT — — — CTV — — — CTV — u REV I DATE sn REVISIONS EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS EDGE OF PUBLICLY AVAILABLE LIDAR EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE EXISTING FENCE LINE PROPOSED FENCE LINE EXISTING OVERHEAD ELECTRIC EXISTING UNDERGROUND ELECTRIC EXISTING UNDERGROUND TELEPHONE EXISTING FIBER OPTIC EXISTING TELECOMMUNICATION LINE EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER TREELINE PROPOSED ACCESS ROAD CENTERLINE EXISTING RIP RAP EXISTING INLET EXISTING CULVERT EDGE OF EXISTING DITCH LIMIT OF DISTURBANCE DESCRIPTION .00 Dominion RWO Energy SITE PLAN (2 OF 3) EXPAN ON ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1"=20' PROJECTI NAME DATE SHEET: O1O DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 20236-00-000-00-C-009-C 2 1 galco�ltants w i 10 Le I A 1 8 7 6 5 V 4 2 2 1 1 \\ \\\ \�\\�\\\\� 1// / j// //////_/ / I GRADING AND DRAINAGE PLAN (1 OF 2) Le L ----------- N,F PARCEL ID' 032✓0-01-00-01600 \ \ wF N/F I 14+'� DECA MR DRIVE \ \ \ PA\ CEL ID. PARCEL /D' MAR/SA GOODW/N \ \ \ 032✓O-OY-00-O>800 t06DECA00-0400 TUROR VE I \ \ \ \\ I >4340ECsI,TURDRIVE \ \ 06 DECM MALONE I I \ \ BR/ANLOQHNES & I \ \ \ \ JENN/FERLOHNES \ \ \ \ \ \NIF OR LAUR/EDALE I I I \\ I \ \\ \ \ \ \\ \\ \\ \\ \ \ 1 / /PARCEL 0,2✓0-02-00�ooco ES OPENS ACEE2 \ \ \ \ \ \ \ \ l I TA \ \ I I I \\ \\ \\ \ \ �\ I� \\IFORES COMAdNITY l \\ \ \ \I \ 1 \ \ 1 '� \ — ` \ \ \ \ \ SSOCA ON/NC PARCEL /D' NSF \ \ \ I` \ '� 032✓O-01-00-0150p \ _ \ - - \ \ \ \ \ - \ \ PARC€L-49' \ \ x \ \ \ \ \- 1416DECaTUROR VE - - \ PARCEL / : \ \ - _ \ 032J0-01-00-019 CASEYROB/NSO�& I \ - -I - 03201-00-0 \ \ \ \ 1440DECATUROR RE/KO /GARASHA _ J _ \ - _ 1428DECATU/RORI \ I - - - - - \ _ _ \ \ R/STOPHERNGOC\ / \ \ \ _ _ I R17C<BOSYMAT/I£N� \ - _ _ \ `� HOANG _ - z - - 1 \ \ \ \ \ \ \ \ \ \ �\ � \ \ \ \ \ � � / / ^ / � \ \ \ _ -\\ NEETHA�LTZ,4kE7)V =I MAC/L/L-�_ _ --- _�__ - \.I \ /\• \ \ I \\ OHE 10 UGE UGE p/ Y UGT — UGT — // / //\\ \ \ \`\ I -------------------- -- --\--- I — —--------= `3on / \ \ \ \ 1 I UFO —UFO- - ------------------------ ----------- _ ��o I \� / - — — — — — —505— — — _-- _ — — — — _ n�� aonon_ ( I ` `\ \\ \\ \\ \ \\ \\ \\ \\ I II 1 I I I I II I \\`�/ / cTv cTv ///////---------------— — — — — — — — — — — — — — — 1 -- --- --3on%-- _ °� __ ------------ _ /--- — — // 3H0 -- --- -- \ 3N0- Y--_-- - 3H0 �I-I�' T7� - - - - 3H0 _ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 tv / \\ W 499.29 ❑ / o ` �— I -� \\ \ \\ \ \\ \ \\ \ \\ \\ 1 11 I 11 II 1 \ \ \\ \ \ \ \ \ \ I SD SD PROPOSED LEVEL SPREADER II 11 I /��_�---�— � \ \\ /// II � •---• - - II I. I -I-..: ;-:'.::j. ':.1.:; I• - 1. \ \ \ \\ � \ \ \ \ o \ \ 1 I III 1 REVISIONS 1 GF -•-I:� ••' L NE \ \ \ \ I I I II // yl� � __—_ \ II 1 - �'I � j - I- .-.�;: -1•oi-� .'.."k�::�4;::1 - o � \ \ \ oNE \ I I I I I I I II— _ % II I I III — or+E l I I / off I � \ \ ,____ JFo I .I . I ��: :..� - --I. - r-::I..•..� ' - \ ` \ \ I II 1 11 � � � I II 01 € I o�� I 1 II �al I UFO €— — uFOy= mil$ —— ;: '.II I I 493.35 I 0 i i I I I I I EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS EDGE OF PUBLICLY AVAILABLE LIDAR EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE EXISTING FENCE LINE PROPOSED FENCE LINE EXISTING OVERHEAD ELECTRIC EXISTING UNDERGROUND ELECTRIC EXISTING UNDERGROUND TELEPHONE EXISTING FIBER OPTIC EXISTING TELECOMMUNICATION LINE EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER TREELINE PROPOSED ACCESS ROAD CENTERLINE EXISTING RIP RAP EXISTING INLET EXISTING CULVERT EDGE OF EXISTING DITCH #21A COMPACTED GRAVEL #57 STONE UNCOMPACTED GRAVEL LIMIT OF DISTURBANCE REV DATE DESCRIPTION I . 1 1 I .iN 13: Energy Dominion /ism II \ —\I I �• il // o�� I I1::II m I I I I II I II I I _ I I I \\ /-- \ ��:� 1 1 1 /- I 1 I I I I I I I I I UFO UFO U \\ UGE O uoUFO �� O u 0 —\ -° _ _ �� �/ I \ u /•�' - ./�' '/I . 1 I . I I I I' I I II I I I I GE UGE — — UGE ucE— 7 0 oHo�—� I I I II GRADING AND DRAINAGE PLAN (2 of 3) _ T —/—_1_I.�/ —1—I. I I / / l• l I I l MATCHLINE SHEET 014 1 \ II I I ��G e, ---- ter\ �/'��I - `-: � • ��� /: � - j - .�• .1 . - { - I I I I � I ` � II I 11 I I I I T 3: I I I 1 1 I I I I I I \\ I I ml o / I I —=—_� / ' / \ 1 I II I I I HC EA ES TAT EXPAN ON galco�ltants 1 / \ oy� / I • ii - /�___/ /./ i/l. II I II II I 11 \ ` /I - / I I II I III o EB OMARoE COUNTY VIR oINIA 3HO ZHO3HO 3HO 3H0 No. SCALE 1 49I1I ' 1II I PROJECDESIGNER T NAME DATE SHEET: SCALE: 20' \ 013 5.00 DRAWING: / 492.59 20 0 20 40 APPROVED BY 20236-00-000-00-C-013-0 8 7 6 5 4 1 3 1 2 1 10 Le I A 0 8 7 6 5 4 2 2 1 1 GRADING AND DRAINAGE PLAN (2 OF 2) 1 —n_ _----= �--—\_ _ y—\/`—\ — �\—`— /��/--`\ _ \ . —. —�/—/ �..::� ���:N\�:�\ \•\.\jo: �-o:•: ��\---__�-///_.�-//./ --�� / - �_--/,IIIIII�-�\I II\ . -I -.;— 'II I'I'rI.I.I/ I I-II\_—�— I\II\I iI--I `'-\ `. I—°.�'. �\--• fj° .�/�I� —I °- —�---N�-- \ �\ . --'_—.�. •/ ---_ i�/- io, N/ \E\ /./�-/..�- . //�\- I�. �-�-��-i i/ \\/��il/.,�//.oOI . N,N - /i-ee . /�'.-o.1��I N/—E.- ��/• /, y�—. //-. /.. II�/'/— . / �.: l/ _•—1,_I.. II 'I _�.� ..1. �_—_- �I �I /—fI,I l '- �:i— —_I p/ I/II _ —:� /'.�- -�/�.- �/I:.,--, .. -:i:IIf/ .-C/.�-'-/- -/'./.�.: /:/.-II /-.:1I.1Il'I�. I/-/Il .-�.:,/: /.�../.:--.: ./ -•.�•i/ II.i �I I- I! _ /-- -// —/, I�%I/I. !I . � - - - /- •I/I/I ' III I 49/II 3.III /I3/o 5/p FO / UFO 5 �€�—u6 GHI I II:I'1 vIIf _U O p UFO UFO h O UFO GE \ UGE /MATCHLINE SHEET 613 U� GE oN m 3:p 3HO 3HO7 3H0 3H0 r,`°y495.00 49259 ' Er Il III II I I I I IIII III II I IIi\I II IIII I IIIII\I I lIII I I/ICIII I I1 I dII1 II ^I 1 II I i II IilII I I I �I I --- e ---• — — --- — - —• e — — • e-- --•e— O —H — E — — — — --=�-- — � — � -CUGE— — U5• If If IDG E2 If crTV-o Iry�rUGT—uGTJvVUFO UFO 1 If CTV—CTV If 493.33 — — — — — — — — — — PROPOSED RETAINING WALL h SD SID SID z It 10000, REVISEDTREELINE// / 10000, / PROPOSED LEVEL SPREADER REVISIONSciE / �If / o I / / •\ �• .0I l I / I .1000, //4 FOREST A ESCOMMON I \ \ \ 10000, / I / AREA PH-> PAR C FORESTLAKES ASSOCIATIO MUN/TY D.B. >3O4, PG. 346 I EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS EDGE OF PUBLICLY AVAILABLE LIDAR EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE EXISTING FENCE LINE PROPOSED FENCE LINE EXISTING OVERHEAD ELECTRIC EXISTING UNDERGROUND ELECTRIC EXISTING UNDERGROUND TELEPHONE EXISTING FIBER OPTIC EXISTING TELECOMMUNICATION LINE EDGE OF EXISTING GRAVEL PROPOSED SUBSTATION PAD EXISTING EDGE OF WATER TREELINE PROPOSED ACCESS ROAD CENTERLINE EXISTING RIP RAP EXISTING INLET EXISTING CULVERT EDGE OF EXISTING DITCH #21A COMPACTED GRAVEL #57 STONE UNCOMPACTED GRAVEL LIMIT OF DISTURBANCE PROPOSED STORM SEWER REV DATE DESCRIPTION � Dominion I � Energy GRADING & DRAINAGE PLAN (3 OF 3) HG EA ES TAT EXPAN ON ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE 1 "=20' PROJECTI NAME DATE SHEET: SCALE: 1 " = 20' DESIGNER 014 \ \ \ \\ PROJECT ENGINEER DRAWING: 20 0 20 40 APPROVED BY 20236-00-000- 8 7 6 5 4 3 1 2 1 y galconsultan[s 10 Le I A n 1*1 7 6 5 4 2 2 1 0 e L A STEEL POST (TYP. LINE POST) PER SE VEP-2020-19-01 O DESIGN WIND SPEED: 90mph N SOIL TYPE: POOR Z N �C Z_ 0 CY 2U oQ¢ Q Q YLL N Z J O Y LL J W Z LL Z J J W I Q Cr ZLU ~ U Q Tn UNQ I r a FOUNDATION PER I SE VEP-2020-19-01 O z U) SEE NOTE 1 SUBSTATION FENCE DETAIL NOT TO SCALE SEE NOTE 1 1 1 SEE NOTE 1 I 1992 3.21 LEVEL SPREADER CROSS SECTION JOR UTE, OR EXCELSIOR STAPLED IN PLACE VARIABLE (MIN. 7') BURIED C MIN. 67 MIN. BURIED MIN. ---- 6" LEYEL UP OF 2:1 OR SPREADER FLATTER MIN. 6. LEVEL SPREADER WITH VEGETATED LIP CROSS SECTION VDOT J3, #357, f57 COARSE AGGVARIABLE (MIN. 7') GALVANIZED WIRE WIRE MESH TO TIMBER + FILTER CLOTHREATED TIMBER 6' MIN. SECURE WIRE TO GROUND WITH WIRE STAPLBAR ;4i ECU TMBER 7' MIN.UNDISTURBE 2:1 OR SOL FLATTER MIN. 6. LEVEL SPREADER WITH RIGID LIP • MIN. PHYSICAL REQUIREMENTS OF FILTER CLOTH NOTED IN STD. 8 SPEC. 3.19, RIPRAP Source: Va. DSWC and N.C. Erosion and Sediment Control Planning and Design Manual Plate 3.21-2 III - 195 f3 7 SUBSTATION FENCE ELEVATION FOR ILLUSTRATIVE PURPOSES ONLY NOT TO SCALE E 5 ---'- POST (TYP. LOST) PER SE 020-19-01 0 LU N Z_ �L J Cc O Q LL YLL N Z LL J LL Z QU C) U RATION PER P-2020-19-0' 4IN. THICI"" T NO.57 C AGGREGAI PROPOSED GRADE M 30'0" MAX (GATE OPENING + POST DIA.) SEE NOTE 1 BI-PARTING SLIDE TYPE GATE FOR ILLUSTRATIVE PURPOSES ONLY COMPACTED BASE COARSE (41N LIFTS) 3 NOT TO SCALE COUNTERBALANCE & GEOMETRY SEE NOTE 1 REVISIONS y galconsultants REV DATE DESCRIPTION .00 Dominion RWO Energy CONSTRUCTION DETAILS nRAFT HG . ES TAT EXPAN ON ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION B/M No. SCALE NTS PROJECTI NAME DATE SHEET: O1 H DESIGNER PROJECT ENGINEER DRAWING: APPROVED BY 220236-00-000-00-C-01 2 1 0 C A 9 7 6 1 5 \1/ 4 1 2 2 I I OVERALL SITE PLAN OHE UGE UGE - UGT - - UGT - UFO UFO C CTV CTV - 7 A �yw� ���� 3 SD EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS EDGE OF PUBLICLY AVAILABLE LIDAR EXISTING ADJACENT PROPERTY LINE EXISTING SITE PROPERTY LINE EXISTING FENCE LINE PROPOSED FENCE LINE EXISTING OVERHEAD ELECTRIC EXISTING UNDERGROUND ELECTRIC \\ \ /! I r (PROJECT DESCRIPTION: THIS PROJECT PROVIDES FOR THE INSTALLATION OF AIR CORE SERIES REACTOR ON LINE 2054 AT HOLLYMEADE SUBSTATION. THE SUBSTATION WILL BE EXPANDED TO PROVIDE SPACE FOR NEW EQUIPMENT. NEW PERIMETER FENCING WILL BE INSTALLED TO MATCH THE EXISTING 'STATION FENCE. AN INTERNAL SEPARATION FENCE MUST ALSO BE INSTALLED TO PROHIBIT PERSONNEL AND EQUIPMENT APPROACH TO REACTORS WHILE ENERGIZED. PARCEL ID. 'ARC L /D I PARCEL DD NIF 032�/0-01-00-01 / \ 032✓0.01-00-0140 I032✓0-01-00-01 0 \ / PARCEL iO: \\ 1IWARISA 22 AQECATURD ME 71434DECATURIQ /I/E \ 032J0-02-00-01%7CO \` / \ 1406DECATUROR E GOOD N I LCS \` / STEIVENM MALOHE BRIANLOHN & ESTESPARKPIASE2 \ C OR LAUR/EDALR N� I \ I ✓ENN/FER LOHNES N/F \ � \ PARCEL /D' \ PARCEL /D I V\ PARCEL /D, \ FORESTLAK S \ \ 0 I 032✓O-01-00-01�00 I� J0.01-00-017 0 032✓0.01-00-0190 \ \ COMMONI \ \ $ Z \ 1416 DECA TUROR/VE 1426 5CATURD VE \ \ 'h(400ECATUROR/ ASSOC/AT/OAI/NC. O CASEYROBINS & /CKBOB TH W& /�R \ ������yyy"""��Y''' C / TOPHERNGO RE/KO /GARAS]'// EETHAEL/ - H _ - -pq�G \ \ 1 \I \ _MAKIL \ \ \ 1 ------ — — — — — 1-------_--- \ \ I \ EXISTING UNDERGROUND TELEPHONE \ �O / / — — ' \ \ \ \ \ \ 1 II /1 / / / �+ e 30n 1 1\ 1\ I \I — — — — — — \ EXISTING FIBER OPTIC Lr _ ; g I \ / EXISTING TELECOMMUNICATION LINE / PARCEL AREA: PROJECT LIMITS AREA: EXISTING IMPERVIOUS/GRAVEL NEW IMPERVIOUS/GRAVEL: TOTAL IMPERVIOUS: 6.72 AC. 1.46 AC. 0.82 AC. 2.28 AC. AREA DISTURBED FOR EXPANSION: 1.66 AC. EXISTING TREE CANOPY: 3.45 AC. (51.3%) PROPOSED TREE CANOPY: 2.54 AC. (37.8%) EDGE OF EXISTING GRAVEL I PROPOSED SUBSTATION PAD \\\ / I I � I III EXISTING EDGE OF WATER \ / / / I II I / — / \ N TREELINE � 3 I PROPOSED ACCESS ROAD CENTERLINE, / l \ \ \ U O E I I II III I / / / `\ �� I � I I I I• EXISTING RIP RAP 02.5 i 1 III I \ EXISTING INLET EXISTING CULVERT \\`1 I \ \ \\ I j TV EDGE OF EXISTING DITCH LIMIT OF DISTURBANCE PROPOSED RETAINING WALL I � T _ PROPOSED LEVEL SPREADER I 11 /// // ✓y �� �'' NSF V �.. .. / / \ PARCEL /D., O46B4-00-00-000AO FORESTLAKES COMMON AREA PH-1 PAR C / FORESTLAKES COMMUNITY ASSOCIATION I \ / D.B 1304, PG. 346 I 7 / / I I / \`— ---- ----_ — — \ \ SCALE' 1" = 50' REVISIONS REV I DATE I DESCRIPTION Dominion Energy OVERALL SITE PLAN HOT"ME E S TAT EXPANSION ALBEMARLE COUNTY VIRGINIA OPERATIONAL REGION I I B/M No. SCALE 1"=50' PROJECTT NAME DATE SHEET: gai co�ltants — \ DESIGNER PROJECT ENGINEER ��------------- — �� �� \ 50 0 50 1 00j APPROVED BY 6 5 4 3 2 I IN C 3 A