Loading...
HomeMy WebLinkAboutSP202200020 Checklist 2022-07-18SPECIAL USE PERMIT CHECKLIST for OF ALBS J? �� O g> [C7 Esmont-Scottsville Transmission Line Upgrade/ TMP 128A2-00-00-01800 etc.'7;,� 1 rIRGtN��� After the mandatory pre -application meeting, county staff will mark this checklist appropriately so that it is clear to the applicant the information from Section 33.33 that must be submitted with the official application smc Required for Provided with application? application (County Staff) (Applicant) SECTION 33.33 X X NOTE to staff: if providing additional comments are provided within the checklist boxes, please distinguish those comments with different color print AND italic/underlined print or some other method that can be distinguished when copied with a black and white YES NO copier/printer. X X A narrative of the project proposal, including its public need or benefit; A narrative of the proposed project's consistency with the comprehensive plan, X X A narrative of the proposed project's impacts on public facilities and public X X infrastructure. X X A narrative of the proposed project's impacts on environmental features. X A narrative of the proffers proposed to address impacts from the proposed project. X X One or more maps showing the proposed project's regional context and existing natural and manmade physical conditions; X X A conceptual plan showing the existing and proposed facilities (towers/poles, lines, other related facilities) 1) entrance, driveways, and parking (application/plan should distinguish between new X X permanent entrances/access roads, temporary construction entrances, and existing access ways.) 2) typical cross -sections to show proportions, scale and StFeetsGape GFOSS X X seGtiGA6jG;FGUIatiGA; (For this project, show cross -sections or photo -simulations of ground -level views of the proposed towers, to demonstrate appearance in landscape) X 3) the general location of pedestrian and bicycle facilities; X N/A 4) building envelopes, (only if new structures or substation equipment are proposed) SPECIAL USE PERMIT CHECKLIST 04/2013 Page 1 of 2 X N/A 5) parking envelopes (only if new parking is proposed); X 6) public spaces and amenities; X 7) areas to be designated as conservation and/or preservation areas; (see note below about vegetation management) X 8) conceptual stormwater detention facility locations; X N/A 9) conceptual grading (if any is proposed); X X Other special studies or documentation, if applicable, and any other information identified as necessary by the county on the pre -application comment form. • Narrative should address plans for vegetation management in the corridor. Another SP recently approved by the Board included requirements (in line with that utility's plan) to apply Integrated Vegetation Management (IVM) within the corridor rather than mowing/clearing. If possible, we would recommend that this proposal also include the use of IVM. • Narrative and images/maps should address the location of historic districts and the visual impacts of the proposed higher towers on the visual character of the area and of views from the Route 6 Entrance Corridor. Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist as required for application. Signature of person completing this checklist Daniel Fraser Print Name 7/18/2022 Date 803-835-5954 Phone SPECIAL USE PERMIT CHECKLIST 04/2013 Page 2 of 2