HomeMy WebLinkAboutWPO201700037-73267-Full Inspection ReportCOUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
STOP WORK ORDER
Hand delivered
Project: WP0201700037
Brookhill Development - Block 4A & 8A - VSMP
Operator/Contractor: Contour Construction LLC
HAUGH, CHARLES R & E J OGLESBY JR TRUSTEES
Issued Date: 7/19/2022
Under § 17-902 of the Albemarle County Code, you are hereby notified to immediately cease
all land disturbing activities on the above referenced property except for work to address
any necessary corrections as given in writing by the County Erosion Control Inspector. This
Stop Work Order is being issued because of the following deficiencies:
Deficiency: Graded areas observed denuded
Corrective Action: Stabilize areas at grade and dormant for
over 14 days
Deficiency: Open, unprotected stockpile area
Corrective Action: Apply stockpile SF protections and establish
a vegetative cover on stockpile dormant for over 14 days
Deficiency: Division dikes not stabilized, interior slopes for SB
B not stabilized
Corrective Action: Reinstall DD as per plan and conveyance
channels stabilizing the DD to SF and water conveyance
channel
Deficiency: Slopes are not stabilized
Corrective Action: Establish slope stabilization
Deficiency: DD not tracked in or stabilized
Corrective Action: Reinstall DD as per plan and conveyance
channels stabilizing the DD to SF and water conveyance
channel
Deficiency: Diversion dikes not tracked in or stabilized
Corrective Action: Reinstall DD as per plan and conveyance
channels stabilizing the DD to SF and water conveyance
channel
A sworn complaint has been made by the Albemarle County Erosion Control Inspector below. This
STOP WORK ORDER shall remain in effect for seven (7) days. If satisfactory repairs have not
been made within seven (7) days, the County may elect to issue another Stop Work Order, and/or
petition the Circuit Court for penalties and relief with regard to this violation.
Reinspections as a result of this notice to verify corrective measures will incur a $170 fee for
the first reinspection and $270 for each subsequent reinspection for single-family dwelling
units (§ 17-207). Reinspections as a result of this notice to verify corrective measures will
incur a $283 fee for the first reinspection and $383 for each subsequent reinspection for
VESCP and VSMP permits (§ 17-207 and § 17-208). A 4% technology fee is due with each
payment.
County Inspector Name: Jonney Otto
County Inspector Phone Number: 434 296-5832
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
Brookhill Development - Block 4A & 8A
project/WPO Number:
WP0201700037
- VSMP
Project Address:
DEQ Permit Number (if
VAR10K793
applicable):
Project Operator:
Contour Construction LLC
Operator Telephone #:
(434) 244-0001
Project Contact:
HAUGH, CHARLES R & E J OGLESBY
Contact Telephone #:
JR TRUSTEES
Contact E-Mail:
Qualified Personnel (QP):
Contour Construction LLC/Sheila
Scott
Inspector:
Jonney Otto
Qualified Personnel (QP)
Email:
Disturbed Acreage:
Weather (Wet/Dry/Rain):
Cloudy
Single -Family:
Inspection Date & Time:
7/19/2022 12:00:00 PM
Stage of Construction: Grading
Other Email:
nick.hahn@riverbendmgt.com
Re -Inspection: No
Other Email:
Bond Inspection: No
Other Email:
COVERAGE & POSTING REQUIREMENTS
Compliant?
Reviewed during re -inspection? Yes
Comments/Description
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
Yes
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
Yes
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
Yes
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Compliant? Reviewed during re -inspection? Yes
Comments/Description
4
The SWPPP is on -site or made available during the inspection? (CGP
Yes
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
Yes
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
Yes
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP includes a narrative description of the nature of the
Yes
7
construction activity, including the function of the project? (CGP Part II
A.1.d)
Page 1 of 6
The SWPPP includes a legible site plan identifying all appropriate
Yes
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
9
The SWPPP contains the name, phone number and qualifications of
Yes
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
Yes
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
Yes
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ ILC ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
Yes
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
Yes
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
Yes
K? (CGP Part II A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
N/A
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Compliant?
Reviewed during inspection? No
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
54.G)
Has the SWPPP been amended if inspections or investigations by the
17
operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19
grading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part II B.4(e-f)) (9VAC25-870-54.G)
24
Amendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
Compliant?
Reviewed during inspection? No
Comments/Description
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
Page 2 of 6
26
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
NIA
plan?
Sequencing of the project is implemented in accordance with the
N/A
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
Graded areas observed denuded
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
No
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
No
Open, unprotected stockpile area
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
No
Stabilize denuded areas dormant for over 14 days
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
yes
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
No
Division dikes not stabilized, interior slopes for SB B
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
not stabilized
54.13)
Are sediment traps and basins installed in accordance with MS-6 and the
No
SB B observed with sediment leaving outlet pipe.
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
Outlet protection inundated with Sediment
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
No
Slopes are not stabilized
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
Rock checks and fabric slope protections installed on
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
No
SB B
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
N/A
38
(9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
N/A
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
No
Diversion dikes not tracked in or stabilized
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
N/A
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
N/A
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
43
Is necessary restabilization of in -stream construction complete? (9VAC
N/A
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
N/A
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are soil and mud kept off paved or public roads to minimize the transport
No
Stone at CE compacted, secondary CE w/o sufficient
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
stone protection
(9VAC25-870-54. B )
Page 3 of 6
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
N/A
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are properties and waterways downstream from development adequately
Sediment discharged into stream
47
protected from erosion, sediment and damage in accordance with the
No
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
N/A
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
yes
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
N/A
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
N/A
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
N/A
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
N/A
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
N/A
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
Yes
Damaged fuel tank liner replaced
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
N/A
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Page 4 of 6
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
Regulatory
Occurrence
Observation/Recommended Corrective Action
Checklist #
Citation/Legal
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 6
Corrective Action Deadline:
Re -Inspection Date:
Comments:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Page 6 of 6
Construction General Permit Site Inspection Report
Request for Correction Action
Check
Regulatory Citation/Legal
Occur.
Observation
Recommended Corrective
List #
Requirement*
Action
30
(9VAC 25-840-40.1)
Graded areas observed
Stabilize areas at grade and
(9VAC25-870-54.B)
denuded
dormant for over 14 days
(9VAC25-880-60) (CGP
Part I F.1(a)) (CGP Part
II A.5.b(1)) (CGP Part 11
A.2.c (8)) (CGP 11 E(1-2))
31
(9VAC 25-840-40.2)
Open, unprotected stockpile
Apply stockpile SF protections
(CGP Part 11 A.2(c))
area
and establish a vegetative
(9VAC25-870-54.B)
cover on stockpile dormant for
over14 days
34
(9VAC 25-840-40.5)
Division dikes not stabilized,
Reinstall DD as per plan and
(CGP Part 11 A.2(c))
interior slopes for SIB B not
conveyance channels
(CGP 11 E(1-2))
stabilized
stabilizing the DD to SF and
(9VAC25-870-54.B)
water conveyance channel
36
(9VAC 25-840-40.7)
Slopes are not stabilized
Establish slope stabilization
(CGP Part 11 A.2(c))
(CGP 11 E(1-2))
(9VAC25-870-54.B)
40
(9VAC 25-840-40.11)
DD not tracked in or stabilized
Reinstall DD as per plan and
(CGP Part 11 A.2(c))
conveyance channels
(CGP 11 E(1-2))
stabilizing the DD to SF and
(9VAC25-870-54.B)
water conveyance channel
40
(9VAC 25-840-40.11)
Diversion dikes not tracked in
Reinstall DD as per plan and
(CGP Part 11 A.2(c))
or stabilized
conveyance channels
(CGP 11 E(1-2))
stabilizing the DD to SF and
(9VAC25-870-54.B)
water conveyance channel
Recommended
Corrective Action
Deadline:
Targeted Re- 7/29/2022
Inspection Date:
Comments: After a DEQ site inspection on 7/14/22 sediment was observed in a stream along
with non -compliant E&S measures. A corrective action list was created.
Manually remove sediment from stream utilizing buckets and shovels documenting
length and volume of sediment removed. Address the corrections listed and
document the items corrected and stabilization dates in sites SWPPP book.
- stabilize denuded areas at grade or dormant for over 14 days
- apply slope stabilization
- stabilize stockpile
- install sized slope drains w/ stone inlet and outlet protection
- Reinstall DD as per plan and conveyance channels stabilizing the DID to
SF and water conveyance channel
- Stabilize interior slopes and ensure functionality of SS on SIB B. Remove sediment
and reinstall outlet protection for SB B
A Stop Work Order has been issued with a reinspection date set for 7/29/22
Inspection Report
*Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control
Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from
Construction Activities (9VAC25-880).
Construction General Permit Site Inspection Photo Log
Photos for Item 2
Photos for Item 4
Photo Description:
Photos for Item 10
Photo Description:
Photos for Item 30
Ti mePhoto_20220720_124948.j pg.jpg
272.41 KB
Photo Description: Areas graded or denuded for over 14 days need to have stabilization applied
Photos for Item 34
Time Photo_20220715_105602.jpg.jpg 846.92KB
Photo Description: Reinstall DID and stabilize the DD to the perimeter SF. Stabilize SB slopes
Photos for Item 35
TimePhoto_20220720_123444.jpg.jpg 331.68KB
Photo Description: Drain SB B and confirm the watertight state of SS. Remove sediment from outlet
stone and reinstall
Photos for Item 36
Time Photo_20220715_105659.jpg.jpg 1.23MB
Photo Description: Apply slope stabilization with matting
Photos for Item 37
TimePhoto_20220715_103232.jpg.jpg 852.66KB
Photo Description: Install a sized slope drain with stone inlet and outlet protection
Photos for Item 40
Time Photo_20220720_115739.jpg.jpg 931.4KB
r
Photo Description: Reinstall Diversion and conveyance channel stabilizing the DID to SF and water
conveyance channel
Photos for Item 45
TimePhoto_20220720_114707.jpg.jpg 844.65KB
Photo Description: Pull up stone in CE to allow sediment removal. Ensure all ingress and egress have
CE protection.
Photos for Item 47
Time Photo_20220720_121624.jpg.jpg 386.17KB
Photo Description: Manually remove sediment from stream utilizing buckets and shovels documenting
length and volume of sediment removed.
Photos for Item 55
TimePhoto_20220720_114707.jpg.jpg 844.65KB
Photo Description: Fuel tank containment cell compliant
Other Photos
Photo Description:
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Inspection Date: 7/21/2022
County Inspector