Loading...
HomeMy WebLinkAboutWPO202200031 Correspondence 2022-07-25LAA BALZER & ASSOCIATES PLANNERS/ARCHITECTS ENGINEERS/SURVEYORS 104 Industry Way Suite 102 Staunton, VA 24401 540.248.3220 w .balzer.cc Roanoke Richmond New River Valley Shenandoah Valley July 20, 2022 County of Albemarle Attn: Matt Wentland 401 McIntire Road, North Wing Charlottesville, VA 22902 RE: Response to Comments Castle Rock Farm — Phase 1 Balzer Project No: 34210060.00 County Project No: WPO-2022-00031 This letter serves as our written responses to the County comments on the subject project: A. Stormwater Pollution Prevention Plan (SWPPP) 1. Provide a SWPPP, including a completed and signed DEQ Registration Form (though no DEQ permit will be required) and a signed Certification. • A SWPPP, including a completed and signed DEQ Registration Form and a signed Certification has been provided B. Pollution Prevention Plan (PPP) 2. Provide a PPP with the SWPPP. • A PPP has been provided with the SWPPP. C. Stormwater Management Plan (SWMP) 3. Projects disturbing 10,000sf or more and meeting the conditions of 17-302 are subject to the VSMP regulations (17-401-405) and will need to meet both quantity and quality requirements. The sheet flow for quantity appears acceptable. • Noted. 4. The quality compliance as determined in the DEQ VRRM worksheet will need to be met. If nutrient credits will be purchased, be aware that the site drains to impaired waters as determined by DEQ and the credits will need to be purchased from within the same 8-digit HUC (the Ivy Creek bank and the Rivanna River bank are both acceptable). Please contact Ana Kilmer in our office prior to purchasing credits. • To achieve water quality standards, a total of 1.18 lbs. of Phosphorus is required to be treated. A total of 1.18 lbs. was achieved through the use of open space. This is now shown on Sheet C4.0. LAA BALZER & ASSOCIATES PLANNERS/ARCHITECTS ENGINEERS/SURVEYORS D. Erosion and Sediment Control Plan (ESCP) 5. The ESC plan appears acceptable at this time, but include a note that additional measures may be required at the request of the County Inspector. • This note has been added to the General Notes on Sheet C 1.0. Please do not hesitate to call with any questions. Sincerely, BALZER AND ASSOCIATES, INC. dV�L William S. Moore, P.E. Vice President Page 2 of 2