Loading...
HomeMy WebLinkAboutSDP202200045 Review Comments Final Site Plan and Comps. 2022-07-26401 McIntire Road, North Wing Charlottesville, County of Albemarle VA 222 Telephone: 434-296-96-5832SS32 +1� COMMUNITY DEVELOPMENT DEPARTMENT WWW,ALBEMARLE.ORG ` `IRGINIP„ Memorandum To: Bryan Cichocki (brvan.cichocki@timmons.com) From: Kevin McCollum — Senior Planner I Division: Planning Services Date: July 26, 2022 Subject: SDP202200045 Towneplace Inn & Suites — Final Site Plan Review Comments The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Applicable Comments from Initial Site Plan Action Letter (dated February 11, 2022) Comments that have been addressed have been blurred out. Additional comments are added in bold font, like this. 1. [32.5.2(a)] Please include a reference to the Initial Site Plan Number: SDP202100097 and include a place holder for the Final Site Plan Number. Include the final site plan application number SDP202200045. 2. 132.6.2(a), 32.5.2(a)] According to Albemarle County GIS the owner of the property is Pantops Hotel LLC. Please clarify this information on the plans and include a deed for reference. Correct all labels that include the owner information. Comment addressed. 3. [32.6.2(a), 32.5.2(d)] Please show and label all Steep Slopes — Managed. a. Clarify the Site Data. Include Steep Slopes - Managed as an applicable Overlay District under the Zoning information. Delete the information regarding Critical Slopes. There are no Critical Slopes on the property. Critical Slopes only apply to properties outside of the Development Areas (ex. in the Rural Areas). Comment addressed. 4. [General Comment] Add a date of revision. Comment addressed. Continue to update the date as revisions are made. 5. [General Comment] Please clarify the title. In some places it reads "Townplace" and others "Towneplace." Comment addressed. 6. [32.5.2 (j)(k)(1), 32.6.2(g)] Show all existing and any proposed easements. Any new easements required for water, sewer, drainage facilities, or any proposed utilities will need to be reviewed, approved, and recorded prior to final site plan approval. Please submit an easement plat application the County for review. The final site plan will need to be updated so that all easements are shown and labeled identifying easement type, whether it's public or private, a width dimension, and the recorded instrument with deed book and page number. Comment stands. 7. [Section 321 Final site plan must comply with all applicable requirements of Section 32.6, 32.7 and 32.8 of the Zoning Ordinance prior to final approval. Comment stands. 8. [General Comment] This site lies in the Monticello Viewshed. Please contact Liz Russell at Irussell&monticello.org to discuss design strategies that comply with the Voluntary Guidelines for Development within Monticello's Viewshed. Comment stands. [32.6.2(i), 4.12.16] Many of the proposed parking spaces do not meet minimum length requirements as outlined in Section 4.12.16(c). a. [4.12.16(c)(6)] It does not appear that the parking spaces meet the criteria for a minimum length reduction as outlined in 4.12.16(c)(6) below. Minimum length reduction. Perpendicular and curvilinear parking space minimum length requirements may be reduced by not more than two feet when any of the following conditions are satisfied: (i) one or more rows of parking are separated by planting islands, median, or other such features (other than sidewalks) and allow for an unobstructed overhang, from each row, equivalent to the reduction; or (ti) one or more rows of parking adjacent to a building are separatedfrom the building byplanting islands, or other such features (other than sidewalks) and allow for an unobstructed overhang, from each row, equivalent to the reduction. Comment addressed. 10. 132.7.9.7 (a)(3)] Please provide a construction detail in plan and profile view of the proposed dumpster enclosure. The detail should identify materials to be used, color, dimensions, etc. Please be aware that walls used for screening must be a minimum of 6' in height. Comment addressed. 11. [32.7.8 and 4.17] Lighting Plan a. Use a light loss factor of 1.0 to determine footcandles on site. Where on the plans does it show the LLF factor? b. Please state the pole height of all outdoor luminaires. c. [4.17.4 (b)] Please add a note that states "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle." d. Correct the job name at the top of the cut sheets table. 12. [32.7.4.11 Please see attached Engineering Division comments. A Water Protection Ordinance (WPO) application amendment must be submitted, reviewed, and approved prior to final site plan approval. Please contact Engineering Division staff with specific questions related to WPO requirements. Comment stands. 13. [32.7.2.31 Pedestrian infrastructure, designed and constructed to the standards of the Virginia Department of Transportation, must be provided along Olympia Dr. and Town and Country Lane. a. The sidewalk shall be at least 5' in width. b. As proposed the sidewalk is within the private property lines. The owner will be responsible for maintenance of the sidewalk and will also have to grant a public access easement over the sidewalk. Submit a public access easement and maintenance agreement to be reviewed and approved prior to final site plan approval. c. Alternatively, the developer can dedicate land to the right-of-way so that the sidewalk is within the public right of way. If the sidewalk is in the right-of-way, VDOT will maintain it and an access easement won't be required. Final Site Plan Review Comments: 1. [32.5.2(a)] For any adjacent parcels visible on the drawings, please show the property lines and include a label stating the owner's name, TMP number, zoning districts, and present uses. Please contact Kevin McCollum at the Department of Community Development at kmccollum@albemarle.org or 296-5832 ext. 3141 for further information. Additional Reviewer Comments Albemarle County Engineering Services — John Anderson, ianderson2 a&albemarle.org — Requested changes, see attached. Albemarle County Building Inspections — Betty Slough, bslou hg &albemarle.org — Review pending. Comments will be forwarded upon receipt. Albemarle County Fire -Rescue — Howard Lagomarsino, hlaeomarsino@albemarle.org — Requested changes, see below. 1. Add note to plan indicating the FDC must be C & O thread 2. During demolition and/or construction, the following fire prevention steps are required, so please note them on the plan: a. Smoking shall be prohibited in areas where smoking makes conditions such as to make smoking a hazard and these areas shall be designated with no smoking signs per Virginia Statewide Fire Prevention Code. b. Areas where smoking can occur, shall have appropriate receptacles for discarded smoking materials per Virginia Statewide Fire Prevention Code. c. Per the Virginia Statewide Fire Prevention Code, vehicular access for firefighting shall be provided at all construction and demolition sites, including access to within 100 ft. of temporary or permanent fire department connections, and have no overhead wiring or other overhead obstructions lower than 13 ft. 6 inches; this access may be via permanent or temporary road, but shall be capable of supporting fire apparatus in all weather conditions. d. Contractor shall ensure the street numbers are always plainly visible from the frontage street during construction per the Virginia Statewide Fire Code e. An approved water supply for firefighting operations shall be in place and available as soon as combustible materials arrive on site. f Waste and combustible debris shall be removed from the building at the end of each day and disposed of in accordance with the Virginia Statewide Fire Code g. Fire extinguishers shall be provided, with not less than one approved fire extinguisher at each stairwell, on all floor levels where combustible materials have accumulated, in every storage and construction shed and in areas of special; hazards, such as where flammable and combustible liquids are stored or used, in accordance with the Virginia Statewide Fire Code h. Operations involving the use of cutting and welding shall comply with the Virginia Statewide Fire Prevention Code and shall require a permit from the Albemarle County Fire Marshal's Office Virginia Department of Transportation— Doug McAvoy Jr., douglas.mcavoy@vdot.vir ig nia.gov —Requested changes, see attached. Albemarle County Service Authority (ACSA) — Richard Nelson, melson&serviceauthority.org — Requested changes, see attached. Albemarle County E911—Elise Kiewra, ekiewra@albemarle.org—No objection (6/30/2022). Rivanna Water and Sewer Authority— Victoria Fort and Dyon Vega, vfort@rivanna.org and dvega@rinavvan.org— RWSA review not yet complete, comments or recommendations will be forwarded to the applicant upon receipt. Albemarle County Architectural Review Board (ARB) — Margaret Maliszewski, mmaliszewski@albemarle.org — see comments below. 1. This plan will be reviewed by the ARB at the August 1, 2022 meeting. Comments will be available after that meeting. �q off nig 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 County of Albemarle Telephone: 434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG ��BGIN�Q' Site Plan review Project title: Townplace Inn & Suites, Final Site Plan Project file number: SDP202200045 Plan preparer: Bryan Cichocki, PE /Timmons Group, bryan.cichocki(i�timmons.com 608 Preston Ave., Suite 200 / Charlottesville, VA 22903 Owner or rep.: Pantops Hotel LLC, P.O. Box 3535, Williamsburg, VA 23185 Applicant: HMP Properties, 5388 Discovery Park Blvd. #300, Williamsburg, VA 23188 hmp(a,,hmphotels. com Plan received date: 24 Jun 2022 Date of comments: 8 Jul 2022 Plan Coordinator: Kevin McCollum Reviewer: John Anderson, PE Engineering has reviewed the final site plan and offers these review comments, which are ISP carryover comments. For Final Site Plan approval: 1. C2.0 a. Please provide deed bk.-pg. ref. for existing public drainage easement for storm conveyance leaving the Guadalajara property to the south, then transiting hotel development parcel. (FSP) Addressed. b. Show and label managed steep slopes. (FSP) Addressed. c. Revise label reading `Use: vacant, TNT 78-1 V since it is a commercial car sales parking lot with non -vacant use (blue -circle area, image, below). (FSP) Partially addressed. Applicant response (letter d. 21-Jun 2022): `The use for TAP parcel 78-11 has been updated to "commercial car sales parking." ' As follow-up: Please ensure parcel ownership data for 78-11B1 and 78-9C displays. [Image removed with ESP comments.] d. Please consider and provide collection/conveyance (as needed) of storm runoff that may transit existing drainage ditch that crosses the hotel site, a ditch beginning near the car sales parking lot (blue aFT-aw, -ielaw): [Image removed with ESP review comments.] (FSP) Addressed. Applicant: `Given the updated survey, a drainage ditch does not exist through the proposed site. See Sheet C2.0. Any off -site storm runoff that may flow from the car sales parking lot towards the site will be captured by curb and routed to an existing storm inlet east of the proposed site (detailed stormwater management plans are included with the WPO plans).' Note: WP0202200027, submitted 7/7/22, review pending. e. Show /label existing sidewalk adjacent to Town and Country Lane. Determine and label ex. sidewalk width. (FSP) Addressed. f. Plan appears to propose elimination of this sidewalk; preserve walk as a required element of public streets per subdivision street design guide, VDOT Road Design Manual, Appx. B(1). n...',....& 2 ...mite :...agog [Image deleted with ESP review comments] (FSP) Addressed. Applicant: `The sidewalk along Town and Country Lane and Olympia Drive will be demolished and reconstructed in order to install the retaining wall as part of this project. The proposed sidewalk is shown on sheet C4.0 with a public access easement shown on C4. L' 2. C4.0 Engineering Review Comments Page 2 of 5 a. Please revise label reading `retaining wall with fall protection barrier on top for vehicles and pedestrians' to `retaining wall with guardrail' since guardrail is appropriate for vehicles. VDOT GR-2 standard is available to include on plans. (FSP) Addressed. b. Provide wheel stops for parking spaces fronting retaining wall. (FSP) Withdrawn. Applicant: `Referencing the 16' deep parking spaces facing the retaining wall north of the project site, curb is being proposed as a wheel stop so that the 2' planting strip can be utilized for the required vehicle overhang. The 16' deep parking spaces are necessary to keep a 26' drive aisle along that section of the site for fire access.' c. Label narrowest width of curvilinear parking spaces in sections that do not label width at narrowest dimension. (FSP) Addressed. d. Revise parking space -sidewalk design; select from allowable parking -sidewalk configurations at p. 17, ACDSM, which requires, for example, wheel stops for 18' L spaces w/ 5' w sidewalks (haps://www.albemarle.orgjEome/ShowDocument?id=270 ). (FSP) Addressed. e. Identify curb type/s. (FSP) Addressed. f Label all sidewalk widths. (FSP) Addressed. g. Provide HC-parking space signs. (FSP) Addressed. h. East entrance to hotel may limit fire rescue (apparatus) access to site. i. Engineering defers to ACFR. (FSP) NA. ii. If ACFR requests site access to include unrestricted access around the hotel, ensure retaining wall design accommodates ACFR vehicle weight (65,000 - 80,0001b.), or weight of vehicle class likely to respond from ACFR Station 16, Pantops. (FSP) Addressed. Applicant: `Noted, retaining wall will be designed to accommodate the ACFR vehicle weight.' iii. If ACFR apparatus requires access around hotel, ensure retaining wall guardrail accommodates overhang portion of ACFR vehicle, from front axle to front fender. (FSP) Addressed. Applicant: `An Auto -turn analysis has been performed confirming the accommodation of the ACFR vehicle. An exhibit of this analysis can be provided upon request.' Asfollow-u : Please provide exhibit. iv. (Please do not assume ACFR vehicles are permitted to stage vehicles or response or presence within public RW of Town and Country Lane, or Olympia Drive.) (FSP) Addressed. Applicant: `Noted, this is not being assumed. The drive aisle is 26' on the north and south sides of the hotel to allow for vehicle staging.' i. Provide GR-2 with labels for retaining wall located along linear and curvilinear parking along N edge of hotel parking lot. (FSP) Addressed. Applicant: `Guardrail has been called out on top of the proposed retaining wall along Town and Country Lane and as well Olympia Drive. The guardrail and retaining wall integration will be further designed and detailed by a structural engineer for the second submission of the final site plan. A note of this has been provided with the detail on Sheet C 1. L' j. Increase 3' sidewalk width along Olympia Drive to meet VDOT minimum sidewalk width, 5'. [See VDOT Road Design Manual, Appx. B(1), Sec. 41I A(2) - httos://www.virginiadot.orgibusiness/resources/LocDes/RDMJApoendBI.pdf ] (FSP) Addressed. k. Provide CG-12 at E end of proposed sidewalk adjacent to Olympia Drive, W side of N entrance to hotel site. (FSP) Addressed. I. Provide GR-2 detail. (FSP) Addressed. in. Submit geotechnical PE -sealed retaining wall design for all wall ht. >4-ft. for Engineering review prior to FSP approval. (FSP) Persists. Applicant: `The retaining wall design will not be submitted with this first submission of the final site plan. The retaining wall will be designed by a structural engineer and detailed for the second submission of the final site plan. We are actively working with geotechnical and structural engineers to design a retaining wall that integrates a guardrail and provides relief for the proposed outfall pipe.' n. Note: All walls >3-ft. ht. not integral to building design will require building permit from building inspections, CDD. (FSP) May persist. Applicant: `Acknowledged.' 3. C5.0 Engineering Review Comments Page 3 of 5 a. Convert parking space with SWM facility manway access to a parking island so that manway access is not obstructed by a parked vehicle. (FSP) NA. Applicant: `The UG detention system has been removed as the downstream pond [sic, biofilter] was designed [for] this site. This has been coordinated with county staff and calculations will be provided with the WPO plans.' b. Provide drainage profiles (storm pipes, UG SWM detention facility). (FSP) Partially addressed. As follow-up: i. Please provide profile label to require %:" steel plate in the floor of MH Str. 102. Ref. VDOT Drainage Manual, p. 9-37, Sec. 9.4.8.7., Maximum grades. ii. Comment 3.b.i. also applies to any other step-down MH Str. where difference between INV IN and INV OUT > 4-11. iii. Please provide SL-1 profile label (safety slab) for MH Str. 102, and any other MH Str. where the difference between top of structure and INV OUT > 12-ft. iv. Revise depth /slope of pipe 107 so that 20' easement width for this pipe (C4.1) may be minimized to extent possible. 20' easement width jeopardizes hotel foundation (strip footer) and likely conflicts with retaining wall. Amending depth /slope of pipe 107 requires adjustment to pipe 300, as well, but it appears possible to raise both pipes. (Please see ACDSM easement width diagram, below, item 3.e.) c. Show /label a public drainage easement extending from UG detention system (SWM easement) that is centered on the facility outfall pipe, OF, to the property boundary. (FSP) NA. Applicant: `As mentioned above, the UG detention system has been removed with this submission. All proposed drainage easements for the other storm structures/sewer have been provided on sheet C4. L' d. Provide detail for relieving arch or pipe sleeve where UG SWM facility outfall pipe, OF, is proposed to pass beneath retaining wall near Olympia Drive. Consider and discuss alternatives, or if no alternative SWM facility outfall location exists, establish this via notes, labels, etc. (FSP) Persists. Applicant: `The retaining wall design will not be submitted for the first submission of the final site plan. The retaining wall will be designed by a structural engineer and detailed for the second submission of the final site plan. We are actively working with geotechnical and structural engineers to design a retaining wall that integrates a guardrail and provides relief for the proposed outfall pipe. As mentioned above, the UG detention system has been removed with this submission.' e. It is not possible without SWM detention profile to evaluate proposed SWM facility easement with precision. As design advances, please consult ACDSM, P. 15, Easement diagram to determine required SWM facility easement width. (FSP) Withdrawn. Applicant: `As mentioned above, the UG detention system has been removed, and has been replaced with storm pipe for the proposed storm system. All proposed easements have been provided on sheet C4. L' 6A591R1TW 11. HLiAfETER. 2'. 2 IH-!'L lY (D'MHN.) Engineering Review Comments Page 4 of 5 f Provide VDOT LD-204 inlet computations. Provide LD-229 storm drain design computations. (FSP) Addressed. Applicant: `All VDOT LD-204 inlet computations and VDOT LD-229 storm drainage computations will be included with the WPO resubmission.' Note: Ref. WPO202200027, sheet C6.2. g. Proposed retaining walls are shown within existing public drainage easement, existing storm pipes are shown crossing beneath or intersecting proposed retaining wall. Provide final site plan that indicates existing storm drain pipes are relocated to avoid any construction or future maintenance conflict with retaining walls. No permanent improvements of type proposed are allowed within public drainage easement. (FSP) Addressed. Applicant: `The existing storm pipes have been relocated to avoid any future conflicts with maintenance or construction with the proposed retaining wall. The existing public drainage easement has been abandoned. A proposed public drainage easement is provided on sheet C4.1, with no permanent improvements proposed within. See note on sheet C4.1.' h. Establish new public drainage easement centered on relocated existing storm drain lines. (FSP) Persists (reE item 31). Applicant: `A new public drainage easement has been provided for the relocated existing storm pipes, shown on sheet C4. L' i. Record new platted public drainage and SWM facility/access easements prior to WPO plan approval. (FSP) Persists. Applicant: `New platted public drainage easements will be provided with future submittal.' j. Note: WPO plan approval is a prerequisite to ESP approval. (FSP) Acknowledged. WPO202200027 received 7/7/22, review pending. k. Furnish relevant design data with WPO, including weir plate, manway, weir orifice design, debris cage, typ. details, plan/profile, etc., as needed. (FSP) May Persist with WPO plan. Applicant: `All relevant stormwater information has been provided with WPO submission.' 1. Avoid nuisance ponding at all locations across parking lots /across site act Main entrance to hotel appears somewhat susceptible to nuisance pending /ice in winter. (FSP) Addressed. Applicant: `With the grading and site constraints, the main entrance to the hotel is lower than the entrance grading. Trench drains have been placed in front of the main entrance of the hotel, and the pavement is crested near the entrance to ensure positive drainage away from the entrance. Most of this area is covered with an overhang, reducing the actual runoff to this area. Inlet sizing calculations will be provided with the WPO plans.' Note: Calcs shown on WPO plan, sheet C6.2. m. Ensure parking lot grade near S entrance to hotel is < 5%' -5.25% impermissible. [ 18-4.12.15.c.] (FSP) Addressed. Applicant: `With the grading constraints of the site and access requirements, we currently have a maximum grade of 6% in the parking aisles and spaces. This is the maximum one -point slope —the slopes parallel and perpendicular to the stalls are less than 5% in each direction.' n. Ensure slope, S entrance to hotel is <10% in every direction. [ 18-4.12.17.a.] (FSP) Addressed. o. Revise grade, S entrance to hotel such that side -slope is traversable for tall (high -clearance) trucks, side -slope is severe at this location posing risk of tipping /loss of control in wet or icy conditions. (FSP) Addressed. Applicant: `The grading in the S entrance to the hotel has been revised to reduce the severity of the cross slope to approx. 3%.' p. Provide /label CG-6 wherever runoff concentrates against curbing, for example: loop around west end of hotel. (FSP) Addressed. q. Recommend YD-inlet above /connecting with storm pipe 6-4 at east end of hotel. (FSP) Addressed. r. Show /label CG-12 at HC-parking spaces at front of hotel. (FSP) Addressed. s. Label parking lot island bullnose radii (or typ. R). (FSP) Addressed. t. Please ensure each building egress is ADA-compliant with respect to landing, max. grade, etc. (FSP) Addressed. u. Collect /convey retaining wall weep discharge via system to prevents water crossing sidewalk/s. (FSP) Addressed. Applicant: `Perforated pipe has been added behind the retaining wall to collect wall weep discharge and is being proposed to tie into storm pipe 101. See sheet C5.0. This specific drainage system and tie-in will be further designed and detailed with the retaining wall and Engineering Review Comments Page 5 of 5 submitted for the second submission of the final site plan. A note of this has been added to sheets C4.0 and C5.0.' Acquire /record off -site temporary construction easement to perform grading on TMP 07800-00- 00-009CO3 or provide copy of written agreement to perform grading across or at edge of this parcel. Proposed site contours are infeasible without easement /Agreement from this TMP owner. (FSP) Persists. Applicant: `Approaches for this are being coordinated and will be further discussed with the next submission.' 4. Submit a WPO plan for hotel development at earliest convenience. (FSP) Addressed. WPO202200027 submitted. 5. Submit separate easement plat for public drainage and SWM facilities associated with this development. Separate plat review process must be completed, plat approved and recorded, prior to WPO plan approval. (FSP) Persists. Applicant: `A separate easement plat will be submitted with future submission.' 6. L1.0 a. Five canopy species (landscape plants) proposed along base of t4' wall have strong potential to undermine wall, revise landscape plan. (FSP) Addressed. Applicant: `These trees have been respaced along Olympia Drive to not undermine the above -mentioned wall.' b. Restore, show, label, and dimension 5' sidewalk (Min. width) along both Town and Country Lane and Olympia Drive since removing /not replacing an existing pedestrian facility within public RW is not an option. (FSP) Addressed. Please feel free to call if any questions: 434.296-5832 -x3069 ( landerson2(a),albemarle.or ). Thank you I Anderson SDP202200045_TownplaceInn_FSP_070822.doc COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 July 01, 2022 Kevin McCollum County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SDP-2022-00045- Towneplace Inn & Suites Pantops— Final Site Plan Dear Mr. McCollum: (804) 7862701 Fax: (804) 7862940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Timmons Group, dated December 27, 2021, revised June 21, 2022 and offer the following comments. 1. Just to reiterate the County's comment, VDOT will not maintain sidewalk without dedicated to right of way to County. 2. Please provide the WPO plans, for pre and post construction drainage calculations, tying into existing structures for adequacy of discharge. If further information is desired, please contact Willis C. Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right of way. The owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, John Wilson, P.E. Assistant Resident Engineer -Land Use Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING Albemarle Gamy Service Authority Serving Conserving July 5, 2022 Timmons Group Attn: Mr. Bryan Cichocki, P.E. 608 Preston Avenue, Suite 200 Charlottesville, Virginia 22903 Re: Townplace Inn and Suites Dear Mr. Cichocki: We have reviewed the plans entitled "Townplace Inn and Suites" dated June 21, 2022, and offer the following comments: General 1. Provide fixture counts to confirm water meter size. 2. Show ACSA utilities on the grading plan. Sheet C1.3 1. To clarify; the VDOT detail for precast manholes does not match ACSA's standard manhole detail. Sheet C1.4 1. Remove Standard Manhole Drop Connection detail and replace with typical branch tie in detail. Sheet C4.0 1. Clarify if the intent is to utilize the existing connection for the hydrant relocation. 2. Specify the relocated hydrant is to be replaced. 3. Relocate portion of proposed water main outside of parking spaces. 4. Reduce proposed water main to 6-inch after FHA, behind hotel. 5. Add a hydrant to the end of the water main, next to the meter vault. 6. Reference the Large Service Line detail for how the service line, from the main, should be run to the meter vault. Sheet 1-1.0 1. Remove proposed trees from ACSA easements. 168 Spotnap Road • Charlottesville, VA 22911 • Tel (434) 977-4511 • Fax (434) 979-0698 www.serviceautkority.org If you have any questions concerning this review, feel free to contact me at (434) 977-4511, Ext. 113. Sincerely, �(J"� k Nam" Richard Nelson Civil Engineer RN:dmg 050601 TownplaceCommentLetter=622