HomeMy WebLinkAboutWPO202100042 Bond Estimates 2022-07-19Project Name: VSMP Plan Bamboo Grove WP02021-00042
WPO file number: WP02021-00042
TMP(s): 05500-00-00-068C0,05500-00-00-068DO
Date Estimate Completed: 07-19-2022, K.Rucker, chk. JA, 072622
Erosion & Sediment Control Plan Bond Estimate
Item Item
Number
i
z
3
4
5
6
7
0
ri
lz
13
14
15
16
17
18
19
20
21
zz
23
24
25
26
27
28
29
30
31
32
33
34
35
36
slablization (PS, TS)
silt fence (SF)
safety fence (SAF)
diversion (DID, FD, RWD)
temporary slope drain (TSD) pipe length
earthwork for trap/basin
-ft pipe diameter i..
No. Unit
Unit Cost
Cost
(installed)
gacres
$5,000.00
$4,600.00
2610.0 ft
$5.00
$13,050.00
430.0 ft
$5.00
$2,150.00
420.0 ft
$13.00
$5,460.00
$0.00
$0.00
height of dam at toeoft
ft cut at high sideoft
ft
9 9
height of fill at faceft cut at faceft
length of damft length of cutft
top Width width of out
(area above transition 90 sf (area below transitir 68 sf
(total width of dam) 6 ft (total width of cut) 41 ft
(height below transitio -3 ft (depth below transit 8 ft
(area below transition) -18 sf (area above transifi 100 sf
(total fill volume) 293.3 cy (total cut volume) 746.7 cy
length of spillway -ft (TOAL CY estimate 844 cy $13.00 $10,972.00
width of spillway ft (spillway stone tons 16.4 tons $50.00 $820.00
silt fence inlet protection (IP) $100.00 l
stone inlet protection (IP) $200.00 $400.00
outlet protection (OP) length ft vddth ft $0.00 )
channel (SCC, matted) length ft vddth ft ,.,,.00
check dam depth in channel Eft channel width oft $0.00 $0.00
construction entrance (CE) $2,500.00 $0.00
wash rack $2,000.00 $2,000.00
paved construction entrance $3,500.00 $3,500.00
rip -rap, placed depth ft length -ft
width (tons) 0 tons $60.00 $0.00
survey and layout (price per 0.1 mi.) acres traps and basins $960.00
mobilization $2,500.00
cost sum $46,412.00
contingency $4,64120
WP0202100042 Bamboo Grow_ESC_bond_SE07-19-2022_072622 Total $551,060
7/26/2022