Loading...
HomeMy WebLinkAboutWPO202100042 Bond Estimates 2022-07-19 (2)Project Name: VSMP Plan Bamboo Grove WP02021-00042 WPO file number: WP02021-00042 TMP(s): 05500-00-00-068CQ, 05500-00-00-068DO Date Estimate Completed: 07-19-2022, K.Rucker, ,hIL)A,072622 Stormwater Management Plan Bond Estimate Item Item Number s permanent diversion or ditch standard inardicic tram, top drop inlet or grate 4 maNrOle structure (per ft. rise) 5 pipe, mp, cmp(15 to W) 6 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 earthwork for detention pond included with 844 CY ESC plan bond trees in ES-1,2 EC-1 in ES-1,2 EC-1 in ES-1,2 ECA in ES 19 ECt in d Ift PW height of dam at toe 3 ft height of fill at face ft length of dam ft top vnMh =ft (area above transition) 80 at (total width of dam) 6 ft (height below transitior -2 ft (area below transition) -10 sf (total fill volume) 2852 cy kxgth of spillway width of spillway =ft ft cut at high side 11 ft cut at face 3 ft length of cut 120 ft width of cut 9 ft (area below transition; 45 at (total width of cut) 37 ft (depth below transitior 8 ft (area above transition 84 sf (total cut volume) 573.3 cy (TOAL CY estimate) 668 cy (spillway stone tons) 7.8 tons seedlings ( $0.80/seedling; installation $3.20/ea.) Applicant estimate of expense : VA.Dept. of Forestry (C11 plan sheet; Mitigation Plantings) trash rack/ arni vortex devices maintenance access mad Un@ price (= iw: SWM facility access largely constructed with SWM deterai( rip rap, placed depth fl length WkIth (tons) 32.1 survey and layout (price per 0.1 mi.) acres- bmps _ mobilization as -built drawings (per facility) compaction testing (per dam) No. Unit Unit Cost Cost (installed) ft $13.00 $2,470.00 as $500.00 $0.00 ea $3,500.00 $aoo ft $450.00 $1,620.00 ft $35.00 $0.00 ft $40.00 $2,900.00 ft $50.00 $aoo ft $75.00 $aoo 0.0 ton $35.00 $aoo $0.01 $6.68 $50.00 $390.00 $275.00 $0.00 $50m $0.00 $4.00 $1,120.00 $5,00 $0.00 $1,500.00 $1,600.00 $25.00 $4,000.00 $60.00 $1,923.75 $1,000.00 $2,500.00 1 are $2, 000.00 $2,000.00 J0 0.00 ea Wea $3,000.00 $3,000.00 $2,500,00 $0.00 7/26/2022 Project Name: VSMP Plan Bamboo Grove WP02021-00042 WPO file number: WP02021-00042 TMP(s): 05500-00-00-068CQ, 05500-00-00-068DO Date Estimate Completed: 07-19-2022, K.Rucker, &IL tn, o72e22 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number(installed) 38 39 cmtsum $24,430.43 40 contingency $2,443.04 41 WPO202100042 Bamboo Gmve_SWIM _bona_SE07-19-2022_072622 42 Total $26,880 7/26/2022