Loading...
HomeMy WebLinkAboutWPO202200008 Agreements 2022-07-28Project Name: VSMP Plan for Take 5 Pantops WPO file number: WP02022.00008 TM P(s): 07800-00-00-005BO Date Estimate Completed: 06-23-2022, K.Rucker Erosion & Sediment Control Plan Bond Estimate. Item teem Number l stablization(PS, TS) 2 sift fence (SF) 3 safety fence(SAF) 4 diversion (DID, FD, RWD) 5 temporary slope drain(TSD) pipe length If pipe diameter Din 6 sift fence inlet protection (IP) 7 stone inlet protection ((P) 8 outlet protection (OP) length ft width 0 It 9 channel (SCC, matted) length it Eft width 0 n 10 check dam depth in channel channel width 0 It 11 construction entrance(CE) 12 wash rack 13 paved construction entrance 14 rip -rep, placed depth 15 width 16 17 survey and layout (price per 0.1 mi.) acres 18 mobilization 19 20 21 WPO202200008 Take 5 Pantops_ESCP_ bond _SE06-23-2022 22 23 -ft (ergs) jjy (tons( 0 0 tons - traps and basins - Ng. Unit UnitSz99 (installed) acres $5.6.00 $,50.00 it$5$5.00 $1,6 50.00 it$5.00 $1,000.00 i-411111 t$13.00 $0.00 $0.00 $0.00 $100.00 $0.00 4 $200.00 $800.00 o $0.00 $0.00 o $0.00 o $0.00 $0.00 0 $2,500.00 $0.00 1 $2,600.00 $2,000.00 1 $3,500.00 $3,500.00 $355.00 $2,500.00 cost sum $15,355.00 contingency $1,535.50 Total $16,900 6/23/2022