Loading...
HomeMy WebLinkAboutSUB202100116 Review Comments Preliminary Plat 2022-07-28�q off nig 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 County of Albemarle Telephone: 434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG ��BGIN�Q' Preliminary Plat review Project title: Granger Property Preliminary Plat Project file number: SUB202100116 Plan preparer: Scott Collins, PE, Collins Engineering [ scott(a),collins-engineering.com ] 200 Garret Street, Suite K, Charlottesville, VA 22902 Owner or rep.: Stribling Holdings, LLC P.O. Box 1467, Charlottesville, VA 22902 Applicant: Alan Taylor [ al�riverbenddev.com ] Riverbend Development 455 Second Street SE, Suite 201 / Charlottesville, VA 22902 Plan received date: 30 Jun 2021 (Rev. 1) 18 Feb 2022 (Rev. 2) 28 Jun 2022 Date of comments: 5 Aug 2021 (Rev. 1) 25 Mar 2022 (Rev. 2) 28 Jul 2022 Plan Coordinator: Kevin McCollum Reviewer: John Anderson, PE, CFM Engineering has reviewed the preliminary plat and offers these review comments. 1. General a. Provide drainage system profile, Engineering accepts that complete details will be shown with ROAD plan, but needs preliminary storm system (drainage) profile information before design proceeds too far. (Rev. 1) Not addressed /withdrawn. Will be reviewed with Road Plan. b. Please submit WPO plan for Granger property subdivision. WPO plan approval and FDP approval are required prior to Final Plat approval. (Rev. 1, D Persists. c. Please submit a ROAD plan application for Granger property. ROAD Plan must be approved, and roads either built or bonded prior to Final Plat approval. (Rev. 1, a) Persists. d. Bridges and Emergency access that serve the proposed road network, or that serve as second point of (emergency) access must also be built or bonded prior to Final Plat approval. (Rev. 1, D Persists. e. SWM detention (stormwater quantity) design is shown (conceptual, UG detention). Please provide narrative and schematic conceptual stormwater quality (SWM) design for Granger property subdivision. (Rev. 1) Not addressed /withdrawn. Will be reviewed with WPO Plan. f. 14-304 appears to require that since the proposed subdivision will require disturbing steep slopes, `the subdivider shall submit ... a written request or application under the applicable sections of the zoning ordinance.' Engineering reminds that subdivider /developer has an apparent obligation to submit written request to disturb both managed and preserved steep slopes. Engineering defers to Planning Division. (Rev. 1) Persists. Engineering defers to Planning. (Rev. 2) May persist. Engineering defers to Planning Division. g. Note: It is difficult given extent of interrelated comments to specifically separate and identify which might be required for preliminary plat approval, which may be deferred until final plat submittal, but Engineering understands that Planning Division may require preliminary plat resubmittal (i.e., intends to issue an action letter as opposed to an SRC comment letter). To the extent Planning guides Applicant resubmittal of a preliminary (subdivision) plat for the Granger property, please address as many Engineering review comments with preliminary Engineering Review Comments Page 2 of 9 plat resubmittal as is practically possible. (Rev. 1, D Not addressed. Majority of initial preliminary Engineering review comments not addressed. Later plan reviews will consider comments not addressed, or that persist. Engineering recommends preliminary plat disapproval given extent of unaddressed comments, especially lots located in stream buffer. On a related note: No trees on preserved slopes may be removed with proposed development. A number of lots include wooded preserved slopes. WPO plan will identify ordinance limits on development relative to wooded preserved steep slopes, and will recommend Note for final subdivision plat to notify prospective property owners that limited use exists on lots proposed to include preserved steep slopes, and especially lots with wooded preserved steep slopes. h. Given extent of comments, additional preliminary plat comments are possible with preliminary plat resubmittal. (Rev. 1, D Persists. 2. Sheet 2 a. `Limits of WPO buffer and 100 year floodplain' (single label) identifies separate line types. Please revise label to read 100 year floodplain and provide separate label for WPO buffer, and provide leader lines to WPO buffer and 100 year floodplain, independently, consistent with GIS, to avoid confusion. Different limits apply to development within WPO buffer and floodplain. (Rev. 1,, Not addressed. b. Submit a floodplain development permit (FDP) application for development within the floodplain. (Rev. 1,, Not addressed. c. At existing Southern railroad underpass, there appears to be heavy line -type that may indicate proposed grading. Please confirm whether grading or structural work to underpass within Southern Railroad RW is proposed with preliminary plat, and if so, please famish evidence of agreement and approval to grade or construct improvements within Southern RR RW. Engineering will consider proposed grade shown on WPO plan at this location with care. (Rev. 1) Not addressed. (Rev. 2) Withdrawn. No indication of grading within railroad RW with current preliminary plat. d. Sheet 2 shows an 8' x 8' concrete arched culvert beneath Southern Railroad. Sheet 11 does not show this portion of the development. Please resubmit with all portions of developed property displayed in adequate detail. Note: 8' x 8' culvert is shown on Sheet 4 but should display on smaller -scale Grading and Layout sheets, if only as an inset detail. (Rev. 1, D Not addressed. e. Please add label to existing 2 Story building (to be removed) since layout sheet shows building is removed with cul-de-sac development /building lots on Serra Drive. (Rev. 1, Not addressed. f Show /label extents of VEPCO facility, TMP 76B-1-7, specifically, please show existing: (Rev. 1) Not addressed. Withdrawn. i. Entrance to VDPCO facility ii. Facility fencing Ref satellite imagery, below, 6/2/20 [ source: Pictometry - CONNECTExolorerT - Engineering Review Comments Page 3 of 9 3. Sheet 3 a. Show and label OHP to Wingfield residence, TNT 76-3-34 (Sunset Ave. Ext.). Ref. satellite 4. Sheet 4 a. Existing 14'-20' paved asphalt road must be capable of supporting 85,000 lb. emergency fire - rescue apparatus. Provide narrative, evaluation, and propose improvements to ensure ex. paved asphalt road meets fire -rescue width, geometry, and weight -bearing requirements. (Rev. 1) Not addressed. (Rev. 2) May persist. Please advise of location of this information, if overlooked. b. Multiple lots are proposed within existing (presumed high voltage) 120' VEPCO easement: i. Label VEPCO easement. (Rev. 1) Addressed. ii. Engineering defers to Planning Division and VEPCO, but recommends: (Rev. 1, Status of design response unknown. Engineering reiterates recommendations and defers to Planning Division. 1. Applicant coordinate design with VEPCO. 2. Furnish written correspondence between Applicant and VEPCO, that VEPCO approves preliminary plat for Granger Property, to include specific acceptance of a. Portions of Lots (22, 23, 24, 30, 31, 32, 33, 48, 49, 50, 51) within VEPCO easement. b. Grading flatter slopes to a steeper proposed final grade, which may affect VEPCO ability to access or utilize their existing easement. c. Explicit acceptance on Applicant's part that VEPCO easement access likely entitles VEPCO to occupy full easement width, with equipment and /or materials needed to maintain high -voltage lines, with little or no obligation to repair what will become lawn areas. d. Explicit acceptance on Applicant's part of future risk to owners of SF residences on Lots 2, 23, 31, preliminary plat proposes building sites immediately adjacent to VEPCO easement. In case of Lot 22, Engineering Review Comments Page 4 of 9 building site effectively touches VEPCO easement. Ref. typical Lot detail. OTn LOT 22 \ i -�..f LOT z c. Sunset Avenue Extended i. Please label existing roadway width. (Rev. 1, D Not addressed. ii. Ensure existing roadway width at subdivision entrance can accommodate left -turning inbound single -unit (SU) truck design vehicle, as defined by AASHTO, without SU vehicle crossing CL (whether CL is marked, or not) of primary subdivision access (Crespi Bluff Drive), and without crossing CL of Sunset Avenue Ext. except at point of intersection. Note: Graphic of 20-ft wheelbase SU truck design vehicle' is less than wheelbase length of typical moving vehicles that will utilize primary subdivision access, not just with initial owner move -in activities, but perpetually. (Rev. 1) Not addressed. (Rev. 2) Not addressed, unless overlooked. iii. Provide Auto -turn figure at intersection of Crespi Bluff Drive and Sunset Ave. Ext. (Rev. 1) Not addressed. (Rev. 2) Not addressed, unless overlooked. ' Appendix B(1) subdivision street design guide, p. 8. [image, below] https://www.virginiadot.org/business/resources/LocDes/RDM/AooendB Lodf FIGURE B(1)-1 MINIMUM TURNING PATH FOR SINGLE UNIT TRUCK SU-30 Rev 10/20 Engineering Review Comments Page 5 of 9 d. Provide deed book -page ref. for Stribling Avenue. (Rev. 1, 2) Not addressed. 5. Sheets 4-6, Future connector road, multiple issues: (Rev. 1, 2) Items persist. a. Corridor violates ordinance and VDOT standards or requirements, and cannot be constructed in this location, given: i. Preserved slopes ii. Stream buffer iii. Sideslope (required deep cut/fill across slopes, or within stream buffer) b. Illogical or problematic geometry. Proposed future connector road: (Rev. 1, 2) Not addressed. Engineering defers to Planning. i. At south end forms an acute angle intersection with Sunset Avenue Extended. Revise to provide right-angle or near right-angle intersection with Sunset Ave. Ext. ii. At north end terminates abruptly at development boundary within or immediately adjacent to these overlay or zoning features: 100 year floodplain, stream buffer, preserved steep slopes, it is exceedingly unlikely that a future connector road will ever need to be, or will actually be, built along this corridor. iii. Engineering defers to Planning Div. on purpose or requirements that may stipulate a future (road) connector corridor in this location but lists obstacles to construction of a future road in this location, given stream, slope and floodplain impacts. 6. Sheet 7 a. Show full extent of proposed emergency access, from proposed bridge replacement for emergency access to the site, to Stribling Ave. Note: Layout and Grading sheets should show full extent of development. Albemarle can make no assumptions concerning areas not shown. (Rev. 1, 2) Not addressed. b. Show and label footprint of proposed UG detention (SWM facility) on Lot 55. (Rev. 1, 2) Not addressed. c. Show and label proposed SWM facility easement on Lot 55. Ref. sheet 11 for schematic. (Rev. 1, 2) Not addressed. 7. Sheets 8. 10 a. Culvert alignment beneath Sera Drive is problematic, and cannot be approved by Albemarle, it may be disallowed by VDOT, as well. Alignment shows Moore's Creek streamline striking at or behind upstream headwall. Moore's Creek must enter drainage structure at this or revised structure location with very slight (preferably no) angle to avoid long-term erosion, embankment failure, and maintenance concerns. (Rev. 1, 2) Not addressed. 8. Sheet 8 a. Delete reference to proposed 100' WPO buffer, buffer exists as an overlay, is not proposed with development. (Rev. 1, 2) Not addressed. b. Label proposed secondary subdivision emergency access. (Rev. 1, 2) Not addressed. c. Proposed emergency access intersects Stribling Avenue at an acute angle that appears to require fire rescue apparatus to pass beneath railway, via tunnel. Provide Auto -turn and coordinate with ACF&R to ensure responding apparatus (likely City of Charlottesville Fontaine Fire Station 10) can use secondary access, either via tunnel or can navigate acute angle at intersection of subdivision secondary emergency access and Stribling Avenue. (Rev. 1, 2) Not addressed. d. Provide sealed design for bridge capable of supporting 85,000 lb. fire apparatus at Morey Creek (see emergency access roadway design weight -bearing capacity label, sheet 7). (Rev. 1) Not addressed. Will be evaluated with Road Plan. (Rev. 2) Persists. e. 4-line underground SWM detention system shows easement encroaches within proposed 61' RW, future connector road. Remove SWM facility (and easement) from future connector road RW. (Rev. 1, 2) Not addressed. f. Please reference easement width image, ACDSM, p. 15, and revise proposed 4-line SWM facility easement width, per proposed SWM facility design. Proposed easement width will likely not accommodate SWM facility. From ACDSM, p. 15 (Rev. 1, 2) May persist. Will be evaluated with WPO plan. Engineering Review Comments Page 6 of 9 EASEMENT WIDTH . DI METER. ?' . 2 (H-S9. 10' 1-'0' VLV. � g. Revise sanitary sewer alignment, if possible, from shared lot line, Lots 30-31, to shared lot line, Lots 31-32, to minimize impact to preserved steep slopes. Recommend examine storm and sanitary sewer lines within same (or wider) easement, with requisite vertical /horizontal separation. (Rev. 1, D Not addressed. h. Show and label SWM facility access to proposed 4-line UG detention system (see pg. 12, ACDSM for specific requirements). (Rev. 1, D Not addressed. i. Retaining walls (and nearly all portions of development) will be visible from I-64 Entrance Corridor. Engineering defers to Planning-ARB, but recommends: (Rev. 1) Engineering defers to Planning /comment withdrawn. i. Early coordination of retaining wall design (ht., material, color) with ARB. ii. Submit sealed retaining wall design to Planning Division, ARB, for review of retaining wall material, color, etc. j. While development has no apparent obligation to construct barriers between lots and adjacent railroad or interstate to screen lots or attenuate train or interstate ambient noise, Engineering recommends developer consider sound attenuation and visual screening shield development from objectionable levels of ambient rail or interstate sound, likely to increase with time. (Rev. 1) Withdrawn. 9. Sheet 9 a. Ensure primary access to subdivision (Crespi Bluff Drive) conveys the 25-year storm event, without overtopping roadway surface. (Rev. 1,1) May persist. Culvert design /calculations will be reviewed with the Road Plan. b. Label existing VDOT culvert beneath I-64, label culvert type, and dimensions. (Rev. 1, Not addressed. Will be evaluated with Road Plan. c. Provide drainage structure design for primary access, Crespi Bluff Drive, consistent with normal design practice, including downstream receiving drainage structure capacity equal or greater than upstream drainage structures (i.e., culvert beneath I-64). I-64 is, in effect, a dam, and it would be unusual to propose primary subdivision access drainage structure smaller than the structure beneath I-64. (Rev. 1, D Not addressed. Will be evaluated with Road Plan. d. Perform hydraulic modeling for the existing drainage structure beneath 1-64 during the 25- year event to ensure primary access to subdivision has capacity to contend with volume, velocity, tailwater elevation, etc. discharging from existing structure beneath I-64. Existing condition (sheet 3) indicates no other drainage structures between 1-64 and this stream's Engineering Review Comments Page 7 of 9 confluence with Moore's Creek. Only a thorough drainage analysis (especially a design that may propose a primary access culvert smaller than the upstream culvert beneath I-64) is likely to be approved by Albemarle, or VDOT. Provide drainage structure hydraulic calculations, and watershed routings. (Rev. 1,, Not addressed. Will be evaluated with Road Plan. e. Coordinate stream loss requirements with primary subdivision access, Crespi Bluff Drive, with USACE (Vinny Pero), provide written evidence of coordination with USAGE. (Rev. 1, D Not addressed. f. Label managed steep slopes, since grading is proposed across managed steep slopes. (Rev. 1, D Not addressed. g. Label preserved steep slopes, to aid review, to ensure no grading or other impermissible activity occurs on preserved steep slopes. (Rev. 1,, Not addressed. 10. Sheet 10 a. Ref. Attached Drainage Plan checklist for plan reviewers, pg. 1, Drainage, last item, and provide yard inlet capture /conveyance systems for drainage across 3 or more lots: Lots 28, 29, 30. Lots 37, 36, 35. Lots 41, 40, 39, 38. Lots � 5, 4, 3, 2, 1. Lots 42,,4T44,45. (Rev. 1) Partially addressed. Please address comment for remaining lots with WPO plan. (Rev. 2) Persists. 11. Sheets 9. 10 a. Show discharge from proposed UG detention system shown at right margin of these sheets. (Rev. 1, 2) Not addressed. 12. Sheets 10, 11 a. Match -line is discontinuous in moving from sheet 10 to I I, for example: future connector road displayed on sheet 10 does not display on sheet 11 (comment applies to sheets 6 and 7, as well). Revise all sheets referenced to display complete layout and grading details. (Rev. 1, D Partially addressed. As follow-up: Please display entire extent of future connector road /emergency access via inset to existing grading /utility plan sheet, or via separate plan sheet. It must be shown in its entirety, to be approved. 13. Sheets 9, 10, 11 a. Label: (Rev. 1, D Not addressed. i. Moore's Creek ii. WPO stream buffer (Rev. 2) Partially addressed. Buffer labeled on sheet 9, only. iii. 100 year floodplain iv. Limits of the sunny day dam break inundation zone b. Show driveways serving each lot, show with VDOT standard private entrance (true scale) geometry to aid review check of potential conflicts. ROAD Plan will show this detail, but preliminary plat proposes a level of density that supports request for this level of detail with the preliminary plat. (Rev. 1, D Not addressed. Comment may repeat with Road plan review. c. Provide frequent existing terrain contour labels such that proposed contours, wall, and proposed grade may be more easily evaluated against existing grade. (Rev. 1,1) Not addressed. Comment may repeat with WPO plan review if frequent existing terrain contour labels are not provided. 14. Sheet II a. Provide landscape plan for stepped retaining wall system/s (screening shrubs planted on 10' centers). (Rev. 1, D Persists. Comment will be evaluated with WPO plan. b. Provide landscape plan that specifies groundcover /permanent stabilization hardier than grass for any slopes steeper than 3, 1. (Rev. 1,, Persists. Comment will be evaluated with WPO plan. c. Provide retaining wall maintenance easements for any walls that cross individual lot /parcel boundaries, with final subdivision plat. (Rev. 1, D Persists. d. Provide evidence of recorded retaining wall maintenance agreement/s. (Rev. 1, D Persists. e. Provide drainage calculations and ditch linings consistent with calculations to prevent erosion over slopes created by existing and proposed slopes, for example, east -west ditch due south of Engineering Review Comments Page 8 of 9 Lot 73 southeast parcel boundary. (Rev. 1, D Persists. Calculations will be reviewed with WPO plan. f. Remove lots from stream buffer (applies to multiple sheets). Ref. 17-601.C.: Management of stream buffer /Incorporation into development design: `Each stream buffer shall be incorporated into the design of the development by keeping stream buffers in open or natural spaces, and out of residential lots or areas of active use, to the fullest extent possible.' [Note: review comment cleared by county engineer.] (Rev. 1, P Not addressed. Engineering recommends preliminary plat disapproval unless /until lots are removed from stream buffer. g. Note: SWM facility proposed for Lots 55 and 56 poses long-term maintenance obligation on HOA, not the individual owners of Lots 55 and 56. SWM facility deed of dedication will be conditioned accordingly. (Rev. 1,, Persists. h. Ensure design conforms with design standards for steep slopes at 18-30.7.5.A.B./C., for example: at Serra Drive Moore's Creek crossing where there is apparent need for reverse slope benching with surface water diversion. (Rev. 1,, Not addressed. i. Retaining wall on Lot 67 appears to lie within 5' of Southern RR property. It is unclear whether proposed (grading or proposed) retaining walls may be constructed this close (5'-10') to railway property. Recommend distribute development plan to Southern Railroad, and coordinate design with Southern Railroad. Provide follow-up to Albemarle, CDD. Railroad approval of preliminary plat development design is presumed required prior to final plat approval. (Rev. 1, D Persists. j. Provide retaining wall maintenance access from Serra Drive to multiple stepped retaining walls that back lots 67-73. (Rev. 1, D Persists /Not addressed. k. Proposed build sites, Lots 67 and 68, are impractical. In each case, there is 2'-3' offset to sunny day dam break inundation line, side setback lines, or front setback lines. Lot 68 shows proposed grade line touching proposed build site. Each structure (SF residence), as well as residences shown on Lots 69-73 are proposed to be built on fill that approaches 20', in places. Revise preliminary plat to include specific and general geotechnical testing and reporting requirements for SF residences proposed on substantial fill, include: clean /suitable earth fill specifications, testing (Min. compaction, etc.), reporting, qualified professional geotechnical monitoring and testing during placement of fill, specifically for these lots. (Rev. 1, D Persists /Not addressed. I. Proposed build sites, Lots 67-68, are inconsistent with graphic representation of these sites on sheet 4. Revise Sheet 4, consistent with proposed Grading, sheet 11. (Rev. 1) Addressed. in. Provide sealed geotechnical retaining wall design for review /evaluation with WPO or ROAD plan. Sealed Retaining Wall plans for wall ht. > 4-ft are required by Building Inspections and Engineering. Sealed Retaining Wall plans are required prior to WPO or ROAD plan approval. Ref. pg. 22, ACDSM. (Rev. 1, D Persists. To date, Engineering has not received retaining wall plans for this project. n. With WPO and FDP, ensure replacement bridge over Morey Creek conforms with requirements at Ch. 18-30.3, especially concerning fill or impact to horizontal limits of floodplain, or base flood elevation (BFE). (Rev. 1,, Persists. To date, Engineering has not received (internal notification of) WPO or EDP Applications for this project. Please feel free to call if any questions: 434.296-5832 -x3069 Thank you J. Anderson Engineering Review Comments Page 9 of 9 SUB2021-00116 Granger Property_prelim plat 072822_rev2.doc