HomeMy WebLinkAboutWPO202200030 Bond Estimates 2022-07-29Project Name: Erosion Control and Stormwater Management Plan - S.L. Williamson Asphalt Plant @ Red Hill Quarry WPO file number: WP02022-00030 TM P(s): 08800-00-00-01800 Date Estimate Completed: 07-29-2022 Stormwater Management Bond Estimate ( Mitigation Plan) Item Item No. Unit Unit Cost Cost Number(installed) permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame lop (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 aggregate base or drainage stone 0.0 in d 0.0 ft L 0.0 ft W 0.0 ton $35.00 $0.00 earthwork for trap/basin height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width Of Cut 0 ft (area above transitic 0 sf (area below transiti( 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transit 0 ft (depth below transit 0 ft (area below transitio 0 sf (area above transiti 0 sf (total fill volume) 0.0 Cy (total fill volume) 0.0 cy length of spillway � 0 ft (TOAL CY estimate 0 cy $13.00 $0.00 width of spillway 0 ft (spillway stone tons 0 tons $50.00 $0.00 structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn E 0 $200.00 $0 barrel diameter 0 in (barrel unit price) $0.00 $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 REF. PLAN SHEET 15, stream buffer mitigation plan ; Plant Schedule planting areas A, B, C trees ( 122 canopy trees, installed as seedlings ) 122 ea $0.01 $1.22 shrubs (All 733 plants : container grown seedlings) - 244 underslory trees, installed as seedlings 244 ea $0.01 $2.44 seedlings [ unit price revised : $5 increased to $10; Alternative unit price : trees @$275 lea. - shrubs @ $50/ea. ] 733 ea $10.00 $7,330.00 underdrain (LF) 0 ft $5.00 $0.00 biofller soil mix (CY) 0 cy $45.00 $0.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access road (LF) 0 ft $50.00 $0.00 rip -rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 0 basins 0 $0.00 7/2912022 Stormwater Management Bond Estimate ( Mitigation Plan) Item Item Number mobilization - revised from $2,500 to $1,000 since SWM facility construction differs from Landscape mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) WP0202200030 S.L. Williamson Asphalt at Red Hill Ouany_Midgafion_bond_072922.xlsx No. Unit Unit Cost Cost (installed) $1,000.00 0 ea $2,000.00 $0.00 0 ea $2,000.00 $0.00 0 ea $3,000.00 $0.00 $0.00 cost sum $8,333.66 contingency $833.37 Total $9,170 7/2912022