HomeMy WebLinkAboutWPO202200030 Bond Estimates 2022-07-29 (2)Project Name: Erosion Control and Stormwater Management Plan - S.L. Williamson Asphalt Plant @ Red Hill Quarry WPO file number: WP02022-00030 TMP(s): 08800-00-00-01800 Date Estimate Completed: 07-29-2022 Erosion & Sediment Control Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 2 3 4 5 6 7 0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 slablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DID, FD, RWD) temporary slope drain (TSD) pipe length fl pipe diameter i.. earthwork for trap/basin Note: basin pre-existing, to a degree height of dam at toe ft cut at high sideoft ft height of fill at faceoft ft cut at faceft length of damft length of cutft top width width of cut (area above transition 0 sf (area below transitie 0 sf (total width of dam) 0 fl (total width of cut) 28 ft (height below transitio 0 fl (depth below transit 6 ft (area below transition) 0 sf (area above transifi 48 sf (total fill volume) 0.0 cy (total cut volume) 195.6 cy length of spillway -ft (TOAL CY estimate 196 cy width of spillway ft (spillway stone tons 11.2 tons silt fence inlet protection (IP stone inlet protection (IP) outlet protection (OP) i-:.go 1 ft channel (SCC, matted) length ft Eft check dam depth in channel construction entrance (CE) wash rack paved construction entrance ; Ex. entrance is paved rip -rap, placed depth -ft width survey and layout (price per 0.1 mi.) acres - mobilization WPO202200030 S.L. Williamson Asphalt at Red Hill Quany_ESC_bond_072922 width ft width ft oft channel width length -ft (tons) 0 tons traps and basins 2-Jacres $5,000.00 730.0 ft $5.00 $5.00 905.0 ft $13.00 $0.00 $12,000.00 $3,650.00 $0.00 $11,765.00 $0.00 $13.00 $2,548.00 $50.00 $560.00 $100.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,500.00 $0.00 $2,000.00 $2,000.00 $3,500.00 $0.00 $60.00 $0.00 $750.00 $2,500.00 cost sum $35,773.00 contingency $3,577.30 Total $39,360 7/29/2022