Loading...
HomeMy WebLinkAboutWPO201600008 Correspondence WPO VSMP 2022-07-18SHIMP ENGINEERING, P.C. Design Focused Engineering July 18'h, 2022 Mr. David James County of Albemarle 401 McIntire Rd Charlottesville, VA 22902 RE: Glenmore K20I — Phase 1 As -Built Comment Response SUB-201600061, WPO-201600059, WPO-201600008 Dear Mr. James, Please find attached the submission package for the Glenmore K2CII Phase 1 Bond Reduction Request. The work under WPO-201600008 for Phase 1 has been satisfactorily completed to warrant a full bond release. The current bond amount for WPO-201600008 for Phase 1 is $126,922.00, which is a reduction of 44% from the original total of $227,280.00. Please note that the work under WPO- 201600059 has been satisfactorily completed and the bond has been fully released. Also note that, the ACSA bond for Phase 1 is currently at $35,600.00, which is an 80% reduction form the original $178,000.00. The ACSA has indicated that the 20% bond will be retained until completion of the top coat of pavement. The current bond amount for SUB-201600061 for Phase 1 is $215,970.00, which is a reduction of 75% from the original total of $877,100.00. A request for the full release of the subdivision bond will be provided upon completion of the top coat of pavement. Included in this submittal are the following: • Bond Inspection Request and Fee Payment Receipt • Comment Response Letter to comments dated January 1 Ith, 2018 • As -Built VSMP Plan original Total Current Reductions Current Total Requested Reduction Requested Total Subdivision $ 877,100.00 75% $ 215,970.00 75% $ 219,275.00 VSMP $ 227,280.00 44% $ 126,92 T 100% $ ACSA $ 178,000.00 80% $ 35,600.00 80% $ 35,600.00 Total 1 $1,282,380.00 1 1 $ 378,492.00 $ 254,875.00 Table 1: Bond Worksheet - Glenmore Phase 1 Regards, Michael Chandler Shimp Engineering, P.C. 912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com