July 18'h, 2022
Mr. David James
County of Albemarle
401 McIntire Rd
Charlottesville, VA 22902
RE: Glenmore K20I — Phase 1
As -Built Comment Response
SUB-201600061, WPO-201600059, WPO-201600008
Dear Mr. James,
Please find attached the submission package for the Glenmore K2CII Phase 1 Bond Reduction
Request. The work under WPO-201600008 for Phase 1 has been satisfactorily completed to warrant a full
bond release. The current bond amount for WPO-201600008 for Phase 1 is $126,922.00, which is a
reduction of 44% from the original total of $227,280.00. Please note that the work under WPO-
201600059 has been satisfactorily completed and the bond has been fully released. Also note that, the
ACSA bond for Phase 1 is currently at $35,600.00, which is an 80% reduction form the original
$178,000.00. The ACSA has indicated that the 20% bond will be retained until completion of the top coat
of pavement. The current bond amount for SUB-201600061 for Phase 1 is $215,970.00, which is a
reduction of 75% from the original total of $877,100.00. A request for the full release of the subdivision
bond will be provided upon completion of the top coat of pavement.
Included in this submittal are the following:
• Bond Inspection Request and Fee Payment Receipt
• Comment Response Letter to comments dated January 1 Ith, 2018
• As -Built VSMP Plan
original
Total
Current
Reductions
Current
Total
Requested
Reduction
Requested
Total
Subdivision
$ 877,100.00
75%
$ 215,970.00
75%
$ 219,275.00
VSMP
$ 227,280.00
44%
$ 126,92 T
100%
$
ACSA
$ 178,000.00
80%
$ 35,600.00
80%
$ 35,600.00
Total 1 $1,282,380.00 1 1 $ 378,492.00 $ 254,875.00
Table 1: Bond Worksheet - Glenmore Phase 1
Regards,
Michael Chandler
Shimp Engineering, P.C.
912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com