HomeMy WebLinkAboutWPO201600008 Correspondence WPO VSMP 2022-07-19SHIMP ENGINEERING, P.C.
Design Focused Engineering
July 18a', 2022
Mr. David James
County of Albemarle
401 McIntire Rd
Charlottesville, VA 22902
RE: Glenmore K20I — Phase 1
As -Built Comment Response
SUB-201600061, WPO-201600059, WPO-201600008
Current Bond Amounts:
SUB-201600061 = $215,970.00 (75% Reduced)
WPO-201600059 = $0.00 (100% Reduced)
WPO-201600008=$126,922.00 (44%Reduced)
ACSA = $35,600.00 (80% Reduced)
1.) Provide as -built drawing information on
a. Sheet C2/C4
Show OP at F 1 — not yet installed / pond not completed
Outlet protection now installed at F1 and included on as -built plans.
2.) Provide signed certification of completion form by owner/developer.
The signed Certification of Completion to be provided upon completion of all work.
3.) Provide surface pavement inspection reports (when the roads are complete)
The surface pavement has not been installed yet.
4.) Install all street trees
Street trees have been installed.
5.) Video inspection of pipe run E8 to E7 shows pipe deflection, and will need to be corrected &
videoed again. Provide PE certification that pipe has been fixed.
Video inspections have been reviewed by the manufacturer, ADS. Their engineer has
provided a certification letter that all discrepancies are within their tolerance and no repairs
are required. Please find attached the PE Certification from Advanced Drainage Systems.
6.) Parge all brickwork in inlets and manholes
Parging of brickwork has been completed.
912 E. High St. Charlottesville, VA 22902 1434.227.5140 1 shimp-engineering.com
7.) Parge lifting holes on inlet tops.
Parging of lifting holes on inlets has been completed.
8.) Provide deed book and page numbers for the new ditch easement on the as -built drawings.
Deed book and page number provided on plans.
Ditch SCC Al Easement DB 946 PG 44E.
9.) Complete final surface pavement.
The surface pavement has not been installed.
Regards,
Michael Chandler
Shimp Engineering, P.C.
uuiimiuiuiuiuui
yyyy��uu�o�,,
Steve Rhyne
Fortiline
Re: Glenmore K2c
Mr. Rhyne:
THE MOST ADVANCED NAME IN DRAINAGE SYSTEMS
January 3, 2020
Advanced Drainage Systems has reviewed the installation video for the above referenced project. Based on the supplied
information, we found the pipe was installed satisfactorily. The joint gaps were within tolerance and the gaskets should
be seated in the bell preventing infiltration. Additionally, the deflections viewed in the video were not excessive to
require any remediation to our pipe.
If you have any questions, feel free to contact me.
Thank you for using Advanced Drainage Systems.
Sincerely,
James M. Clark, P.E.
Sales Engineer
ADVANCED DRAINAGE SYSTEMS, INC., 4640 TRUEMAN BLVD., HILLIARD, OH 43026 PHONE: 800/733-7473
E-mail: info@ads-pipe.com Web site: w . ads-pipe.com