HomeMy WebLinkAboutZMA202100016 Proffers 2022-08-01111 MI 111
AMENDED PROFFER STATEMENT
UNIVERSITY OF VIRGINIA FOUNDATION
NORTH FORK REZONING AMENDMENT
Date: August 1, 2022
ZMA-2021-00016 North Fork UVA Discovery Park
Tax Map Parcels — see list of parcel numbers, existing zoning designation, and proposed zoning
designation below
Parcel
Owner
Existing Zoning
Designation
Proposed Zoning
Designation
Acres
03200000001800
UniveisityoMiginia Foudation
PD-IP
NMD
11.220
032000000018AO
UnhiersityoMiginiaFoudation
PD4P
NMD
9.501
032000000006R0 Portion
Uniwrsity of VhginiaFoudation
PD4P
NMD
151.580
032000000006R0 Residue
Unhersibj ofVi iniaFoudation
PD-P
PD-P*
315.943
032000000022B1
Unhersity ofVi inia Foudation
Hr*
PD-P
4.979
032000000022B2
UniwrsiV ofVi inia Foudation
R7
PD-P
1.897
032000000019DO
UnhersiV ofVi iniaFoudation
PD-P
PD-P*
4.002
0320000000191-11
Unhersitv ofVi inia Foudation
PD-P
PD-P*
0.326
032000000019F1
UniveisityoMiginia Foudation
PD-P
PD-P*
2.532
032000000019GO
UniveisityoMiginia Foudation
PD-P
PD-P*
4.770
032000000019EO
Unhersity of Vhginia Foundation
PD-P
PD-P*
7.100
032000000019CO
Unharsity oWliginia Foundation
PD-P
PD-P*
4.863
032000000019FO
University oWliginia Foudation
PD-P
PD-IP*
6.024
032000000006A2
UniNeisity of Vhginia Foudation
PD-P
PD-IP*
7.110
032000000019J1
University of VhginiaFoudation
PD-P
PD-IP*
4.669
032000000019H0
Unrve ofVi iniaFoudation
PD-P
PD-P*
2.601
032000000019J0
UM�ersi ofVi iniaFoudation
PD-IP
PD-P*
4.333
Total Acres:
643.450
Total NMD Acres:
172. 001
*The Application Plan and Proffers are being amended for terse parcels that are remaining PD-IP.
"The existing HI Property associated with ZMA 1987-007 Is being amended to be rezoned to PD4P and rennDee existing
proffers.
All of the parcels listed above are part of ZMA 2021-016, and subject to these proffers (the
"Property").
Some of the parcels comprising the Property were originally rezoned as part of the original
rezoning of the University of Virginia Research Park to Planned Development -Industrial Park as
ZMA 95-04, which was amended by ZMA 1998-27. The zoning was further amended with
ZMA 2005-0003, which added additional parcels. Parcel 32-22B 1 was zoned Heavy Industrial
("HF") by ZMA 1989-07.
ZMA 95-04, ZMA 1998-27, ZMA 2005-003, and ZMA 1989-07, together with all applicable
application plans and proffer statements associated therewith, are collectively referred to herein
as the "Prior Zoning Actions."
This rezoning amendment application proposes to rezone some of the parcels subject to the prior
Zoning Actions from Planned Development -Industrial Park ("PD-IP') to Neighborhood Model
District ("NMD"), to rezone one parcel from R-1 Residential ("R-1") to PD-IP, to rezone one
parcel from III to PD-IP, and to amend previously approved application plans and proffers
associated with the Prior Zoning Actions, each as listed in more detail on the table on page one
herein (this "Rezoning Amendment"). This amended proffer statement (this "Amended Proffer
Statement") modifies and supersedes all prior proffer statements associated with the Prior Zoning
Actions.
The development of the Property authorized by this Rezoning Amendment is referred to as the
"Project." The University of Virginia Foundation is the owner of the Property (the "Owner")
and the Applicant of this Amendment (the "Applicant"). For purposes of this Amended Proffer
Statement, the terms Applicant and Owner are interchangeable.
The Applicant hereby voluntarily proffers that if the Albemarle County Board of Supervisors
acts to rezone the property subject to ZMA 2021-016 as requested, the Applicant shall develop
the Property in general accord with the following proffers pursuant to Sections 15.2-2303 and
15.2-2303.4 of the Code of Virginia, 1950, as amended, and pursuant to Section 33.7 of the
Albemarle County Zoning Ordinance. The Applicant specifically deems the following proffers
reasonable and appropriate, as conclusively evidenced by the signatures below. If the Rezoning
Amendment is denied, these proffers shall immediately be null and void and of no further force
and effect.
1. Application Plan and Code of Development. The Property is depicted on the plans
entitled "North Fork ZMA Rezoning Application Plan" dated December 13, 2021, revised
August 1, 2022, prepared by Timmons Group and LPDA (the "Application Plan"). Exhibit 0 to
the Application Plan is a Code of Development that shall regulate the development of the areas
within the Project that are proposed to be zoned NMD (the "Code of Development). The
property will be developed in general accord with the essential elements of the Application Plan,
and in the areas zoned NMD, the Code of Development.
2. Maximum Non -Residential Area. The total maximum square footage of non-residential
uses developed within the Project shall not exceed three million, seven hundred thousand
(3,700,000) square feet gross floor area (the "Non -Residential Limit"). The Non -Residential
limit shall expressly exclude the following permitted uses:
a. Recycling centers
b. Structures included as amenities within Green Space or amenity areas (as shown on
the Application Plan or as regulated by the Code of Development) or any other
common area, such as picnic shelters, trail head kiosks, and restrooms.
c. Fire and emergency response stations(s)
d. Temporary construction uses
e. Storage buildings that are accessory to a permitted primary use (as distinguished
from uses defined in Section 3.1 of the Zoning Ordinance as
"Storage/Warehousing/Distribution/Transportation")
2
f. Utility infrastructure
g. Public Uses
h. Other uses that the Zoning Administrator determines to be similar in nature to those
listed herein.
3. Transportation Improvements. To accommodate the additional traffic estimated to be
generated by the Project, the Applicant will design and construct the following road
improvements, each as generally shown on Exhibit K Proffered Road Improvements:
A. US Route 29 at Lewis & Clark Drive Intersection.
i). Second Eastbound Left Turn Lane. Prior to the approval of a final site plan or final
subdivision plat within the Project that, based on a projected traffic count, would
cause the eastbound left turn volume (turning left from Lewis & Clark Drive to
proceed north on to Route 29) generated by the Project to exceed 150 vehicles during
the PM peak hour, the Applicant shall install a second eastbound left turn lane.
ii). Second Northbound Left Turn Lane. Prior to the approval of a final site plan or final
subdivision plat that, based on a projected traffic count, would cause the northbound
left turn volume generated by the Project making a northbound left turn lane (turning
left from Route 29 to proceed west onto Lewis & Clark Drive) to exceed 150 vehicles
during the AM peak hour, the Applicant shall install a second northbound left turn
lane.
B. Lewis & Clark Drive.
Widen Lewis & Clark Drive to Four Lanes. Prior to the approval of a final site plan or
final subdivision plat that, based on a projected traffic count, would cause the
projected number of vehicle trips generated by the Project on Lewis & Clark Drive to
exceed 12,000 trips per day, the Applicant shall widen the segment of Lewis & Clark
Drive between Quail Run and Airport Road to four lanes.
C. Route 29 Northbound at Airport Road.
i). Segment of Third Northbound Through Lane on Route 29. Prior to the approval of a
final site plan or final subdivision plat that, based on a projected traffic count, would
cause the projected number of vehicle trips generated by the Project to exceed
10,000 vehicle trips per day, the Applicant shall install a segment of a third
northbound through lane on US Route 29, beginning at the Route 29/Airport Road
intersection and extending north to the Airport Acres Road median crossover
(approximately 1,000 feet north).
ii). Median U-Turn Intersection. Prior to the approval of a final site plan or final
subdivision plat that, based on a projected traffic count, would cause the projected
number of vehicle trips generated by the Project to exceed 20,000 trips per day, the
3
Applicant will install a Median U-Turn intersection at the US Route 29/Airport Road
Intersection.
All construction by the Applicant of offsite road improvements is expressly subject to the County
or the Virginia Department of Transportation ("VDOT") obtaining any required right-of-way (if
such right-of-way is not owned in fee simple by Applicant).
5. Buffer Adjacent to Dickerson Road. The one hundred fifty (150) foot buffer adjacent to
Dickerson Road and shown as "150' Buffer Area" on Exhibit C — NMD-PDIP Application Plan
may be reduced by up to fifty (50) feet if the dedication of right of way is required for the
widening of Dickerson Road by VDOT.
6. Recreational Areas, Trails, and Open Space.
A. Dabney Grove Recreation Area. In the area shown and labeled as "Dabney Grove Park
Parcel" on Exhibit E — Proposed and Existing NMD-PDIP Parks & Rec Facilities (the
"Dabney Grove Park Parcel"), the Applicant shall construct an active amenity area
containing a recreation field (the "Dabney Grove Field"), picnic area, and restrooms prior
to the approval of a final site plan or subdivision plat that would authorize the
construction of the 2011 residential dwelling unit within the Project. Once completed, the
Applicant shall make the Dabney Grove Field generally available for public use by
partnering with local community groups to allow the use and rental of the Dabney Grove
Field for community activities.
B. Sports Field/Active Recreation Area Land Dedication. The Foundation shall dedicate the
area shown as "Sports Field/Active Recreation Area Dedication" on Exhibit E, which
area contains approximately twenty-one (21) acres (the "Sports Field/Active Recreation
Area Land"), to the County for the construction by the County of sports field(s) and/or
active recreational areas and amenities for use by the public. Such dedication shall occur
within a reasonable time frame following the written request of the County.
C. Pedestrian Trails. The Applicant has previously conveyed to the County a Deed of
Dedication and Easement for the County to construct a public access trail and greenway
within the area shown as "Existing Greenway Easement along Rivanna River" on Exhibit
E (the "Rivanna River Greenway Trail"). As of the date of this Proffer Statement, the
Rivanna River Greenway Trail has not been constructed. The Applicant shall construct
the following improvements within the Project:
a. Trail Connecting Dabney Grove Park Parcel to a Greenway Trail. The Applicant
will construct a pedestrian connection between the Dabney Grove Park Parcel and
either the Rivanna River Greenway Trail or the Jacob's Run Greenway Trail in at
least one of the potential areas shown and labeled as "Potential Trail Connection"
on Exhibit E (the "Connection Trail"). The Connection Trail may be comprised of
a Class B, Type 1, Primitive Trail (a "Primitive Trail") or a public sidewalk, or
some combination thereof, and shall be made available for public use via a public
access easement. The Connection Trail shall be constructed prior to the approval
19
of a final site plan or subdivision plat that would authorize the construction of the
2011 residential dwelling unit within the Project; provided, however, if the
Rivanna River Greenway Trail has not yet been constructed at such time, the
Applicant shall commence construction of the Connection Trail within three (3)
months after the County notifies the Applicant in writing that it has completed
construction of the Rivanna River Greenway Trail, and shall complete
construction and dedication of the Connection Trail within twelve (12) months
following the commencement of construction.
b. Public Pedestrian Trail within Jacob's Run Greenway. Subject to the terms and
conditions of an existing license with the U.S. Department of Forestry, the
Applicant will construct a Primitive Trail through the area shown and labeled as
"Jacob's Run Greenway and Primitive Trail" on Exhibit E, which trail shall be
dedicated to the County for public use (the "Jacob's Run Greenway Trail"). The
Jacob's Run Greenway Trail shall be completed and dedicated prior to the
approval of a final site plan or subdivision plat that would authorize the
construction of the 2011 residential dwelling unit within the Project; provided,
however, if the Rivanna River Greenway Trail has not yet been constructed at
such time, the Applicant shall commence construction of the Jacob's Run
Greenway Trail within three (3) months after the County notifies the Applicant in
writing that it has completed construction of the Rivanna River Greenway Trail,
and shall complete construction and dedication of the Jacob's Run Greenway
Trail within twelve (12) months following the commencement of construction.
D. Trailhead Parking Area. The Applicant will provide a trailhead parking area to
accommodate approximately seven (7) vehicles, in an area within the Property that
provides reasonably convenient public access to the Connection Trail trailhead, which
may be a portion of an existing parking lot (the "Trailhead Parking Area"). The Trailhead
Parking Area shall be completed generally at the same time as the Connection Trail.
E. NMD Amenity Areas. In the areas zoned NMD, the Code of Development shall regulate
the development of Amenity Areas.
F. Overall Open Space. The total area of green space and open space over the entirety of
the Project (areas zoned NMD and areas zoned PD-IP) will not be less than 200 acres.
The Dabney Grove Park Parcel, the Sports Field/Active Recreation Area Land, any land
that is shown as green space or open space on the Application Plan, and any land that is
or has been dedicated to the County or to any other public entity shall continue at all
times to be counted as Open Space for purposes of this paragraph 6.17. The Code of
Development shall regulate the open space in the areas zoned NMD. Except for (i) the
Dabney Grove Park Parcel; (ii) the Sports Field/Active Recreation Area Land (which will
be dedicated to the County for the County to construct improvements therein pursuant to
paragraph 6.13. herein); and (iii) the greenspace and open space areas of the Project zoned
PD-IP, no structural improvements shall be constructed in the Open Space other than
utilities, pedestrian and bike trails, restrooms, trailhead parking areas (and other trailhead
improvements), amenity improvements, and similar structures determined by the County
E
to be appropriate for green space and open space areas, or as otherwise permitted by
applicable provisions of the County Code.
7. Historic Resources in Block D. Prior to demolition of any of the existing buildings located
within Blocks D-1 or D-2 (except for the Fire Rescue Station Parcel), the Applicant shall
document such buildings with photographs and drawings in coordination with the Albemarle
County Historic Preservation Committee.
8. Water Conservation. No single industrial or commercial user which proposes a use that will
require more than One Hundred Twenty -Five Thousand (125,000) gallons per day (average daily
consumption) of potable water shall be constructed without written confirmation from the
Albemarle County Service Authority prior to approval of a final site plan (or prior to issuance of
a building permit or final zoning clearance if a site plan is not required) that sufficient water
capacity exists to support such a user. Such site plan approval, building permit, or zoning
clearance, as applicable, may include reasonable conditions relation to water usage.
9. Miscellaneous.
A. Tracking Details on Site Plan. If requested by the County in connection with its review of
any site plan application within the Project, the Applicant shall include a summary chart of
total gross square footage of non-residential uses and number of residential dwelling units
completed within the Project to date, and/or trip generation estimates for such application,
to assist with monitoring compliance with this Proffer Statement.
B. Dedication of Land or Easements. For any proffer in this Amended Proffer Statement
requiring the Applicant to dedicate land or easements to the County for public use, the
Applicant shall bear the costs of preparing any necessary subdivision plat, easement plat, or
related plat, and the cost to prepare the Deed or other instrument.
These proffers shall run with the Property and each reference to the "Applicant" or "Owner"
within these proffers shall include within its meaning, and shall be binding upon, Applicant's and
Owner's successor(s) in interest and/or the developer(s) of the Property or any portion of the
Property.
0
46651722.9
OWNER and APPLICANT:
UNIVERSITY OF VIRGINIA FOUNDATION
a Virginia non -stock corporation
Tim R. Rose, Chief Executive Officer
7