RE: Response Letter #2 for SDP202100008 Proffit Road Townhomes South— Final Site Plan
Dear Cameron,
Thank you for your review of the Final Site Plan for Prolfit Road Townhomes South. This letter contains
responses to County comments dated October 29, 2021.Our responses are as follows:
Applicable Comments from Initial Site Plan Action Letter (December 19, 2019):
3. [32.5. 2b] The Land Use schedule needs a number of revisions:
a. The open space listed on one location states 51, 717sf, then is listed as 7,OOOsf below.
Open space has a definition and iP s unclear if there are elements being counted as open
space that are permitted as open space under the definition. First submittal: Comment not
fully addressed. The Cover Sheet states that 51, 717 sq. ft. of open space are provided.
However, Sheet C5 does not identify the square footage/ acreage of open space areas.
There are 7,400 sq. ft. of recreation area identified (including the tot lot) along Private
Road A. But the open space area adjacent to Lot 40 does not list an acreage. Please add the
acreage of that open space area to the callout. It does not appear that the open space area
adjacent to Lot 40 plus the 7,400 sq. ft. recreation area will equal 51, 717 sq. ft. Please
clearly label and identify all land within the proiect that is open space on Sheet C5. Rev.
1: Comment not addressed. Per Section 18- 4.16. 1 of the Zoning Ordinance, 200 sq.
ft. of open space must be provided per dwelling unit. For 40 lots, this equals 8, 000 sq.
ft. The site plan states that only 7,400 sq. ft. is provided. An additional 600 sq. ft. is
required and must be proposed. Please revise the calculation on Sheet 1, and show
new open space areas as necessary. Per the definition of open space in the Zoning
Ordinance, land within private lots cannot count toward meeting minimum open
space requirements. See comment # 5 below for further information.
The open space provided is sufficient as section 4.16.1 states that
"A minimum of 200 square feet per unit of recreational area shall be provided in
common area or open space on the site, this requirement not to exceed five
percent of the gross site area."
Since 5% of the site gross area is 6,406 sf and the provided area is more than the
required 5% (7,400 sf provided), we meet the regulations.
The recreational area/open space narrative on Sheet C1 has been revised to explain
the requirements better.
SHIMP ENGINEERING, P.C.
Design Focused Engineering
b. The percentages and square feet calculations don't seem to be correct. Double check the
math. The amounts provided do not seem to add up. First submittal: Comment not fully
addressed. The Cover Sheet states that 7, 000 sq. ft. of recreation area are provided. But
Sheet C5 shows 7,400 sq. ft. including the 2,000 sq. ft. tot lot. Please revise labels and
calculations as necessary. Rev. 1: Comment not addressed. Once the revisions
mentioned in comment # 3a have been made, update labels and calculations for open
space as necessary.
The labels and calculations for open space have not been revised due to the response
to comment 3a.
5. [32.5. 2n] Label the area between the emergency access and the main entrance. Will this be open
space? First submittal: Comment stands. If this area will be counted toward open space, please
clearly delineate the boundaries of the open space area, and show the emergency access
easement within it. State a sq. ft. or acreage figure in the label/ callout for this open space area.
See comment # 3 above for more information. Rev. 1: There is still a discrepancy with the
open space proposed. Exhibit on Sheet C15 states that Open Space B measures 9, 970 sq. ft.
and Open Space C measures 4, 937 sq. ft. This differs from the calculation stated on Sheet
1. Additionally, the area labeled as "Open Space A" on the exhibit on Sheet C15 does not
meet Zoning Ordinance definition of open space. Please revise the exhibit so that it does
not call out Open Space A.
The 7,400 area shown on Sheet C5 is a sub area of the 9,658 sf shown on Sheet C14.
Leaders have been added to labels "5,000 sf recreation area," and "2,400 sf (60'x40') tot
lot" on sheet C5 to avoid confusion.
Please note that due to deletion of VDOT details from the site plan, as per the new VDOT
requirements, the sheet numbers had to be revised.
New Comments Final Site Plan:
15. [General Comment] Prior to final site plan approval, an Easement Plat Application must be
submitted, review, approved, and recorded. Please address the following related to easements:
a. [ZMA201800019] Access easements are required to be platted and recorded prior to
approval of the final site plan. Proffer # 3 requires access easements to be made to TMPs
32- 29D and 46134- 5A. These should be provided at the end of Road C where adjoining
both properties. Once the easement plat is approved and recorded, show the access
easements on the site plan with dimensions, and state the recorded instrument number in
the easement labels. Rev. 1: Per applicant comment response letter, this comment is
acknowledged and an easement plat application will be submitted for review prior to
final site plan approval. Site plan will be updated with recordation information as
specified once easement plat is approved and recorded.
The easements on the site plan include instrument numbers with this submission.
b. [32.6. 2 ( d)] All new ACSA water and sewer easements must be shown on the easement
plat and recorded. Once the plat is recorded, update all water and sewer easements so that
they state the dimensions and recorded instrument number. Rev. 1: Per applicant
comment response letter, this comment is acknowledged and an easement plat
application will be submitted for review prior to final site plan approval. Site plan will
be updated with recordation information as specified once easement plat is approved
and recorded.
The easements on the site plan include instrument numbers with this submission.
SHIMP ENGINEERING, P.C.
Design Focused Engineering
c. [32. 6. 2 ( e)] All stormwater and drainage easement must be shown on the easement plat
and recorded. Once the plat is recorded, update easement labels so they state the
dimensions of the easements, identify whether they are public or private, and state the
recorded instrument number. Rev. 1: Per applicant comment response letter, this
comment is acknowledged and an easement plat application will be submitted for
review prior to final site plan approval. Site plan will be updated with recordation
information as specified once easement plat is approved and recorded.
The easements on the site plan include instrument numbers with this submission.
d. Any offsite construction easements will need to be shown on the easement plat. The final
site plan will need to label all offsite construction easements prior to approval. See
Engineering comments for further information. Rev. 1: Per applicant comment response
letter, this comment is acknowledged and an easement plat application will be
submitted for review prior to final site plan approval. Site plan will be updated with
recordation information as specified once easement plat is approved and recorded.
All offsite improvements are completed and the easements have been recorded. The
deed book and page numbers are shown on sheet C4.
e. Update the source of title on the Cover sheet so that it states the recorded plat instrument,
and any deeds of easements that are recorded separately from the actual easement plat.
Rev. 1: Per applicant comment response letter, this comment is acknowledged and an
easement plat application will be submitted for review prior to final site plan
approval. Site plan will be updated with recordation information as specified once
easement plat is approved and recorded.
The easements on the site plan include instrument numbers with this submission.
17. [32. 7.21 Prior to final site plan approval, a Road Plan Application must be submitted,
reviewed, and approved. All comments from Planning, Engineering, Fire Rescue, and VDOT
must be addressed related to street improvements and design. Rev. 1: Comment stands, road
plan under review with SUB202100124. Road plan application is not vet approved or
bonded.
The road plan is approved and the Plat is recorded.
If you have any questions or concerns about these revisions, please feel free to contact me at
Stephanienshimp-en ing eerieg com or by phone at 434-227-5140.