HomeMy WebLinkAboutWPO201700037-68985-Full Inspection ReportCOUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
STOP WORK ORDER
Hand delivered
Project: WP0201700037
Brookhill Development - Block 4A & 8A - VSMP
Operator/Contractor: Contour Construction LLC
HAUGH, CHARLES R & E J OGLESBY JR TRUSTEES
Issued Date: 8/3/2022
Under § 17-902 of the Albemarle County Code, you are hereby notified to immediately cease
all land disturbing activities on the above referenced property except for work to address
any necessary corrections as given in writing by the County Erosion Control Inspector. This
Stop Work Order is being issued because of the following deficiencies:
Deficiency: Field exhibit for additional E&S measures
submitted to Albemarle Co.
Corrective Action: Field exhibit submitted to improve E&S
controls approved by Albemarle County 8/2/22
Deficiency: Graded denuded areas observed
Corrective Action: Continue with stabilization on areas that
are dormant for over 14days
Deficiency: Unprotected stockpile areas observed
Corrective Action: Apply stockpile protections
Deficiency: Observed the stabilization process on DD
Corrective Action: Stabilize DD & conveyance channel and
area to perimeter SF adding matting on slopes
Deficiency: SB B observed functional and clean. Sediment
eroding around head wall outlet pipe releasing sediment into
outlet stone protection
Corrective Action: Reinstall outlet protection and use stone
protection around outlet headwall.
Deficiency: DD not tracked in or stabilized
Corrective Action: Stabilize DD & conveyance channel and
area to perimeter SF adding matting on slopes
Deficiency: Stone CE compacted, secondary entrance on
Salamander closed off
Corrective Action:
Deficiency: Sediment observed discharged into stream.
Corrective Action: Continue to remove discharged sediment
from the stream utilizing buckets and shovels documenting
length and volume of sediment removed in SWPPP book
Deficiency: Fuel tank liner replaced
Corrective Action: Observed the replacement of fuel tank liner
A sworn complaint has been made by the Albemarle County Erosion Control Inspector below. This
STOP WORK ORDER shall remain in effect for seven (7) days. If satisfactory repairs have not
been made within seven (7) days, the County may elect to issue another Stop Work Order, and/or
petition the Circuit Court for penalties and relief with regard to this violation.
Reinspections as a result of this notice to verify corrective measures will incur a $170 fee for
the first reinspection and $270 for each subsequent reinspection for single-family dwelling
units (§ 17-207). Reinspections as a result of this notice to verify corrective measures will
incur a $283 fee for the first reinspection and $383 for each subsequent reinspection for
VESCP and VSMP permits (§ 17-207 and § 17-208). A 4% technology fee is due with each
payment.
County Inspector Name: Jonney Otto
County Inspector Phone Number: 434 296-5832
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
Brookhill Development - Block 4A & 8A
project/WPO Number:
WP0201700037
- VSMP
Project Address:
DEQ Permit Number (if
VAR10K793
applicable):
Project Operator:
Contour Construction LLC
Operator Telephone #:
(434) 244-0001
Project Contact:
HAUGH, CHARLES R & E J OGLESBY
Contact Telephone #:
JR TRUSTEES
Contact E-Mail:
Qualified Personnel (QP):
Contour Construction LLC/Sheila
Scott
Inspector:
Jonney Otto
Qualified Personnel (QP)
Email:
Disturbed Acreage:
Weather (Wet/Dry/Rain):
Clear
Single -Family:
Inspection Date & Time:
8/3/2022 9:00:00 AM
Stage of Construction: Grading
Other Email:
Re -Inspection: Yes
Other Email:
Bond Inspection: No
Other Email:
COVERAGE & POSTING REQUIREMENTS
Compliant?
Reviewed during re -inspection? No
Comments/Description
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Compliant? Reviewed during re -inspection? No
Comments/Description
4
The SWPPP is on -site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part II
A.1.d)
Page 1 of 6
The SWPPP includes a legible site plan identifying all appropriate
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
9
The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ ILC ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part II A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Compliant?
Reviewed during inspection? Yes
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
Yes
discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
54.G)
Has the SWPPP been amended if inspections or investigations by the
17
operator's qualified personnel, or by local, state or federal officials find that
N/A
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
N/A
identified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
Yes
19
grading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
Yes
(CGP Part II B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
N/A
stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
N/A
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
N/A
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part II B.4(e-f)) (9VAC25-870-54.G)
24
Amendments, modifications, or updates to the SWPPP are signed in
N/A
accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
Compliant?
Reviewed during inspection? No
Comments/Description
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
Page 2 of 6
26
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
yes
plan?
Sequencing of the project is implemented in accordance with the
yes
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
Graded denuded areas observed
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
No
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
No
Unprotected stockpile areas observed
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
NIA
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
N/A
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
No
Observed the stabilization process on DID
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are sediment traps and basins installed in accordance with MS-6 and the
SB B observed functional and clean. Sediment
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
No
eroding around head wall outlet pipe releasing
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
sediment into outlet stone protection
Are finished cut and fill slopes adequately stabilized to prevent or correct
No
Slope not stabilized.
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
N/A
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
N/A
38
(9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
N/A
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
NO
DID not tracked in or stabilized
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
N/A
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
N/A
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
43
Is necessary restabilization of in -stream construction complete? (9VAC
N/A
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
N/A
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
45
Are soil and mud kept off paved or public roads to minimize the transport
No
Stone CE compacted, secondary entrance on
Salamander closed off
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
Page 3 of 6
(9VAC25-870-54. B )
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
N/A
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are properties and waterways downstream from development adequately
Sediment observed discharged into stream.
47
protected from erosion, sediment and damage in accordance with the
No
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
N/A
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
yes
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
N/A
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
N/A
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
N/A
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
N/A
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
N/A
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
Yes
Fuel tank liner replaced
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
N/A
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Page 4 of 6
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
Regulatory
Occurrence
Observation/Recommended Corrective Action
Checklist #
Citation/Legal
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 6
Corrective Action Deadline:
Re -Inspection Date:
Comments:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Page 6 of 6
Construction General Permit Site Inspection Report
Request for Correction Action
Check
Regulatory Citation/Legal
Occur.
Observation
Recommended Corrective
List #
Requirement*
Action
16
(CGP Part II B(1))
Field exhibit for additional
Field exhibit submitted to
(9VAC25-870-54.G)
E&S measures submitted to
improve E&S controls
Albemarle Co.
approved by Albemarle
County 8/2/22
30
(9VAC 25-840-40.1)
Graded denuded areas
Continue with stabilization on
(9VAC25-870-54.B)
observed
areas that are dormant for
(9VAC25-880-60) (CGP
over 14days
Part I F.1(a)) (CGP Part
11 A.5.b(1)) (CGP Part 11
A.2.c (8)) (CGP 11 E(1-2))
31
(9VAC 25-840-40.2)
Unprotected stockpile areas
Apply stockpile protections
(CGP Part 11 A.2(c))
observed
(9VAC25-870-54. B )
34
(9VAC 25-840-40.5)
Observed the stabilization
Stabilize DD & conveyance
(CGP Part 11 A.2(c))
process on DD
channel and area to perimeter
(CGP 11 E(1-2))
SF adding matting on slopes
(9VAC25-870-54. B )
35
(9VAC 25-840-40.6)
SB B observed functional and
Reinstall outlet protection and
(CGP Part 11 A.2.c (9))
clean. Sediment eroding
use stone protection around
(CGP Part 11 A.2(c))
around head wall outlet pipe
outlet headwall.
(CGP 11 E(1-2))
releasing sediment into outlet
(9VAC25-870-54.B)
stone protection
40
(9VAC 25-840-40.11)
DD not tracked in or stabilized
Stabilize DD & conveyance
(CGP Part 11 A.2(c))
channel and area to perimeter
(CGP 11 E(1-2))
SF adding matting on slopes
(9VAC25-870-54. B )
45
(9VAC 25-840-40.17)
Stone CE compacted,
(CGP Part 11 A.2(c))
secondary entrance on
(CGP 11 E(1-2))
Salamander closed off
(9VAC25-870-54. B )
47
(9VAC 25-840-40.19(a-
Sediment observed
Continue to remove
n))
discharged into stream.
discharged sediment from the
stream utilizing buckets and
shovels documenting length
and volume of sediment
removed in SWPPP book
55
(CGP Part 11 A.4.e(7)
Fuel tank liner replaced
Observed the replacement of
(9VAC25-870-56)
fuel tank liner
Recommended
Corrective Action
Deadline:
Targeted Re- 8/12/2022
Inspection Date:
Comments: A reinspection was performed on 8/3/22 observed the work actively addressing the
corrections listed on 7/22/22 Stop Work Order including the removal of sediment
discharged into the stream. Corrected items are being removed from the action list
but after a week long rain event the reinspection date will need to be extended to
allow for drying and access. The Stop Work Order has been reissued with a new
reinspection date set for 8/12/22.
*Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control
Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from
Construction Activities (9VAC25-880).
Construction General Permit Site Inspection Photo Log
Photos for Item 2
Photos for Item 4
Photo Description:
Photos for Item 10
Photo Description:
Photos for Item 30
Time Photo_20220803_093812.jpg.jpg 770.85KB
Photo Description: Stabilization has started. Recent inclement weather has paused efforts.
Photos for Item 34
Time Photo_20220803_093419.jpg.jpg 1.28MB
Photo Description: Work continues applying seed and straw mulch on DID
Photos for Item 35
TimePhoto_20220803_094728.jpg.jpg 1.01 MB
Photo Description: Reinstall stone outlet protections around top of head wall and remove sediment from
outlet of SB B
Photos for Item 36
Time Photo_20220803_094351.jpg.jpg 507.54KB
Photo Description: Install slope stabilization seed, straw mulch and mat. implement field exhibit
approved on 8/2/22
Photos for Item 40
TimePhoto_20220803_093812.jpg.jpg 770.85KB
Photo Description: Stabilize DID & conveyance channel and area to perimeter SF adding matting on
slopes
Other Photos
Photo Description:
x Javj=*6
County Inspector
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Inspection Date: 8/4/2022
Charlottesville, Virginia 22902