HomeMy WebLinkAboutSUB201700005 Correspondence 2017-06-06Cameron Langille
From:
Cameron Langille
Sent:
Tuesday, June 06, 2017 5:10 PM
To:
'less Achenbach'
Cc:
Megan Yaniglos
Subject:
RE: Glenmore K2C-II Recordation Docs
Attachments:
Carroll Creek Road and Glenmore K2C-2 Phase 1
Jess,
I apologize for the delay in my response. I spoke with Bobby Jocz about the deed for the private drainage easements and
he says that as long as they are shown to be dedicated to the HOA on the plat, we don't need an updated deed.
The WPO you reference was for the Carroll Creek Road and bridge improvements. I was referring to WP0201600059,
which was the VSMP for Phase K2C-II. Bobby confirmed that the plan has an approval stamp dated 10-7-2016. 1
apologize for the confusion.
Other than that, the road bonds have been posted for the roads within Phase K2C-II, this occurred back in
November. Please refer to the attached email for bond approvals— it appears that everything has been covered.
The only thing left is for the County Engineer to give me the final approval for the Carroll Creek Crossing opening. I
spoke with one of the engineering inspectors, and the contractor informed him that it should be ready next week (as
you mentioned).
Let me know if you have any more questions,
Cameron
From: Jess Achenbach [mailto:jess@reddirtdev.coml
Sent: Thursday, June 01, 2017 6:02 PM
To: Cameron Langille <blangille@albemarle.org>
Cc: Jess Achenbach <jess@reddirtdev.com>; Megan Yaniglos <myaniglos@albemarle.org>
Subject: Re: Glenmore K2C-11 Recordation Docs
Thanks, Cameron. I appreciate you looking into this. I've attached the WPO plan approval letter, if
that helps.
As an FYI, the Carroll Creek Crossing is scheduled to open next week.
On Thu, Jun 1, 2017 at 5:55 PM, Cameron Langille <blanille a albemarle.org> wrote:
Hi Jess,
The only other document related to the final plat approval that may be outstanding is a deed for the new private storm
drainage easements. I am working with Bobby Jocz who is the staff engineer that has been reviewing these plats, to
verify whether a new deed is needed or if the WPO plan has covered that. Our tracking system appears to show that
the WPO has not been approved yet, but Bobby is going to check our files and get back to me. I am going to be out of
the office tomorrow, so I will follow up with you at the beginning of next week.
The only other thing is the status of the road construction, including the bridge over Carroll Creek. I'II check on that and
get back to you.
Please let me know if you have any other questions. Thanks,
Cameron
From: Megan Yaniglos
Sent: Thursday, June 01, 2017 3:14 PM
To: Cameron Langille <blaneille@albemarle.org>
Subject: FW: Glenmore K2C-ll Recordation Docs
Cameron,
Since you have been the lead reviewer for this, can you follow up with Jess? I am not sure there are any
outstanding documents that are needed, planning wise. I am not sure if they need a stormwater management
agreement or anything. Happy to answer questions that you might have with this.
Thanks,
Megan Yanig/oc, A/CP
Principal Planner
Community Development Department
Planning Services
ph: 434.296.5832 ext. 3004
From: Jess Achenbach [mailto:iess@reddirtdev.coml
Sent: Thursday, June 01, 2017 3:08 PM
To: Megan Yaniglos <myaniglos@albemarle.org>
Subject: Glenmore K2C-ll Recordation Docs
Hi Megan,
As I'm moving the subdivision plat forward, I'd like to prepare all other documents that the County
will require for the project. Can you please provide a list of what will be needed for this particular
project?
Thanks
Jess Achenbach
Red Dirt Developments
P.O. Box 645 1 Charlottesville, VA 122902
C (434) 242-4802 1 jessOreddirtdev.com
JessAchenbach
Red Dirt Developments
P.O. Box 645 1 Charlottesville, VA 122902
C (434) 242-4802 1 jess(a)reddirtdev.com
Cameron Langille
From:
Robert Jocz
Sent:
Tuesday, June 06, 2017 2:24 PM
To:
Cameron Langille
Subject:
RE: WP0201600059
I just pulled the folder to make sure, its approved. It received an approval stamp on 10-7-16
From: Cameron Langille
Sent: Tuesday, June 06, 2017 2:12 PM
To: Robert Jocz <rjocz@albemarle.org>
Subject: WP0201600059
Hey dude,
I feel stupid asking this again because I know we've talked about it and I might've just forgotten. Did you ever find out if
Matt had approved this WPO?
Cameron Langille
Senior Planner
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
Ph: 434-296-5832 ext. 3432
blangille(a)albemarle.org
Cameron Langille
From: Cameron Langille
Sent: Monday, April 24, 2017 3:01 PM
To: RobertJocz
Subject: RE: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Sounds good, Bobby. Thanks for looking into this.
From: Robert Jocz
Sent: Monday, April 24, 2017 1:31 PM
To: Cameron Langille <blangille@albemarle.org>
Subject: FW: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Matt is going to change the status of the project to approved. Since the project has been bonded and the WPO is
approved, there should not be any more hurtles for the approval of the PLAT. From the engineering department
standpoint that is.
From: Ana Kilmer
Sent: Monday, April 24, 2017 12:23 PM
To: Robert Jocz <riocz@albemarle.org>
Cc: Cameron Langille <blangille@albemarle.org>; Matthew Wentland <mwentland@albemarle.ore>; Jonney Otto
<iotto@albemarle.org>
Subject: RE: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
The nutrient credit agreement for wpo-2016-00008 was finalized and approved 11/1/2016 — Glenmore K2C-II, Phase
1. There is a copy of the agreement in the bond file.
Thanks
Ana D. Kilmer
Management Analyst
Community Development Department
401 McIntire Road
Charlottesville, VA 22902
434-296-5832
akilmer@albemarle.org
From: Robert Jocz
Sent: Monday, April 24, 2017 10:58 AM
To: Ana Kilmer <akilmer@albemarle.org>
Cc: Cameron Langille <blangille@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; Jonney Otto
<iotto@albemarle.org>
Subject: FW: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Ana,
I have been looking through all the documents we have upstairs and have not been able to figure out whether required
nutrient credits were purchased for this project. Can you provide some clarification?
Thanks
From: Cameron Langille
Sent: Monday, April 24, 2017 10:28 AM
To: Robert Jocz <riocz@albemarle.org>
Subject: RE: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Thanks Bobby, keep me updated on the nutrient credits.
From: Robert Jocz
Sent: Monday, April 24, 2017 9:01 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Scratch that,
The Road bonds have been posted. The WPO was contingent on the purchase of nutrient credits for the site. I'm waiting
for Johnny to get in this morning to figure out if they were purchased. Will get back to you ASAP and let you know.
From: Cameron Langille
Sent: Friday, April 21, 2017 4:42 PM
To: Robert Jocz <riocz@albemarle.org>
Subject: RE: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Hi Bobby,
Do you know the status of the VSMP WPO plan for Glenmore K2C-II? It appears that it is WPO201600059, and County
View says it is still Under Review. I have the final plat for K2C-II Phase 1 in right now, and we didn't make a comment on
the first review regarding approval of the WPO plan. I'm trying to figure out if I should make a comment that we can't
approve this final plat until the WPO is approved. Let me know what you think.
From: RobertJocz
Sent: Monday, February 06, 2017 11:43 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Yep, that's kind of where I tracked this to as well.
Thanks
From: Cameron Langille
Sent: Monday, February 06, 2017 11:37 AM
To: Robert Jocz <riocz@albemarle.org>
Subject: RE: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Bobby,
I had a hard time trying to figure all of this out myself. The subdivision plat that was related to the easement plat
(SUB2017-04) is SUB2015-156. That was the plat which approved Lots 8-16 in Phase K2B. For some reason, the recorded
lots don't show up in our GIS system yet. However, I checked the clerk records and those lots were recorded in Deed
Book 4831, pp. 419-425. That took place on October 18, 2016. The actual approved plat is viewable in County View if
you go to that project number I mentioned. I don't have the hard copy files though, I think they're downstairs in the
filing cabinets. Let me know if this info helps.
Cameron
From: Robert Jocz
Sent: Monday, February 06, 2017 11:13 AM
To: Cameron Langille <blangille@albemarle.org>
Subject: RE: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Cameron,
Do you have any of the site plans related to SUB2017-04? I am having the hardest time trying to find the related plans.
From: Cameron Langille
Sent: Friday, February 03, 2017 4:54 PM
To: Frank Pohl <fpohl@albemarle.org>; Robert Jocz <riocz@albemarle.org>
Subject: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Hi Frank & Bobby,
I am reviewing the subdivision plats for Glenmore Phase K2C-II that we have in right now. I met with Megan today to go
over some questions related to the review comments I have drafted. She suggested that I follow up with Engineering
about three topics:
1. Road plans were approved for Phase K2C-II on the subdivision plat SUB2016 -61 which was reviewed by John
Anderson and approved on July 25, 2016. The road plans have not been uploaded to Laserfische yet, so I can't
verify that the information shown on the final plats for K2C-II is accurate. I'm trying to figure out if the road
plans included all the private street maintenance agreements required by 14-317, or if that information needs to
be required during the final plat review.
2. Did the applicant provide the County with a surety/bond for the road improvements in K2C-II as required by 14-
435? As far as I can tell, the roads have not been constructed yet.
3. One of the proffers that was approved through ZMA200600016 required the developer to install an equestrian
trail within the open space parcels along the southern side of the residential lots in K2C-II. The trail isn't shown
on the final plat, and I'm wondering if it was already provided on the road plans. Megan said that if the trail was
not shown on the road plans and the applicant doesn't show it on the final plat, we will need to ask for a zoning
performance bond to ensure it gets built/constructed.
4. Do we need an instrument evidencing maintenance of the stormwater devices and a deed for the stomrwater
easements in the open space parcels as required by Section 14-317, or is this handled through the VSMP WPO
that is under review for K2C-II? That project number is WPO201600059 but it doesn't look like it's been
approved yet.
5. A critical slopes waiver was granted for this project through ZMA200600016. Does the final plat for K2C-II satisfy
the requirements of that waiver?
I was hoping to get your input before we send comments to the applicant next Wednesday. Are either/both of you
available to meet for a half hour or so on Monday? I can meet between 1-3 PM. If not, I can meet any time on Tuesday
except for 2-3 PM.
Thanks for your help,
Cameron Langille
Senior Planner
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
Ph: 434-296-5832 ext. 3432
blanoille(a)albemarle.oro
Cameron Langille
From: Robert Jocz
Sent: Monday, February 06, 2017 9:00 AM
To: Cameron Langille
Cc: Frank Pohl
Subject: RE: Glenmore K2C-II Questions, SUB2017-04 and SUB2017-05
Hey Cameron,
1) 1 have SUB2016 -61 here in my office if you'd like to look at it. I can bring it over to you. It appeared that all
information on the plats were accurate, at least from a stormwater perspective. I have not found the correct
SUB/WPO for the K2C-11 Offsite easement plat however (Working on that now).
2) There is a bond estimate posted for the K2C-II Subdivision included for SUB2016-61, I will have to check with
Ana to see if it had been posted.
3) The trail is shown on the Road Plans along the southern edge of the residential lots as described.
4) This would be handled under the WPO.
5) Its this supposed to reference 201600006, or 200600016 as you state? I don't seem to see what you are
referencing on County View.
From: Cameron Langille
Sent: Friday, February 03, 2017 4:54 PM
To: Frank Pohl <fpohl@albemarle.org>; Robert Jocz <rjocz@albemarle.org>
Subject: Glenmore K2C-11 Questions, SUB2017-04 and SUB2017-05
Hi Frank & Bobby,
I am reviewing the subdivision plats for Glenmore Phase K2C-II that we have in right now. I met with Megan today to go
over some questions related to the review comments I have drafted. She suggested that I follow up with Engineering
about three topics:
1. Road plans were approved for Phase K2C-11 on the subdivision plat SUB2016 -61 which was reviewed by John
Anderson and approved on July 25, 2016. The road plans have not been uploaded to Laserfische yet, so I can't
verify that the information shown on the final plats for K2C-11 is accurate. I'm trying to figure out if the road
plans included all the private street maintenance agreements required by 14-317, or if that information needs to
be required during the final plat review.
2. Did the applicant provide the County with a surety/bond for the road improvements in K2C-II as required by 14-
435? As far as I can tell, the roads have not been constructed yet.
3. One of the proffers that was approved through ZMA200600016 required the developer to install an equestrian
trail within the open space parcels along the southern side of the residential lots in K2C-II. The trail isn't shown
on the final plat, and I'm wondering if it was already provided on the road plans. Megan said that if the trail was
not shown on the road plans and the applicant doesn't show it on the final plat, we will need to ask for a zoning
performance bond to ensure it gets built/constructed.
4. Do we need an instrument evidencing maintenance of the stormwater devices and a deed for the stormwater
easements in the open space parcels as required by Section 14-317, or is this handled through the VSMP WPO
that is under review for K2C-11? That project number is WPO201600059 but it doesn't look like it's been
approved yet.
5. A critical slopes waiver was granted for this project through ZMA200600016. Does the final plat for K2C-II satisfy
the requirements of that waiver?
I was hoping to get your input before we send comments to the applicant next Wednesday. Are either/both of you
available to meet for a half hour or so on Monday? I can meet between 1-3 PM. If not, I can meet any time on Tuesday
except for 2-3 PM.
Thanks for your help,
Cameron Langille
Senior Planner
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
Ph: 434-296-5832 ext. 3432
blanoille(a2albemarle.oro