Re: SDP 02-096 Maple Grove Christian Church Final Site Plan
Letter of Revision-Landscape/Retaining Wall Changes
Dear Mr. Sensabaugh:
This letter is in response to your request, dated May 15, to replace the approved retaining wall on this
site with landscaping consisting of a weed barrier and mulch, combined with seventy-two (72) Sea
Green Juniper shrubs. Due to the simplicity of this changes,the request has been reviewed as a Letter
of Revision to the most recently approved site plan for the church, entitled SDP 00-152 Maple Grove
Christian Church Final Site Plan.
The Engineering Department has reviewed your written request and supports the proposed changes
with the following condition:
The final constructed slopes shall not exceed 2:1 (horizontal:verical).
'Therefore, the Department of Planning and Community Development has not identified any
unfavorable consequences as the result of your proposal, and this request is hereby approved. As'an
additional condition of this approval,the Junipers shall be included in the Landscape Maintenance
Bond amount to be calculated by the Department of Building Code and Zoning Services as a
guarantee for replacement if any plants may die within a minimum of one year. Please note that this
approval is only for the changes requested in your letter, and all other conditions of the final site plan
approval are still applicable to this site.
This approval is being viewed as the first Letter of Revision for the above-mentioned final site plan
[SDP 02-096 Maple Grove Christian Church Final Site Plan]. A total of three (3) Letters of Revision
are allowed before all changes to the final site plan are required to be submitted in the form of a new
site plan amendment. Please retain a copy of this letter for your site plan records, and contact me if
you should have any further questions.
Sincerely,
Stephen B. Waller, AICP
Senior Planner
Attachments: Request Letter and Schedule of Changes, dated May 15 (5 pages)
. Proposed revision to Site Plan for Maple Grove Christian Church
Date: May 15 2003
Submitted To: Stephen Waller
Albermarle County Planning Department
Phone (434) 296 5823 ext 3385
Project Name: Maple Grove Christian Church site work.
Summary:
Maple Grove Christian Church is located on Profit Road and is currently undergoing expansion.
Construction is under way on the site with Brad Booker Excavating working as the site contractor. The
site plan for the current expansion was prepared by Brent Nelson of Roudabush,Gale,& Associates and
was approved by the County of Albermarle in Fall of 2002.
Requested change to Site Plan:
The current site plan,see attachments 1 and 2,shows a retaining wall which borders the right middle
parking lot and faces the property of Ms. Lucile McCauley. It is our request to remove the wall from the
site plan for the following reasons:
1. Aesthetics. We feel the wall would not be attractive to adjoining property owners, McCauly and
Estes,or to members of the church.
2. Maintenance.'If the wall is installed as shown on the plan it will require weed eating of the swale/
bank between the wall and the driveway of Mrs. Estes.
'3. Slope. The slope from the parking lot to the driveway below is not steep enough to require a
retaining wall.
4. Cost. The cost of our proposed change would be significantly lower than that of installing the
retaining wall.
As a replacement for the retaining wall (see attachment#3)we would prefer to cover the slope in question
with a commercial grade weed barrier stapled to the ground,spread a 3-4 inch layer of mulch on the weed
barrier,and plant 72 Sea Green Juniper four feet on center to stabilize the bank. Sea Green Juniper,
Juniperis chinensis `Sea Green; is a vigorous growing evergreen shrub. Plant size at maturity would be 3 to 4
feet tall by 6+ feet wide. Plants would be 1 gal size at planting and 10-15 inches tall&wide at planting.
Plants should grow together and be touching each other within 2 year. This would give a dense mass of
plant foliage to cover the bank as well as a strong root system to retain the soil of the bank,thus
eliminating the need for a retaining wall. In addition,planting would have the added benefit of providing
increased parking lot screening.
We feel that this change to the site plan would more attractive to adjoining land owners,require less
maintenance,stabilize the slope,and be much more cost effective. We wouldlike to meet with yourself or
someone from the engineering department on the site to discuss this matter farther. Please see contact
information on the following page.
MAY ;. c 200:i
Contact Information:
Allow me to introduce myself. My name is Matt Sensabaugh and I attend Maple Grove Christian Church.
I am employed by Messer Landscape&Nursery of Staunton VA. I received my BA in Horticulture from
Virginia Tech and have 10 years experience in landscape and nursery work (primarily landscape). During
my employment at Messer Landscape I have completed several planting jobs that involved stabilizing steep
banks by planting. We have been very successful with these plantings and I would be glad to provide
photographs to give a visual of what I.am describing on the previous page. I have also attached three
reference contacts from commercial customers I have dealt with through Messer Landscape.
Thank you for your time&consideration. Please contact me with any questions.
Matthew G. Sensabaugh. •
Cell phone: 540 430 9149
Office: 540 886 5408 (Messer Landscape&Nursery)
Home: 540 885 4040
Commercial References:
City of Harrisonburg Public Works. September 2002 to October 2002.
Description: Bank stabilization of steep banks at Harrisonburg resource recovery site. Planting of
Seargents and Sea Green Juniper,mulching,hydro-seeding of crown vetch
Project Size: 2,200 Juniper.,230 Cubic yards mulching,25,000 square feet weed barrier,.25 acre lawn
seeding,and.25 acre crown vetch seeding.
Project Value: $53,742.20
Contact: Charlie Honaker, 540 434 5928
Status: Completed
University of Virginia,McCormick Road Residence Halls. January 3 2002 January 29 2001.
Description: Landscape&tree planting at McCormick Road Residence Halls. Extensive bed prep,
mulching and ground cover planting. One year maintenance contract.
Project size: 21 Trees (small), 181 Shrubs, 17,000 groundcover (4" pot size) 173 CY mulch,56 CY
compost,bed prep approximately 15000 Square feet.
Project value: $65,803.00
Status: Planting&mulching completed&accepted on time,maintenance contract complete.
Contact: Lynn Rush,Project Manager UVA. (434) 982 5905 ext 4621
Todd Romanac,Grounds Supervisor UVA, (434) 982 4667
VDOT Route 37 Interchange,Winchester VA. Nov 1 2001-Dec 14 2001 •
Description: Landscape &tree planting over a 2.5 mile stretch of Route 37 bypass and at new
interchange. Planting,layout,mulching,and follow up maintenance.
Project size: 247 Trees, 1246 shrubs (Sargeants Juniper),855 CY Mulch
Project value: $102,509.30
Status: Planting completed on time, 1 year maintenance contract complete.
Contact; VDOT Roadside Development Manager: Scott Nye, (540) 332 9891
General Contracter: Fairfield Skanska,Wade Shiffiett site supervisor, (540).270 6781
)„,..T.
„,,,,,atm;a 44 J WI 11 11 i ui . fq.,.
____.....______________________7,77_,__, ,i, ,..._________________.-eize_savyas vo c
...... -
.. .. i.,. ..... )
F--------c—es___9-,92 dadd
✓ M t •0t
.:
..,
• AG ,,,.
kr
....„,......___-•,..--„,. ....._i ._ ...„....... ,,,...
...mi.\ .Atatat
4 - - .
.......___________ i .
SOS�O V ��i� � � -..L•v,. ..�. �sj�' nal 4.
\ _,,z
� �S:` !��/
y' .-
abi
_��
, , iiii, -.
RA WO 13AN/219
t
a J
rbi:
SSI"i
Q35� ` , •N �vds a1
73
i 1 ,i 7C
•
9JL d 'aNO •
9 U i k
,'(
? S
rti
�; ��,
•h�a �rzs 7 3. 5 no � i i
' _ is
hhs s� TWn� 41+►t Mir1'37� d24ao?k1 '' 1, .>
I P • •. \ i-
> i
'' aNicLei 1 ,A.. ,\ ., , ..t,r
�i� ao�
VI
i
Vilc
� l°\ I •18"Pf `� DENOTES LIMIT5 OF GRADING AND CLEARING.
I. `,
3-�R ti3
% -
1
,. 5-SL \ 1,, '.
1 ..- — cflt1 i
, � 1
' /1 '#', r �f A-r(-kk 4.meaTC $ Z._
V.y:' . , I i;' I P IZ.opoW? 2tr42.01,4 /4 "4" 49 sk l#
' s - -likk:' , p-p' -OW 'Neer $ (t kypyc�E Rc. aF L L
D.B. 8'
7-77-77.71
Zot
: - :::" E► 'c
51 ' I r'`^_`
' loke4
�. , 3-GGA Pi)
• ______!,,;II iEAsEMENT
i+
r---z.---
s---Lckc ,
),,
fir.` iii 4/ '
!F 3_,36-' - --—---- _ ___----- _
ilf
11111P @
\ / • �'„ 4 a A WI$D EZ- -'.�r ` ►� ��jc�4_�— ._,. _may-.-PRpp6 �— .,I �„ � � -- ��' ir '` .-w.%7 ? T —_ G LFF t
41 1 6 Oil illr Fre Ilammiig-7-,;11-i-11,--, :701111r.t.- .7"--a
''..... t! ............,.... e)f 3" . „.......r!' i 4.....r•
1 .1111 �.�
..!� f Inc rE� —��.. -��,���
Gf, - .1k:' 40'1*_--.,_gN7_.-..-7-.._,a7__
l_-i1r_1•1 i..0.1.t_9...-._,,.-,,-,1a,•_..G4g...e.,_
ram; .* 4 1t_,1Ip,.1!'e.•i.1 e.--..-' • .7:•:' .- � t] ►, C 1 •` f R /?_;t_?1. C,.,I
t 7
T.,i„„Or_-1..,,,.i--,.„.t.7.I.4,Pi„_4g.---„l-.._-g-,'-‘_G-91.-1,,1-:
.,'_,_A'4_..4u..\.r.1.s1_?l_._"iI l..,i_e.-g:1_.g,A,_.,m,_I,_..-P,.._tA...---._.i.---e4-a-A'..n-0..."-,.a%..'„..a_.t.:'l-
.N.m.ihi1_.g n-.*_..s_--._hr-
_..,,-.t,—a
k,,___d-o,__e-.;_--e_l--Pr—;_1.iI I.ie 1h I,4t.f IqtI
-wP L„.124 P,ia 1-
,7.I,./i.-7
z--...i4.lii.ti:4.).
f:.:_=.eq-i-_?_-._yIii.ii%./PL1z-p a-j,p.,,.i:i•!t.,?4;24•:•.:`"._,-z,,;"*.-,1,4z
-..'._•.,,2'..i.'ii0r,n.-Lg.-&.1.-.1_.-i1,l7i-w4,14.1:•l1.
:_i to4ailiinkmii,7•4..f.1p.-.-
.9•,. a7A
5,9 -M :. 0.i • rPAt -'Or!>r1!^l , w`,y,r';C 'r`.. _ n..rs= s1r....'
---- _ —_`____ -- ____'___- _____ _` SS-G a s. .__ ft ,.,_ , it
"galesv ..z• kvi:- If
\i o -Pk i .i :p
M aw� Ate ,\ a ' 7*.m.,j
-t
SG-39')Id_a \ ‘` *7 . 1 /4- Nib,...__ ii,;::,
1 c * q 11 .„
',-, '0 I I kel 99-G :
''''''----____,/4 I 1 E-11•41 r_ 1:71 :::7:7-.•::-.--,,.......„.I., :
1 u..?.4 iv 'V t2:;::•:-:•:'F::':::::.:.Y.::-::R::•1-:::..:1:•.-••• :
I\ 1 4#47---1 1-:.
--arathir, fro sly
4 ,
Fr-
tg g y 3 _ - IA'
_�1 •�ta►biSv o i I ,!1,:1 � I':� .ifs 74,HG N'h�w bH ;tc:.• ----aaJ � h vet Y1 , of
Airubm
413,41,44.
4fs1, 722'1t4W14 o_i. -araa-/o,n , �L
_ ..-71.ft s',.i.:
2 c n► vhvas rs 1 (ZL) taxi, 9,y.,dl ill > ."
ii
oi
3r�r d��a�b�Z! ,u�� 111;:-
%.i.,itel . . ._...a i L. .,_
wor
'9�1 essi7 CM' 9NIa'd219 �O S.1.IWI'1 SaLON3Q 4��3�lld,gl 1 � ` ��,F I� r
\
of Al.
l'I$GnaYx
COUNTY OF ALBEMARLE
Department of Engineering&Public Works
MEMORANDUM
To: Stephen Waller
From: Glenn Brooks
Subject: Maple Grove Christian Church, letter of revision for walls
Date received: 21 May 2003
Date of Comment: 6 Jun 2003
Approval is recommend for replacement of the retaining walls with landscaped slopes with the
following condition:
1. Slopes shall not exceed 2:1 (horizontal:vertical).
Copy: file 2323
File:Maple Grove Christian Church mia rw(1).doc
,640i, t TI lrl i
SHEET 1/11 ---- COVER SHEET : 'd '!- 1 ' . ' ',i, -y.``` s 'F
i, i nil'
SHEET 2 11 ---- EXISTING CONDITIONS f.,: a $44 s ' .� F.
/ / DEMOLITION, PLAN. ',;,�� • �;��� , �� rr ��I, ;.4
SHEET 3/11 ---- PHASE 1 - SITE LAYOUT •. ',,,� ;_ ;i I.` fi`,1, ,,. �,,,;
SHEET 4/11 ---- PHASES 1 & 2 - SITE LAYOUT ' '-J r 7' I f 1 J__''- I r • }y .
SHEET 5/1 i ---- PHASE 1 - GRADING AND UTILITIES a, j `' `i'1 '' Se.:. '
f,l 0 s.: Z
SHEET 6/11 ---- PHASE 2 - GRADING AND UTILITIES °ti- I ; , i:-,;. u. ,.
PLANS SHEET 7/11 ---- STORM AND WATERLINE PROFILES p;. `'{ k� �'` 'W
SHEET 8/11PLANTING PLAN ,,, <.', .r ' ii ¢
--�-� :A
SHEET 9/11 PLANTING DETAILS .'•� I `�'��j � r��,. ' nil!, ' I ; �.�.
SHEET 10/11 ---- LIGHTING PHOTOMETRIC .. ' - �/� -� ,.
wy existing SHEET 11/11 ---- LIGHTING DETAILS .. . '+� ''!-�' ii •1 ' 1,9 fto.% �
cisting road. 0 ,'. , i v ' n f
:ment of
L'- JI 4ai ;i , 4L: 4 Y.
s not accurately .. '' 4 ,1 .
discrepancies i tj, r ' I .'t . i'
cta��1 methods r ;.,. ; . , '* >`.''4.4' i. '.! I I . ;it li7t: '1''''7C 1
" 1�w i:', �, ky
3, is',,a. s 'ifair, Rep), ,,,
Ids of V. D. O. T. t
ovided in accordance APPROVAL .T,; ,.., i ; .:144 -: -<'; 1 ;.. -'z`; ;
e 'instal led _,,, 1 - q' r ' 's•:i i?( 4-5,;.,1,-, ,z, : s '
on. .'3 4r4. 'off ilk.';"'.;;:- )
d. seeded and .�.�-_ //27/eZ t o E .�•s.��y r I - :.. s;; :
z o n t a l: vertical . DE T T. OF PLANNING ..=` 1 '"`''j`• 7`k' Y'���=V't'`,' `� VIRGINI�DEPT. 'OF HIGHWAYS �' .: � ��_;+ :�� 1�,4rµ�r,;-.�.r ,
Or better are & COMMUNITY DEV ° •`;,g 7, ,; 'I r4_$;
y be required • l l/ )az N A -. •�:' a•;,?, , . .I,� , �r
or of L" P i EN INEERING VIRGINIA DEPT. OF HEALTH '-''' -1 r
ecessary ,. ,,
'r.: UMSER ' .
I .`, , f .:irginia //4%2. /1ai ex A '"tr, !i 1819
EPT. OF ZONING ALBEMARLE COUNTY /,jRRj ',
reinforced SERVICE AUTHORITY ; t1-t l i =f'l
{ �Fk'f «'
ust comply _,f" {f }
with � � ll(��o� ��/�+►�ti�o ;f±��,�; #a
FR Part 1926 . AL MARLS COUNTY FIRE OFFICIAL ALB RLE COUNTY BUILDING OFFICIALti; �� •
1: , '•' a z SHEET