Loading...
HomeMy WebLinkAboutSDP201800082 Correspondence 2021-07-30Ben Holt From: John Anderson Sent: Friday, July 30, 2021 10:38 AM To: Geoff Elsie Cc: Ben Holt; Cameron Langille; Justin Shimp Subject: RE: Planning Application Review for SDP201800082 OAK HILL CONVENIENCE STORE - FINIAL. [ Engineering review comments ] Geoff, head's up! Thanks From: John Anderson Sent: Friday, July 30, 2021 10:33 AM To: Justin Shimp <justin@shimp-engineering.com> Cc: Ben Holt <bholt@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: Planning Application Review for SDP201800082 OAK HILL CONVENIENCE STORE - FINIAL. [ Engineering review comments ] The Review forthe following application has been completed: Application Number = SDP201800082 — LOR1 Reviewer = John Anderson Review Status = No Objection Completed Date = 07/30/2021 This email was sent from County View Production. Justin, Thanks for your patience. Please note: Ben Holt is Planning LOR review coordinator. Engineering does not approve LORs, but with this email, signals No objection to proposed change outlined in the LOR. CV comments: [ Note, graphic clip does not display in CV] Justin Shimp contacted Engineering Q. Anderson) 2-3 weeks ago to discuss design change prompted by precise survey data along existing EP, Country Green Road. The approved CG near Int. Country Green Road and Oak Hill Place will not allow runoff to drain around the proposed (approved) curb bump -out at the east end of parallel parking spaces, depicted below. Applicant, consulted with VDOT (Adam Moore), and indicates VDOT is accepting of this change within public right- of-way, indicates there is no increase in runoff or change in destination of runoff which would otherwise be concentrated against CG-6. Engineering does not object to removal of a portion of approved CG-6, removal of section of sidewalk and construction instead of a sloped shoulder of suitable material and compaction, stabilized to resist erosion, with contours (contour 480, shown in red) that direct drainage, to alleviate and prevent nuisance ponding which would otherwise occur on Country Green Road. Applicant is advised that non -durable surfaces must be adequately stabilized prior to WPO plan close- out. Otherwise, no other effects anticipated. ESC measures and permanent stabilization are not new requirements with this change, but exist under any design scenario, whether initial site plan, or design alteration proposed with this LOR. No further coordination with Engineering is required. No WPO plan Amendment is required. Please coordinate project activities within VDOT right-of-way with VDOT, Charlottesville Residency. Letter (to whom it may concern) d. Jul-16, 2021 and Attachments were distributed to Engineering via internal email, sent 7/30/2021 9:29 AM. Also available via CV.' STATE ROUTE 875 COUNTRY GREEN ROAD 30' PRESCRIPTIVE EASEMENT HA SPEED LIMIT 30 MPH -a+v ---- _--=------- - side«de e curb ends reo"- _... 85 � do (\ 8 '• -Connects to 81" v c.;stmg EP s Take care, best, J. Anderson John E. Anderson, PE I Civil Engineer 11 Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3069 2