RE: Planning Application Review for SDP201800082 OAK HILL CONVENIENCE STORE -
FINIAL. [ Engineering review comments ]
Geoff, head's up!
Thanks
From: John Anderson
Sent: Friday, July 30, 2021 10:33 AM
To: Justin Shimp <justin@shimp-engineering.com>
Cc: Ben Holt <bholt@albemarle.org>; Cameron Langille <blangille@albemarle.org>
Subject: Planning Application Review for SDP201800082 OAK HILL CONVENIENCE STORE - FINIAL. [ Engineering review
comments ]
The Review forthe following application has been completed:
Application Number = SDP201800082 — LOR1
Reviewer = John Anderson
Review Status = No Objection
Completed Date = 07/30/2021
This email was sent from County View Production.
Justin,
Thanks for your patience.
Please note: Ben Holt is Planning LOR review coordinator. Engineering does not approve LORs, but with this email, signals
No objection to proposed change outlined in the LOR.
CV comments: [ Note, graphic clip does not display in CV]
Justin Shimp contacted Engineering Q. Anderson) 2-3 weeks ago to discuss design change prompted by precise survey data
along existing EP, Country Green Road. The approved CG near Int. Country Green Road and Oak Hill Place will not allow
runoff to drain around the proposed (approved) curb bump -out at the east end of parallel parking spaces, depicted
below. Applicant, consulted with VDOT (Adam Moore), and indicates VDOT is accepting of this change within public right-
of-way, indicates there is no increase in runoff or change in destination of runoff which would otherwise be concentrated
against CG-6. Engineering does not object to removal of a portion of approved CG-6, removal of section of sidewalk and
construction instead of a sloped shoulder of suitable material and compaction, stabilized to resist erosion, with contours
(contour 480, shown in red) that direct drainage, to alleviate and prevent nuisance ponding which would otherwise occur on
Country Green Road. Applicant is advised that non -durable surfaces must be adequately stabilized prior to WPO plan close-
out. Otherwise, no other effects anticipated. ESC measures and permanent stabilization are not new requirements with this
change, but exist under any design scenario, whether initial site plan, or design alteration proposed with this LOR. No further
coordination with Engineering is required. No WPO plan Amendment is required. Please coordinate project activities within
VDOT right-of-way with VDOT, Charlottesville Residency.
Letter (to whom it may concern) d. Jul-16, 2021 and Attachments were distributed to Engineering via internal email, sent
7/30/2021 9:29 AM. Also available via CV.'
STATE ROUTE 875
COUNTRY GREEN ROAD
30' PRESCRIPTIVE EASEMENT
HA SPEED LIMIT 30 MPH
-a+v ---- _--=------- -
side«de e
curb ends
reo"-
_...
85 �
do
(\
8 '• -Connects to
81" v c.;stmg EP
s
Take care, best, J. Anderson
John E. Anderson, PE I Civil Engineer 11
Department of Community Development I County of Albemarle, Virginia
401 McIntire Road I Charlottesville, VA 22902
434.296.5832 ext. 3069