Subdivision Bond Inspection
Bond Title: Sunset Overlook
File Number: SUB201600017
Date of inspection: 29 Jul 2022
Reviewer: John Anderson, PE Original Bond Amount: $633,540
Phone: (434) 296-5832 Current Bond Amount: $633,540
Your bond inspection request has been processed. This list contains an update on the items
received and approved.
Received
Approved
Y
N
Y
N
N/A vDoT
■
❑
Completed inspection request and fee
■
❑
❑
❑
❑
■
As -built plan, updated, sealed to current date, per As -built policy
❑
■
❑
❑
■
❑
Copies of recorded plats for right-of-way, easements
■
❑
❑
❑
❑
■
VDOT approval AM-4.3, or partial completion via punchlist
❑
❑
■
❑
❑
■
Letter from P.E. certifying improvements are built to plan
❑
■
❑
❑
■
❑
Current certification form completed by owner/developer
■
❑
❑
❑
■
❑
CBR test reports for each road
■
❑
❑
❑
■
❑
Stone depth and material inspection reports (or core tests)
■
❑
❑
❑
■
❑
Pavement depth and material inspection reports (or core tests)
■
❑
❑
❑
❑
■
Compaction test reports for fill areas under road
❑
■
❑
❑
❑
■
Pipe trench inspection reports
❑
❑
■
❑
■
❑
Pipe interior inspections reports and video
■
❑
❑
❑
❑
■
Concrete test reports for structural concrete, curbing, aprons, etc.
❑
■
❑
❑
❑
■
Structural inspection reports for any bridges or box culverts
❑
❑
■
❑
■
❑
county road name signs and posts, or a sign agreement for alt. posts
■
❑
❑
Updated bond amount based on completed work: $126,708
Please refer to on-line content https://www.albemarle.or /g/govemment/community-development/applv-
for/en ine eering-applications/road-plans for checklists and procedures.
For ROAD plan bond release, items required:
1. As -built drawing
2. PE -certification
Notes:
1. Improvements to Sunset Ave. Ext. are not covered by county bond, but by VDOT bond. This bond reduction does
not affect VDOT bond for Sunset Ave. Ext. widening, striping, or mill /pave.
2. CBR values for Sun Valley Drive (see May 6, 2021 F&R letter with summary table (CV); F&R and calculated
pavement design and As -built values (D, DP, SSV, etc.):
a. CBRs / Sun Valley: Sta. 27+00 =2.0; Sta. 33+00 =3.2 — use Ave. CBR to calculate SSV (ref. 2018
VDOT pavement design guide):
i. SSV = (Ave. CBR tests x 2/3) x RF (resiliency factor)
ii. use RF=1.0:
b. SSV = (2.6 x 0.66) x 1 = 1.733
c. D, = 3.48 ln(ADT/Sun Valley) -1.48 ln(SSV) -7.23 [ ROAD plan sheet 9, ADT
i. 3.48 ln(223) — 1.48 ln(1.733) — 7.23
ii. 3.48(5.41) — 1.48(.55) — 7.23 =
iii. 18.82 — 0.814 — 7.23 = 10.77
d. Dp (see F&R report for asphalt /stone depth values; use Min. values)
i. Dp=2.25(asphalt depth) + 0.6(aggregate depth)
ii.=2.25 x 4.8 + 0.6 x 4
iii.=10.35 + 2.4 = 12.75
e. Dp > Dr, depth provided > depth required, calc. based on F&R depth and CBR test reports.
f. Visual inspection, 7/29/22: no visible issues.
g. Atlas Industrial Services pipe video inspection summaries (CV) indicate several defects rated Grade 2:
`Defects that have not begun to deteriorate — pipe unlikely to fail for at least 20 years.'