Loading...
HomeMy WebLinkAboutSP202200009 Study 2022-08-12VIRGINIA INSTITUTE OF AUTISM - HILLSDALE EXPANSION ALBEMARLE COUNTY, VIRGINIA SPECIAL USE PERMIT SUPPLMENTARY INFORMATION ON PARKING STUDY MARCH 21, 2022 REVISED: AUGUST 12, 2022 • TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Prepared by: Jonathan Showalter, PE Timmons Group 608 Preston Avenue, Suite 200 Charlottesville, VA 22903 434.327.1688 The Virginia Institute of Autism (VIA) is looking to expand their Hillsdale Site to include a second building to expand the school. This study is a supportive document to go with the Virginia Institute of Autism Hillsdale Expansion Special Use permit. The expansion of the existing Hillsdale Site will occur in two phases. In Phase 1, the younger students from the Westwood Road Campus would be relocated to the new building at 485 Hillsdale Drive. VIA plans, following a capital campaign, to expand within the building at 485 Hillsdale to renovate it to include an additional four classrooms that could serve up to an additional 32 students and 39 staff. The amount of parking anticipated for the Hillsdale Expansion was determined by the amount of parking utilized at the existing Hillsdale site and the Westwood Site. This study compares the amount of parking used versus employee present over a three-day period at both of the sites. (Refer to table 1). An average car to employee ratio was found between the two sites to be 0.94. The majority of parking needed is generated by the staff and teachers, and therefore this ratio was used to determine the anticipated amount of parking needed per employee for each phase of the Hillsdale expansion (Refer to table 2). Table 1: Existing Parking Count Existing Vehicle Count for Hillsdale & Westwood Da Cars Employees I Cars: Employees I Location 7/20/2022 53 52 1.02 Hillsdale 7/21/2022 53 50 1.06 Hillsdale 7/22/2022 52 47 1.11 Hillsdale 7/20/2022 46 58 0.79 Westwood 7/21/2022 43 51 0.84 Westwood 7/22/2022 38 45 0.84 Westwood Average: 0.94 Table 2: Anticipated Parking Needed for Hillsdale Expansion Required & Provided Parking Phase Employees Anticipated Parking Needed* Parking Provided Phase 1 128 121 121 Phase 2 39 37 66 Total 167 157 187 *REQUIRED PARKING = EMPLOYEES * 0.94 RATIO DETERMINED FROM PARKING STUDY COMPLETED AT HILLSDALE ON 7/20/2022, 7/21/2022, & 7/22/2022