HomeMy WebLinkAboutWPO202100060 Plan - VSMP 2022-08-15VIRGINIA STORMWATER MANAGEMENT PLAN REFERENCES AND CONTACTS ♦ BOUNDARY & TOPOGRAPHIC SURVEY: BOHLER 12825 WORLDGATE DRIVE, SUITE 700 HERNDON, VA 20170 DATED: 04/20/2021 SURVEY JOB SV211201 ELEVATIONS: BASED ON GPS OBSERVATIONS *ARCHITECTURAL PLAN: ARCHITECTURAL RESOURCE TEAM 1055 E. INDIAN SCHOOL ROAD PHOENIX, AZ 85014 CAD FILE NAMED: "VAC 12457- CHARLOTTESVILLE, VA - CONCEPTUAL FLOOR PLAN -6B-RH$O.DWG" DATED: 10/18/2021 GOVERNING AGENCIES *ALBEMARLE COUNTY SITE REVIEW COMMITTEE ALBEMARLE COUNTY, VA 401 MCINTIRE ROAD CHARLOTTESVILLE, VA 22902 PHONE: (434) 243-7929 UTILITIES *ALBEMARLE COUNTY SERVICE AUTHORITY 168 SPOTNAP ROAD CHARLOTTESVILLE, VA 22911 PHONE: (434) 977-4511 ' THE ABOVE REFERENCED DOCUMENTS ARE INCORPORATED BY REFERENCE AS PART OF THESE PLANS, HOWEVER, BOHLER ENGINEERING DOES NOT CERTIFY THE ACCURACY OF THE WORK REFERENCED OR DERIVED FROM THESE DOCUMENTS, BY OTHERS. NOTE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TC THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN FNLL CONFORMANCE WITH LOCAL REGIILITIONS ANO CODES. FOR LOCATION OF SITE 1636 SEMINOLE TRAIL ALBEMARLE COUNTY CHARLOTTESVILLE, VIRGINIA RIO MAGISTERIAL DISTRICT D.B. 1980 PG. 239 PIN: 06100-00-00-120J O WP0202100060 ��MuntlaY Cmlenry /aC�sa,aoknr � e`Pq +E , y .( Car:Rnook H4 / / Elementaryur, CT R % Nool 10� d � ,eadwatlesmtlk {Eleen�ary 5 LaI or qq, 3� A4 90 f q N pdA F Sg WuWLeuuk 12 g Y rtlwnamad SITE a a a � Fs Ocj S s S ftrlcdY S cF:Aof,eeville B Ogo t n�a 0.d Eaem— square �e P r Nmrt a 9 S iw Re �cc fl 2 ee eI Squire Hill a 4e � pe Ole e G. m .Wakefield R. ° a i 4 rNe .l H@le ' H B LOCATION MAP SCALE: 111= 2,000 Copyright: Microsoft Corporation OWNER MIMOSA L.L.C. OWNER ADDRESS:C/O DUFFY BIRCKHEAD P.O. BOX 7652 CHARLOTTESVILLE VA, 22906 OWNER CONTACT: FRANK BIRKHEAD DEVELOPER HALLE PROPERTIES, LLC C/O DISCOUNT TIRE 20225 N. SCOTTSDALE ROAD SCOTTSDALE, AZ 85255 CONTACT: MATTHEW JOHNSON DEVELOPER PHONE: (840)-606-5758 BOHLER" CONTACT: RYAN T YAUGER, P.E. SHEETINDEX SHEET TITLE SHEET NUMBER COVER SHEET C-101 GENERAL NOTES C-102 GENERAL NOTES AND LEGEND C-103 EXISTING CONDITIONS AND DEMOLITION PLAN C-201 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 C-601 EROSION AND SEDIMENT CONTROL PLAN PHASE 11 C-602 EROSION AND SEDIMENT CONTROL NOTES C-603 EROSION AND SEDIMENT CONTROL DETAILS C-604 STORMWATER COMPLIANCE PLAN C-901 - 906 SWM SYSTEM DETAILS C-907 VSMP NOTES C-908 SHEET TOTAL = 16 J m z EE W W W U) z W Z Z Z W U W(72U0C) (9ZW W(j)�W zr(9H WQW(n F W ¢ = W z > z U w W �Of m W��QQz(�� zU2WzP: O0QQa~p 0<(DUUW a- Q w Z u) a z > aJ U W H rn REVISIONS REV DATE COMMENT CHECKED9Y 1 01/21/2022 PER COUNTY COMMENTS BSC RTY 2 04/08/2022 PER COUNTY COMMENTS BSC RTY 3 08/09/2022 PER COMMEENTS CDH RTY TY ro Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAWING I$ INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: CNDS -1 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN DDgQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLER// 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com TH MN YAUGER Lie. No. 0402056625 SHEET TITLE: 08/09/2022 COVER SHEET SHEET NUMBER. C-101 N N N N m Q REVISION 3 - 08/09/2022 GENERAL NOTES (Rev. 22021) DEMOLITION NOTES (Rev. 22021) SITE LAYOUT NOTES (Rev. 12020) LIGHTING NOTES (Rev. 12020) w O Z 0 U n O 3 n i . 0 Z U 0 N Z 3 D. D. 2 0 w 0 3 D. N 0 Z 3 Ir U 1. THESE PLANS ARE SOLELY BASED ON INFORMATION THE OWNER AND OTHERS PROVIDED TO BOHLER ENGINEERING, VIRGINIA (HEREIN "BOHLER") PRIOR TO THE DATE ON WHICH THE ENGINEER OF RECORD AND BOHLER PREPARED THESE PLANS. THE CONTRACTOR MUST FIELD VERIFY ALL EXISTING CONDITIONS AND IMMEDIATELY NOTIFY BOHLER , IN WRITING, IF ANY ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THESE PLANS, OR IF THE PROPOSED WORK CONFLICTS WITH ANY OTHER SITE FEATURES. 2. THE CONTRACTOR MUST STRICTLY COMPLY WITH THESE NOTES AND ALL SPECIFICATIONSIREPORTS CONTAINED HEREIN. THE CONTRACTOR MUST ENSURE THAT ALL SUBCONTRACTORS FULLY AND COMPLETELY CONFORM TO AND COMPLY WITH THESE REQUIREMENTS THESE NOTES AND THE REQUIREMENTS ARTICULATED IN THE NOTES CONTAINED IN ALL THE OTHER DRAWINGS THAT COMPRISE THE PLAN SET OF DRAWINGS. ADDITIONAL N TE AND PE IFI PLAN N TE MAY BE F ND N THE INDIVID AL PLAN . THE E ENERAL N TE APPLY T THI ENTIRE D MENT PA KA E. O S S C C O S OU O U S S G O S O S OCU C G IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL CONSTRUCTION CONTRACT DOCUMENTS INCLUDING, BUT NOT LIMITED TO, ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE, PRIOR TO THE INITIATION AND COMMENCEMENT OF CONSTRUCTION. 3. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST CONFIRM WITH THE ENGINEER OF RECORD AND BOHLER THAT THE LATEST EDITION OF THE DOCUMENTS AND/OR REPORTS REFERENCED WITHIN THE PLAN REFERENCES ARE BEING USED FOR CONSTRUCTION. THIS IS THE CONTRACTOR'S SOLE AND COMPLETE RESPONSIBILITY. 4. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST ENSURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION IS TO BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED THE CONDITIONS OF APPROVAL TO ALL PLANS AND OTHER DOCUMENTS REVIEWED AND APPROVED BY THE PERMITTING AUTHORITIES AND HAS ALSO CONFIRMED THAT ALL NECESSARY AND REQUIRED PERMITS HAVE BEEN OBTAINED. THE CONTRACTOR MUST HAVE COPIES OF ALL PERMITS AND APPROVALS ON SITE AT ALL TIMES. 5. THE CONTRACTOR MUST ENSURE THAT ALL WORK IS PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONSIREPORTS AND CONDITIONS OF APPROVAL AND ALL APPLICABLE REQUIREMENTS RULES REGULATIONS STATUTORY REQUIREMENTS CODES LAWS AND STANDARDS OF ALL GOVERNMENTAL ENTITIES WITH JURISDICTION OVER THIS PROJECT AND ALL PROVISIONS IN AND CONDITIONS OF THE CONSTRUCTION CONTRACT WITH THE OWNER/DEVELOPER INCLUDING ALL EXHIBITS ATTACHMENTS AND ADDENDA TO SAME. 6. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION THE CONTRACTOR MUST COORDINATE THE BUILDING LAYOUT BY CAREFULLY REVIEWING THE MOST CURRENT ARCHITECTURAL CIVIL AND STRUCTURAL CONSTRUCTION DOCUMENTS INCLUDING BUT NOT LIMITED TO MECHANICAL ELECTRICAL, PLUMBING AND FIRE SUPPRESSION PLANS, WHERE APPLICABLE). THE CONTRACTOR MUST IMMEDIATELY NOTIFY OWNER, ARCHITECT AND ENGINEER OF RECORD AND BOHLER, IN WRITING, OF ANY CONFLICTS, DISCREPANCIES OR AMBIGUITIES WHICH EXIST BETWEEN THESE PLANS AND ANV OTHER PLANS THAT COMPRISE THE CONSTRUCTION DOCUMENTS. 7. CONTRACTOR MUST REFER TO AND ENSURE COMPLIANCE WITH THE APPROVED ARCHITECTURALBUILDING PLANS OF RECORD FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRVBXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY LOCATIONS. 8. THE CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS SHOWN ON THESE PLANS, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR MUST IMMEDIATELY NOTIFY ENGINEER OF RECORD AND BOHLER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES OR AMBIGUITIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR WORK WHICH HAS TO BE RE -DONE OR REPAIRED DUE TO DIMENSIONS MEASUREMENTS OR GRADES SHOWN INCORRECTLY ON THESE PLANS PRIOR TO BOTH A THE CONTRACTOR GIVING ENGINEER OF RECORD AND BOHLER WRITTEN NOTIFICATION OF SAME AND B () () ENGINEER OF RECORD AND BOHLER, THEREAFTER, PROVIDING THE CONTRACTOR WITH WRITTEN AUTHORIZATION TO PROCEED WITH SUCH ADDITIONAL WORK. 9. THE CONTRACTOR MUST VERIFY ALL DIMENSIONS AND MEASUREMENTS INCLUDED ON DESIGN DOCUMENTS HEREIN AND MUST NOT SCALE OFF THE DRAWINGS DUE TO POTENTIAL PRINTING INACCURACIES. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE CHECKED AND CONFIRMED BY THE GENERAL CONTRACTOR PRIOR TO PREPARATION OF SHOP DRAWINGS, FABRICATION/ORDERING OF PARTS AND MATERIALS AND COMMENCEMENT OF SITE WORK. SITE PLAN DRAWINGS ARE NOT INTENDED AS SURVEY DOCUMENTS. DIMENSIONS SUPERSEDE GRAPHICAL REPRESENTATIONS. THE CONTRACTOR MUST MAKE CONTRACTOR'S OWN MEASUREMENTS FOR LAYOUT OF IMPROVEMENTS. 10. THE OWNER AND CONTRACTOR MUST BE FAMILIAR WITH AND RESPONSIBLE FOR THE PROCUREMENT OF ANV AND ALL CERTIFICATIONS REQUIRED FOR THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 11. WHEN INCLUDED AS ONE OF THE REFERENCED DOCUMENTS, THE GEOTECHNICAL REPORT, SPECIFICATIONS AND RECOMMENDATIONS SET FORTH THEREIN ARE A PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND IN CASE OF CONFLICT DISCREPANCY OR AMBIGUITY THE MORE STRINGENT REQUIREMENTS AND/OR RECOMMENDATIONS CONTAINED IN: (A) THE PLANS; AND (B) THE GEOTECHNICAL REPORT AND RECOMMENDATIONS, MUST TAKE PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS. THE CONTRACTOR MUST NOTIFY THE ENGINEER OF RECORD AND BOHLER, IN WRITING, OF ANV SUCH CONFLICT, DISCREPANCY OR AMBIGUITY BETWEEN THE GEOTECHNICAL REPORT AND PLANS AND SPECIFICATIONS, PRIOR TO PROCEEDING WITH ANY FURTHER WORK. IF A GEOTECHNICAL REPORT WAS NOT CREATED, THEN THE CONTRACTOR MUST FOLLOW AND COMPLY WITH ALL OF THE REQUIREMENTS OF ANY AND ALL MUNICIPAL, COUNTY, STATE, AND FEDERAL LAWS AND APPLICABLE SPECIFICATIONS WHICH HAVE JURISDICTION OVER THIS PROJECT. 12. ENGINEER OF RECORD AND BOHLER ARE NEITHER LIABLE NOR RESPONSIBLE FOR ANV SUBSURFACE CONDITIONS AND FURTHER, HAS NO LIABILITY FOR ANV HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, OR POLLUTANTS ON, ABOUT OR UNDER THE PROPERTY. 13. THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING WHEN AND WHERE SHORING IS REQUIRED AND FOR INSTALLING ALL SHORING REQUIRED DURING EXCAVATION (TO BE PERFORMED IN ACCORDANCE WITH CURRENT OSHA STANDARDS) AND ANY ADDITIONAL PRECAUTIONS TO BE TAKEN TO ASSURE THE STABILITY OF ADJACENT, NEARBY AND CONTIGUOUS STRUCTURES AND PROPERTIES. ALL OF THIS WORK IS TO BE PERFORMED AT CONTRACTOR'S SOLE COST AND EXPENSE. 14. THE CONTRACTOR MUST EXERCISE EXTREME CAUTION WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT TO PAVEMENT, STRUCTURES, ETC. WHICH ARE TO REMAIN EITHER FOR AN INITIAL PHASE OF THE PROJECT OR AS PART OF THE FINAL CONDITION. THE CONTRACTOR IS RESPONSIBLE FOR TAKING ALL APPROPRIATE MEASURES REQUIRED TO ENSURE THE STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT, UTILITIES, BUILDINGS, AND INFRASTRUCTURE WHICH ARE TO REMAIN, AND TO PROVIDE A SAFE WORK AREA FOR THIRD PARTIES, PEDESTRIANS AND ANYONE INVOLVED WITH THE PROJECT. 15. DEBRIS MUST NOT BE BURIED ON THE SUBJECT SITE. ALL DEMOLITION AND CONSTRUCTION WASTES, UNSUITABLE EXCAVATED MATERIAL, EXCESS SOIL AND DEBRIS (SOLID WASTE) MUST BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANV AND ALL MUNICIPAL, COUNTY, STATE, AND FEDERAL LAWS AND APPLICABLE CODES WHICH HAVE JURISDICTION OVER THIS PROJECT OR OVER THE CONTRACTOR. 16. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO MAINTAIN RECORDS TO DEMONSTRATE PROPER AND FULLY COMPLIANT DISPOSAL ACTIVITIES, TO BE PROMPTLY PROVIDED TO THE OWNER UPON REQUEST. 17. THE CONTRACTOR MUST REPAIR, AT CONTRACTOR'S SOLE COST, ALL DAMAGE DONE TO ANY NEW OR EXISTING CONSTRUCTION OR PROPERTY DURING THE COURSE OF CONSTRUCTION, INCLUDING BUT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME TO INCLUDE, BUT NOT BE LIMITED TO, REDESIGN, RE -SURVEY, RE -PERMITTING AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR AND MUST REPLACE ALL SIGNAL INTERCONNECTION CABLE, WIRING CONDUITS, AND ANV UNDERGROUND ACCESSORY EQUIPMENT DAMAGED DURING CONSTRUCTION AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE REPAIR OF ANV SUCH NEW OR EXISTING CONSTRUCTION OR PROPERTY MUST RESTORE SUCH CONSTRUCTION OR PROPERTY TO A CONDITION EQUIVALENT TO OR BETTER THAN THE CONDITIONS PRIOR TO COMMENCEMENT OF THE CONSTRUCTION, AND IN CONFORMANCE WITH APPLICABLE CODES, LAWS, RULES, REGULATIONS, STATUTORY REQUIREMENTS AND STATUTES. THE CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE CONTRACTOR MUST, PROMPTLY, DOCUMENT ALL EXISTING DAMAGE AND NOTIFY, IN WRITING, THE OWNER AND THE CONSTRUCTION MANAGER PRIOR TO THE START OF CONSTRUCTION. 18. THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR AND HAVE NO CONTRACTUAL, LEGAL OR OTHER RESPONSIBILITIES FOR JOB SITE SAFETY JOB SITE SUPERVISION, OR ANYTHING RELATED TO SAME. THE ENGINEER OF RECORD AND BOHLER HAVE NOT BEEN RETAINED TO PERFORM OR TO BE RESPONSIBLE FOR JOB SITE SAFETY, SAME BEING WHOLLY OUTSIDE OF ENGINEER OF RECORD'S AND BOHLER SERVICES AS RELATED TO THE PROJECT. THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE TO IDENTIFY OR REPORT ANY JOB SITE SAFETY ISSUES OR ANV JOB SITE CONDITIONS, AT ANY TIME. 19. THE CONTRACTOR MUST IMMEDIATELY IDENTIFY IN WRITING, TO THE ENGINEER OF RECORD AND BOHLER , ANY DISCREPANCIES THAT MAY OR COULD AFFECT THE PUBLIC SAFETY, HEALTH OR GENERAL WELFARE, OR PROJECT COST. IF THE CONTRACTOR PROCEEDS WITH CONSTRUCTION WITHOUT PROVIDING PROPER WRITTEN NOTIFICATION AS DESCRIBED ABOVE, IT WILL BE AT THE CONTRACTOR'S OWN RISK AND, FURTHER, THE NTRA T R M T INDEMNIFY DEFEND AND H LD HARMLE THE EN INEER F RE RD AND B HLER F R ANY AND ALL DAMA E T CO C O US O SS G O CO O O G S COS S INJURIES, ATTORNEY'S FEES AND THE LIKE WHICH RESULT FROM OR ARE IN ANY WAY RELATED TO SAME INCLUDING, BUT NOT LIMITED TO, ANY THIRD PARTY AND FIRST PARTY CLAIMS. 20. THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR ANY INJURY OR DAMAGES RESULTING FROM THE CONTRACTOR'S FAILURE TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH THE APPROVED PLANS, AND CURRENT CODES, RULES, STATUTES AND THE LIKE. IF THE CONTRACTOR AND/OR OWNER FAIL TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, RULES, STATUTES, CODES AND THE LIKE, THE CONTRACTOR AND/OR OWNER AGREE TO AND MUST JOINTLY, INDEPENDENTLY, SEPARATELY, AND SEVERALLY INDEMNIFY AND HOLD THE ENGINEER OF RECORD AND BOHLER HARMLESS FOR AND FROM ALL INJURIES, CLAIMS AND DAMAGES THAT ENGINEER AND BOHLER SUFFER AND ANY AND ALL COSTS THAT ENGINEER AND BOHLER INCUR AS RELATED TO SAME. 21. ALL CONTRACTORS MUST CARRY AT LEAST THE MINIMUM AMOUNT OF THE SPECIFIED AND COMMERCIALLY REASONABLE STATUTORY WORKER'S COMPENSATION INSURANCE, EMPLOYER'S LIABILITY INSURANCE AND COMMERCIAL GENERAL LIABILITY INSURANCE (CGL) INCLUDING ALSO ALL UMBRELLA COVERAGES. ALL CONTRACTORS MUST HAVE THEIR CGL POLICIES ENDORSED TO NAME BOHLER , AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AS ADDITIONAL NAMED INSUREDS AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE SUFFICIENT TO INSURE (DEFEND, IF APPLICABLE) AND HOLD HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED AND AGREED TO BY THE CONTRACTOR HEREIN. ALL CONTRACTORS MUST FURNISH BOHLER WITH CERTIFICATIONS OF INSURANCE OR CERTIFICATES OF INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE COVERAGES PRIOR TO COMMENCING ANY WORK AND UPON RENEWAL OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION AND FOR T/VO YEARS AFTER THE COMPLETION OF CONSTRUCTION AND AFTER ALL PERMITS ARE ISSUED, WHICHEVER DATE IS LATER. IN ADDITION, ALL CONTRACTORS AGREE THAT THEY WILL, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, INDEMNIFY, DEFEND AND HOLD HARMLESS BOHLER AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS FROM AND AGAINST ANY DAMAGES, INJURIES, CLAIMS, ACTIONS, PENALTIES, EXPENSES, PUNITIVE DAMAGES, TORT DAMAGES, STATUTORY CLAIMS, STATUTORY CAUSES OF ACTION, LOSSES, CAUSES OF ACTION, LIABILITIES OR COSTS, INCLUDING, BUT NOT LIMITED TO, REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING OUT OF OR IN ANV WAY CONNECTED WITH OR TO THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTOR(S), ALL CLAIMS BY THIRD PARTIES AND ALL CLAIMS RELATED TO THE PROJECT. THE CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, AT LEAST THIRTY (30) DAYS PRIOR TO ANY TERMINATION, SUSPENSION OR CHANGE OF ITS INSURANCE HEREUNDER. 22. THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR CONSTRUCTION METHODS, MEANS, TECHNIQUES OR PROCEDURES, GENERALLY OR FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES OR PROCEDURES FOR COMPLETION OF THE WORK DEPICTED BOTH ON THESE PLANS, AND FOR ANV CONFLICTS IN SCOPE AND REVISIONS THAT RESULT FROM SAME. THE CONTRACTOR IS FULLY AND SOLELY RESPONSIBLE FOR DETERMINING THE MEANS AND METHODS FOR COMPLETION OF THE WORK, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 23. NEITHER THE PROFESSIONAL ACTIVITIES OF BOHLER, NOR THE PRESENCE OF BOHLER AND/OR ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AT A CONSTRUCTION/PROJECT SITE (HEREIN "BOHLER PARTIES-), RELIEVES OR WILL RELIEVE THE CONTRACTOR OF AND FROM CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, OVERSEEING, SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND COMPLIANCE WITH ALL HEALTH AND SAFETY PRECAUTIONS REQUIRED BV ANY REGULATORY AGENCIES WITH JURISDICTION OVER THE PROJECT AND/OR PROPERTY. BOHLER PARTIES HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER (OR ANY RESPONSIBILITY FOR) ANV CONSTRUCTION, THE CONTRACTOR OR ITS EMPLOYEES RELATING TO THEIR WORK AND ANY AND ALL HEALTH AND SAFETY PROGRAMS OR PROCEDURES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY. THE CONTRACTOR MUST INDEMNIFY, DEFEND, PROTECT AND HOLD HARMLESS BOHLER PARTIES FOR AND FROM ANY LIABILITY TO BOHLER PARTIES RESULTING FROM THE CONTRACTOR'S WORK, SERVICES AND/OR VIOLATIONS OF THIS NOTE, THESE NOTES OR ANV NOTES IN THE PLAN SET AND, FURTHER, THE CONTRACTOR MUST NAME BOHLER AS AN ADDITIONAL INSURED UNDER THE GENERAL CONTRACTOR'S POLICIES OF GENERAL LIABILITY INSURANCE AS DESCRIBED ABOVE. 24. WHEN IT IS CLEARLY AND SPECIFICALLY WITHIN BOHLER'S SCOPE OF SERVICES CONTRACT WITH THE OWNER/DEVELOPER, BOHLER WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH AS SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA, WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT ONLY FOR THE LIMITED PURPOSE OF EVALUATING CONFORMANCE WITH THE DESIGN INTENT AND THE INFORMATION SHOWN IN THE CONSTRUCTION CONTRACT DOCUMENTS. CONSTRUCTION MEANS AND METHODS AND/OR TECHNIQUES OR PROCEDURES, COORDINATION OF THE WORK WITH OTHER TRADES, AND CONSTRUCTION SAFETY PRECAUTIONS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND BOHLER HAS NO RESPONSIBILITY OR LIABILITY FOR SAME. BOHLER WILL PERFORM ITS SHOP DRAWING REVIEW WITH REASONABLE PROMPTNESS, AS CONDITIONS PERMIT. ANY DOCUMENT, DOCUMENTING BOHLER'S REVIEW OF A SPECIFIC ITEM OR LIMITED SCOPE, MUST NOT INDICATE THAT BOHLER HAS REVIEWED THE ENTIRE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER IS NOT RESPONSIBLE FOR ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR MUST, IN WRITING, PROMPTLY AND IMMEDIATELY BRING ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS TO BOHLER'S ATTENTION. BOHLER IS NOT REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN RECEIVED. 25. IF THE CONTRACTOR DEVIATES FROM THESE PLANS AND/OR SPECIFICATIONS, INCLUDING THE NOTES CONTAINED HEREIN, WITHOUT FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE ENGINEER OF RECORD AND BOHLER FOR ALL DEVIATIONS WITHIN ENGINEER'S SCOPE, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PAYMENT OF ALL COSTS INCURRED IN CORRECTING ANV WORK PERFORMED WHICH DEVIATES FROM THE PLANS, ALL FINES AND/OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER, MUST DEFEND, INDEMNIFY, PROTECT, AND HOLD HARMLESS THE ENGINEER OF RECORD AND BOHLER PARTIES TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, FOR AND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, JUDGMENTS, CLAIMS, INJURIES, PENALTIES AND THE LIKE RELATED TO SAME. 26. THE CONTRACTOR IS RESPONSIBLE FOR A MAINTAINING AND PROTECTING THE TRAFFIC CONTROL PLAN AND ELEMENTS IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS, FOR ALL WORK THAT AFFECTS PUBLIC TRAVEL EITHER IN THE RIGHT OF WAY OR ON SITE. THE COST FOR THIS ITEM MUST BE INCLUDED IN THE CONTRACTOR'S PRICE AND IS THE CONTRACTOR'S SOLE RESPONSIBILITY. 27. OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATURES AND DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS IN STRICT ACCORDANCE WITH THE APPROVED PLAN(S) AND DESIGN; AND, FURTHER, THE ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR ANY FAILURE TO SO MAINTAIN OR PRESERVE SITE AND/OR DESIGN FEATURES. IF OWNER FAILS TO MAINTAIN AND/OR PRESERVE ALL PHYSICAL SITE FEATURES AND/OR DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, OWNER AGREES TO INDEMNIFY AND HOLD THE ENGINEER OF RECORD AND BOHLER PARTIES, HARMLESS FOR ALL INJURIES, DAMAGES AND COSTS THAT ENGINEER OF RECORD AND BOHLER INCUR AS A RESULT OF SAID FAILURE OR FAILURE TO PRESERVE. 28. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING THAT ALL CONSTRUCTION ACTIVITIES AND MATERIALS COMPLY WITH AND CONFORM TO APPLICABLE FEDERAL, STATE AND LOCAL RULES AND REGULATIONS, LAWS, ORDINANCES, AND CODES, AND ALL APPLICABLE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, (29 U.S.C. 651 ET SEQ.) AS AMENDED, AND ANY MODIFICATIONS, AMENDMENTS OR REVISIONS TO SAME. 29. THE CONTRACTOR MUST STRICTLY COMPLY WITH THE LATEST AND CURRENT OSHA STANDARDS AND REGULATIONS, AND/OR ANY OTHER AGENCY WITH JURISDICTION OVER EXCAVATION AND TRENCHING PROCEDURES. ENGINEER OF RECORD AND BOHLER HAS NO RESPONSIBILITY FOR OR AS RELATED TO EXCAVATION AND TRENCHING PROCEDURES AND WORK. 30. THE CONTRACTOR AND THE OWNER MUST INSTALL ALL ELEMENTS AND COMPONENTS IN STRICT COMPLIANCE WITH AND IN ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDED INSTALLATION CRITERIA AND SPECIFICATIONS. IF THE CONTRACTOR AND/OR OWNER FAIL TO DO SO, THEY AGREE TO JOINTLY, INDEPENDENTLY, SEPARATELY, COLLECTIVELY, AND SEVERALLY INDEMNIFY, DEFEND, PROTECT AND HOLD ENGINEER OF RECORD AND BOHLER PARTIES HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS AS A RESULT OF SAID FAILURE. 31. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN AN ON -SITE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN COMPLIANCE WITH THE ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUIREMENTS OR LOCAL GOVERNING AGENCY FOR SITES WHERE ONE (1) ACRE OR MORE IS DISTURBED BY CONSTRUCTION ACTIVITIES (UNLESS THE LOCAL JURISDICTION REQUIRES A DIFFERENT THRESHOLD). THE CONTRACTOR MUST ENSURE THAT ALL ACTIVITIES, INCLUDING THOSE OF ALL SUBCONTRACTORS, ARE IN COMPLIANCE WITH THE SWPPP, INCLUDING BUT NOT LIMITED TO LOGGING ACTIVITIES (MINIMUM ONCE PER WEEK AND AFTER RAINFALL EVENTS) AND CORRECTIVE MEASURES, AS APPROPRIATE AND FURTHER, THE CONTRACTOR IS SOLELY AND COMPLETELY RESPONSIBLE FOR FAILING TO DO SO. 32. AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED DOCUMENTS PREPARED BY THE ENGINEER OF RECORD AND BOHLER, THE USE OF THE WORDS'CERTIFY' OR'CERTIFICATION' CONSTITUTE(S) AN EXPRESSION ONLY OF PROFESSIONAL OPINION REGARDING THE INFORMATION WHICH IS THE SUBJECT OF THE ENGINEER OF RECORD'S AND BOHLER KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON AND ACCEPTED PROCEDURE CONSISTENT WITH THE APPLICABLE STANDARDS OF PRACTICE, AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE OF ANY NATURE OR TYPE, EITHER EXPRESSED OR IMPLIED, UNDER ANY CIRCUMSTANCES. 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. THE CONTRACTOR MUST CONDUCT DEMOLITIONIREMOVALS ACTIVITIES IN SUCH A MANNER AS TO ENSURE MINIMUM INTERFERENCE WITH ROADS STREETS SIDEWALKS WALKWAYS AND ALL OTHER ADJACENT FACILITIES. THE CONTRACTOR MUST OBTAIN ALL APPLICABLE PERMITS FROM THE APPROPRIATE GOVERNMENTAL AUTHORITY IES PRIOR TO THE ( ) COMMENCEMENT OF ANV ROAD OPENING OR DEMOLITION ACTIVITIES IN OR ADJACENT TO THE RIGHT-OF-WAY. 3. WHEN DEMOLITION -RELATED ACTIVITIES IMPACT ROADWAYS AND/OR ROADWAY RIGHT-OF-WAY THE CONTRACTOR MUST PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE WITH THE CURRENT FEDERAL HIGHWAY ADMINISTRATION "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" MUTCD AND THE FEDERAL STATE AND LOCAL ( ). REGULATIONS. 4. THE DEMOLITION AND/OR REMOVALS PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION AND TO IDENTIFY ONLY ( ) CONDITIONS REGARDING ITEMS TO BE DEMOLISHED REMOVED AND/OR TO REMAIN. A. THE CONTRACTOR MUST ALSO REVIEW ALL CONSTRUCTION DOCUMENTS AND INCLUDE WITHIN THE DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE IMPROVEMENTS. B. THIS PLAN IS NOT INTENDED TO AND DOES NOT PROVIDE DIRECTION REGARDING THE MEANS METHODS SEQUENCING TECHNIQUES AND PROCEDURES TO BE EMPLOYED TO ACCOMPLISH THE WORK. ALL MEANS METHODS SEQUENCING TECHNIQUES AND PROCEDURES TO BE USED MUST BE IN STRICT ACCORDANCE AND CONFORMANCE WITH ALL STATE, FEDERAL, LOCAL, AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR MUST COMPLY WITH ALL OSHA AND OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE FOR THE CONTRACTOR AND THE PUBLIC. 5. THE CONTRACTOR MUST PROVIDE ALL "METHODS AND MEANS" NECESSARY TO PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF EXISTING STRUCTURES, AND ANY OTHER IMPROVEMENTS THAT ARE REMAINING ON OR OFF SITE. THE CONTRACTOR, AT THE CONTRACTOR'S SOLE COST, MUST REPAIR ALL DAMAGE TO ALL ITEMS AND FEATURES THAT ARE TO REMAIN. CONTRACTOR MUST USE NEW MATERIAL FOR ALL REPAIRS. CONTRACTOR'S REPAIRS MUST INCLUDE THE RESTORATION OF ALL ITEMS AND FEATURES REPAIRED TO THEIR PRE -DEMOLITION CONDITION, OR BETTER. CONTRACTOR MUST PERFORM ALL REPAIRS AT THE CONTRACTOR'S SOLE EXPENSE. 6. ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. THE CONTRACTOR MUST PROCEED WITH THE DEMOLITION IN A SYSTEMATIC AND SAFE MANNER COMPLYING WITH ALL OSHA REQUIREMENTS TO ENSURE PUBLIC AND CONTRACTOR SAFETY AND SAFETY TO ALL PROPERTY ON THE SITE OR ADJACENT OR NEAR TO THE SAME. 7. THE CONTRACTOR IS RESPONSIBLE FOR JOB SITE SAFETY, WHICH MUST INCLUDE, BUT IS NOT LIMITED TO, THE INSTALLATION AND MAINTENANCE OF BARRIERS, FENCING, OTHER APPROPRIATE AND/OR NECESSARY SAFETY FEATURES AND ITEMS NECESSARY TO PROTECT THE PUBLIC FROM AREAS OF CONSTRUCTION AND CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST SAFEGUARD THE SITE AS NECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE ENTRY OF ALL UNAUTHORIZED PERSONS AT ANY TIME, TO OR NEAR THE DEMOLITION AREA. 8. PRIOR TO THE COMMENCEMENT OF ANY SITE ACTIVITY AND ANY DEMOLITION ACTIVITY, THE CONTRACTOR MUST, IN WRITING, RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS AND/OR SPECIFICATIONS, ALL CONCERNS OR QUESTIONS REGARDING THE APPLICABLE SAFETY STANDARDS, AND/OR THE SAFETY OF THE CONTRACTOR AND/OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT. ANV SUCH CONCERNS MUST BE CONVEYED TO THE ENGINEER OF RECORD AND BOHLER , IN WRITING AND MUST ADDRESS ALL ISSUES AND ITEMS RESPONDED TO, BY THE ENGINEER OF RECORD AND BV BOHLER, IN WRITING. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, REQUIREMENTS, STATUTES, ORDINANCES AND CODES. 9. THE CONTRACTOR MUST BECOME FAMILIAR WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AND/OR DISCONNECTION AS IDENTIFIED OR REQUIRED FOR THE PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED, REMOVED AND/OR ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY COMPANY REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. 10. PRIOR TO COMMENCING ANY DEMOLITION, THE CONTRACTOR MUST: A OBTAIN ALL REQUIRED PERMITS AND MAINTAIN THE SAME ON SITE FOR REVIEW BY THE ENGINEER AND ALL PUBLIC AGENCIES WITH JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK, AND DEMOLITION WORK. B. NOTIFY, AT A MINIMUM, THE MUNICIPAL ENGINEER, DESIGN ENGINEER, AND LOCAL SOIL CONSERVATION JURISDICTION, AT LEAST 72 BUSINESS HOURS PRIOR TO THE COMMENCEMENT OF WORK. C. INSTALL THE REQUIRED SOIL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO SITE DISTURBANCE, AND MAINTAIN SAID CONTROLS UNTIL SITE IS STABILIZED D. IN ACCORDANCE WITH STATE LAW, THE CONTRACTOR MUST CALL THE STATE ONE -CALL DAMAGE PROTECTION SYSTEM FOR UTILITY MARK OUT, IN ADVANCE OF ANY EXCAVATION. E. LOCATE AND PROTECT ALL UTILITIES AND SERVICES, INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN AND ADJACENT TO THE LIMITS OF PROJECT ACTIVITIES. THE CONTRACTOR MUST USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL UNDERGROUND UTILITIES. F. PROTECT AND MAINTAIN IN OPERATION, ALL ACTIVE UTILITIES AND SYSTEMS THAT ARE NOT BEING REMOVED DURING ANY DEMOLITION ACTIVITIES. G. ARRANGE FOR AND COORDINATE WITH THE APPLICABLE UTILITY SERVICE PROVIDER(S) FOR THE TEMPORARY OR PERMANENT TERMINATION OF SERVICE REQUIRED BV THE PROJECT PLANS AND SPECIFICATIONS REGARDING THE METHODS AND MEANS TO CONSTRUCT SAME. THESE ARE NOT THE ENGINEER OF RECORD'S RESPONSIBILITY. IN THE EVENT OF ABANDONMENT, THE CONTRACTOR MUST PROVIDE THE UTILITY ENGINEER AND OWNER WITH IMMEDIATE WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH JURISDICTIONAL AND UTILITY COMPANY REQUIREMENTS. H. ARRANGE FOR AND COORDINATE WITH THE APPLICABLE UTILITY SERVICE PROVIDER(S) REGARDING WORKING "OFF-PEAK' HOURS OR ON WEEKENDS AS NECESSARY OR AS REQUIRED TO MINIMIZE THE IMPACT ON, OF, AND TO THE AFFECTED PARTIES. WORK REQUIRED TO BE PERFORMED "OFF-PEAK" IS TO BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER. I. IN THE EVENT THE CONTRACTOR DISCOVERS ANV HAZARDOUS MATERIAL, THE REMOVAL OF WHICH IS NOT ADDRESSED IN THE PROJECT PLANS AND SPECIFICATIONS OR THE CONTRACT WITH THE OWNER/DEVELOPER, THE CONTRACTOR MUST IMMEDIATELY CEASE ALL WORK IN THE AREA OF DISCOVERY, AND IMMEDIATELY NOTIFY, IN WRITING AND VERBALLY, THE OWNER AND ENGINEER OF RECORD AND BOHLER, THE DISCOVERY OF SUCH MATERIALS TO PURSUE PROPER AND COMPLIANT REMOVAL OF SAME. 11. THE CONTRACTOR MUST NOT PERFORM ANY EARTH MOVEMENT ACTIVITIES, DEMOLITION OR REMOVAL OF FOUNDATION WALLS, FOOTINGS, OR OTHER MATERIALS WITHIN THE LIMITS OF DISTURBANCE, UNLESS SAME IS IN STRICT ACCORDANCE AND CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS, OR PURSUANT TO THE WRITTEN DIRECTION OF THE OWNER'S STRUCTURAL OR GEOTECHNICAL ENGINEER. 12. DEMOLITION ACTIVITIES AND EQUIPMENT MUST NOT USE OR INCLUDE AREAS OUTSIDE THE DEFINED PROJECT LIMIT LINE, WITHOUT SPECIFIC WRITTEN PERMISSION AND AUTHORITY OF AND FROM THE OWNER AND ALL GOVERNMENTAL AGENCIES WITH JURISDICTION. 13. THE CONTRACTOR MUST BACKFILL ALL EXCAVATION RESULTING FROM, OR INCIDENTAL TO, DEMOLITION ACTIVITIES. BACKFILL MUST BE ACCOMPLISHED WITH APPROVED BACKFILL MATERIALS AND MUST BE SUFFICIENTLY COMPACTED TO SUPPORT ALL NEW IMPROVEMENTS AND MUST BE PERFORMED IN COMPLIANCE WITH THE RECOMMENDATIONS AND GUIDANCE ARTICULATED IN THE GEOTECHNICAL REPORT. BACKFILLING MUST OCCUR IMMEDIATELY AFTER DEMOLITION ACTIVITIES AND MUST BE PERFORMED SO AS TO PREVENT WATER ENTERING THE EXCAVATION. FINISHED SURFACES MUST BE GRADED TO PROMOTE POSITIVE DRAINAGE. THE CONTRACTOR IS RESPONSIBLE FOR COMPACTION TESTING AND MUST SUBMIT SUCH REPORTS AND RESULTS TO THE ENGINEER OF RECORD AND THE OWNER. 14. EXPLOSIVES MUST NOT BE USED WITHOUT PRIOR WRITTEN CONSENT FROM BOTH THE OWNER AND ALL APPLICABLE, NECESSARY AND REQUIRED GOVERNMENTAL AUTHORITIES. PRIOR TO COMMENCING ANY EXPLOSIVE PROGRAM AND/OR ANY DEMOLITION ACTIVITIES, THE CONTRACTOR MUST ENSURE AND OVERSEE THE INSTALLATION OF ALL OF THE REQUIRED PERMIT AND EXPLOSIVE CONTROL MEASURES THAT THE FEDERAL, STATE, AND LOCAL GOVERNMENTS REQUIRE. THE CONTRACTOR IS ALSO RESPONSIBLE TO CONDUCT AND PERFORM ALL INSPECTION AND SEISMIC VIBRATION TESTING THAT IS REQUIRED TO MONITOR THE EFFECTS ON ALL LOCAL STRUCTURES AND THE LIKE. 15. IN ACCORDANCE WITH FEDERAL, STATE, AND/OR LOCAL STANDARDS, THE CONTRACTOR MUST USE DUST CONTROL MEASURES TO LIMIT AIRBORNE DUST AND DIRT RISING AND SCATTERING IN THE AIR. AFTER THE DEMOLITION IS COMPLETE, THE CONTRACTOR MUST CLEAN ALL ADJACENT STRUCTURES AND IMPROVEMENTS TO REMOVE ALL DUST AND DEBRIS WHICH THE DEMOLITION OPERATIONS CAUSE. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL ADJACENT AREAS TO THEIR "PRE -DEMOLITION" CONDITION AT CONTRACTOR'S SOLE COST. 16. PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES. ALL DEBRIS FROM REMOVAL OPERATIONS MUST BE REMOVED FROM THE SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS OUTSIDE OF APPROVED AREAS WILL NOT BE PERMITTED, INCLUDING BUT NOT LIMITED TO, THE PUBLIC RIGHT-OF-WAY. 17. THE CONTRACTOR MUST MAINTAIN A RECORD SET OF PLANS WHICH INDICATES THE LOCATION OF EXISTING UTILITIES THAT ARE CAPPED, ABANDONED IN PLACE, OR RELOCATED DUE TO DEMOLITION ACTIVITIES. THIS RECORD DOCUMENT MUST BE PREPARED IN A NEAT AND WORKMAN -LIKE MANNER AND TURNED OVER TO THE OWNERIDEVELOPER UPON COMPLETION OF THE WORK, ALL OF WHICH IS AT THE CONTRACTOR'S SOLE COST. 18. THE CONTRACTOR MUST EMPTY, CLEAN AND REMOVE FROM THE SITE ALL UNDERGROUND STORAGE TANKS, IF ENCOUNTERED, IN ACCORDANCE WITH FEDERAL, STATE, COUNTY AND LOCAL REQUIREMENTS, PRIOR TO CONTINUING CONSTRUCTION IN THE AREA AROUND THE TANK WHICH EMPTYING, CLEANING AND REMOVAL ARE AT THE CONTRACTOR'S SOLE COST. SOIL EROSION & SEDIMENT CONTROL PLAN NOTES (Rev.12020) 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. EROSION CONTROL MEASURES MUST CONFORM TO THE VIRGINA GUIDELINES FOR URBAN EROSION AND SEDIMENT CONTROL UNLESS OTHERWISE NOTED, OR UNLESS ENGINEER CLEARLY AND SPECIFICALLY, IN WRITING, DIRECTS OTHERWISE. INSTALLATION OF EROSION CONTROL, CLEARING, AND SITE WORK MUST BE PERFORMED EXACTLY AS INDICATED IN THE EROSION CONTROL CONSTRUCTION NOTES. 3. THE DISTURBED LAND AREA OF THIS SITE IS APPROXIMATELY 1.31 ACRES. 4. THE FOLLOWING EROSION CONTROL MEASURES ARE PROPOSED FOR THIS SITE: A STABILIZED CONSTRUCTION ENTRANCE/ EXIT -A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT IS TO BE INSTALLED AT THE DESIGNATED LOCATION SHOWN ON THE PLAN. THIS AREA MUST BE GRADED SO THAT RUNOFF WATER WILL BE RETAINED ON -SITE. B. SEDIMENT FENCE - INSTALL SILT FENCE(S) AND/OR SILT SOCK AROUND ALL OF THE DOWNSLOPE PERIMETERS OF THE SITE, TEMPORARY FILL AND SOIL STOCKPILES. C. INSTALL FILTER FABRIC DROP INLET PROTECTION AROUND EACH DRAINAGE INLET AS DRAINAGE STRUCTURES ARE INSTALLED TO REDUCE THE QUANTITY OF SEDIMENT. INSTALL TEMPORARY INLET PROTECTION ON INLETS DOWNSLOPE FROM DISTURBANCE, WHICH MAY BE BEYOND THE LIMITS OF DISTURBED AREA. 5. INSTALLATION OF EROSION CONTROL DEVICES MUST BE IN ACCORDANCE WITH ALL OF THE MANUFACTURER'S RECOMMENDATIONS. 6. THE CONTRACTOR MUST INSPECT EROSION CONTROL MEASURES WEEKLY. THE CONTRACTOR MUST REMOVE ANV SILT DEPOSITS GREATER THAN 6" COLLECTED ON THE FILTER FABRIC AND/OR SILT SOCK BARRIERS AND EXCAVATE AND REMOVE ANY SILT FROM DROP INLET PROTECTION. 7. THE CONTRACTOR MUST APPLY TEMPORARY SEED AND MULCH TO ALL DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINISHED GRADE AND VEGETATED WITHIN 7 DAYS. WHEN AREAS ARE DISTURBED AFTER THE GROWING SEASON, THE CONTRACTOR MUST STABILIZE SAME WITH GEOTEXTILE FABRIC AND MAINTAIN SAME IN STRICT ACCORDANCE WITH BEST MANAGEMENT PRACTICES. 8. THE CONTRACTOR MUST INSTALL ADDITIONAL EROSION CONTROL MEASURES IF ENGINEER SO REQUIRES, TO PREVENT ANY, INCLUDING THE INCIDENTAL, DISCHARGE OF SILT -LADEN RUNOFF FROM EXITING THE SITE. 9. THE CONTRACTOR MUST BE RESPONSIBLE FOR INSPECTING AND MAINTAINING ALL EROSION CONTROL MEASURES ON THE SITE UNTIL PERMANENT PAVING AND TURF/LANDSCAPING IS ESTABLISHED. THE COSTS OF INSTALLING AND MAINTAINING THE EROSION CONTROL MEASURES MUST BE INCLUDED IN THE BID PRICE FOR THE SITE WORK AND THE CONTRACTOR IS RESPONSIBLE FOR ALL SUCH COSTS. 10. THE CONTRACTOR MUST CONTINUE TO MAINTAIN ALL EROSION CONTROL MEASURES UNTIL THE COMPLETION OF CONSTRUCTION AND THE ESTABLISHMENT OF VEGETATION. 11. THE CONTRACTOR MUST REMOVE EROSION CONTROL MEASURES, SILT AND DEBRIS AFTER ESTABLISHING PERMANENT VEGETATION COVER OR OTHER INSTALLING A DIFFERENT, SPECIFIED METHOD OF STABILIZATION. 12. THIS PLAN REPRESENTS THE MINIMUM LEVEL OF IMPLEMENTATION OF TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES, MEASURES AND STRUCTURES. ADDITIONAL FACILITIES, MEASURES AND STRUCTURES MUST BE INSTALLED WHERE NECESSARY TO COMPLY WITH ALL APPLICABLE CODES AND STANDARDS AND/OR TO PREVENT ANY, INCLUDING THE INCIDENTAL DISCHARGE OF SILT -LADEN RUNOFF FROM EXITING THE SITE. 13. THE CONTRACTOR MUST PROTECT ALL EXISTING TREES AND SHRUBS. THE CONTRACTOR MUST REFER TO THE LANDSCAPE AND/OR DEMOLITION PLAN($) FOR TREE PROTECTION, FENCE LOCATIONS AND DETAILS. 14. THE CONTRACTOR MUST REFER TO GRADING PLANS FOR ADDITIONAL INFORMATION. 15. THE CONTRACTOR MUST CLEAN EXISTING AND PROPOSED DRAINAGE STRUCTURES AND INTERCONNECTING PIPES ON OR OFF -SITE AS THE JURISDICTIONAL AGENCY REQUIRES, BOTH AT THE TIME OF SITE STABILIZATION AND AT END OF PROJECT. 16. SOIL EROSION CONTROL MEASURES MUST BE ADJUSTED OR RELOCATED BY THE CONTRACTOR AS IDENTIFIED DURING SITE OBSERVATION IN ORDER TO MAINTAIN THE COMPLETE EFFECTIVENESS OF ALL CONTROL MEASURES. 17. THE CONTRACTOR MUST IDENTIFY, ON THE PLAN, THE LOCATION OF WASTE CONTAINERS, FUEL STORAGE TANKS, CONCRETE WASHOUT AREAS AND ANY OTHER LOCATIONS WHERE HAZARDOUS MATERIALS ARE STORED. 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. PRIOR TO THE COMMENCEMENT OF GENERAL CONSTRUCTION, THE CONTRACTOR MUST INSTALL SOIL EROSION CONTROL AND ANY STORMWATER POLLUTION PREVENTION PLAN SWPPP MEASURES NECESSARY AS INDICATED ON THE APPROVED SOIL ( ) EROSION AND SEDIMENT CONTROL PLAN AND IN ACCORDANCE WITH APPLICABLE AND/OR APPROPRIATE AGENCIES' GUIDELINES TO PREVENT SEDIMENT AND/OR LOOSE DEBRIS FROM WASHING ONTO ADJACENT PROPERTIES OR THE RIGHT OF WAY. 3. ALL DIRECTIONAL/TRAFFIC SIGNING AND PAVEMENT STRIPING MUST CONFORM TO THE LATEST STANDARDS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND ANV APPLICABLE STATE OR LOCALLY APPROVED SUPPLEMENTS, GUIDELINES RULES REGULATIONS STANDARDS AND THE LIKE. 4. THE LOCATIONS OF PROPOSED UTILITY POLES AND TRAFFIC SIGNS SHOWN ON THE PLANS ARE SCHEMATIC AND PRELIMINARY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR FIELD -VERIFYING THEIR LOCATION. THE CONTRACTOR MUST COORDINATE THE RELOCATION OF TRAFFIC SIGNS WITH THE ENTITY WITH JURISDICTION OVER THE PROJECT. 5. ALL DIMENSIONS SHOWN ARE TO BOTTOM FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF BUILDING, EXCEPT WHEN DIMENSION IS TO A PROPERTY LINE, STAKE OUT OF LOCATIONS OF INLETS, LIGHT POLES, ETC. MUST BE PERFORMED IN STRICT ACCORDANCE WITH THE DETAILS UNLESS NOTED CLEARLY OTHERWISE. GRADING NOTES (Rev.22021) 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. SITE GRADING MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AS REFERENCED IN THIS PLAN SET. IF NO GEOTECHNICAL REPORT HAS BEEN REFERENCED THE CONTRACTOR MUST HAVE A GEOTECHNICAL ENGINEER PROVIDE WRITTEN SPECIFICATIONS AND RECOMMENDATIONS PRIOR TO THE CONTRACTOR COMMENCING THE GRADING WORK. THE CONTRACTOR MUST FOLLOW THE REQUIREMENTS OF ALL MUNICIPAL, COUNTY, STATE, AND FEDERAL LAWS, WHICH HAVE JURISDICTION OVER THIS PROJECT. 3. THE CONTRACTOR IS REQUIRED TO SECURE ALL NECESSARY AND/OR REQUIRED PERMITS AND APPROVALS FOR ALL OFF -SITE MATERIAL SOURCES AND DISPOSAL FACILITIES. THE CONTRACTOR MUST SUPPLY A COPY OF APPROVALS TO THE ENGINEER OF RECORD AND THE OWNER PRIOR TO THE CONTRACTOR COMMENCING ANY WORK. 4. THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFYING EXISTING TOPOGRAPHIC INFORMATION AND UTILITY INVERT ELEVATIONS PRIOR TO COMMENCING ANV CONSTRUCTION. SHOULD DISCREPANCIES BETWEEN THE PLANS AND INFORMATION OBTAINED THROUGH FIELD VERIFICATIONS BE IDENTIFIED OR EXIST, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING. 5. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING ALL UNSUITABLE MATERIALS WITH SUITABLE MATERIALS AS SPECIFIED IN THE GEOTECHNICAL REPORT. THE CONTRACTOR MUST COMPACT ALL EXCAVATED OR FILLED AREAS IN STRICT ACCORDANCE WITH THE GEOTECHNICAL REPORTS GUIDANCE. MOISTURE CONTENT AT TIME OF PLACEMENT MUST BE SUBMITTED IN A COMPACTION REPORT PREPARED BV A QUALIFIED GEOTECHNICAL ENGINEER, REGISTERED WITH THE STATE WHERE THE WORK IS PERFORMED. THIS REPORT MUST VERIFY THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES WHICH ARE IN EFFECT AND WHICH ARE APPLICABLE TO THE PROJECT. SUBBASE MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT MUST BE FREE OF ORGANICS AND OTHER UNSUITABLE MATERIALS. SHOULD SUBBASE BE DEEMED UNSUITABLE BY OWNERIDEVELOPER, OR OWNER/DEVELOPER'S REPRESENTATIVE, SUBBASE MUST BE REMOVED AND FILLED WITH APPROVED FILL MATERIAL, COMPACTED AS THE GEOTECHNICAL REPORT DIRECTS. EARTHWORK ACTIVITIES INCLUDING, BUT NOT LIMITED TO, EXCAVATION, BACKFILL, AND COMPACTING MUST COMPLY WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. EARTHWORK ACTIVITIES MUST COMPLY WITH THE STANDARD STATE DOT SPECIFICATIONS FOR ROADWAY CONSTRUCTION (LATEST EDITION) AND ANY AMENDMENTS OR REVISIONS THERETO. 6. IN THE EVENT OF A DISCREPANCY(IES) AND/OR A CONFUCT(S) BETWEEN PLANS, OR RELATIVE TO OTHER PLANS, THE GRADING PLAN TAKES PRECEDENCE AND CONTROLS. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING, OF ANV DISCREPANCY(IES) AND/OR CONFUCT(S). 7. THE CONTRACTOR IS RESPONSIBLE TO IMPORT FILL OR EXPORT EXCESS MATERIAL AS NECESSARY TO CONFORM TO THE PROPOSED GRADING, AND TO BACKFILL EXCAVATIONS FOR THE INSTALLATION OF UNDERGROUND IMPROVEMENTS. ACCESSIBILITY DESIGN GUIDELINES (Rev.12020) 1. ALL ACCESSIBLE (A.K.A. ADA) COMPONENTS AND ACCESSIBLE ROUTES MUST BE CONSTRUCTED TO MEET, AT A MINIMUM, THE MORE STRINGENT OF: (A) THE REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACT (ADA) CODE (42 U.S.C. § 12101 ET SEQ. AND 42 U.S.C. § 4151 ET SEQ.); AND (B) ANY APPLICABLE LOCAL AND STATE GUIDELINES, AND ANV AND ALL AMENDMENTS TO BOTH, WHICH ARE IN EFFECT WHEN THESE PLANS WERE COMPLETED. 2. THE CONTRACTOR MUST REVIEW ALL DOCUMENTS REFERENCED IN THESE NOTES FOR ACCURACY, COMPLIANCE AND CONSISTENCY WITH INDUSTRY GUIDELINES. 3. THE CONTRACTOR MUST EXERCISE APPROPRIATE CARE AND PRECISION IN CONSTRUCTION OF ACCESSIBLE (ADA) COMPONENTS AND ACCESSIBLE ROUTES FOR THE SITE. FINISHED SURFACES ALONG THE ACCESSIBLE ROUTE OF TRAVEL FROM PARKING SPACES, PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, AND INTER -BUILDING ACCESS, TO POINTS OF ACCESSIBLE BUILDING ENTRANCEEXIT, MUST COMPLY WITH THE ACCESSIBLE GUIDELINES AND REQUIREMENTS WHICH INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: A. ACCESSIBLE PARKING SPACES AND ACCESS AISLES SLOPES MUST NOT EXCEED 1:50 (2.0%) IN ANV DIRECTION. B. PATH OF TRAVEL ALONG ACCESSIBLE ROUTE MUST PROVIDE A 36-INCHES MINIMUM WIDTH (48-INCHES PREFERRED), OR AS SPECIFIED BV THE GOVERNING AGENCY. UNOBSTRUCTED WIDTH OF TRAVEL (CAR OVERHANGS AND/OR HANDRAILS) MUST NOT REDUCE THIS MINIMUM WIDTH. THE SLOPE MUST NOT EXCEED 1:20 (5.0%) IN THE DIRECTION OF TRAVEL AND MUST NOT EXCEED 1:50 (2.0%) IN CROSS SLOPE. WHERE ACCESSIBLE PATH OF TRAVEL IS GREATER THAN 1:20 (5.0%), AN ACCESSIBLE RAMP MUST BE PROVIDED. ALONG THE ACCESSIBLE PATH OF TRAVEL, OPENINGS MUST NOT EXCEED 12-INCH IN WIDTH. VERTICAL CHANGES OF UP TO 12-INCH ARE PERMITTED ONLY IF THEY INCLUDES A 114-INCH BEVEL AT A SLOPE NOT STEEPER THAN 1:2. NO VERTICAL CHANGES OVER 114-INCH ARE PERMITTED. C. ACCESSIBLE RAMPS MUST NOT EXCEED A SLOPE OF 1:12 (8.3%) AND A RISE OF 30-INCHES. LEVEL LANDINGS MUST BE PROVIDED AT EACH END OF ACCESSIBLE RAMPS. LANDING MUST PROVIDE POSITIVE DRAINAGE AWAY FROM STRUCTURES, AND MUST NOT EXCEED 1:50 (2.0%) SLOPE IN ANY DIRECTION. RAMPS THAT CHANGE DIRECTION BETWEEN RUNS AT LANDINGS MUST HAVE A CLEAR LANDING OF A MINIMUM OF 60-INCHES BY 60-INCHES. HAND RAILS ON BOTH SIDES OF THE RAMP MUST BE PROVIDED ON AN ACCESSIBLE RAMP WITH A RISE GREATER THAN 6-INCHES. D. ACCESSIBLE CURB RAMPS MUST NOT EXCEED A SLOPE OF 1:12 (8.3%). WHERE FLARED SIDES ARE PROVIDED, THEY MUST NOT EXCEED 1:10 (10%) SLOPE. LEVEL LANDING MUST BE PROVIDED AT RAMPS TOP AT A MINIMUM OF 36-INCHES LONG (48-INCHES PREFERRED). IN ALTERATIONS, WHEN THERE IS NO LANDING AT THE TOP, FLARE SIDES SLOPES MUST NOT EXCEED A SLOPE OF 1:12 (8.3%). E. DOORWAY LANDINGS AREAS MUST BE PROVIDED ON THE EXTERIOR SIDE OF ANY DOOR LEADING TO AN ACCESSIBLE PATH OF TRAVEL. THIS LANDING MUST BE SLOPED AWAY FROM THE DOOR NO MORE THAN 1:50 (2.0%) FOR POSITIVE DRAINAGE. THIS LANDING AREA MUST BE NO FEWER THAN 60-INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE CLEARLY PERMITTED BY ACCESSIBLE STANDARDS FOR ALTERNATIVE DOORWAY OPENING CONDITIONS. (SEE ICC/ANSI A717.1-2009 AND OTHER REFERENCES INCORPORATED BY CODE). F. WHEN THE PROPOSED CONSTRUCTION INVOLVES RECONSTRUCTION, MODIFICATION, REVISION OR EXTENSION OF OR TO ACCESSIBLE COMPONENTS FROM EXISTING DOORWAYS OR SURFACES, THE CONTRACTOR MUST VERIFY ALL EXISTING ELEVATIONS SHOWN ON THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT OF JUSTICE'S ADA STANDARDS FOR ACCESSIBLE DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING, OF ANV DISCREPANCIES AND/OR FIELD CONDITIONS THAT DIFFER IN ANY WAY OR IN ANY RESPECT FROM WHAT IS SHOWN ON THE PLANS BEFORE COMMENCING ANY WORK. CONSTRUCTED IMPROVEMENTS MUST FALL WITHIN THE MAXIMUM AND MINIMUM LIMITATIONS IMPOSED BV THE BARRIER FREE REGULATIONS AND THE ACCESSIBLE GUIDELINES. G. THE CONTRACTOR MUST VERIFY ALL OF THE SLOPES OF THE CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE. IF ANY NON-CONFORMANCE EXISTS OR IS OBSERVED OR DISCOVERED, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING, PRIOR TO POURING CONCRETE. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND/OR REPLACE NON -CONFORMING CONCRETE AND/OR PAVEMENT SURFACES. 4. IT IS STRONGLY RECOMMENDED THAT THE CONTRACTOR REVIEW THE INTENDED CONSTRUCTION TO ENSURE SAME IS CONSISTENT WITH THE LOCAL BUILDING CODE PRIOR TO COMMENCING CONSTRUCTION. DRAINAGE AND UTILITY NOTES (Rev.22021) 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. LOCATIONS OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE, AND THE CONTRACTOR MUST INDEPENDENTLY VERIFY AND CONFIRM THOSE LOCATIONS AND SERVICES WITH LOCAL UTILITY COMPANIES PRIOR TO COMMENCING ANV CONSTRUCTION OR EXCAVATION. THE CONTRACTOR MUST INDEPENDENTLY VERIFY AND CONFIRM ALL SANITARY CONNECTION POINTS AND ALL OTHER UTILITY SERVICE CONNECTION POINTS IN THE FIELD, PRIOR TO COMMENCING ANY CONSTRUCTION. THE CONTRACTOR MUST REPORT ALL DISCREPANCIES, ERRORS AND OMISSIONS IN WRITING, TO THE ENGINEER OF RECORD. 3. THE CONTRACTOR MUST VERTICALLY AND HORIZONTALLY LOCATE ALL UTILITIES AND SERVICES INCLUDING, BUT NOT LIMITED TO, GAS, WATER, ELECTRIC, SANITARY AND STORM, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE OR WORK SPACE, WHICHEVER IS GREATER. THE CONTRACTOR MUST USE, REFER TO, AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL OF THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO ANV EXISTING UTILITIES WHICH OCCUR DURING CONSTRUCTION, AT NO COST TO THE OWNER AND AT CONTRACTOR'S SOLE COST AND EXPENSE. THE CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH DAMAGE TO ANV EXISTING UTILITIES WHICH OCCURS DURING CONSTRUCTION. 4. THE CONTRACTOR MUST FIELD VERIFY THE PROPOSED INTERFACE POINTS (CROSSINGS) WITH EXISTING UNDERGROUND UTILITIES BY USING A TEST PIT TO CONFIRM EXACT DEPTH, PRIOR TO COMMENCEMENT OF CONSTRUCTION. 5. STORMWATER ROOF DRAIN LOCATIONS ARE BASED ON ARCHITECTURAL PLANS. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATIONS OF SAME BASED UPON FINAL ARCHITECTURAL PLANS. 6. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING SITE PLAN DOCUMENTS AND ARCHITECTURAL PLANS FOR EXACT BUILDING UTILITY CONNECTION LOCATIONS; GREASE TRAP REQUIREMENTS; AND DETAILS, DOOR ACCESS, AND EXTERIOR GRADING. THE ARCHITECT WILL DETERMINE THE UTILITY SERVICE SIZES. THE CONTRACTOR MUST COORDINATE INSTALLATION OF UTILITY SERVICES WITH THE INDIVIDUAL COMPANIES TO AVOID CONFLICTS AND TO ENSURE THAT PROPER DEPTHS ARE ACHIEVED. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT INSTALLATION OF ALL IMPROVEMENTS COMPLIES WITH ALL UTILITY REQUIREMENTS OF THE APPLICABLE JURISDICTION AND REGULATORY AGENCIES AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES AND, FURTHER, IS RESPONSIBLE FOR COORDINATING THE UTILITY TIE-INS/CONNECTIONS PRIOR TO CONNECTING TO THE EXISTING UTILITY/SERVICE. WHERE A CONFUCT(S) EXISTS BETWEEN THESE DOCUMENTS AND THE ARCHITECTURAL PLANS, OR WHERE ARCHITECTURAL PLAN UTILITY CONNECTION POINTS DIFFER, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER OF RECORD, IN WRITING, AND PRIOR TO CONSTRUCTION, MUST RESOLVE SAME. 7. ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION MUST BE EXACTLY AS PER THE RECOMMENDATIONS PROVIDED IN THE GEOTECHNICAL REPORT AND THE CONTRACTOR MUST COORDINATE SAME WITH THE APPLICABLE UTILITY COMPANY SPECIFICATIONS. WHEN THE PROJECT DOES NOT HAVE GEOTECHNICAL RECOMMENDATIONS, FILL AND COMPACTION MUST COMPLY WITH APPLICABLE REQUIREMENTS AND SPECIFICATIONS. ENGINEER OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR DESIGN OF TRENCH BACKFILL OR FOR COMPACTION REQUIREMENTS 8. DURING THE INSTALLATION OF SANITARY, STORM, AND ALL UTILITIES, THE CONTRACTOR MUST MAINTAIN A CONTEMPORANEOUS AND THOROUGH RECORD OF CONSTRUCTION TO IDENTIFY THE AS -INSTALLED LOCATIONS OF ALL UNDERGROUND INFRASTRUCTURE. THE CONTRACTOR MUST CAREFULLY NOTE ANY INSTALLATIONS THAT DEVIATE, IN ANV RESPECT, FROM THE INFORMATION CONTAINED IN THESE PLANS. THIS RECORD MUST BE KEPT ON A CLEAN COPY OF THE APPROPRIATE PLAN(S), WHICH THE CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER IMMEDIATELY UPON THE COMPLETION OF WORK. 9. THE CONTRACTOR MUST ENSURE THAT ALL UTILITY TRENCHES LOCATED IN EXISTING PAVED ROADWAYS INCLUDING SANITARY, WATER AND STORM SYSTEMS, ARE REPAIRED IN ACCORDANCE WITH REFERENCED MUNICIPAL, COUNTY AND OR STATE DOT DETAILS AS APPLICABLE. THE CONTRACTOR MUST COORDINATE INSPECTION AND APPROVAL OF COMPLETED WORK WITH THE AGENCY WITH JURISDICTION OVER SAME. 10. FINAL LOCATIONS OF PROPOSED UTILITY POLES, AND/ OR POLES TO BE RELOCATED ARE AT THE SOLE DISCRETION OF THE RESPECTIVE UTILITY COMPANY, REGARDLESS OF WHAT THIS PLAN DEPICTS. 11. WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS MUST BE SPECIFIED BY THE LOCAL UTILITY COMPANY. THE CONTRACTOR MUST CONTACT THE APPLICABLE MUNICIPALITY TO CONFIRM THE PROPER WATER METER AND VAULT, PRIOR TO COMMENCING CONSTRUCTION. 12. THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT MUST BE ADJUSTED, AS NECESSARY, TO MATCH PROPOSED FINISHED GRADES WITH NO TRIPPING OR SAFETY HAZARD IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. 1. THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2. THE LIGHTING CONTRACTOR MUST COMPLY WITH ALL APPLICABLE CONTRACTOR REQUIREMENTS INDICATED IN THE PLANS, INCLUDING BUT NOT LIMITED TO GENERAL NOTES GRADING AND UTILITY NOTES SITE SAFETY AND ALL AGENCY AND GOVERNMENTAL REGULATIONS. 3. THE LIGHTING PLAN DEPICTS PROPOSED SUSTAINED ILLUMINATION LEVELS CALCULATED USING DATA PROVIDED BY THE NOTED MANUFACTURER. ACTUAL SUSTAINED SITE ILLUMINATION LEVELS AND PERFORMANCE OF LUMINAIRES MAY VARY DUE TO VARIATIONS IN WEATHER, ELECTRICAL VOLTAGE, TOLERANCE IN LAMPS, THE SERVICE LIFE OF EQUIPMENT AND LUMINAIRES AND OTHER RELATED VARIABLE FIELD CONDITIONS. 4. THE LIGHTING VALUES AND CALCULATION POINTS DEPICTED ON THIS PLAN ARE ANALYZED ON A HORIZONTAL GEOMETRIC PLANE AT GROUND LEVEL UNLESS OTHERWISE NOTED. ILLUMINATION LEVELS ARE SHOWN IN FOOT-CANDLES FC . ( ) 5. THE LUMINAIRES, LAMPS AND LENSES MUST BE REGULARLY INSPECTED/MAINTAINED TO ENSURE THAT THEY FUNCTION PROPERLY. THIS WORK SHOULD INCLUDE, BUT IS NOT LIMITED TO, VISUAL OBSERVATION, CLEANING OF LENSES, AND RE-LAMPING ACCORDING TO MANUFACTURER RECOMMENDATIONS. FAILURE TO FOLLOW THE ABOVE STEPS COULD RESULT IN IMPROPER LIGHT DISTRIBUTION AND FAILURE TO COMPLY WITH THE APPROVED DESIGN. UPON COMPLETION AND OWNER'S ACCEPTANCE OF THE WORK THE ABOVE RESPONSIBILITIES BECOMES SOLELY THE OWNER'S. 6. THE LIGHTING PLAN IS INTENDED TO SHOW THE LOCATIONS AND TYPE OF LUMINAIRES. POWER SYSTEM, CONDUITS, WIRING AND OTHER ELECTRICAL COMPONENTS ARE SOLELY THE ARCHITECTS, MECHANICAL ENGINEER'S AND/OR LIGHTING CONTRACTOR'S RESPONSIBILITY, AS INDICATED IN THE CONSTRUCTION CONTRACT DOCUMENTS. THE LIGHTING CONTRACTOR MUST COORDINATE WITH THE PROJECT ARCHITECT AND/OR ELECTRICAL ENGINEER REGARDING ANY AND ALL POWER SOURCES AND TIMING DEVICES NECESSARY TO MEET THE DESIGN INTENT. THESE ITEMS MUST BE INSTALLED AS REQUIRED BY STATE AND LOCAL REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF LIGHTING FIXTURES AND APPURTENANCES IN ACCORDANCE WITH ALL APPLICABLE BUILDING AND ELECTRICAL CODES. 7. THE CONTRACTOR MUST BRING IMMEDIATELY, IN WRITING, ANV LIGHT LOCATIONS THAT CONFLICT WITH DRAINAGE, UTILITIES, OR OTHER STRUCTURE(S) TO THE ENGINEER OF RECORD'S ATTENTION, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 8. THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT SHIELDING AND OR ROTATED OPTICS ARE INSTALLED AS INDICATED ON THE PLAN IN ORDER TO ACHIEVE THE LIGHTING LEVELS THE REVIEWING AGENCY APPROVED. ALBEMARLE COUNTY NOTES 1. ACCESSIBLE PARKING SPACES, ACCESS ISLES, AND ACCESSIBLE ROUTE SHALL BE INSTALLED IN ACCORDANCE WITH ICC ANSI A717.1-09 AND THE 2015 VIRGINIA CONSTRUCTION CODE. 2. ALL WATER LINES, SEWER LINES, AND FIRE LINES FROM THE MAIN TO THE STRUCTURE LOCATED ON PRIVATE PROPERTY MUST HAVE A VISUAL INSPECTION PERFORMED BY THE BUILDING DEPARTMENT. 3. WHERE THE FLOOD LEVEL RIMS OF PLUMBING FIXTURES ARE BELOW THE ELEVATION OF THE MANHOLE COVER OF THE NEXT UPSTREAM MANHOLE IN THE PUBLIC SEWER, THE FIXTURES SHALL BE PROTECTED BY A BACKWATER VALVE INSTALLED IN THE BUILDING DRAIN, BRANCH OF THE BUILDING DRAIN OR HORIZONTAL BRANCH SERVING SUCH FIXTURES. PLUMBING FIXTURES HAVING FLOOD LEVEL RIMS ABOVE THE ELEVATION OF THE MANHOLE COVER OF THE NEXT UPSTREAM MANHOLE IN THE PUBLIC SEWER SHALL NOT DISCHARGE THROUGH A BACKWATER VALVE. 4. ALL ROOF DRAINS SHALL DISCHARGE IN A MANNER NOT TO CAUSE A PUBLIC NUISANCE AND NOT OVER SIDEWALKS. 5. BUILDINGS OR STRUCTURES BUILT BEFORE JANUARY 1, 1985 MUST HAVE AN ASBESTOS SURVEY PERFORMED IN ORDER TO APPLY FOR A DEMOLITION PERMIT. ASBESTOS REMOVAL PERMITS ARE REQUIRED IF POSITIVE FOR SUCH FROM ALBEMARLE COUNTY AND VDOU. CONTACT VDOU FOR THEIR ADDITIONAL REQUIREMENTS AND PERMITS FOR DEMOLITION PROJECTS AT 540-562-3580 X131. 6. A KNOX BOX WILL BE REQUIRED. J m Z D_ W W W U7 Z W ZZ= Z W U W H W C7 U-U UZ W IE_UU ZrC�~ W �fn F W Q 2 p W Z Z)>ZULecnO p Z) 2 < in ('i 7 z U) Q Q Z Q Z 2 W Z F F OzQQQF0 U H O Q a p Z) Z 7 O p W Z Q (n a J d Q Er j J F U W H O7 REVISIONS REV DATE COMMENT CFI : DBY 1 1121/2 22 0 0 PER COUNTY COMMENTS BSC RTY 2 04/08/2022 PER COUNTY COMMENTS BSC RTY 3 08/09/2022 PER COUNTY COMMENTS CDH RTY Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. IAPPROVED FOR CONSTRUCTION I THI$ DRAWING I$ INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INUICATED OTHERWISE. I I PROJECT No.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: CNDS -1 PROJECT: V/RGINIA STORMWATER MANAGEMENT PLAN FOR D�gQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLER// 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com TH MN YAUGER Lie. No. 0402056625 08/09/2022 SHEET TITLE: GENERAL NOTES SHEET NUMBER. C-102 N O O N N m� a t REVISION 3 - 08/09/2022 0 z 0 U STANDARD DRAWING LEGEND ABBREVIATIONS STANDARD ij 3:Q Z W� Z W U) of LUEXISTING Z W ? Z W U W Z 2 W- C) W Z } (D� W it U) F W Q 2 W Z � Q ) J U) O of mCDF U) Z) 2 W Z z F Q Q U d -J V) 0_ In Of Z U) 0- Q J 0- Q It U J ~ H p FS a a @ 5 3N m gg ti § p &S po 5 g $ 82 `4 u S .9 S < - FOR ENTIRE PLAN SET LIMIT OF WORK LOW —LOW— LIMIT OF DISTURBANCE LOD LOD FOR ENTIRE PLAN SET AC ACRES NOTE TYPICAL NOTE TEXT PROPOSED NOTE ADA AMERICANS WITH DISABILITY ACT ONSITE PROPERTY LINE / R.O.W. LINE ARCH ARCHITECTURAL BC BOTTOM OF CURB — — NEIGHBORING PROPERTY LINE / INTERIOR PARCEL LINE _ _ BF BASEMENT FLOOR BK BLOCK EASEMENT LINE BL BASELINE BLDG BUILDING — — — — — — — — — — SETBACK LINE BM BUILDING BENCHMARK BRL BUILDING RESTRICTION LINE CF CUBIC FEET CONCRETE CURB & GUTTER CURB AND GUTTER CL CENTERLINE CMP CORRUGATED METAL PIPE SPILL TRANSITION CONN CONNECTION DEPRESSED AND GUTTER CONC CONCRETE _CURB CPP CORRUGATED PLASTIC PIPE CY CUBIC YARDS REVISIONS UTILITY POLE WITH LIGHT DEC DECORATIVE REV DATE COMMENT cHecxeD DRAWN POLE LIGHT �� DEP DEPRESSED er KI(EDr DIP DUCTILE IRON PIPE 1 01/21/2022 PER COUNTY COMMENTS BSC RTY TRAFFIC LIGHT F4- DOM DOMESTIC 2 04/08/2022 PER COUNTY COMMENTS BSC ELEC ELECTRIC RTY O UTILITY POLE p 3 08/09/2022 PER COUNTY COMMENTS CDH ELEV ELEVATION RTY EP EDGE OF PAVEMENT 4 (� TYPICAL LIGHT ES EDGE OF SHOULDER ACORN LIGHT EW END WALL EX EXISTING TYPICAL SIGN FES FLARED END SECTION FF FINISHED FLOOR PARKING COUNTS zi FH FIRE HYDRANT FG FINISHED GRADE , � Know whatk below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. G GRADE GF GARAGE FLOOR (AT DOOR) — —%10-- — ------------- 169------------ CONTOUR LINE 190 187 GH GRADE HIGHER SIDE OF WALL 7C 5164 OR 5/6.4 SPOT ELEVATIONS C 516.00 FTC516.00 BC 515.55 TCH EK 518.02 t) 1 GL GRADE LOWER SIDE OF WALL GIRT GRATE GV GATE VALVE HOPE HIGH DENSITY POLYETHYLENE PIPE SAN SANITARY LABEL SAN # HP HIGH POINT STORM LABEL # HOR HORIZONTAL APPROVED FOR CONSTRUCTION HW HEADWALL S/ SANITARY SEWER LATERAL INT INTERSECTION THIS DRAW NG IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEWANDAPPROVAL. IT I$ NOT INTENDED ASA CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. INV INVERT /y UNDERGROUND WATER LINE W LF LINEAR FOOT PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: CNDS-1 E UNDERGROUND ELECTRIC LINE E LOC LIMITS OF CLEARING LOD LIMITS OF DISTURBANCE G UNDERGROUND GAS LINE 0 LOS LINE OF SIGHT LP LOW POINT PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR ICI] E D g MU lu.�I'lU — PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 off OVERHEADR �H us LANDSCAPE MAX MAXIMUM T UNDERGROUND TELEPHONE LINE T MIN MINIMUM C UNDERGROUND CABLE LINE C MH MANHOLE MJ MECHANICAL JOINT STORM SEWER OC ON CENTER PA POINTOFANALYSIS S SANITARY SEWER MAIN S PC POINT CURVATURE HYDRANT PCCR POINT OF COMPOUND CURVATURE, CURB RETURN PI POINT OF INTERSECTION O SANITARY MANHOLE O POG POINT OF GRADE O STORM MANHOLE r'O , I\®_ i PROP PROPOSED PT POINT OF TANGENCY WM ® WATER METER (� PTCR POINT OF TANGENCY, CURB RETURN WV WATER VALVE • PVC POLYVINYL CHLORIDE PIPE B O H L E R I PVI POINT VERTICAL INTERSECTION GAS VALVE PVT POINT OF VERTICAL TANGENCY ® MEGAS TER ® R RADIUS 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA 23146 Phone: (804) 893-8200 VA@BohlerEng.com RCP REINFORCED CONCRETE PIPE TYPICAL END SECTION RET WALL RETAINING WALL R/W RIGHT OF WAY � HE ENDWALOR DWALL �o,�� S SLOPE LTH pF` C� V N YA R y .p Lic. No. 0402056625 OA 0$/09/202t2�_`v-� O GRATE INLET O SAN SANITARY SEWER SF SQUARE FEET p� CURB INLET STA STATION STM STORM O CLEAN OUT O S/W SIDEWALK TBR TO BE REMOVED O ELECTRIC MANHOLE O TBRL TO BE RELOCATED O TELEPHONE MANHOLE O TIC TOP OF CURB TELE TELEPHONE EB ELECTRIC BOX EB TPF TREE PROTECTION FENCE SHEET TITLE: GENERAL NOTES AND LEGEND TW TOP OF WALL EP ELECTRIC PEDESTAL EP TYP TYPICAL UG UNDERGROUND UP UTILITY POLE ® MONITORING WELL W WIDE W/L WATER LINE SHEET NUMBER. C-10 3 TEST PIT YYY WIM WATER METER 3 PLUS OR MINUS BENCHMARK ® o DEGREE BORING YYY REVISION 3 - 08/09/2022 # NUMBERR 0 O 0 6 w 0 N 09 LANDS N F ---------------- \ SULL/VAN, W/LL/AM EDWAD & ✓OHN A F (B D.B. 1095 PG. 2J7/ ' � \ PIN- 06100-0-00-00-12-120W0 ZONED. HC�H/GHWAY COMMERC/ALA j / \ US COMMERCIAL , hp9 , 0101 ________ \ i CrrAxs/a2r MP9 INC. \ LANDS N/F \ D.B. ' S476 PG. 471LOD P/N. 06P00-00-00-12000 Am)(TYP.J E \ZONED.• HC (hYIOMWAY COMMERC/AL��, /'xsne \ 6NUSE. --WAREHOUSESE \0----- L000,_ )�,/ ;A Y1 ------------------------------------- - 5 Yl IA- �,� ,/�---� � you , \ — \ _________________________ / ` y ) / - APPROX/MATE (4N0,rON OF ,h10 \ / 0� SCOPE MAINTENANCE EASEMENT ------------------------------ \ EX. FENCE ,' �i /Ja-j `�' ! �_ -__--. �- __-- -_' --h� D.B. 670,'PG 0275 / ----- \\ (TBR) /S t0.7' /Y\'', 5 / /I Y Oe1� - - / \� I SOUTHOFP �S , T1YYY h y\xm? _ 507" \ / \ r sc2 0 1 oa -rrriacEs , \ i y l , , \� 5 ��\J 5�6 LANDS Oi , MIM �1 r _r -�y D.B. 1980 PG. 239 - - i r ; 'S IY�D eA, J ` A 2 �' c 5�1 ♦ r / AREA: 1 3 A C. (R) r ; ' 57,240 S.F. 1.314 ACRES (M) 505' PIN: 06100 00 00 120 O \ BORN J m . LANDS N/F EX/SllhW TREES (TBRJ 5 t t 1 I V �, r -- - C RENTAL PR/OPER�BS LLCLE - - / X - FOUN04 x % I o `�/\ •` �\ rc y0� \- -•-r -- -- - ti- D.B. 5040 PG. 206 - - - /V / \fir r \ \ 1 P/N.• 06100-00-00-120RO 4, \ l 1 I GRAVEZ AND PAVEMENT / \" r \ � ZONED. HC HIGHWAY COMMERC/ALJ -______ - X sl , o - ta�\S - l REMNAN7S(TBRJ .-' / ' gT ,r` \yam/r r (� / y\\so U$ COMMER_LYAL \\--------- 01 1 s1 v1� �xs/ier EX/ST/N TREES (TBRJ l \ r �' 9< r \ \ r \ UYJOD PECK (7BR) I 14N, \ 21 PS (IBRJ \ 11iP70�ST� 1C\ s siaarx <1 A , C , I I , I I , I I , , I, , , I, , , I, I , , , I , , , I , , 1 , , , 1, , 1 , 1 , , I, I, , , I, , I , I, , I I, , , , I , I, , I, I Ii I ■ 09 1K 1117�t1"C�� , ! \_� \i /, ;\ \�i �`',I \ Ix \ °O ..�I\\\ TREES R (/Y�J .`.--------- I I 1 STORY�1�E \\ ' _ I<1 l 0l(�J \ \ (mil r \\� \ \ /� R'/ \ / \BENCH,k4/pA•/TO BE i f=� \ LAW ow) (hp) RESET ro / y� �>s4�t v v v v LAND L7/S7URB4NCEj �� 1 STQRY FR4Kf / ARG AWL SET Er >ewSFDJ �__ � ELEu=499>B m) 0 % F.Y/SA.9 TREES (TBR) ,c,�/xt �, , ' I :\ \ \ l I\ 5011T \ .\`.; `A�X_ / �,T/ it, OF \ 1 ` �"� / l Ff 51J05D\g,a �.� CURB INLET �' 1 �' 2 \ / ' \ \ R/M=50233 1 \ $77EST / I 1 II `\ CLLARANCE�II i\/\\ x\ EXrbr 1 \ \ \ ll (J r \ UNDERGROUND / D LWN£ DAfl% vv� vvJi \ G4S. (7BR) V vv vs0,-IN,- \ ow R•a/..i \\F;Y(SI'M 177YEASSEME T OUT (7BR) I I'\i -�28;,/4594 ,��: 25 T d ♦ \o / �� p CONC. IYALK , . / f uDgypRJDv MS. iA\ �METER (TBRJ I Vyp l�' AV 0� P/�.R17fJ \ ° D �"` EfiA/C-_!C_f9R.lf R'IAl. m\\ \\ 4 STAIRS 0Q� / rF.mzsb UNDERGROUND�F� \� ♦ / F' - RCP c xazr \ A A C! l Vv l (J\\ ELEC. (TBR) l l I \\ / EX,t;77NG TREES S �,arn \ T �� I \ f 'SE EMO N0 l \\ Q<\ 1 SIORYLIE/CK Vt e7 0 �// a"..=5G Uv BUILDING 7YENDYS" Y\Q \� `?P EX CURB INLET I 0 NO J,J51 S.F. (73R) /�Tgp/�f h N NO ACCESS \ / B'1 a i �0�(, / R/M=�uuu� R/M=493.95 "s, Q / o LANbS N/F o \\\ l l //W- 4.92.. V a� �� CONC CURB S S C 4000(5iTION_ /NC. \ \ g l l \ (sE� DEMo NOTE 4J S4N �99.& r IVAN 20 ,mt -/ crce�e 1Y/T.4RNHOLE D.B. 1429\PG. J O \ \ \A l I \\ coyc. WALK (I R I / NO?Ec P/N. 06100-00�00-120,91 \ °o \\\\ / \\\ �� ss /� h9h f �e S URBRN ET 4.59� \ \ ZONED. HC (H/GHW4K COMMEI�C/AL) \ \\ / / \� b I I ��► / RNV-49.00 USE- SELF STOWAGE \ ��' vvA cere ,tip`I ua'� , Nv-49000 yoo \ ( \ j ,� / (,>L ZIL NOTE 4) l EXLSRNG TREES (MR) \-- \� I \� CANOPY (TBRJ s z4r ' � :n PROP SAW CUT Av l (h IRON ROD S 1i/I /y 'J \ FOUND oOI \� l S�� ii <'�a�I V� CD/t, av- y / 494.91 l_ / i / �J / /; \ V/ j V _ /--soy— \ /\l / �� �' r XWN ;�, o> / / \ r ' l / / �, ,(' gi + APPROXIMATE LOC4AON Or 5i - \ ���-' 30� �' �/ / �`, V PERMANENT DRAINAGE EASEMENT ¢9y- / W may" a ,�11/ OB 4594 PG 25 -- , ---------- ----- ----- \ \ \\ l t15' ON) 00 / A C V00T JOINT USE , y0 0� �/ f //�\ UTIV7Y EASEMENT - ---------' °o Qti C \ n / rya 37 _ I f - 50�" o a '-� ____________________________" - F `� awn /___ LT G 0B 4594 PG 14 +i/ /V '' / / /�i� V OR 5 PG 5 -;°O\ •.o .tea `. rn ' ` /yam/ � > _ _____________' / --- 50t Coy9 - / -- _ S1 - \ ` \� /RIM 49 52 Q /_ V LriRB GU77D? _ _ \ \ / 48 B2 ,ate O _ / 5/6, \ z l* \ G�/ / �J LANDS N F - ,' 91 �� STORM ALANHCH£¢96 Y♦ IMI9=484.96 � v D. B J682 PG. 130 l `'` , t' /y v /NV A=4B511 �/ 06100-00-00-120 ; �P�rLXSIREt7LA lT G�• P �' -- -ZONED HC�`W/OHWAY COMME Lf;,'`.,\ X'4WJ�o ( J LEGEND / ,---- USE. FUEL STAT/ON / EY ELEC V t \ LIP NO \ OP W/ TRWS NO �-------- --- - ----- Wei K)4Va c DEMOLITION NOTES: 1. ALTA/NSPS LAND TITLE SURVEY ENTITLED "DISCOUNT TIRE CHARLOTTESVILLE" PROVIDED BY: BOHLER 12825 WORLDGATE DRIVE SUITE 700 HERNDON, VA 20170 DATE: 01/20/2021 DATUM VCS NAD83/2011 SOUTH ZONE ELEVATIONS: ARE BASED ON NAVD88 DATUM DETERMINED BY GPS OBSERVATIONS 2. ADDITIONAL TOPOGRAPHICAL INFORMATION OUTSIDE OF PROPERTY BOUNDARY IS BASED ON ALBEMARLE COUNTY GIS CONTOURS. 3. WATER/SEWER SERVICES WILL BE REQUIRED TO BE DISCONNECTED PRIOR TO DEMO PERMIT APPROVAL. 4. EXISTING STORM SEWER INVERTS AND PIPIE INFORMATION OBTAINED FROM PREVIOUSLY APPROVED WENDY'S PLAN BY HAMILL AND MCKINNEY ARCHITECTS AND ENGINEERS DATED NOVEMBER 14, 1983. 5. LOCATION OF EXISTING GREASE INTERCEPTOR IS UNKNOWN. 6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING GAS, ELECTRIC, AND TELECOM SERVICES TO THE STORE. 7. CONTRACTOR RESPONSIBLE FOR MAINTENANCE OF PEDESTRIANNEHICULAR TRAFFIC DURING CONSTRUCTION ACTIVITIES. 8. CONTRACTOR TO COORDINATE WITH ALBEMARLE COUNTY ON STREET LIGHT POLE RELOCATION FOR MATERIALS, SPECIFICATION, AND PROCESS. CONTRACTOR TO RESET NORTHEASTERN MOST EXISTING STREET LIGHT POLE IF REQUIRED DUE TO SIDEWALK CONSTRUCTION IN THE VICINITY OF THE EXISTING POLE. 9. OVERHEAD UTILITY LINE IS TO REMAIN. IT IS WITHIN CLOSE PROXIMITY TO THE EXISTING BUILDING. CARE TO BE TAKEN DURING CONSTRUCTION AND DEMOLITION. CONTRACTOR TO COMPLY WITH LOCAL, STATE, AND NATIONAL REGULATIONS FOR WORKING WITHIN CLOSE PROXIMITY TO OVERHEAD UTILITY LINE. DEMOLITION I REMOVAL LEGEND DEMOLITIONIREMOVAL NOTE TYPICAL NOTE TEXT ----------------- EASEMENT LINE CONCRETE CURB& --- GUTTER UTILITY POLE WITH LIGHT POLE LIGHT ■� TRAFFIC LIGHT UTILITY POLE TYPICAL LIGHT �� ACORN LIGHT ---�-- TYPICAL SIGN /^ X� PARKING L COUNTS SPOT Or 5',^_ ELEVATIONS SAN SANITARY # LABEL TM STORM # LABEL -------SL------- SANITARY SEWER LATERAL -------W------- UNDERGROUND WATER LINE -------E------- UNDERGROUND ELECTRIC LINE -------0------- UNDERGROUND GAS LINE -------OH ------_ OVERHEAD WIRE — — — — — — — T — — — — — — — UNDERGROUND TELEPHONE LINE _-----_0_-----_ UNDERGROUND CABLE LINE STORM SEWER _------S _-----_ SANITARY SEWER MAIN HYDRANT (`s) SANITARY MANHOLE (\D) STORM MANHOLE WM WATER ® METER WV WATER VALVE GAS VALVE ® GAS METER LIMITS —LOD LOD— N DISTURBANCE ALBEMARLE COUNTY MANAGED SLOPES I I // '%,r1 BOX (Va)L C� ,�\�P /9�l _ — — , — — • — — , — PROP SAWCUT 70 ACCEss RIM=49451 LOW —LOW— LIMIT OF WORK —CURB INLET LOD LOD LIMIT OF DISTURBANCE a is RIM=494 19 P /c. S \ r rnj 1NV=48899 PROP -.SAW CUT HYDRANT 20 10 5 0 20 4Ad77 Vf 1"=20' €S zLU � §s z F LU W W. Wz 20 C)0�S C7ZW W>W 8N Z_ FWQ2In LIJZ gg > Z 2 W� O N mao)Z)2QQz< Z U)2 W zFH_ x OzW<1-- 0 Q Q W Z U) a z sg o Q J ro LU O F 3& 'aq �s og �a REVISIONS DRAWN BY REV DATE COMMENT cecxED HMI(EDB BY 1 10/29/2021 PER ISP COMMENTS DSH RTY 2 01/21/2022 PER COUNTY BSC COMMENTS RTY 3 04/08/2022 PER COUNTY BSC COMMENTS RTY 4 08/09/2022 PER COUNTY CDH COMMENTS RTY Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAW NG I$ INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 10/29/2021 CAD I.D.: DEMO -2 PROJECT: SITE PLAN DOCUMENTS FOR DDgQ gmu GOMM PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@,BohlerEng.com Lie. No. 0402056625 O, 08/09/2022 j SHEET TITLE: EXISTING CONDITIONS AND DEMOLITION PLAN SHEET NUMBER. C-201 REVISION 4 - 08/09/2022 0 0 w N I ; 1 I I I I I ; I N/F INC. J ' U.tJ. ',5415 PG. 471 PIN• 06Pg0-00-00-12000 % ED.- HC (N/OHWAY COMMERCIAL) '1 % \ — < USE- `WAREHOUSE ' W 0 i o \ , I / , , I \ I \ \ \SF \ ti F =0.12 AC. I 'I � I , REBAR Errs` \ ' FOUND ,= -,5og ij, TS \ TREES ORR I I , I \ ,SF \ 1 I I I / I I I I I \\\ I ` I ` I '\ I I I \ \ I \ I \ I \ \ I I ` \ I \ ` \ C\ \ O \ \ \ \ \ \ \ \ \ \ \ \ I \ I I I � \ I \ I \ I I I I I I I I I I II I 1 I I 1 I I 1 I , I 1 I ' I ' 1 I I I I I\ I \ J\ \\ 1 \ I \ \ `\ I \ \ I I1 \ I I II ' I II I \ \ \ I I ' I ' I , I \ \, \ so LANDS N F / SULL/VAN, W/LL/AM EDWAD & ✓OHN A F / D.B. 1095 PG. 237 FIN.- 06100-00-00-120WO ZONED. HC /(H/GHWAY COMMERC/ALA !LS COMMFRC/AT / \ i o _ h` ----- 50 y\ _ \� ----------------------- - 1 - y rrrsriaGWEt3-Tig, o - ' ---------- ,.5 , -- ` —505' 504 x- \ ------ Y OF Dh� TREES%_------ r-/------------ ---- CHARLOTTES�F`ALBEMARLE-''-\ --------------------- bp�\ S" \ / RENTAL PROPERTIES LLC ^\i ------------------ D.B. 5040 PG. 206 \- - i so , ZO P/N. 0610H/GHWAY COMMERC/AL \`w \\ so i-OMMERLIAL-------- J--------- A \pro �`\ / \ 1 \/l!ErISIWO lP Il ', �'; '/ v TREES /fTBRJ j il\/� /*{�/.BESET L4N00/STUR AIAG MIL ELEY.=499.18 E(TX/SN/ C TREES \ it/ II d� / G 18 I \ �1` • \ ` ``\ \ CURB 0NLET p I I I it ' CLEARANCE ' ` Aa4 /\ G/ `y \•` • `` •` �`` i /�' i �/ / i BAR (TBRJ�Il111�, .i\/\\ s.�.�/'/ \ �\\, TM EX`.\ ----- --NRtt PR _ \ \ AMENU(TBR) \ - \�``;`.;`;`\ \0 61 AC.I\ `49yIt RCP It tA,: 7NG TREES BR \ \ .\ . I\\ �F� I = (S EMO NOT JiKL4TdY mo'vl EX CURB TNLET/�TgO QEl!=5GYL10 IP � \ I / \I� \`\ NOAC L4Nb,5N/F 'I \ \'` �� l l \\ /NV=49200 ' DEMO NOTE 4J S S C ACQU(S/T/ONE C. Q Y MANHOLE D.B. 1429`\PG. 330/N\ \ `\ ` ` \` `�N\' 496 "" NO?EC£�i PIN- 06100-00�00_ 120,Q 1 \ ` `.' `` � \\ \ \\' ° &9 \ 494.59 `ZONED.• HC H/GHWAY COMME&IAL / \``,;`; �, �\ / \ RiM=49ss4 \ ( \ \ \ . . \� / \ 'mil ``, jam\ �•• /NV-490.00 E. SELF STORAGE \ `, `; \� DEMO NOTE 4 ° \ o `� SAR/N\� \�`. `.�`� l EX/SBNG TREES R i US MR J % PROP .SAW CUT TS ' 1 IRON ROD - \ FOUND \ `�\ �I ��/✓ i GONC/I�LIP-505 \ 505 oy 05 j ---------, � `� cn ------ eti \\ -------------------------------- y __ --- -- -' / 501 oy NV R - R/M 49 O ;P J /-------<-------------------------------- / \ / Ip \w --------------' LA/l/DS F' --_ _=;,I --- ------ W/LCOHESS ALE. -- _ -R/ 06100-00700-120Q0 _Z0_NED HC�`H(GHWAY-CONIME# A4)'t,' USE.• Fl R,STAROW, 0O H /------------------ -------- VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL EROSION AND SEDIMENT CONTROL NOTES: 1. SEE SHEET C-603 FOR SEQUENCE OF CONSTRUCTION. 2. OFFSITE BORROW OR HAUL TO BE FROM AN APPROVED SITE. SOILS TABLE SYMBOL SOIL NAME SLOPES HSG 88 UDORTHENTS, LOAMY 2-25% D A c - N 3,9T7, T25 - / STORM MAN110LE(7BR)- ,� / RIM=494.86 I G INV B=484.86 Y`� ® INV A=48511 1� - P LEGEND 0 / ,--•--,— PROPSAWCUT A=0.07 AC. .225/ \t^ �\\ h� \\ LOW —LOW— LIMIT OF WORK • V` Y\P G O\ LOD LOD LIMIT OF DISTURBANCE ✓LET \Q �'C �' `\\ -46899 PROP_54W CUT �`\����� \ EXISTING DRAINAGE DIVIDES HYDRANT ` , QP�� _off/\G20 10 5 0 20 Illlllla O z EE w W W fn z W wz WlW ZQ W C7gUgUE>� Ur z W W 2 5 W zrUxwEo,z Fw< ,>zULucnO j>Q0mCDF Wx2QQz 02wzF xzQ 0QQ~p U U U a U _j Q 0 Z Z) LU z > o J O U W H REVISIONS REV DATE COMMENT 1 01/21/2022 PER COUNTY COMMENTS 2 04/08/2022 PER COUNTY COMMENTS 3 08/09/2022 PER COUNTY COMMENTS RTY BSC RTY CDH RTY Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAWING I$ INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: GRAD -1 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR DDgQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com MN YAUGER Lie. No. 0402056625 6, 08/09/2022 j SHEET TITLE: EROSION AND SEDIMENT CONTROL PLAN PHASE I SHEET NUMBER. C-601 REVISION 3 - 08/09/2022 0 0 w N \ I I \ i I , , , / / / / / \`LANDS N/F 5t� MPB, INC. J % D.8.15476 PG. 471 i PIN. 06Pg0-00-00-12000 % ' ' �,'' E \ZONED.• HC (H/OHWAY COMMERC1ALj I SF < ' USE. `WAREHOUSE w m 0 a � I \ IN o SpS ' \ \ \ I .0 F SIF o` I oa ' FOUND , IN \ 1 I ' SIF IN / I , / I \ I I I _ \ I \ \ O I \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I \ 1 1 1 I \ 1 1 \ I 1 1 1 I 1 1 1 I 1 1 1 1 I 1 1 1 1 I 1 1 1 I 1 1 1 1 1 1 1 , 11 � ' 1 1 ' 1 1 � � 1 1 1 1 ` 1 1 ` 1 � � I 1 � 1 I 1 I I \ 1 \ \ J \ \ \ I \ \ \ \\ 1 \ \ I 1 1 \ I '1 I IN I 1 I II I \\\\ \ \ \ I I I II ' I ' IN \ I IN 1 , \ ,09 LANDS N F SULL/VAN, W/LL/AM EDWAD & ✓OHN A F D.B. 1095 PG. 2J7/ ' PIN.- 06100-0-00-00-12-120W0 ZONED. HC�H/GHWAY COMMERC/AL) US COMM ERCIAL , / *`,J917,490 i o ` \ \ 1 A \ 1 I \ S \ 508.= / RaP`KEYS I ONE RETAINING WALL WITH SAFETY RAILING COLOR: PALOMINO (KW. 511'" MEIGHT: 4') TO BE DESIGNED ,'------- ' �OBYOTHERS, '' / / h------- ------------------------------------- IN ----- -- I \ _ 0 A \, \ ----------- - LANDS N F / - ------- - ---- CHARLOTTESV/LLSL_EMAh'LE \ REN7AD. R 5040PPC1 5 LZC -- _ _ PIN 06 00 00 120P0 ZONED HC 1 !/ H/I HWAY COMMERCIAL),% __ ' A = 0.18 AC / MMERCIAL 4) TIM Gm IN - IF 5 / \IN- �\ IN STM / \\\ , PROP. SITE AREA = AC (R) 1.314 (M) A V A I--_ _ T RD- ROP. KEYS \ \ \ P INING WA \ - II 12D-1 A = 0.09 A 0 STM B-10 R. PALOMINO \ C = 0.90 A=0.24AC HEIGHT 02) \ \ DESIGNED I�U�,1 U IILJ,V�III I ( C 0-3 I IP 00 . Ate` �� '\ T TM A-50 CURB /NLET \. ', • A=0.05 AC ( \\�\` \ ;\\ \ RLN=505.50 FO STM ;,I A 022AC \\ .SO Ip 37C,IN I \ A=0.05AC II V V 499" / 241 RCP I / / &2 ?98 _ 1. / LU9Y �0 A RAMP \ / i // a � II'I SQL. PRO KEYSTONE v � '1 � � `v p•Z 'I B-10 LANb N F \ RETAINING WALL / \ ` S S C ACQUS/TONI: /NC. WITH RAILING \ `\ ` , / / Cl \ COLOR: PALOMINO \ ``� I � D.B. 1429`\PG. 336t (MAX. HEIGHT: 4.8') \ 496 �1` \ / i i �� NO�C£�F NHOLE `\ TO BE DESIGNED \` tea, , ', ST gy "� /�� R/M=494.59� \ P/N• 06100-00�00-120Q1 \ BY OTHERS \` \ / / & �� URB INLET `ZONED.• HC HIGHCOMMEI&YAL ```�\ / v „ ' W'' RiN=49ss4 \ ( \ ) \ �`` /NV=490.00 ` USE.• SELF STORAGE s ��``� � A=0.22AC 'I � - / SEEOEMO NCTE 4 °� `\ o sPRUVrK` ,� \'`. \�`.iL o� � � 17 SAW CUT i IN PS 1 ---------- IRON ROD �� • FOUND \ - A-20 \ `� ' oy \`. 499 1 -505— �` ? ® o , �\ 05 ` PROP. SITE AREA =1.32 AC (R)1.314(M) VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL EROSION AND SEDIMENT CONTROL NOTES: 1. SEE SHEET C-603 FOR SEQUENCE OF CONSTRUCTION. 2. OFFSITE BORROW OR HAUL TO BE FROM AN APPROVED SITE. /-- --------- CG / h ti o ' IN- \ �0' t, . R '� ` -20r IP / \ - G / ------------ __, C / / -+a -------------------------------- �'`_ �'` , 499 I � \\\ ' ` �' / STM 49 tw / _ \ 3917125 i � l i �O R -49 , 491 ' �( \ / , 6 --= 0� �682 PG. 130"INIt'-, t� � Q �v �l �� \ `_ �osloo-00-oo-1�vo' `\ ; \ —�� • /; / 1/ �j��\P� LEGEND -----_ZONED HC�`l%h%AY Z'ONIMERCIAL)'(, / _ _ o IP USE.• FELISTATION. J s P� 01 -- -- -- — ipy ' 'FH �!�` ,9 PROP SAWCUT ----------- �dff., ON' OA . \Ba _—_ �ip S4N/TARP MAN�� `�- //Jy�8�` v�9 \1i __� 1 / / NO ACCESS ��PQ 9y� \ LOW —LOW— LIMIT OF WORK p RIM=49451 �ti A C gyp\ l °° ® \ CURB INLET I0 \\U'p \O RIM=49419 ♦ V`PQY�a1F, r' \ GP LOD LOD LIMIT OF DISTURBANCE /NV=48899 `�0� � �y0 Q�,�0 '// // \\"PRBR_.SAW CUT O��Q J\`�P �PROPOSED DRAINAGE DIVIDES / \ NYDRANr �`� QP�o - G�� zo 0 5 o zo / -- \ / --- FS �a 0 zILL � §s z F w Ng Wz W�ZWE�S (9zWWU)�W � ZrCO=w�L m FW<O �I gg cnZ)maQz¢m. z<n2ILL zFF OZQQQFO �uQ Q W Z O LU D z sg o_ Q J ro ILL 2 O F 3& �s og Sa REVISIONS DMWN BY REV DATE COMMENT CNECI(EDBY 1 01/21/2022 PER COUNTY BSC COMMENTS RTY 2 04/08/2022 PER COUNTY BSC COMMENTS RTY 3 08/09/2022 PER COUNTY CDH COMMENTS RTY Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: GRAD -1 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR DDgQOMU GOMM PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com v MN YAUGER P, .p Lie. No. 0402056625 A 0.C� 08/09/2022 K-1 SHEET TITLE: EROSION AND SEDIMENT CONTROL PLAN PHASE It SHEET NUMBER C-602 REVISION 3 - 08/09/2022 EROSION AND SEDIMENT CONTROL NARRATIVE SEQUENCE OF CONSTRUCTION MINIMUM STANDARDS DESCRIPTION OF SITE THIS PROPERTY IS LOCATED ON AN COMMERCIAL PARCEL WITH AN EXISTING COMMERCIAL BUILDING AT 1636 SEMINOLE TRAIL IN ALBEMARLE COUNTY VIRGINIA. THIS PROJECT PROPOSES TO REDEVELOP THE EXISTING PARCEL FOR A NEW COMMERCIAL BUILDING. THE SUBJECT PARCEL SITE IS 1.32 ACRES AND THE AREA OF LAND DISTURBANCE REQUIRED FOR PROPOSED CONSTRUCTION IS APPROXIMATELY 1.31 ACRES. APPROXIMATELY 0.31 ACRES WILL BE PERMANENTLY SEEDED. SEDIMENT CONTROL FOR THE PROPOSED CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH THE POLICIES AND REQUIREMENTS OF THE VIRGINIA EROSION & SEDIMENT CONTROL FIELD HANDBOOK. AS REQUIRED, THIS PLAN PROPOSES EROSION AND SEDIMENT CONTROL IN TWO SEPARATE PHASES. A CONSTRUCTION SEQUENCE IS PROVIDED DETAILING THE PROPOSED PHASING OF EROSION AND SEDIMENT CONTROL BEFORE AND DURING CONSTRUCTION. EXISTING SITE CONDITIONS THE PROPOSED SITE IS AN EXISTING COMMERCIAL LOT WITH PAVED PARKING AND GRASS AREAS. THE EXISTING SLOPE RANGES FROM 2% TO 12%. THE SITE GENERALLY DRAINS FROM NORTHWEST TO SOUTHEAST. CRITICAL EROSION AREAS THERE ARE NO CRITICAL EROSION AREAS KNOWN TO EXIST ON SITE. ADJACENT PROPERTY THE SITE FRONTS ON SEMINOLE TRAIL TO THE EAST AND IS SURROUNDED BY HIGHWAY COMMERCIAL ZONED PROPERTIES ON THE NORTH, SOUTH AND WEST. ADEQUATE OUTFALL ADEQUATE OUTFALL INFORMATION CAN BE FOUND IN THE STORMWATER MANAGEMENT PLAN. OFFSITE AREAS NO OFF -SITE AREAS REQUIRED FOR EXPORT OF MATERIALS ARE ANTICIPATED WITH THE PROJECT. IF EXCAVATED MATERIAL IS GENERATED IT SHALL BE DISPOSED OF IN A LAWFUL MANNER AND THE CONTRACTOR SHALL COORDINATE THE HAUL ROUTE WITH THE JURISDICTIONAL INSPECTOR. IT IS THE CONTRACTORS RESPONSIBILITY TO ENSURE ALL OFF -SITE HAULBORROW AREAS ARE PROPERLY PERMITTED. SOILS THE SOILS ON -SITE, PER THE NRCS WEB SOIL SURVEY, ARE AS FOLLOWS: 88 - UDORTHENTS, LOAMY, 2-25 PERCENT SLOPES HYDROLOGIC SOIL GROUP - D SINKHOLES ARE NOT ANTICIPATED TO AFFECT THE SITE. EROSION CONTROL PROGRAM EROSION CONTROL SHALL BE MAXIMIZED THROUGH RAPID STABILIZATION OF THE DISTURBED AREAS AND BY INSTALLATION OF PERIMETER CONTROLS. NOT MORE THAN 7 CALENDAR DAYS ARE TO ELAPSE WITH ANY DISTURBED AREA REMAINING DENUDED. TEMPORARY COVER, BY SEEDING AND/OR MULCHING, SHALL BE APPLIED TO AREAS THAT WILL BE EXPOSED FOR A PERIOD OF GREATER THAN 7 DAYS, BEFORE PERMANENT STABILIZATION. PERMANENT COVER SHOULD BE PROVIDED OVER ALL DISTURBED AREAS AS SOON AS POSSIBLE UPON ACHIEVING FINAL GRADE, BY MEANS OF SEEDING AND MULCHING, SODDING AND PEGGING, PAVING, OR AS OTHERWISE DIRECTED BY THE PLAN. LIKEWISE, ALL STOCKPILES SHALL BE STABILIZED WITHIN 7 DAYS OF ACHIEVING FINAL GRADES. UTILITY TRENCHES SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS AFTER BACKFILLING TO THE PROPOSED GRADE. SEDIMENT CONTROL PROGRAM SEDIMENT CONTROL SHALL BE ACCOMPLISHED THROUGH RAPID STABILIZATION AND BY THE INSTALLATION OF MECHANICAL DEVICES, AS SHOWN ON THE PHASE I PLAN: STRUCTURAL PRACTICES 1. SAFETY FENCE -3.01 TO BE PROVIDED TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY THE PUBLIC. 2. CONSTRUCTION ENTRANCE - 3.02 TEMPORARY CONSTRUCTION ENTRANCES WITH WASH RACKS AND SETTLING AREAS ARE TO BE PROVIDED AT EACH POINT OF ACCESS TO THE SITE FOR THE DURATION OF CONSTRUCTION. THE CONTRACTOR IS TO SUPPLY A WATER SOURCE BY PROVIDING A WATER TRUCK/WATER TANK ONSITE FOR WASHING CONSTRUCTION VEHICLES BEFORE ENTERING THE PUBLIC ROAD. 3. SILT FENCE - 3.05 TO BE PROVIDED FOR INTERCEPTING AND DETAINING SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS TO PREVENT SEDIMENT FROM LEAVING THE SITE. 4. STORM DRAIN INLET PROTECTION - 3.07 A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET. 5. TEMPORARY SEEDING -3.31 ESTABLISHMENT OF TEMPORARY VEGETATIVE COVER BY SEEDING WITH APPROPRIATE RAPIDLY GROWING PLANTS ON DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF MORE THAN 14 DAYS. 6. PERMANENT SEEDING - 3.32 ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER BY PLANTING SEED ON ROUGH -GRADED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A YEAR OR MORE OR WHERE PERMANENT, LONG-LIVED VEGETATIVE COVER IS NEEDED ON FINE -GRADED AREAS. VEGETATIVE PRACTICES 1. SURFACE ROUGHENING - AREAS TO BE SEEDED SHALL BE LIGHTLY ROUGHENED AND LOOSE TO A DEPTH OF 2" TO 4" PRIOR TO SEEDING. AREAS WHICH HAVE BEEN GRADED AND WILL NOT BE STABILIZED IMMEDIATELY MAY BE ROUGHENED TO REDUCE VELOCITY UNTIL SEEDING TAKES PLACE. 2. TOPSOILING (STOCKPILES) - TOPSOIL WILL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER USE. STOCKPILE ARE TO BE LOCATED ON -SITE IN OPEN SPACE AREAS, AS DEPICTED ON THE PLAN, ARE TO BE STABILIZED WITH TEMPORARY VEGETATION, AND ARE TO BE SURROUNDED AT THE BASE BY SUPER SILT FENCE. 3. TEMPORARY SEEDING - ALL DENUDED AREAS THAT WILL BE LEFT DORMANT FOR EXTENDED PERIODS OF TIME SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING. SELECTION OF THE SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR THAT IT IS APPLIED. 4. EROSION CONTROL BLANKETS OR MULCH - EROSION CONTROL BLANKETS WILL BE INSTALLED OVER FILL SLOPES WHICH HAVE BEEN BROUGHT TO FINAL GRADE AND SEEDED TO PROTECT THE SLOPES FROM RILL AND GULLY EROSION AND ALLOW THE SEED TO GERMINATE PROPERLY. MULCH (STRAW OR FIBER) WILL BE USED ON RELATIVELY FLAT AREAS AND WILL BE APPLIED AS A SECOND STEP IN THE SEEDING OPERATION. ALL SILTATION CONTROL MEASURES ARE INTENDED TO PREVENT SEDIMENT FROM ENCROACHING INTO ENVIRONMENTALLY SENSITIVE AREAS OR ONTO ADJACENT PROPERTIES AND ROADWAYS. THE FAUQUIER COUNTY INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE EROSION AND SEDIMENT CONTROLS IN THE FIELD AS SITE CONDITIONS WARRANT. IN ADDITION, NO SEDIMENT TRAPS OR SEDIMENT BASINS MAY BE REMOVED WITHOUT THE PRIOR APPROVAL OF THE COUNTY INSPECTOR. UNLESS OTHERWISE NOTED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH). THE MINIMUM STANDARDS OF VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE. 0 O z 0 O w PHASE I: PHASE I OPERATIONS WILL INCLUDE THE INSTALLATION OF MEASURES TO CONTROL EROSION AND SILTATION ASSOCIATED WITH INITIAL CLEARING AND GRADING OPERATIONS. AS REQUIRED, PHASE I CONTROLS SHALL BE ESTABLISHED IN A ONE (1) STEP PROCESS: 1. CONTRACTOR TO NOTIFY ALBEMARLE COUNTY AT LEAST 48 HOURS PRIOR TO THE START OF CONSTRUCTION AND OBTAIN A LAND DISTURBANCE PERMIT. 2. OWNER CONTRACTOR RESPONSIBLE LAND DISTURBER AND PROJECT ENGINEER SHALL ATTEND A PRE -CONSTRUCTION MEETING WITH THE COUNTY INSPECTOR PRIOR TO STARTING ANY LAND DISTURBING ACTIVITIES. OBTAIN A GRADING PERMIT AND VDOT ENTRANCE PERMIT PRIOR TO THE PRE -CONSTRUCTION MEETING. 3. AREAS WHICH ARE TO BE DISTURBED SHALL BE CLEARLY MARKED IN THE FIELD. 4. INSTALL PERIMETER CONTROLS INCLUDING SILT FENCE AND SAFETY FENCE. INSTALL INLET PROTECTION. 5. INSTALL CONSTRUCTION ENTRANCE CE AS SHOWN ON PHASE I PLAN. PROVIDE THE CONSTRUCTION ENTRANCE WITH WASH RACKS THAT DRAIN TO AN APPROPRIATE SETTLING AREA AND ESTABLISH A PROTECTED STAGING AND EQUIPMENT AREA. ALL HARD SURFACE ROADS SHALL BE CLEANED AT THE END OF THE DAY AND SOURCE OF WATER SHALL BE ESTABLISHED ON SITE. 6. APPLY TEMPORARY STABILIZATION TO ALL DISTURBED AREAS IN ACCORDANCE WITH THE APPLICABLE MINIMUM STANDARDS FOUND IN 9VAC25-850-40. 7. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSPECTED AND REPAIRED AT THE END OF EACH DAY. 8. CONTRACTOR TO ENSURE THE THE COUNTY EROSION AND SEDIMENT CONTROL INSPECTOR HAS VERIFIED ALL PHASE I E&S MEASURES ARE CORRECTLY INSTALLED AND PHASE I WORK IS COMPLETED PRIOR TO THE START OF PHASE 11. PHASE II: THE PHASE II SEDIMENT CONTROL MEASURES ARE INTENDED FOR THE FINAL STAGES OF SITE DEVELOPMENT. PHASE I CONTROL MEASURES, WHICH ARE NOT IN CONFLICT WITH FINAL CONSTRUCTION AND PROVIDE EFFECTIVE CONTROL, SHALL REMAIN IN PLACE FOR FINAL DEVELOPMENT. THE CONTRACTOR AND THE RESPONSIBLE LAND DISTURBER SHALL FOLLOW THE COUNTY INSPECTOR'S DIRECTION IN PROVIDING ADDITIONAL CONTROL MEASURES NEEDED DURING THE DEVELOPMENT PROCESS, TO ENSURE THAT SEDIMENT IS PREVENTED FROM POLLUTING OFF -SITE AREAS, STREAMS AND/OR PROTECTED ON -SITE AREAS. 1. INSTALL PHASE II SILT FENCE AND SAFETY FENCE AS SHOWN ON THE PHASE II E&S CONTROL PLAN. 2. BEGIN ROUGH GRADING. 3. TEMPORARILY STABILIZE THROUGHOUT CONSTRUCTION AND IMMEDIATELY FOLLOWING THE COMPLETION OF THE MOST RECENT LAND DISTURBING ACTIVITY ANY DISTURBED AREAS INCLUDING MATERIALS STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN INACTIVE FOR 7 DAYS OR MORE. 4. CONSTRUCT ENTRANCE AND PROPOSED PARKING AREAS. 5. INSTALL INLET PROTECTION AS REQUIRED AS PROPOSED UTILITIES ARE INSTALLED. 6. OBTAIN COUNTY E&S INSPECTORS APPROVAL PRIOR TO THE REMOVAL OF ANY SEDIMENT CONTROLS. 7. OBTAIN CONCURRENCE FROM THE INSPECTOR THAT THE SITE HAS BEEN FULLY STABILIZED AND ALL CONSTRUCTION HAS BEEN COMPLETED. STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF TEMPORARY EROSION CONTROL MEASURES. PERMANENT STABILIZATION ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISHED GRADING. SEEDING SHALL BE DONE WITH KENTUCKY 31 TALL FESCUE ACCORDING TO STD. & SPEC 3.32, PERMANENT SEEDING, OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. EROSION CONTROL BLANKETS WILL BE INSTALLED OVER FILL SLOPES, WHICH HAVE BEEN BROUGHT TO FINAL GRADE AND HAVE BEEN SEEDED. THIS WILL PROTECT THE SLOPES FROM RILL AND GULLY EROSION AND ALLOW THE SEED TO GERMINATE PROPERLY. MULCH (STRAW OR FIBER) WILL BE USED ON RELATIVELY FLAT AREAS. IN ALL SEEDING OPERATIONS, SEED, FERTILIZER AND LIME WILL BE APPLIED PRIOR TO MULCHING. APPROXIMATELY 3.75 ACRES OF THE SUBJECT SITE SHALL BE PERMANENTLY SEEDED. STREAM BANK STABILIZATION STREAM BANK STABILIZATION IS NOT REQUIRED FOR THIS SITE. STORMWATER RUNOFF CONSIDERATIONS CALCULATIONS PROVIDED IN STORMWATER MANAGEMENT PLAN. MAINTENANCE PROGRAM IN GENERAL ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL EVENT. THE FOLLOWING MEASURES WILL BE CHECKED IN PARTICULAR. SAFETY FENCE: INSPECTIONS SHALL BE CONDUCTED REGULARLY TO CHECK FOR WEATHER -RELATED OR OTHER DAMAGE; REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. ALL ACCESS POINTS MUST BE SECURE AT THE END OF EACH WORKING DAY AND LOCKING DEVICES MUST BE REPLACED OR REPAIRED AS NECESSARY. CONSTRUCTION ENTRANCES: INSPECTIONS SHALL BE MADE DAILY FOR ENTRANCE INTEGRITY; REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. THE CONSTRUCTION ENTRANCE IS TO BE REGULARLY MAINTAINED TO INCLUDE SCARIFICATION AND ADDITION OF FRESH STONE AS NEEDED. SILT FENCE: INSPECTIONS SHALL BE MADE DAILY FOR FENCE INTEGRITY; REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. SEDIMENT IS TO BE REMOVED WHEN DEPOSITS REACH ONE-HALF THE FENCE HEIGHT. TEMPORARY AND PERMANENT SEEDING: SEEDED AREAS SHALL BE CHECKED REGULARLY TO ASSURE A GOOD STAND OF GRASS IS BEING MAINTAINED. AREAS THAT FAIL TO ESTABLISH VEGETATIVE COVER ADEQUATE TO PREVENT RILL EROSION SHALL BE RE -SEEDED AS SOON AS THEY ARE IDENTIFIED. NO UNPROTECTED, DISTURBED AREA SHALL DRAIN TO ROADWAY PAVEMENTS SUCH THAT THE SUB BASE, BASE, OR WEARING SURFACE ARE CONTAMINATED BY SILT TRAPPED AT LOW POINTS OR INLETS. DEVICES SHOWN ARE TO BE CONSIDERED AS MINIMUM EROSION AND SEDIMENTATION CONTROLS. ADDITIONAL CONTROLS MAY BE NECESSARY DUE TO CONTRACTOR'S PHASING OR OTHER UNANTICIPATED CONDITIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADDITIONAL DEVICES AS NECESSARY IN ORDER TO CONTROL EROSION AND SEDIMENTATION. EROSION AND SEDIMENTATION MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION. THE CONTRACTOR IS TO PROVIDE ADEQUATE MEANS OF CLEANING AND REMOVING ALL LAYING DUST AS NECESSARY BY APPLYING EITHER MOISTURE, CALCIUM CHLORIDE, OR OTHER APPROVED MATERIALS ALONG THOSE SECTIONS OF THE PROJECT ADJACENT TO EXISTING DWELLINGS OR PUBLIC ACCESS. CONTROLS MAY BE REMOVED AFTER THE AREAS ABOVE THEM HAVE BEEN STABILIZED AND WITH THE APPROVAL OF THE COUNTY INSPECTOR. SPECIAL CARE NOTES IT IS THE INTENT OF THIS PLAN TO PRECLUDE SEDIMENT POLLUTION FROM LEAVING THE DELINEATED CONSTRUCTION ZONES. THE CONTRACTOR AND THE RESPONSIBLE LAND DISTURBER SHALL TAKE SPECIAL CARE TO PREVENT CONSTRUCTION DEBRIS AND MUD FROM BEING TRACKED ONTO SURROUNDING PUBLIC AND PRIVATE ROADS. CONSTRUCTION TRAFFIC SHALL ONLY ENTER AND EXIT THE CONSTRUCTION SITE VIA DESIGNATED LOCATIONS, WHICH HAVE WORKING CONSTRUCTION TRAFFIC WASH RACKS. THE CONTRACTOR AND RESPONSIBLE LAND DISTURBER SHALL TAKE SPECIAL CARE TO PROTECT THE EXISTING VEGETATION AND STREAMS OUTSIDE OF THE DESIGNATED LIMITS OF WORK SHOWN ON THE PLANS. GENERAL EROSION AND SEDIMENT CONTROL NOTES: 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING AND GRADING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLANS SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. CONTRACTOR MUST CONTACT THE COUNTY ARBORIST PRIOR TO THE INSTALLATION OF TREE PROTECTION AND PLANT MATERIAL. 11. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING MUD FROM TRUCKS AND/OR OTHER EQUIPMENT PRIOR TO ENTERING THE PUBLIC RIGHT-OF-WAY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAR THE STREETS AND TAKE WHATEVER MEASURES NECESSARY TO ENSURE THAT THE STREETS ARE MAINTAINED IN A CLEAN AND DUST -FREE CONDITION AT ALL TIMES. 12. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM THE WORK IN SUCH A MANNER AS TO PREVENT THE WASHING OF ANY TOPSOIL OR DEBRIS ONTO ADJACENT PROPERTIES. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACK FILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RE -STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. GENERAL LAND CONSERVATION & STABILIZATION NOTES: 1. NO DISTURBED AREA WHICH IS NOT ACTIVELY BEING WORKED SHALL REMAIN DENUDED FOR MORE THAN 7 CALENDAR DAYS UNLESS OTHERWISE AUTHORIZED BY THE DIRECTOR. 2. ALL E&S CONTROL MEASURES APPROVED WITH THE PHASE I E&S CONTROL PLAN SHALL BE PLACED AS THE FIRST STEP IN GRADING. 3. ALL STORM AND SANITARY SEWER LINES NOT IN STREETS SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS AFTER BACKFILL. NO MORE THAN 500' SHALL BE OPEN AT ANY ONE TIME. 4. ELECTRIC, TELEPHONE AND GAS SUPPLY TRENCHES SHALL BE COMPACTED, SEEDED AND MULCHED WITHIN 7 DAYS AFTER BACKFILL. 5. ALL TEMPORARY EARTH BERMS, DIVERSIONS AND SEDIMENT CONTROL DAMS SHALL BE SEEDED AND MULCHED FOR TEMPORARY VEGETATIVE COVER IMMEDIATELY (AS SOON AS POSSIBLE, BUT NOT LATER THAN 48 HORS) AFTER COMPLETION OF GRADING. STRAW OR HAY MULCH IS REQUIRED. ALL SOIL STOCKPILES SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS AFTER GRADING. 6. ANY DISTURBED AREA NOT COVERED BY NOTE #1 ABOVE AND NOT PAVED, SODDED OR BUILT UPON BY NOVEMBER 1, OR DISTURBED AFTER THAT DATE, SHALL BE MULCHED IMMEDIATELY WITH HAY OR STRAW MULCH AT THE RATE OF 2 TONS/ACRE (4483 KG/HA) AND OVER -SEEDED BY APRIL 15. 7. AT THE COMPLETION OF ANY PROJECT CONSTRUCTION AND PRIOR TO BOND RELEASE, ALL TEMPORARY SEDIMENT CONTROLS SHALL BE REMOVED AND ALL DENUDED AREAS SHALL BE STABILIZED. 8. CONTRACTOR TO PROVIDE DOCUMENTATION SHOWING SOURCE OF OFF -SITE FILL AND TESTING RESULTS TO GEOTECHNICAL ENGINEER TO DOCUMENT CAPABILITY OF FILL TO MEET COMPACTION REQUIREMENTS. MS-1: FOLLOWING INITIAL SOIL DISTURBANCE OR REDISTURBANCE PERMANENT OR TEMPORARY STABILIZATION SHALL BE COMPLETED WITHIN: 1 SEVEN CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER DIKES SWALES DITCHES PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND 2) SEVEN DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS UPON REACHING FINAL GRADE OR THE SITE BEING IDLE. MS-2: TEMPORARY SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. PROVIDE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS SOIL TRANSPORTED FROM THE PROJECT SITE. MS-3: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IN THE OPINION OF THE ARCHITECT/ENGINEER IS UNIFORM MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. MS-4: SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE OR TIMBERING TAKES PLACE. MS-5: STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. MS-6: SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAT THREE ACRES. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED TO ACCOMMODATE THE ANTICIPATED SEDIMENT LOADING FROM THE LAND -DISTURBING ACTIVITY. THE OUTFALL DEVICE OR SYSTEM DESIGN SHALL TAKE INTO ACCOUNT THE TOTAL DRAINAGE AREA FLOWING THROUGH THE DISTURBED AREA TO BE SERVED BY THE BASIN. MS-7: CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. MS-8: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. MS-9: WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. MS-10: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. MS-11: BEFORE STORM WATER CONVEYANCE CHANNELS ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. MS-12: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. MS-13: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIALS SHALL BE PROVIDED. MS-14: ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. MS-15: THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY FOLLOWING AFTER WORK IN THE WATERCOURSE IS COMPLETED. MS-16: UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH SHALL BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFFSITE PROPERTY. D. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. E. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MS-17: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. MS-18: ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL AUTHORITY HAVING JURISDICTION. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. MS-19: PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA: A. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. B. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINTS OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2) (A) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED BANKS. (B) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS AND BY THE USE OF A TWO-YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN-YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C. IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: (1) IMPROVE THE CHANNELS TO A CONDITION WHERE A TEN-YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO-YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR BANKS; OR (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN-YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES; OR (3) DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN-YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURES WHICH IS SATISFACTORY TO THE PLAN -APPROVING AUTHORITY TO PREVENT DOWNSTREAM EROSION. D. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. E. ALL HYDROLOGIC ANALYSES SHALL BE BASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT OF THE SUBJECT PROJECT. F. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION, HE SHALL OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. G. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. H. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. I. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENT ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. J. IN APPLYING THESE STORMWATER MANAGEMENT CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD, THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. K. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. L. ANY PLAN APPROVED PRIOR TO JULY 1, 2014, THAT PROVIDES FOR STORMWATER MANAGEMENT THAT ADDRESSES ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS SHALL SATISFY THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS IF THE PRACTICES ARE DESIGNED TO (1) DETAIN THE WATER QUALITY VOLUME AND TO RELEASE IT OVER 48 HOURS; (11) DETAIN AND RELEASE OVER A 24-HOUR PERIOD THE EXPECTED RAINFALL RESULTING FROM THE ONE YEAR, 24-HOUR STORM; AND (111) REDUCE THE ALLOWABLE PEAK FLOW RATE RESULTING FROM THE 1.5, 2, AND 10-YEAR, 24-HOUR STORMS TO A LEVEL THAT IS LESS THAN OR EQUAL TO THE PEAK FLOW RATE FROM THE SITE ASSUMING IT WAS IN A GOOD FORESTED CONDITION, ACHIEVED THROUGH MULTIPLICATION OF THE FORESTED PEAK FLOW RATE BY A REDUCTION FACTOR THAT IS EQUAL TO THE RUNOFF VOLUME FROM THE SITE WHEN IT WAS IN A GOOD FORESTED CONDITION DIVIDED BY THE RUNOFF VOLUME FROM THE SITE IN ITS PROPOSED CONDITION, AND SHALL BE EXEMPT FROM ANY FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS FOR NATURAL OR MAN-MADE CHANNELS AS DEFINED IN ANY REGULATIONS PROMULGATED PURSUANT TO § 62.1-44.15:54 OR 62.1-44.15:65 OF THE ACT. M. FOR PLANS APPROVED ON AND AFTER JULY 1, 2014, THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT AND THIS SUBSECTION SHALL BE SATISFIED BY COMPLIANCE WITH WATER QUANTITY REQUIREMENTS IN THE STORMWATER MANAGEMENT ACT (§ 62.1-44.15:24 ET SEQ. OF THE CODE OF VIRGINIA) AND ATTENDANT REGULATIONS, UNLESS SUCH LAND -DISTURBING ACTIVITIES (1) ARE IN ACCORDANCE WITH PROVISIONS FOR TIME LIMITS ON APPLICABILITY OF APPROVED DESIGN CRITERIA IN 9VAC25-870-47 OR GRANDFATHERING IN 9VAC25-870-48 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION, IN WHICH CASE THE FLOW RATE CAPACITY AND VELOCITY REQUIREMENTS OF § 62.1-44.15:52 A OF THE ACT SHALL APPLY, OR (11) ARE EXEMPT PURSUANT TO § 62.1-44.15:34 C 7 OF THE ACT. N. COMPLIANCE WITH THE WATER QUANTITY MINIMUM STANDARDS SET OUT IN 9VAC25-870-66 OF THE VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP) REGULATION SHALL BE DEEMED TO SATISFY THE REQUIREMENTS OF THIS SUBDIVISION 19. J m z Z EE W W W 01 Z U.1 Z Z= Z W U W 1--W (720-0Ix (DZW W(n>W ZrQ of V) F W Q 2 W Z In J Z U W > J O U)Z)2<co z U) Q Q Z Q Z W Z F F 0ZW< It U H o_ zQ jOf0UUIYU Q zJ)az > aL J Of U W H U) REVISIONS REV DATE COMMENT cxecxED er 1 01/21/2022 PER COUNTY COMMENTS BSC RTY 2 04/08/2022 PER COUNTY COMMENTS BSC RTY 3 08/09/2022 PER COUNTY COMMENTS CDH RTY ro Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. IAPPROVED FOR CONSTRUCTION THIS DRAW NG IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLE$$ INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: GRAD -1 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR ED9QOL�7aQ PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com TH MN YALIUER Lie. No. 0402056625 08/09/2022 SHEET TITLE: EROSION AND SEDIMENT CONTROL NOTES SHEET NUMBER C-603 REVISION 3 - 08/09/2022 0 0 Le w N SAFETY FENCE 3"T, PERSPECTIVE VIEW ;fJjS=sC�II;J;C�Ci;J�TT��C - - r, ti:':.'.j�,`.I •'• - t III 1 1 •1 h -LINE POST � 10' BRACINC ''�CONCRETE GROUND IFT FOOTING PERSPECTIVE VIEW PERSPECTIVE VIEW PLASTIC FENCE METAL FENCE SOURCE: CONWED PLASTICS, VDOT ROAD AND BRIDGE STANDARDS, VA DSWC 1992 3.32 TABLE 332-D SITE. SPECIFIC SEEDING MLCTURES FOR PIEDMONT AREA Total Lbs. Per Acre Minimum Care lawn - Commercial or Residential 175-200 lbs. - Kentucky 31 or Turf -Type Tall Fescue 95-1009, - Improved Perennial Ryegrass 0.5% - Kentucky Bluegrass 0-5% High -Maintenance Iawn 200-250 lbs. - Kentucky 31 or Turf -Type Tall Fescue m0% General Slope -a 1 or less) - Kentucky 31 Fescue 128 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop 20 lbs 150 Its. Low -Maintenance Slope (Steeper than 3.1) - Kentucky 31 Fescue 108 Its. - Red Top Grass 2 lbs. - Seasonal Nurse Crop ' 20 lbs. - Crownvetch " 20 lbs. 150 lbs. ' Use seasonal nitre crop in accordanm with seeding dates as stated below: February 16th through April ...................... Armual Rye May 1st through August 15th ........ . . . . ....... Foxmil Millet Augur[ 16th through October ...................... Annual Rye November through February 15th ................... Winter Rye •' Substitute Sericea lespedeza for Crownvetch east of Farmvine, Va. (May through September use hulled %ericea, all tither periods, use ruhuned Sencea). If Flatpe t is used in lieu of Crowmetch, increase rate to 30lbs./acre. All legume seed must be properly inoculated. Weeping Lovegrass may be added to any slope or low -maintenance mix during warmer seeding periods; add 10-20 lbs./acre in mixes. In - 303 BLOC & GRAVEL CURB INLET SEDIMENT FALTER CURB INL7 PLATE 3.07-8 Albemarle County Design Standards Manual -Engineering mow. STONE 70' MIN. CONSTRUCTION ACCESS 3" SM-2A ASPHALT TOP COURSE $ 2$ 6" MIN. 21A AGGREGATE BASE STONE CONSTRUCTION ASPHALT PAVED ACCESS A WASHRACK EXISTING 2% 2% PAVEMENT 2%, 12' MIN.• "MUST EMEND FILL WIDTH L-0 `POSITIVE DRAINAGE OF INGRESS AN O EGRESS TO SEDIMENT OPERATION TRAPPING DEVICE PLAN 1�12' MII POSITIVE DRAINAGET 2% TO SEDIMENT TRAPPING DEVICE IIIIIFILTER CLOTH SECTION A -A A ulimmun water tap of 1 Inch must be Installed with a uummum 1 inch Hancock shutoff valve supplying a wash hose with a diameter of L s niches for adequate constluit pressare. Brash water (mist be carried away from the enhance to yr approved seNIiIX area to reluove serWuad..AU .,ecWneM liaf be pteveuted fl'om entering storm rkams, ditches or waterennrae PAVED WASH RACK NO SCALE 1992 3.32 TABLE 3.32-E QUALITY OF SEED" Minimum Seed Minimum ]dplm45 Purity M) Germination M) Crowm etch 98 65" Lespedeza, Korean 97 85" Lespedeza, Settees Grasses 98 85" Bluegrass, Kentucky 97 85 Fescue, Tall (Improved, Turf -Type Cultivars) 98 85 Fescue, Tall (Ky-31) 97 85 Fescue, Red 98 85 Redtop 94 80 Reed Canarygrass 98 80 Perennial Ryegrass 98 90 Weeping Lovegrass 98 87 Annual Annual Ryegrass 97 90 German Millet 98 85 Oats 98 80 Cereal Rye 98 85 ' Seed containing prohibited or restricted noxious weeds should not be accepted. Seed should not contain in excess of 0.5%weed seed. To calculate percent pure, live seed, multiply germination times purity and divide by 100. EXaIDRl4: Ky-31 Tall Fescue with a germination of 85 percent and a purity of 97 percent. 97 X 85 = 8245. 8245 = 100 = 82.45 percent pure live seed. " Includes "hard seed" TYPICAL ORIENTATION OF PLATE 3, 6-1 TREATMENT e I (SOIL STABILIZATION BLANKET) cuennw ON SHALLOW SLOPES, STRIPS OF 4 '--111 "rV NETTING PROTECTIVE COVERINGS y -'FIL„i . MAY BE APPLIED ACROSS THE 19 x SLOPE. Z BERM WIRE KRELN CONCRETE BOCK _�� —� WHERE THERE /S A BERM AT THE TOP OF THE SLOPE, GRAVEL FILTER BRING THE MATERIAL OVER THE BERM AND ANCHOR ll BEHIND THE BERM. ,TDL hilt I RUNOFF WATER WITH OV-RFLOW FILTERED WATER SEDIMENT �� 1t itG ' SEDIMENT y II WIRF SCRFFN 2" X L" WOOD STUD CURD INL7 SPECIAL APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE. * GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE SOURCE: VA DSWC BRING MATERIAL DOWN TO A LEVEL AREA BEFORE TERMINATING THE INSFALL4TION TURN THE END UNDLR 4" AND SIA'LL Al 12" INILRAALS. ON .STEEP .SIOPFS, APPI Y PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF FLOW AND ANCHOR SECURELY. 4"~ IN DITCHES, APPLY PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF FLOW USE CHECK SLOTS AS REQUIRED AVOID JOINING MATERIAL IN THE CENTER OF THE DITCH IF AT ALL POSSIBLE SOURCE: ADAPTED FROM LUDLOW PRODUCTS BROCHURE Page 8 of 23 1992 Figure 3-9: Typical Detail for Concrete Wash -Out Area STAKE STRAW BALES 10 MIL PLASTIC LINING F f111IBL1 SIGN STAKE STRAW BALES 10 MIL PLASTIC LINING 4T__T NATURAL GROUND rlr SECTIONA - A VISIBLE SIGN BELOW GROUND 000ee STAKES a.. /10 LNNI�PLASTC NATURALGROUND SECTIONA - A WOOD PLANKS ABOVEGROUND TABLE 3.33"A TYPE OF SOD AVAILABLE IN VIRGINIA AND RECOMMENDED USES Kentucky Bluegrass: Adapted to the Northern Piedmont and Mountain Regions. Individual varieties selected must make up not less than 10%, nor more than 35% of the total mixture on a weight basis. All varieties must be certified. Selections can be made from Category I alone or various combinations of Categories 1, U and III, as noted. Category I - Recommended Kentucky Bluegrass Varieties 65% - 100% A-34, Abbey, Aspen, Asset, Baron, Blacksburg, Bristol, Cheri, Chateau, Classic, Coventry, Georgetown, Glade, Haga, Julia, Liberty, Loft's 1757, Merit, Midnight, Monopoly, Plush, Princeton 104, Rugby, Suffolk, Victa Category U - Special use varieties. If used, must contain at least 65010 Category I varieties Shade Tolerant 10-35% Bristol, Columbia, Georgetown, Glade, Midnight Low -Maintenance Tolerant 10-35% Columbia, Georgetown, Monopoly, Ram I, Touchdown, Victa Category III - Promising Kentucky Bluegrass - Limited performance data or seed availability 10-35% Dawn, Estate, Freedom, Kelly OVERFLOW RUNOFF WATER WITH SEDIMENT FILTER "(continued)" 3.33 1992 CONSTRUCTION OF A SILT FENCE 3A5- 01 (WITH WIRE SUPPORT) 1. SET POSTS AND EXCAVATE A 4"U" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. FLOW —I 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. SOURCE: ADAPTED FROM INSTALLATION OF STRAW AND FABRIC FILTER BARRIERS FOR SEDIMENT CONTROL, SHERWOOD & WYANT 3.33 1992 TABLE 333-A (CONTINUED) TYPE OF SOD AVAILABLE IN VIRGH41A AND RECOMMENDED USES Tall Fescue: Adapted to the entire state. Recommended Tall Fescue Varieties: 90-1000/a Amigo,Apache, Bonanza, Chieftain, Finelawn 5GL, Mesa, Rebel B, Shenandoah, Tribute Promising TAB Fescue,s Certified Arriba, Austin, Avanti, Aztec, _ Cochise, Crossfire, Eldorado, Hubbard 87, Jaguar D, Maverick IT, Monarch, Olympic IT, Phoenix, Safari, Shortstop, Sundance, Taurus, Thoroughbred, Titan, Tradition, Vegas, Winchester, Wrangler - 0-10% Kentucky bluegrass: Baron, Cheri, Columbia, Monopoly, Nassau, Ram L Victa Bermudagrass: Tufcote is adapted to the Richmond -Danville -Newport News triangle. Midiron may be used east of Roanoke and south of Charlottesville. Tifgreen and Tifway may be used to the east and south of Richmond. Vamont may be Used east of Roanoke and at lower elevations in southwestern Virginia. Certified Midiron, Tifgreenl, Tifway, Tifway D, Tufcote and Vamont Zoysiagrass: This sod performs best in southeastern Virginia. Meyer, EmeraldW Note: Common Bermudagrass is not recommended for sod production. # Only recommended in southeastern Virginia. Source: 1991 Virginia Turfgrass Varferi Remmmendatioas. Virginia Crop Improvement Association 1 i SCREEN F- FILTERED WATER DROP INLET WITH GATE SEDIMENT `- SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. ' GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE. SOURCE: VA DSWC CONSTRUCTION OF A SILT FENCE 309E. (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 6'MAX. FLOW 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE ONE OF STAKES. � � l 4. BACKRLL AND COMPACT THE EXCAVATED SOIL. i FLOW SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SOURCE: ADAPTED FROM INSTALLATION OF STRAW AND FABRIC FILTER BARRIERS FOR SEDIMENT CONTROL,VA. DSWC, SHERWOOD AND WYANT TABLE 3,35-A ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES: MULCHES: NOTES: Per Acre Per 1000 sq. ft. Straw or Hay I z - 2 tons 70 - 90 lbs. Free from weeds and coarse (Minimum 2 matter. Must be anchored., tons for Spread with mulch blower winter cover) or by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 1500 lbs. winter cover or during hot, dry periods." Apply as slurry. Com Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf areas. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 lbs nitrogen per ton, Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. 1-2 cu. yds. Free of Coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. " When fiber mulch is the only available mulch during periods when Straw should be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft. Source: Va. DSWC FS �a P. z_ � §s z F � cud Wz W0-0IX W Z2 W U) U W 8 4 zrd�WWU) m FW<. LIC g6 >¢f)LUm0N U) Z) <<Z Q zcn�WZFF � OZQQQFO PE82 0�00Z)tYZ &Ft Q Z - Z) Lij Q sg a Q o __ J IS U ~g O U) 8& Q �s og �a REVISIONS DRAWN REV DATE COMMENT ECKEDB cHECKEo BY 1 01/21/2022 PER COUNTY BSC COMMENTS RTY 2 04/08/2022 PER COUNTY BSC COMMENTS RTY 3 08/09/2022 PER COUNTY CDH COMMENTS RTY Know what's below. Call before you dry. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAWING Is INTENDED FOR MUNICIPAL ANDIOR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: GRAD -1 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR D��QOL�7aQ PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-5200 VA@BohlerEng.com _tc.pLTH e.. MN YAUI Lie. No. 0402056625 08/09/2022 e2 SHEET TITLE: EROSION AND SEDIMENT CONTROL DETAILS SHEET NUMBER C-604 REVISION 3 - 08/09/2022 0 0 U K 3 K 0 N / LANDS F / SULL/MN, W/LLIAM EDWD & ✓OHN A F D.B. 1095 PG. 237 - --- --- P/N• 06100-00-00- MIVO P011 ZONEIl-AILF/IGhWAY COMMERC/ALA V US COMMERC/AL AREA =0.12AC -ems / ______---- CN = 83 ----- \`\ g \ Q1= 0.29 CFS \ .' Q10 = 0.72 CFS S _ IS \ 0 50, i \ __ \ I , OI / LANDS N-------------- \ 5p6 6HAOfiESV/LLE A jj A E ----- h / R I)✓TAL PROPERTIES -- ----- ---_-_ \ �,49.8. 5040_PG. 206 ' I Z`r?`r av.. 06100-00.00-120P0 E / / COMEC4ME C /AL O I5F MA- _ , I 'll I j I,I I II Si „Oh,' `,''V ( )�✓ I S`; `, '/ \ It 11 I LANDS Ni✓F l ®(lam.\\41065-O %` ^ O I 55 c\acoursrrinNsNc.\ ems° I D.B. `1429 PG. \330 1 PIN- 06100-00-00-�120Dn, A --- _ O / T I ZOAY2 0, HC (H16 ,0AY CdWERCI4Z J �� i o • \ \\ I USE-SELf STORAGE _ - 505 -/-_-------- 4.0���` `���`v lv--Y ' I /i� 0 __•� _ _ ----- - 502 --''-- - ' _ --- I �_ ----- \ 5p1 T ; - ''------L4NOS All P \ 1 I / ,' JyILCQHE68, SS.LGE HC (Hiv W Or✓°�M�RF 42J k e USE. FUEL STc�T)ON 9fl� `% _------ \\ P012 x AREA=1.19AC \ �' ---- I CN = 90 \ ", \`'`' �\ Q1=3.90CFS ,, \- \ Q10=8.19CFS 0 20 10 0 40 1 "= 40' PRE DEVELOPED DRAINAGE AREA ENERGY BALANCE Site: Discount Tire Charlottesville Jurisdiction: Albemarle County Storm Event: 1 Year 24-Hour Rainfall Depth: 3.01" Point of Interest ID 1 2 Comments Pre -Development 1yr 1yr Q, Flow (cfs) 0.29 3.90 CN, Curve Number 83 90 RV, Runoff Depth (in) 1.45 1.99 Drainage Area (ac) 0.12 1.19 RV, Runoff Volume (ac-in) 0.17 2.37 Post -Development Q, Flow (cfs) 0.04 2.12 1. F. 0.80 0.80 Improvement Factor CN, Curve Number 80 94 RV, Runoff Depth (in) 1.26 2.36 Drainage Area (ac) 0.02 1.29 RV, Runoff Volume (ac-in) 0.03 3.04 Energy Balance (EB) Q, Post-Dev (cfs) 0.04 2.12 1. F. ' Q pre' RV pre 0.29 2.43 Q, Post-Dev Allowable (cfs) RV post EB Achieved Yes Yes Notes: 1. Q Post-Dev must always be less than or equal to Q Pre-Dev 2. Q Post-Dev is not required to be less than that calculated in the equation (Q forest x RV forest) / RV Post-Dev 3. I.F. = 0.8 for sites > 1.0 acre, 0.9 for sites < 1.0 acre 4. 24-Hour Rainfall Depth per NOAA Atlas 14 Precipitation Frequency Estimates 5. RV value calculated using Equation 12.15, Chapter 12 of Virginia Stormwater Management Handbook Ov , I I I , I l I I I I / I I i I O EXISTING IMPERVIOUS AREAS EXISTING PERVIOUS AREA O O 37,919 SF - 0.87 AC 19,091 SF- 0.44 AC \ LANDS N/F 5OUIVAN, WILLIAM EDrYARD & 10HN A F / \ D.B. 1095 PG. 237 ; P/N• 06100 00 00 1 Wl1 - �7LF/IGHWAY COMMERCIAL% POI US : COMMERCIAL \ `\ \ AREA C 0 02 A \ \ o \ Q1= 0.04 CFS -- Q10 = 0.11 CFS �5p1 y p6' / 50 5 ------ - i 47T=111E"AZBsA4RLf ------ 5 a . 8. '55040_PG. 206 - /. - -- % 0611'00-00=00-120P0,--'' ENE 14 / E-------- I hOti � ,SE�COMAIERCAM-- R-----CIAL) - 1 , \ O O \ \ ---------------- 0 0 / �_bl can \ I w J P012 a ` 1 \ LANDS N}!F \ P012 It I s s C\ACOU/S/T/O/VS �', I \`,\ D.B. `J429 PG. \330 ` "oJ` `so .., ,. ;� ` - X_ . PIN- 06100-00-00�120D�\ \ 6'`----` ZOr1�D.• HC (HlG'HWAY C0WZ_RdAZ) I USE.- SZU STORAGE\ \ Og56k5 -/ / -------' I _- -- - - \ I ` \ / - ----- 00 o Y P - 9 1 I k - o - HC (Hiv7fW9 P 0!� P F'4Z' FUEL ----------------- \ ------------- AREA=1.29AC f __ \'ll/ �\ Q1=2.12CFS Q10=7.62CFS 40 20 10 0 40 POST DEVELOPED DRAINAGE AREA 1 "= 40' STORMWA TER MANAGEMENT A(ARRA T1VE 43,8 50SF D1 00 AC AREAS PROPOSED 6SF0 32 AC US AREA O O OSE THE PROPOSED PROJECT IS FOR THE DEVELOPMENT OF A DISCOUNT TIRE STORE AND ASSOCIATED SITE IMPROVEMENTS. THE EXISTING PROPERTY IS CURRENTLY DEVELOPED AS A CLOSED FAST-FOOD RESTAURANT AND ADDITIONAL COMMERCIAL BUILDINGS IN THE REAR. THE TOTAL DISTURBED AREA IS 1.31 ACRES, WITHIN THIS AREA, THERE ARE 0.87 ACRES OF IMPERVIOUS AREA IN THE EXISTING CONDITION. THE POST DEVELOPMENT CONDITIONS WILL BE 78% (1.02 ACRES) IMPERVIOUS AND 22% (0.29 ACRES) PERVIOUS. THE SITE CONDITIONS WERE ANALYZED AT TWO POINTS OF INTEREST, POI 1 AND P012. THE FIRST ANALYZED POINT OF INTEREST (POI 1) IS LOCATED TO THE NORTHWEST OF THE SITE THE SECOND ANALYZED POINT OF INTEREST (POI 2) IS LOCATED TO THE SOUTH OF THE SITE, ALONG SEMINOLE TRAIL, WHERE THE PROPOSED SITE RUNOFF CONVERGES AT THE SAME DOWNSTREAM POINT AND THE REDUCTION OF RUNOFF WITHIN OUR DISTURBED AREA RESULTS IN AN IMPROVED DOWNSTREAM CONDITION. WATER QUALITY REQUIREMENTS FOR THIS SITE WILL BE MET BY PURCHASING 0.66 LBS OF NUTRIENT OFFSET CREDITS. WATER QUANTITY REQUIREMENTS WILL BE MET THROUGH THE USE OF A UNDERGROUND STORAGE CHAMBERS. THE CHAMBERS ARE AN ON -SITE DETENTION SYSTEM THAT UTILIZES A WEIR OUTFALL STRUCTURE. THIS MEASURE ATTENUATES THE POST DEVELOPMENT FLOWS TO MEET ENERGY BALANCE AND FLOOD PROTECTION REQUIREMENTS. THE PRE AND POST -DEVELOPMENT FLOW RATES FOR THE 1-YEAR 2-YEAR AND 10-YEAR STORM EVENTS FOR THIS SITE WERE CALCULATED USING THE SCS METHOD IN THE PROGRAM AUTOCAD HYDRAFLOW HYDROGRAPHS. TO CALCULATE THE RUNOFF REDUCTION REQUIRED TO MEET THE ENERGY BALANCE REQUIREMENTS, CURVE NUMBERS WERE CALCULATED USING VALUES FROM SCS TABLE 2.2A, RUNOFF CURVE NUMBERS FOR URBAN AREAS. RAINFALL DEPTHS USED TO CALCULATE FLOWS WERE TAKEN FROM NOAA ATLAS 14. THE PRE -DEVELOPMENT FLOW RATES ARE SHOWN BELOW: THE POST -DEVELOPMENT FLOW RATES ARE SHOWN BELOW: POI 1 POI 2 POI 1 POI 2 1-YEAR CFS: 0.294 1-YEAR CFS: 3.904 1-YEAR CFS: 0.043 1-YEAR CFS: 2.119 2-YEAR CFS: 0.400 2-YEAR CFS: 5.004 2-YEAR CFS: 0.059 2-YEAR CFS: 3.573 10-YEAR CFS: 0.719 10-YEAR CFS: 8.185 10-YEAR CFS: 0.111 10-YEAR CFS: 7.618 AS SHOWN IN THE POST DEVELOPED DRAINAGE PLAN ABOVE, THE RUNOFF FROM THE 1-YEAR, 2-YEAR AND 10-YEAR STORM EVENTS HAS BEEN REDUCED IN THE POST -DEVELOPMENT CONDITION TO LEVELS BELOW THE PRE -DEVELOPMENT CONDITION THEREFORE MEETING THE FLOOD PROTECTION REQUIREMENT. AS SHOWN ON THE ENERGY BALANCE CALCULATIONS ON THIS SHEET, THE REDUCTION IN THE POST DEVELOPMENT FLOWS ARE SUFFICIENT TO SATISFY THE ENERGY BALANCE EQUATION, THEREFORE MEETING THE CHANNEL PROTECTION REQUIREMENTS FOR THE SITE. THE ALLOWABLE RELEASE RATE FOR ENERGY BALANCE WAS CALCULATED TO BE 2.43 CFS. THE COMBINED RELEASE RATE OF THE UNDERGROUND DETENTION SYSTEM WAS CALCULATED TO BE 2.12 CFS. THEREFORE, BECAUSE BOTH FLOOD PROTECTION AND CHANNEL PROTECTION REQUIREMENTS HAVE BEEN MET FOR THE SITE, ALL STORMWATER QUANTITY REQUIREMENTS HAVE BEEN MET AND NO FURTHER CALCULATIONS ARE REQUIRED. BEST MANAGEMENT PRACTICES NARRATIVE SINCE THE SUBJECT SITE IS AN EXISTING DEVELOPED SITE, WATER QUALITY REQUIREMENTS FOR THE DEVELOPMENT OF THIS SITE WERE CALCULATED USING THE VIRGINIA RUNOFF REDUCTION METHOD (VRRM) REDEVELOPMENT SPREADSHEET. USING THIS SPREADSHEET IT WAS DETERMINED THAT THE DEVELOPMENT OF THIS SITE WOULD REQUIRE THE TREATMENT OF AN ADDITIONAL 0.66 LB/YR OF PHOSPHOROUS REMOVAL. TO MEET THIS REMOVAL REQUIREMENT, NUTRIENT OFFSET CREDITS WILL BE PURCHASED. SINCE THE PHOSPHOROUS REMOVAL ACHIEVED BY THESE CREDITS MEETS THE AMOUNT REQUIRED BY THE VRRM REDEVELOPMENT SPREADSHEET, ALL STORMWATER QUALITY REQUIREMENTS FOR THIS PROJECT HAVE BEEN MET AND NO FURTHER ANALYSIS IS REQUIRED. CONCLUSION SINCE THE 1-YEAR, 2-YEAR, AND 10-YEAR FLOW RATES IN THE POST -DEVELOPED CONDITION MEET ENERGY BALANCE AND FLOOD PROTECTION, IN ADDITION TO THE PHOSPHOROUS REMOVAL RATE MEETING THE VRRM REDEVELOPMENT PHOSPHOROUS REMOVAL REQUIREMENT, IT IS THE OPINION OF THE ENGINEER THAT THE STORMWATER QUANTITY AND QUALITY REQUIREMENTS ARE SATISFIED FOR THIS PROJECT. ADEQUATE OUTFALL NARRATIVE THE EXISTING SITE GENERALLY DRAINS TO THE SOUTH INTO EXISTING STORM INLETS ALONG THE EDGES OF THE SITE. THE RUNOFF IS THEN ROUTED EAST ALONG SEMINOLE TRAIL WHERE ALL OF THE SITE RUNOFF CONVERGES AT THE EXISTING STRUCTURE NOTED AS EX-1. THE PROPOSED DEVELOPMENT CAPTURES AND DETAINS THE SITE RUNOFF BEFORE IT IS RELEASED AT POI-2 AT A RATE WHICH IS LESS THAN THE EXISTING CONDITION. SINCE THE OVERALL FLOWS TO POI-1 AND POI-2 AND ALL DOWNSTREAM STRUCTURES ARE REDUCED FOR THE 1-YEAR, 2-YEAR, AND 10-YEAR STORM EVENTS, THIS OUTFALL IS CONSIDERED ADEQUATE. AS SUCH, IT IS THE OPINION OF THE ENGINEER THAT ADEQUATE OUTFALL REQUIREMENTS HAVE BEEN MET FOR THE SUBJECT SITE. €S z Ud z F w Id Wz W If (W) cw7zwwU)>W zrc9�wo W m F W Q2UJUJz gg cnZ)2aQz¢ _ zc,2u1zFF � OU z < 0 > S Q z a- Q sg o Q rr J ro Ud U F �g O F 8& U) �Q �s og �a REVISIONS REV DATE COMMENT CleClao sr 1 01/21/2022 PER COUNTY BSC COMMENTS RTY 2 04/08/2022 COMMENTS RTY 3 08/09/2022 PER COUNTY CDH COMMENTS RTY Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: DRIN -1 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR GOMM PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com pLTH OF L O Z V N YA R V, .p Lie. No. 0402056625 08/09/2022 SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER. C-901 REVISION 3 - 08/09/2022 data input cells Project Name: Discount Tire Charlottesville constant values Date: 10/18/2021 Linear Development Project? No calculation cells Site Information Post -Development Project (Treatment Volume and Loads) Enter Total Disturbed Area (acres) + 1.31 Check BMP Design Specifications List. 2013 Draft Stds & Specs • % Linear project? No • 4 Land cover areas entered correctly? • . • • • • • r® Total disturbed area entered? Pre-ReDevelopment Land Cover (acres) A Solis B Soils C Soils D Soils Totals Forest/Open Space (acres) - undisturbed forest/open sace 0.00 Managed Turf (acres) -- disturbed, graded for yards or other turf to be mowed/managed 0.43 0.43 Impervious Cover (acres) 0.88 0.88 1.31 Post -Development Land Cover (acres) A Soils B Soils C Soils D Soils Totals Forest/Open Space (acres) -- undisturbed, protected forest/open space or reforested land 0.00 Managed Turf (acres) -- disturbed, graded for yards or other turf to be mowed/managed 0.29 0.29 Impervious Cover (acres) 1.02 1.02 11 Area Check OK. OK. OK. OK. 1.31 Constants Runoff Coefficients (Rv) Annual Rainfall (inches) 43 A Soils B Soils C Soils D Soils Target Rainfall Event (inches) 1.00 Forest/Open Space 0.02 0.03 0.04 0.05 Total Phosphorus (TP) EMC (mg/L) 0.26 Managed Turf 0.15 0.20 0.22 0.25 Total Nitrogen (TN) EMC (mg/L) 1.86 Impervious Cover 0.95 0.95 0.95 0.95 Target TP Load (lb/acre/yr) 0.41 Pj (unitless correction factor) 0.90 LAND COVER SUMMARY -- PRE -REDEVELOPMENT LAND COVER SUMMARY POST DEVELOPMENT Land Cover Summary -Pre Land Cover Summary -Post (Final) Land Cover Summary -Post Land Cover Summary -Post Pre-ReDevelopment Listed Adjusted' Post ReDev. & New Impervious Post-ReDevelopment Post -Development New Impervious Space Space Forest/Open Forest/Open S ace Cover acres P (acres) 0.00 0.00 0.00 0.00 (acres) Cover acres Cover acres (acres) Weighted Rv(forest) 0.00 0.00 Weighted Rv(forest) 0.00 Weighted Rv[forest) 0.00 % Forest 0 0 0 o % % Forest 0 a % % Forest 0 o % Turf Cover rManaged Managed Turf Cover Managed Turf Cover(acres) 0.43 0.29 (acres) 0.29Mana 0.29 (acres) Weighted Rv turf g Rv(turf) 0.2 5 0 .25 Weighted Rv turf g (turf) 0.25 Weighted Rv to .2 g (turf) 0 5 %Mena Managed g 33% 25% %Mena Managed g 22% %Mena Managed 25% g .......................... :::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: Impervious Cover (acres) 0.88 0.88 Impervious Cover 102 ReDev. Impervious 0 88 New Impervious Cover 0.14 (acres) Cover (acres) (acres) t0.95 Rv(impervious) 0.95 0.95 Rv(impervious) 0.95 Rv(impervious) 0.95 Rv(impervious) %Im Impervious P 0 7 0 6 / 0 7 5� %Im Impervious P 0 7 8� 0 %Im Impervious 7 5� P Total ReDev. Site Area Total ite Area (acres) 1.31 1.17 Final Site Area (acres) 1.31 1.17 acres() ) Site Rv 0.72 0.78 Final Post Dev Site Rv 0.80 ReDev Site Rv 0.78 Treatment Volume and Nutrient Load Treatment Volume and Nutrient Load Final Post- Pre-ReDevelopment Treatment Volume Development Post-ReDevelopment Post -Development 0.0786 0.0757 0.0868 Treatment Volume 0.0757 Treatment Volume 0.0111 (acre-ft) Treatment Volume (acre-ft) (acre-ft) (acre-ft) Final Post- Post-ReDevelopment Post -Development Pre-ReDevelopment Treatment Volume 3,425 3,298 Development 3,751 Treatment Volume 3,298 Treatment Volume (cubic 483 (cubic feet) Treatment Volume (cubic feet) feet) (cubic feet) Post-ReDevelopment Post -Development TP Pre-ReDevelopment TP Load Final Post- 2.15 2.07 Development TP Load 2.38 Load (TP) 2.07 0.30 (lb/yr) Load (lb/yr) (lb/yr) (lb/yr)* Post-ReDevelopment TP Pre-ReDevelopment TP Load per acre Final Post -Development TP (lb/acre/yr) 1.64 1.77 Load per acre 1.81 Load per acre (lb/acre/yr) (lb/acre/yr) Baseline TP Load (lb/yr) Max. Reduction Required (0.41 Ibs/acre/yr applied to pre -redevelopment area excluding pervious 0.48 (Below Pre- 20% land proposed for new impervious cover) ReDevelopment Load) i Adjusted Land Cover Summary: Pre ReDevelopment land cover minus pervious land cover (forest/open space or TP Load Reduction Required for 0.41 TP Load Reduction Required for New 0.25 managed turf) acreage proposedfor new impervious cover. Redeveloped Area Impervious Area (Ib/yr) (Ib/yr) Adjusted total acreage is consistent with Post-ReDevelopment acreage (minus acreage of new impervious cover). Column I shows load reduction requriement for new impervious cover (based on new development load limit 0.41 lbs/acre/year). Post -Development Requirement for Site Area TP Load Reduction Required (Ib/yr) 0.66 Nitrogen Loads (Informational Purposes Only) Final Post -Development TN Load Pre-ReDevelopment TN Load (lb/yr) 15.39 (Post-ReDevelopment & New 16.99 Impervious) (lb/yr) ELEV = 498. RIM OF STRUCTURE CEILING = ELEV = 498. RIM OF STRUCTURE 6' CEILING = 494.90 ID CAST III -III 10YR-WSEL _494.09 CRETE WALLS -III-III- I CONE 9_112_, a _ _ _ _ _ _ _ a (TYP.) I -III -III _______� --WSEL=49_- I -III -III _ 2YR=WSEL = 493_53 d_ _ _ 2YR-WSE_L = 493.53 ° - 1Y_R=WSEL=493.27_ "CONC. WALL- - - TOP = 494.00 1.5'WEIRAT492.8d ° .. ` d Q ° 'd `d N FLOW48"1.5' WEIR AT 492.80 .a d ° 12" O.C. (TYP.) M.H. .4 g 'd STEPS/LADDER ° B d .. d RUNGS STANDARD '° _ - ° ° 4" DIAMETER d. 6" CONIC, WALE LOW FLOW ORIFICE (INV.=490.9T . ° �... 4 ° %a a (CONTRACTOR TO ENSURE TRASH RACK OPENINGS ARE s 1/2") a. 15"RCP .A!/ /OOUT��FALL4. 1 d ° a A ° .4 INV.=490.90 15"RCP ° - ° INV.= 490.90 490 80- - - - - - OUTFALL -.: ..; a ° ° / 6" REINF. CONC. ° °/1 PROP TRASH RACK FOOTING SECTION A -A FLOW ORIFICES (CONTRACTOR TO ENSURE TRASH PROP TRASH RACK 90) RACK OPENINGS ARE 5 1/2') OUTLET STRUCTURE DETAIL - STRUCTURE A-20 NOT TO SCALE NOTE: CONTRACTOR TO SUBMIT SHOP DRAWINGS TO ENGINEER FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. Virginia Runoff Reduction Method Worksheet DEQ Virginia Runoff Reduction Method Re -Development Compliance Spreadsheet readsheet - Version 3.0 BMP Design Specifications List: 2013 Draft Stds & Specs 9p Site Summary Project Title: Discount Tire Charlottesville Date: 44487 Total Rainfall (in): 43 Total Disturbed Acreage: 1.31 Site Land Cover Summary Pre-ReDevelopment Land Cover (acres) A soils B Soils C Soils D Soils Totals % of Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf (acres) 0.00 0.00 0.00 0.43 0.43 33 Impervious Cover (acres) 0.00 0.00 0.00 0.88 0.88 67 1.31 100 Post-ReDevelopment Land Cover (acres) A soils B Soils C Soils D Soils Totals % of Total Forest/Open (acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf (acres) 0.00 0.00 0.00 0.29 0.29 22 Impervious Cover (acres) 0.00 0.00 0.00 1.02 1.02 78 1.31 100 Site Tv and Land Cover Nutrient Loads Final Post -Development Post- Post- Adjusted Pre- (Post-ReDevelopment Development Impervious) & New Im p ) ReDevelopment (New Impervious) ReDevelopment Site Rv 0.80 0.78 0.95 0.78 Treatment Volume (it') 3,781 3,298 483 3,298 TP Load (lb/yr) 1 2.38 2.07 1 0.30 1 2.07 Total TP Load Reduction Required (lb/yr) 0.66 0.41 0.25 Final Post -Development Load (Post-ReDevelopment & New Impervious) Pre- ReDevelopment TN Load (lb/yr) 16.99 15.39 Pre - Final Post -Development Post-ReDevelopment TP ReDevelopment TP Load per acre Load per acre TP Load per acre (lb/acre/yr) (lb/acre/yr) (lb/acre/yr) 1.77 1.81 1.77 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Site Compliance Summary Maximum % Reduction Required Below Pre-ReDevelopment Load 20/ Total Runoff Volume Reduction (ft3) 0 Total TP Load Reduction Achieved (lb/yr) 0.00 Total TN Load Reduction Achieved (lb/yr) 0.00 Remaining Post Development TP Load (lb/yr) 2.38 Remaining TP Load Reduction (lb/yr) Required 0.66 J M (, z it w LLI LU U) Z of LU Z W D Z W U (Jr Z W L11 W 5 LU Z70LE W W Fw¢= Luz J> Z O W W O =of<o'mC7P: (n 7 2 Q Q z Q z U)2 W z ~i- OOf zW< 0 Q Of J) a z J o Q Of > J F U W H In REVISIONS REV DATE COMMENT DRAWN HEM[E)r cxccxeD er PER COUNTY BSC 1 01/21/2022 COMMENTS RTY PER COUNTY BSC 2 04/08/2022 COMMENTS RTY PER COUNTY CDH 3 08/09/2022 COMMENTS RTY ro Know what's below. Call before udi . you 9 ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: ORIN -1 PROJECT: V/RGINIA STORMWATER MANAGEMENT PLAN FOR DDgQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLER// I 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com 7,11 pJkUff rim RTAN YAUGER Lie. No. 0402056625 0_ 08/09/2022 4 SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER C-902 REVISION 3 - 08/09/2022 Watershed Model Schematic HydraflowHydrographs Extension for Autodesk®Civil 3D®byAutodesk, Inc. v202O 2 Hydrograph Report Hydrograph Report 3 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 1 POI-1 Pre Hydrograph type = SCS Runoff Peak discharge = 0.294 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 594 cult Drainage area = 0.120 Be Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 2 POI-1 Post Hydrograph type = SCS Runoff Peak discharge = 0.043 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 86 cuft Drainage area = 0.020 Be Curve number = 80* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 3 POI-2 Pre Hydrograph type = SCS Runoff Peak discharge = 3.904 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 8,072 cuft Drainage area = 1.190 Be Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 2 ^ V7 V0.40 g ` Composite (Area/CN) _ [(0.100 x 80) + (0.020 x 98)] 10.120 P0I-1 Pre Q (Cfs) Hyd. No. 1 --1 Year Q (cfs) ` Composite (Area/CN) _ [(0.020 x 80)] / 0.020 P0I-1 Post Q (cfs) Hyd. No. 2 --1 Year Q (cfs) ` Composite (Area/CN) _ [(0.330 x 80) + (0.860 x 98)] 11.190 P0I-2 Pre Q (cfs) Hyd. No. 3 --1 Year Q (cfs) 0.50 0.50 0.10 0.10 4.00 4.00 0.45 0.45 0.09 0.09 0.40 0.08 0.08 3.00 3.00 0.35 0.35 0.07 0.07 0.30 0.30 0.06 0.06 0.25 0.25 0.05 0.05 2.00 2.00 0.20 0.20 0.04 0.04 0.15 0.15 0.03 0.03 1.00 1.00 0.10 0.10 0.02 0.02 0.05 0.05 0.01 0.01 0.00 0.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 1 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) -Hyd No. 2 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) -Hyd No. 3 Project: Quantity.gpw Wednesday, 04 / 6 / 2022 Hydrograph Report 5 Hydrograph Report 6 Hydrograph Report Hydrograph Report $ Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 4 POI-2 to Underground Hydrograph type = SCS Runoff Peak discharge = 4.670 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 10,210 cult Drainage area = 1.220 Be Curve number = 95* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 5 POI-2 Undetained Hydrograph type = SCS Runoff Peak discharge = 0.149 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 300 cult Drainage area = 0.070 Be Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 6 Offsite Detained Hydrograph type = SCS Runoff Peak discharge = 0.021 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 43 cult Drainage area = 0.010 Be Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 7 Detained Hydrograph type = Combine Peak discharge = 4.691 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 10,253 cult Inflow hyds. = 4, 6 Contrib. drain. area = 1.230 Be Detained Q (cfs) Hyd. No. 7 --1 Year Q (cfs) ` Composite (Area/CN) _ [(0.200 x 80) + (1.020 x 98)] 11.220 P0I-2 to Underground Q (Cfs) Hyd. No. 4 --1 Year Q (cfs) P0I-2 Undetained Q (cfs) Hyd. No. 5 --1 Year Q (cfs) Offsite Detained Q (cfs) Hyd. No. 6 -- 1 Year Q (Cfs) 5.00 5.00 0.50 0.50 0.10 0.10 5.00 5.00 0.45 0.45 0.09 0.09 4.00 4.00 0.40 0.40 0.08 0.08 4.00 4.00 0.35 0.35 0.07 0.07 3.00 3.00 0.30 0.30 0.06 0.06 3.00 3.00 0.25 0.25 0.05 0.05 2.00 2.00 0.20 0.20 0.04 0.04 2.00 2.00 0.15 0.15 0.03 0.03 1.00 1.00 0.10 0.10 0.02 0.02 1.00 1.00 0.059A 0.05 0.01 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) - Hyd No. 4 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) y o. y o. y o. 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) -Hyd No. 5 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Y o. W 2 O m z it W w w m ? w Z W�5- Z WU W C7gU�U � Ur ZW Wry>W ZrCOH WQa(n F W¢ 2 W Z �>zUlurnO <x-,J0 oz,2¢¢z¢ z<n�wzFF OU0<CL: O co Q WZC00 z > aJ 5 W H REVISIONS REV I DATE I COMMENT PER COUNTY BSC 1 01/21/2022 COMMENTS RTY PER COUNTY BSC 2 04/08/2022 COMMENTS RTY PER COUNTY CID 3 08/09/2022 COMMENTS RTY ro Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAW NG IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: DRIN -1 PROJECT: V/RGINIA STORMWATER MANAGEMENT PLAN FOR - DDgQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com LTH OF V N YA R y .p Lie. No. 0402056625 08/09/2022�� SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER. C-903 REVISION 3 - 08/09/2022 Hydrograph Report 9 Pond Report 10 Hydrograph Report 11 Hydrograph Report 12 Hydraflow Hydrogmphs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v202O Wednesday, 04 / 6 / 2022 Pond No. 1 - Storage Pond Data Pond storage is based on user -defined values. Stage / Storage Table Stage ft Elevation ft Contour area s ft Incr. Storage tuft Total storage tuft 9 O O l a)( ) e( ) 0.00 490.90 n/a 0 0 0.25 491.15 n/a 134 134 0.50 491.40 n/a 238 372 0.75 491.65 n/a 297 669 1,007 1.00 49190 1.25 492,15 n/a 339 n/a 388 1,376 1.50 492.40 n/a 389 1,765 2.75 1.00 422.42.65 90 n/a 403 n/a 400 2,167 2,567 2.25 493.15 n/a 418 2,955 2.50 493.40 n/a 403 3,386 2.75 493.65 Ma 389 3,T77 3.00 493.90 n/a 368 4,145 3.25 494.15 n/8 339 4,484 3.50 494.40 n/a 297 4,781 3.75 494.65 n/a 238 5,018 4.00 494.90 n/a 134 5,152 Hydraflow Hydrographs Extension for Aulotlesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 8 POI-2 Detained Hydrograph type =Reservoir Peak discharge = 2.041 cfsHydrograph Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd, volume = 10,249 cult Inflow hyd. No. = 7 -Detained Max. Elevation = 493.13 ft Reservoir name = Storage Max.torage = 2,959 g ax. cult Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 9 POI-2 Post type =Combine Peak discharge = 2.119 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 10,548 cult Inflow hyds. = 5, 8 Contrib. drain. area = 0.070 Be Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 1 POI-1 Pre Hydrograph type =SCS Runoff Peak discharge = 0.400 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd, volume = 811 tuft Drainage area = 0.120 Be Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.65 in Distribution =Type II Storm duration = 24 hrs Shape factor = 484 POI-2 Post Q (Cfs) Hyd. No. 9 --1 Year Q (Cfs) Storage Indication method used. POI-2 Detained Q (Cfs) Hyd. No. 8 --1 Year Q (cfs) 5.00 5.00 • Composite (Areal • [(0.100 x 80) + (0.020 x 98)] f 0.120 POI-1 Pre Q (Cfs) Hyd. No. 1 -- 2 Year Q (cfs) 0.50 0.50 Culvert Orifice Structures Weir Structures [A] IS] [C] [PrfRsrl [A] IBI [C] [D] Rise (in) 16.00 4.00 Inactive Inactive Crest Len (ft) - 4.50 1.50 0.00 0.00 Span (in) = 15.00 4.00 0.00 0.00 Crest El. (ft) = 494.00 492.80 0.00 0.00 No. Barrels = 1 2 0 0 Weir Coeff. = 3,33 3.33 3.33 3.33 Invert El. (ft) - 490.80 490.90 0.00 0.00 Weir Type - 1 Root - - Length (ft) = 83.69 0.00 0.00 0.00 Multi4tage = Yes Yes No No Slope (%) = 1.08 0.00 0.00 Na N-Value - .013 .013 .013 We Orlftes Coeff. = 0.80 0.80 0.60 0.00 Ex01.(Inthr) = 0.000 (by Wet area) Multi -Stage = Na Yee No No TW Elev. (ft) = 0.00 3.00 3.00 0.45 0.40 0.45 0.40 2.00 2.00 4.00 4.00 0.35 0.35 Note: GUInNOrillee ouMovn ere analyzed antler Wattle) and eutlsl (oe)mntrel. Weir liwNchecketl farariflee mntli4one Cc) and aubmeryenw (a). Stage (ft) Stage t Discharge Elev (ft) 4.00 494.90 3.00 3.00 0.30 0.30 0.25 0.25 2.00 2.00 1.00 1.00 0.20 0.20 3.00 493.90 0.15 _ 0.15 1.00 1.00 2.00 492.90 0.10 0.10 0.05 0.00 0.05 0.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 -Hyd No. 9 -Hyd No. 5 -Hyd No. 8 Time (min) 1.00 i0i 491.90 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 8 -Hyd No. 7 ®Total storage used = 2,959 tuft Time (min) 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 -Hyd No. 1 Time (min) 1 i i 0.00-1490.90 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Q Discharge (cfs) Hydrograph Report 73 Hydrograph Report 14 Hydrograph Report 15 Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 2 POI-1 Post Hydrograph type = SCS Runoff Peak discharge = 0.059 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 120 cult Drainage area = 0.020 Be Curve number = 80* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3D@ by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 3 POI-2 Pre Hydrograph type = SCS Runoff Peak discharge = 5.004 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 10,483 cult Drainage area = 1.190 Be Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 4 POI-2 to Underground Hydrograph type = SCS Runoff Peak discharge = 5.775 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 12,814 cult Drainage area = 1.220 Be Curve number = 95* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 5 POI-2 Undetained Hydrograph type = SCS Runoff Peak discharge = 0.207 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 418 cult Drainage area = 0.070 Be Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ` Composite (Area/CN) _ [(0.020 x 80)] / 0.020 P0I-1 Post Q (Cfs) Hyd. No. 2 -- 2 Year Q (Cfs) ` Composite (Area/CN) _ [(C.330 x 80) + (0.860 x 98)] / 1.190 POI-2 Pre Q (cfs) Hyd. No. 3 -- 2 Year Q (Cfs) ` Composite (Area/CN) _ [(C.200 x 80) + (1.020 x 98)] 11.220 POI-POI-2 to Underground Q (cfs) Hyd. No. 4 -- 2 Year Q (Cfs) P01-2 Undetained Q (Cfs) Hyd. No. 5 -- 2 Year Q (Cfs) 0.10 0.10 6.00 6.00 6.00 6.00 0.50 0.50 0.09 0.09 0.45 0.45 5.00 5.00 5.00 5.00 0.08 0.08 0.40 0.40 0.07 0.07 0.35 0.35 4.00 4.00 4.00 4.00 0.06 0.06 0.30 0.30 0.05 0.05 3.00 3.00 3.00 3.00 0.25 0.25 0.04 0.04 0.20 0.20 2.00 2.00 2.00 2.00 0.03 0.03 0.15 0.15 0.02 0.02 0.10 0.10 1.00 1.00 1.00 1.00 0.01 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) -Hyd No. 4 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) -Hyd No. 5 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 2 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) -Hyd No. 3 W X O m Z EE W w w (WO? w Z (Z(J?ZU W W C7gU�U � Ur ZW Wry>W IYrn F W¢ 2 W Z �>zULurnO �IY¢IY m0F 0='2¢¢z¢ z<n�wzFF OU0<CL: O Co Q WZCOD z > aJ U W fn REVISIONS REV I DATE I COMMENT PER COUNTY BSC 1 01/21/2022 COMMENTS RTY PER COUNTY BSC 2 04/08/2022 COMMENTS RTY PER COUNTY CDH 3 08/09/2022 COMMENTS RTY ro Know what's bBIOW. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAW NG Is INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENTUNLESSINUIC IEDOTHERWISE. PROJECT No.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: DRIN -1 PROJECT: V/RGINIA STORMWATER MANAGEMENT PLAN FOR - DDgQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com LTH OF Z V N YA R y .p Lie. No. 0402056625 08/09/2022�� SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER. C-904 REVISION 3 - 08/09/2022 N z 3 w g o. 0 z z 0 U Hydrograph Report 77 Hydrograph Report 18 Hydrograph Report 19 Hydrograph Report 20 Hydranow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 16 / 2022 Hyd. No. 6 Offsite Detained Hydrograph type = SCS Runoff Peak discharge = 0.030 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 60 cuft Drainage area = 0.010 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Wednesday, 04 16 / 2022 Hyd. No. 7 Detained Hydrograph type = Combine Peak discharge = 5.805 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 12,874 cuft Inflow hyds. = 4, 6 Contrib. drain. area = 1.230 ac Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 16 / 2022 Hyd. No. 8 POI-2 Detained Hydrograph type = Reservoir Peak discharge = 3.452 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 12,870 cuft Inflow hyd. No. = 7 -Detained Max. Elevation = 493.41 ft Reservoir name = Storage Max. Storage = 3,402 cuft Hydranow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 16 / 2022 Hyd. No. 9 POI-2 Post Hydrograph type = Combine Peak discharge = 3.573 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 13,289 cuft Inflow hyds. = 5, 8 Contrib. drain. area = 0.070 ac Detained Q (cfs) Hyd. No. 7 -- 2 Year Q (Cfs) P0I-2 Post Q (cfs) Hyd. No. 9 -- 2 Year Q (Cfs) Storage Indication method used. POI-2 Detained Q (cfs) Hyd. No. 8 -- 2 Year Q (Cfs) Offsite Detained Q (afs) Hyd. No. 6 -- 2 Year Q (Cfs) 0.10 0.10 6.00 6.00 6.00 6.00 4.00 4.00 0.09 0.09 5.00 5.00 5.00 5.00 0.08 0.08 3.00 3.00 0.07 0.07 4.00 4.00 4.00 4.00 0.06 0.06 0.05 0.05 3.00 3.00 3.00 3.00 2.00 2.00 0.04 0.04 2.00 2.00 2.00 2.00 0.03 0.03 1.00 1.00 0.02 0.02 1.00 1.00 1.00 1.00 0.01 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) -Hyd No. 9 -Hyd No. 5 -Hyd No. 8 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) -Hyd No. 7 -Hyd No. 4 -Hyd No. 6 0.00 0.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 6 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) -Hyd No. 8 -Hyd No. 7 ®Total storage used = 3,402 tuft Hydrograph Report 21 Hydrograph Report zz Hydrograph Report 23 Hydrograph Report za Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 0416 / 2022 Hyd. No. 1 POI-1 Pre Hydrograph type = SCS Runoff Peak discharge = 0.719 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,486 cuft Drainage area = 0.120 ac Curve number = 83* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Wednesday, 0416 / 2022 Hyd. No. 2 POI-1 Post Hydrograph type = SCS Runoff Peak discharge = 0.111 cfS Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 227 cult Drainage area = 0.020 ac Curve number = 80* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 0416 / 2022 Hyd. No. 3 POI-2 Pre Hydrograph type = SCS Runoff Peak discharge = 8.185 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 17,696 cuft Drainage area = 1.190 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 0416 / 2022 Hyd. No. 4 POI-2 to Underground Hydrograph type = SCS Runoff Peak discharge = 8.953 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 20,448 cuft Drainage area = 1.220 ac Curve number = 95* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(0.100 x 80) + (0.020 x 98)] 10.120 P0I-1 Pre Q (afs) Hyd. No. 1 -- 10 Year Q (Cfs) ' Composite (Area/CN) _ [(0.020 x 80)] / 0.020 P0I-1 Post Q (cfs) Hyd. No. 2 -- 10 Year Q (Cfs) ' Composite (Area/CN) _ [(0.330 x 80) + (0.860 x 98)] 11.190 P0I-2 Pre Q (cfs) Hyd. No. 3 -- 10 Year Q (Cfs) ' Composite (Area/CN) _ [(0.200 x 80) + (1.020 x 98)] 11.220 P0I-2 to Underground Q (cfs) Hyd. No. 4 -- 10 Year Q (Cfs) 1.00 1.00 0.50 0.50 10.00 10.00 10.00 - 10.00 0.90 0.90 0.45 0.45 0.80 0.80 0.40 0.40 8.00 8.00 8.00 8.00 0.70 0.70 0.35 0.35 0.60 0.60 0.30 0.30 6.00 6.00 6.00 6.00 0.50 0.50 0.25 0.25 0.40 0.40 0.20 0.20 4.00 4.00 4.00 4.00 0.30 0.30 0.15 0.15 0.20 0.20 0.10 0.10 2.00 2.00 2.00 2.00 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) - Hyd No. 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) Hyd No. 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) -Hyd No. 2 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) - Hyd No. 1 W 2 O m z EE W W W m Z W Z W� Z WU wC7gU�U � Ur ZW IYrn F W z 2 W Z J>zU-j0 2 < z cn�QZQ z<n2 W zP: Oz<,QQ~OW 0< U U U Y U Q z CO a- z J aQ X j J F U w REVISIONS REV I DATE I COMMENT PER COUNTY BSC 1 01/21/2022 COMMENTS RTY PER COUNTY 2 04/08/2022 JBCOMMENTS PER COUNTY 3 08/09/2022 COMMENTS ro Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAW NG Is INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: DRIN -1 PROJECT: V/RGINIA STORMWATER MANAGEMENT PLAN FOR - DDgQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com LTH OF V N YA R y .p Lic. No. 0402056625 08/09/2022 �oNAL�' SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER. C-905 REVISION 3 - 08/09/2022 a 0 0 U 3 K 0 N rn ti 0 3 A I d z 0 N 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 7 Detained Hydrograph type = Combine Peak discharge = 9.008 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 20,562 cult Inflow hyds. = 4, 6 Contrib. drain. area = 1.230 ac Q (Cfs) 10.00 4.00 2.00 0.00 0 120 Hyd No. 7 Detained Hyd. No. 7 -- 10 Year 240 360 480 - Hyd No. 4 600 720 - Hyd No. 6 840 960 Q (Cfs) 10.00 4.00 2.00 -- 0.00 1080 1200 Time (min) 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 5 POI-2 Undetained Hydrograph type = SCS Runoff Peak discharge = 0.390 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 796 cult Drainage area = 0.070 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 120 240 - Hyd No. 5 360 480 600 Hydrograph Report POI-2 Undetained Hyd. No. 5 -- 10 Year Q (Cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 720 840 960 1080 1200 1320 Time (min) Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 8 POI-2 Detained Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 7 -Detained Reservoir name = Storage Storage Indication method used Q (cfs) 10.00 a 1/ 2.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage P0I-2 Detained Hyd. No. 8 -- 10 Year 28 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Wednesday, 04 / 6 / 2022 Hyd. No. 6 Offsite Detained Hydrograph type = SCS Runoff Peak discharge = 0.056 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 114 cult Drainage area = 0.010 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Offsite Detained Q (Cfs) Hyd. No. 6 -- 10 Year Q (Cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 6 Time (min) Hydrograph Report Wednesday, 04 / 6 / 2022 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 9 POI-2 Post = 7.315 cfs Hydrograph type = Combine = 720 min Storm frequency = 10 yrs = 20,558 cult Time interval = 2 min = 494.01 ft Inflow hyds. = 5, 8 = 4,299 cult Q (Cfs) 10.00 . 11 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) - Hyd No. 8 - Hyd No. 7 f`?'TT�I Total storage used = 4,299 tuft Q (cfs 8.00 . 11 4.00 2.00 29 Wednesday, 04 / 6 / 2022 Peak discharge = 7.618 cfs Time to peak = 720 min Hyd. volume = 21,354 cult Contrib. drain. area = 0.070 ac POI-2 Post Hyd. No. 9 -- 10 Year ft ILL Q (Cfs) 8.00 J rl z z EE W w w m ? w Z W�5_ Z WU W C7gU�U � Ur ZW IYrn F W¢ 2 W Z J> Z U W O R n W< W m 0 cn o 22 ¢ ¢ Z ¢ z<n�wzFF 0Uz¢Q¢~O 0<U(nUWrp Q W Z a z J a¢ X > J F U W 75 REVISIONS REV DATE COMMENT PER COUNTY 1 01/21/2022 COMMENTS PER COUNTY ]RTY 2 04/08/2022 COMMENTS PER COUNTY 3 08/09/2022 COMMENTS ro Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAWING I$ INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: DRIN -1 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR DDgQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLER// 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com v MN YAUGER 4.00 .p Lic. No. 0402056625 �04L:08/09/2022 4 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 - Hyd No. 9 - Hyd No. 5 - Hyd No. 8 Time (min) SHEET TITLE: STORMWATER COMPLIANCE PLAN SHEET NUMBER C-906 REVISION 3 - 08/09/2022 PROJECT SUMMARY CALCULATION DETAILS • LOADING = HS20/HS25 STORAGE SUMMARY • PIPE STORAGE VOLUME 1115,152 CF • BACKFILL STORAGE VOLUME = 0 CF • TOTAL STORAGE PROVIDED 15,152 CF PIPE DETAILS • DIAMETER = 48" • CORRUGATION = 2 2/1 • GAGE =16 • COATING =ALT2 • WALL TYPE = SOLID • BARREL SPACING = 24" NOTES R • RIBERAND STUB DIMENSIONSARE TO CENTERLINE. ALL ELEVATIONS, DIMENSIONS, AND LOCATIONS OF RISERS AND INLETS, SHALL BE VERIFIED BY THE ENGINEER OF RECORD PRIOR TO RELEASING FOR FABRICATION. • ALL FITTINGS AND REINFORCEMENT COMPLY WITH ASTM A998. • ALL RISERS AND STUBS ARE 23° x V CORRUGATION AND 18 GAGE UNLESS OTHERWISE NOTED. • RISERS TO BE FIELD TRIMMED TO GRADE. • QUANTITY OF PIPE SHOWN DOES NOT PROVIDE EXTRA PIPE FOR CONNECTING THE SYSTEM TO EXISTING PIPE OR DRAINAGE STRUCTURES. OUR SYSTEM AS DETAILED PROVIDES NOMINAL INLET AND/OR OUTLET PIPE STUB FOR CONNECTION TO EXISTING DRAINAGE FACILITIES. IF ADDITIONAL PIPE IS NEEDED IT IS THE RESPONSIBILITY OF THE CONTRACTOR • BAND TYPE TO BE DETERMINED UPON FINAL DESIGN. • THE PROJECT SUMMARY IS REFLECTIVE OF THE DYODS DESIGN, QUANTITIES ARE APPROX. AND SHOULD BE VERIFIED UPON FINAL DESIGN AND APPROVAL. FOR EXAMPLE, TOTAL EXCAVATION DOES NOT CONSIDER ALL VARIABLES SUCH AS SHORING AND ONLYACCOUNTS FOR MATERIAL WITHIN THE ESTIMATED EXCAVATION FOOTPRINT. • THESE DRAWINGS ARE FOR CONCEPTUAL PURPOSES AND DO NOT REFLECT ANY LOCAL PREFERENCES OR ASSEMBLY REGULATIONS. PLEASE CONTACT YOUR LOCAL CONTECH REP FOR MODIFICATIONS. SCALE: 1" = 10' LplW umriCNirevaF.i-Ey " r C�.�NTE H A� ��ITCAu' -....::__� 48"0 UNDERGROUND DETENTION SYSTEM -- P0.0JECr, Na.: � SEO. rb: GATE: "' 1120" DESIGNEDovan" DYD DRAWN: D- ==I,",>d•gym"="+="I„",,.•"""=I"InN, ENGINEERED SOLUTIONS LLC CMP DETENTION SYSTEMS DISCOUNT TIRE - CHARLOTTESVILLE www.ContechES.com CONTECH CHARLOTTESVILLE, VA `HEQKED: MPRWEn: 9026 Centre Pointe Dr., Suite 400 West ChesterW OH 469 DYODS Dro Dro SITE DESIGNATION: SHEET NO.: 800-338-1122 513-645-7000 513845-]993 FAX DRAWING 1 DATE REVISION DESCRIPTION BY me,bIllm.u""." i°ec ran... TEMPORARY COVER FOR CONSTRUCTION LOADS HEIGHT OF COVER FINISHED GRADE FOR TEMPORARY CONSTRUCTION VEHICLE LOADS, AN EXTRAAMOUNT OF COMPACTED COVER MAY BE REQUIRED OVER THE TOP OF THE PIPE. THE HEIGHT -OF -COVER SHALL MEET THE MINIMUM REQUIREMENTS SHOWN IN THE TABLE BELOW. THE USE OF HEAVY CONSTRUCTION EQUIPMENT NECESSITATES GREATER PROTECTION FOR THE PIPE THAN FINISHED GRADE COVER MINIMUMS FOR NORMAL HIGHWAY TRAFFIC. PIPE SPAN, AXLE LOADS (kips) INCHES s 75 1 75- MINIMUM COVER (FT) 2.0 1Z-42 48-72 3.04.0 78-120 3.04.0 U3.0 128-144 3.54.5 'MINIMUM COVER MAY VARY DEPENDING ON LOCAL CONDITIONS. THE CONTRACTOR MUST PROVIDE THE ADDITIONAL COVER REQUIRED TOAVOID DAMAGE TO THE PIPE. MINIMUM COVER IS MEASURED FROM THE TOP OF THE PIPE TO THE TOP OF THE MAINTAINED CONSTRUCTION ROADWAY SURFACE. CONSTRUCTION LOADING DIAGRAM SCALE: N.T.S. SCOPE THIS SPECIFICATION COVERS THE MANUFACTURE AND INSTALLATION OF THE DESIGNED DETENTION SYSTEM DETAILED IN THE PROJECT PLANS. MATERIAL THE MATERIAL SHALL CONFORM TO THE APPLICABLE REQUIREMENTS LISTED BELOW: ALUMINIZED TYPE 2 STEEL COILS SHALL CONFORM TO THE REQUIREMENTS OF AASHTO M-274 OR ASTM A-92. THE GALVANIZED STEEL COILS SHALL CONFORM TO THE REQUIREMENTS OF AASHTO M418 OR ASTM A-929. THE POLYMER COATED STEEL COILS SHALL CONFORM TO THE REQUIREMENTS OF AASHTO M-248 OR ASTM A-742. THE ALUMINUM COILS SHALL CONFORM TO THE APPLICABLE OF AASHTO MA97 ORASTM B-744. CONSTRUCTION LOADS CONSTRUCTION LOADS MAY BE HIGHER THAN FINAL LOADS. FOLLOW THE MANUFACTURER'S OR NCSPA GUIDELINES. i NOTE: ? THESE DRAWINGS ARE FOR CONCEPTUAL I PURPOSES AND DO NOT REFLECTANY LOCAL I PREFERENCES OR REGULATIONS. PLEASE i CONTACT YOUR LOCAL CONTECH REP FOR r GASKET MATERIAL SUFFICIENT TO PREVENT SLAB FROM BEARING ON RISER TO BE PROVIDED BY CONTRACTOR. #4 DIAGONAL TRIM BAR (TYR 4 PLACES), SEE NOTE 7. OPENING IN PROTECTION SLAB FOR CASTING En THE PIPE SHALL BE MANUFACTURED IN ACCORDANCE TO THE APPLICABLE REQUIREMENTS LISTED BELOW: ALUMINIZED TYPE 2: AASHTO M-88 ORASTM A480 GALVANIZED: AASHTO M-36 ORASTM A-780 ARRO COATED: AASHTO M-245 ORASTM A-702 ALUMINUM: AASHTO M-198 ORASTM B•746 APPLICABLE HANDLING AND ASSEMBLY SHALL BE IN ACCORDANCE WITH NCSP'S (NATIONAL CORRUGATED STEEL ARR68?ASSBCIATION) FOR ALUMINIZED TYPE 2, GALVANIZED OR POLYMER COATED STEEL SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS FOR ALUMINUM PIPE. REQUIREMENTS INSTALLATION SHALL BE IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, SECTION 26, DIVISION II DIVISION II ORASTM A-798 (FOR ALUMINIZED TYPE 2, GALVANIZED OR POLYMER COATED STEEL) ORMTM B-788 (FOR ALUMINUM PIPE)AND IN CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS. IF THERE ARE ANY INCONSISTENCIES OR CONFLICTS THE CONTRACTOR SHOULD DISCUSS AND RESOLVE WITH THE SITE ENGINEER. IT IS ALWAYS THE RESPONSIBILITY OF THE CONTRACTOR TO FOLLOW OSHA GUIDELINES FOR SAFE PRACTICES. INTERRUPTED BAR REPLACEMENT, SEE NOTES. ACCESS CASTING TO BE PROVIDED AND INSTALLED BY CONTRACTOR. s•I — B CMP RISER G, a— jW F O 0 N B 11°TYP.L SECTION VIEW BA OB #4 DIAGONAL TRIM BAR (TYP. 4 PLACES), SEE NOTE 7. (TYP) OPENING IN PROTECTION SLAB FOR CASTING REINFORCING TABLE "BEARING a CMP A 0 B REINFORCING PRESSURE RISER (PSF) 24" m 4' 26" #5 @ 12^ OCEW 2,410 OW #5 @ 12^ OCEW 1,780 30" B 4'-6" 32" #5 @ 12^ OCEW 2,120 4'-8" X 4'46" #5 @ 12^ OCEW 1,530 36" or 5' 38" #5 @ 10^ OCEW 11890 X 6' #5 @ 10^ OCEW 1,350 42" 44„ its @ 10, OCEW 1,720 X S'•8" #5 @ 9" OCEW 1,210 48" S0" #511 DOEW 1,000 XB' #5@8"CEW 1,100 **ASSUMED SOIL BEARING CAPACITY STANDARD STANDARD REINFORCING, REINFORCING, Be INTERRUPTED BAR SEE TABLE SEE TABLE REPLACEMENT, SEE NOTE S. ROUND OPTION PLAN VIEW SQUARE OPTION PLAN VIEW Huff$, 1. DESIGN IN ACCORDANCE WITH AASHTO, 17th EDITION. 7. TRIM OPENING WITH DIAGONAL #4 BARS, EXTEND BARS A MINIMUM OF 12' BEYOND OPENING, BEND 2. DESIGN LOAD HS25. BARS AS REQUIRED TO MAINTAIN BAR COVER. 3. EARTH COVER III 1'MAX. 8. PROTECTION SLAB AND ALL MATERIALS TO BE PROVIDED AND INSTALLED BY CONTRACTOR. 4. CONCRETE STRENGTH = 3,500 psi 9. DETAIL DESIGN BY DELTA ENGINEERING, BINGHAMTON, NY. S. REINFORCING STEEL=ASTM A615, GRADE 60. 6. PROVIDE ADDITIONAL REINFORCING AROUND MANHOLE CAP DETAIL OPENINGS EQUAL TO THE BARS INTERRUPTED, HALF EACH SIDE. ADDITIONAL BARS TO BE IN SCALE: N.T.S. THE SAME PLANE. = afc"" C�NTECH e A�\v�uTCAV® 48"O UNDERGROUND DETENTION SYSTEM - _ P0.0E b: 7585 SEQ.b: WE: 12729 1111202] m M � 011', r'♦ r� DESIGNED: OMWN: DISCOUNT TIRE CHARLOTTESVILLE ==N"�•m=="„e"III"°,.."""=INI�I,", ENGINEERED SOLUTIONS LLC CMP DETENTION SYSTEMS - Dro Dro "_- _ mew JBY www.ContechES.com 9026 Centre Pointe Dr., Suite 400 West Chester OR 4W69 CONTECH DYODS CHARLOTTESVILLE, VA `""K°° DYO ""R°"°° DYO min DRAWING SITE DESIGNATION: SHEET NO.: l)elpn"parefio e%-1OFIal —1 "°.,,,,,,,„,„m,,,""„"",„"",",",,, DATE REVISION DESCRIPTION 800-338-1122 513-645-]0W 513645-]993 FAX 1 t� DETENTION SYSTEMS -CMP DETENTION / CMP DRAINAGE Metemel LGcatim Description Material Designation Designei Rigid or Flexible Pavement (Neppllcable) Road Baas (H appllpde) Geoland le Layer Non -Woven Ge escutile OONTECH C40 or Engineer Dedalon for consideration to prevent soil C45 migreticn into varying it types Backflll Well graded gmnular materW AASHTO M 14SM, Placed in B^+l-loose lies end compacted to 90% which may contain small A-2, AJ Standard Proctor PerAASHTO T 99 amounts of sill or day. Bedding Blond wen graded granular eir ing AASHTO 1443- Englnser to determine If badd ig Is refund. Pipe material wAradmum pwUole 3,357,4,467, 5, 56, 57 may be placed on the trench bottom of a 61SIP ly size o13" loose, native suitable wall graded S granular material. For Arch pipes it is recommended to be shaped to a relatively flat bottom or fine -grade the foundation to a sli9htvehape. Unsuitable materiel should be over -excavated and re -placed wfth • 4"-e" layer o/well graded 4 granular stone parthe minimal designation Sea AASHTO 25,3.8.1 /26.6.3 Bedding info. Geohnible Layer Noo-Wonn Osotarrile CONTECH CPO or Engineer Qedslon for consideration to prevent wIl C45 migration into varying soil types Note: Backflil using conpoeed IQw-strength material (CLSM, "flash ltlror °Howaft A10 when pis spacing be"w drs p'pw RSA not allow for propo]Mnt and adeguns °ompeceon offhe DBpk011. INITIAL FILL ENVELOPE MINIMUM WIDTH DEPENDS ON SITE CONDITIONS AND ENGINEERING JUDGEMENT FOUNDATIONIBEDDING PREPARATION PRIOR TO PLACING THE BEDDING, THE FOUNDATION MUST BE CONSTRUCTED TO A UNIFORM AND STABLE GRADE. IN THE EVENT THAT UNBUITA13LE FOUNDATION MATERIALS ARE ENCOUNTERED DURING EXCAVATION, THEY SHALL BE REMOVED AND BROUGHT BACK TO THE GRADE WITH A FILL MATERIALAS APPROVED BYTHE ENGINEER. HAUNCH ZONE MATERIAL SHALL BE PLACED AND UNIFORMALLY COMPACTED WITHOUT SOFT SPOTS. BACKFILL WHEN PLACING THE FIRST LIFTS OF BACKFILL IT IS IMPORTANT TO MAKE SURE THAT THE BACKFILL IS PROPERLY COMPACTED UNDER AND MOUND THE PIPE HAUNCHES. BACKFILL SHALL BE PLACED SUCH THAT THERE IS NO MORE THAN ATWO LIFT (IS-) DIFFERENTIAL BETWEEN ANY OF THE PIPES ATANY TIME DURING THE BACKFILL PROCESS. THE BACKFILL SHALL BE ADVANCED ALONG THE LENGTH OF THE DETENTION SYSTEM AT THE SAME RATE TO AVOID DIFFERENTIAL LOADING ON THE PIPE. OTHERALTERNATE BACKFILL MATERIAL MAY BE ALLOWED DEPENDING ON SITE SPECIFIC CONDITIONS, AS APPROVED BY SITE ENGINEER. PLAN TYPICAL MANWAY DETAIL SCALE: N.T.S. FRONT NOTE: MANWAY DETAIL APPLICABLE FOR CMP SYSTEMS WITH DIAMETERS 48" AND LARGER. MANWAYS MAY BE REQUIRED ON SMALLER SYSTEMS DEPENDING ON ACTUAL SITE SPECIFIC CONDITIONS. ER (TYP.) E DETAIL ELEVATION END TYPICAL RISER DETAIL LLAAOOERSARE oFrioNALANDARE NOT REQUIRED FORALL SYSTEMS. SCALE: N.T.S. 20 MIL HDPE MEMBRANE LINER OVER TOP OF PIPE (IF REQUIRED) I TYPICAL SECTION VIEW LINER OVER ROWS SCALE: N.T.S. NOTE: IF SALTING AGENTS FOR SNOW AND ICE REMOVAL ARE USED ON OR NEAR THE PROJECT, AN HOPE MEMBRANE LINER IS RECOMMENDED WITH THE SYSTEM. THE IMPERMEABLE LINER IS INTENDED TO HELP PROTECT THE SYSTEM FROM THE POTENTIAL ADVERSE EFFECTS THAT MAY RESULT FROM A CHANGE IN THE SURROUNDING ENVIRONMENT OVER A PERIOD OF TIME. PLEASE REFER TO THE CORRUGATED METAL PIPE DETENTION DESIGN GUIDE FOR ADDITIONAL INFORMATION. eN' a I� AEI/uTCAu® 48"O UNDERGROUND DETENTION SYSTEM 'aa' ""a ""' CmI�NTECH �:.►-•:: ��� • - - DESIGNED DRAWN DISCOUNT TIRE CHARLOTTESVILLE •_=°�m=-^�LT.a°°�(�"b ENGINEERED SOLUTIONS LLC CMP DETENTION SYSTEMS - Dvo Dvo ",". www.ContachES.com CONTECH CHARLOTTESVILLE, VA `NEGKE°' APPROVED 9025 Centre Pointe Dr., Suite 400, West Chester, OR 45089 DYODS Dvo Dvo _ �b. C SITE DESIGNATION: J E SIGNATION: aHEErNo: '"`"""'" 804338-1122 513645-7000 513-645-7993 FAX oRnwwG DATE REVISION DESCRIPTION BV CMP DETENTION SYSTEM INSPECTION AND CMP DETENTION INSTALLATION GUIDE IN -SITU TRENCH WALL MAINTENANCE WHEN FLOWABLE FILL IS USED, YOU MUST PREVENT PIPE FLOATATION. PROPER INSTALLATION OF A FLEXIBLE UNDERGROUND DETENTION SYSTEM IF EXCAVATION IS REQUIRED, THE TRENCH WALL NEEDS TO BE CAPABLE OF TYPICALLY, SMALL LIFTS ARE PLACED BETWEEN THE PIPES AND THEN UNDERGROUND STORMWATER DETENTION AND INFILTRATION SYSTEMS MUST WILL ENSURE LONG-TERM PERFORMANCE. THE CONFIGURATION OF THESE SUPPORTING THE LOAD THAT THE PIPE SHEDS AS THE SYSTEM IS LOADED. IF ALLOWED TO SET-UP PRIOR TO THE PLACEMENT OF THE NEXT LIFT. THE BE INSPECTED AND MAINTAINED AT REGULAR INTERVALS FOR PURPOSES OF SYSTEMS OFTEN REQUIRES SPECIAL CONSTRUCTION PRACTICES THAT SOILS ARE NOT CAPABLE OF SUPPORTING THESE LOADS, THE PIPE CAN DEFLECT. ALLOWABLE THICKNESS OF THE CLSM LIFT IS A FUNCTION OF A PROPER PERFORMANCE AND LONGEVITY. BALANCE BETWEEN THE UPLIFT FORCE OF THE CLSM, THE OPPOSING DIFFER FROM CONVENTIONAL FLEXIBLE PIPE CONSTRUCTION. CONTECH PERFORM ASIMPLE SOIL PRESSURE CHECK USING THE APPLIED LOADS TO WEIGHT OF THE PIPE, AND THE EFFECT OF OTHER RESTRAINING INSPECTION ENGINEERED SOLUTIONS STRONGLY SUGGESTS SCHEDULING DETERMINE THE LIMITS OF EXCAVATION BEYOND THE SPRING LINE OF THE MEASURES. THE PIPE CAN CARRY LIMITED FLUID PRESSURE WITHOUT PRE -CONSTRUCTION MEETING WITH YOUR LOCAL SALES ENGINEER TO OUTER MOST PIPES. PIPE DISTORTION OR DISPLACEMENT, WHICH ALSO AFFECTS THE CLSM INSPECTION IS THE KEY TO EFFECTIVE MAINTENANCE OF CMP DETENTION DETERMINE IF ADDITIONAL MEASURES, NOT COVERED IN THIS GUIDE, ARE IN MOST CASES THE REQUIREMENTS FOR A SAFE WORK ENVIRONMENT AND LIFT THICKNESS. YOUR LOCAL CONTECH SALES ENGINEER CAN HELP SYSTEMS AND IS EASILY PERFORMED. CONTECH RECOMMENDS ONGOING, APPROPRIATE FOR YOUR SITE. PROPER BACKFILL PLACEMENT AND COMPACTION TAKE CARE OF THIS CONCERN. DETERMINE THE PROPER LIFT THICKNESS. ANNUAL INSPECTIONS. SITES WITH HIGH TRASH LOAD OR SMALL OUTLET CONTROL ORIFICES MAY NEED MORE FREQUENT INSPECTIONS. THE RATE AT FOUNDATION BACKHL.- WELLGRADED 3 GRANUtARANDSMAUER L E Loan WHICH THE SYSTEM COLLECTS POLLUTANTS WILL DEPEND MORE ON SITE SPECIFICACTIVITIES RATHER THAN THE SIZE OR CONFIGURATION OF THE O O a REDTO ONSTRUCTAFOUNDATI FOUNDATION CAN SUPPORT THE DESIGNL DING C 0LOADING " ^^7^^^'^....^[^^^^^^^^'!,%'.^:. .. -. ,, r,.,...,. r , ,....,,,. CONTROL, PIPE CONTROSTAGEPWRS FLOATAREGTION AND SYSTEM. EMBANKMENT DlsmRnorvmisvucEmsnr APPLIED BY THE PIPE ANDADJACENT BACKFILL WEIGHTAS WELLAS MAINTAIN IBM ITS INTEGRITY DURING CONSTRUCTION. �O� INSPECTIONS SHOULD BE PERFORMED MORE OFTEN IN EQUIPMENT GEOTEXTLE SEPARATION F Emennxm6nr WASHDOWN AREAS, IN CLIMATES WHERE SANDING AND/OR SALTING IF SOFT OR UNSUITABLE SOILS ARE ENCOUNTERED, REMOVE THE POOR SOILS BBOVEAND BELOW i�ii e600ln0lwRHDNIFORmLr '! OPERATIONS TAKE PLACE, AND IN OTHER VARIOUS INSTANCES IN WHICH ONE DOWN TO A BUITA13LE DEPTH AND THEN BUILD UP TO THE APPROPRIATE OWED BEDDwD ureR, WOULD EXPECT HIGHER ACCUMULATIONS OF SEDIMENT OR ABRASIVE ELEVATION WITHACOMPETENT BACKFILL MATERIAL. THE STRUCTURAL FILL BEING -WELL GRADED CORROSIVE CONDITIONS. A RECORD OF EACH INSPECTION IS TO BE MATERIAL GRADATION SHOULD NOTALLOW THE MIGRATION OF FINES, WHICH STIANUTARAND SMALLER MAINTAINED FOR THE LIFE OF THE SYSTEM CAN CAUSE SETTLEMENT OF THE DETENTION SYSTEM OR PAVEMENTABOVE. IF THE STRUCTURAL FILL MATERIAL IS NOT COMPATIBLE WITH THE WEIGHTED PIPE WITH MOBILE CONCRETE BARRIERS UNDERLYING SOILSAN ENGINEERING FABRIC SHOULD BE USEDAS A (OR OTHER REMOVABLE WEIQxTai MAINTENANCE SEPARATOR. IN SOME CASES, USING ASTIFF REINFORCING GEOGRID BACKFILL PLACEMENT REDUCES OVER EXCAVATION AND REPLACEMENT FILL QUANTITIES. CMP DETENTION SYSTEMS SHOULD BE CLEANED WHEN AN INSPECTION MATERIAL SHALL BE WORKED INTO THE PIPE HAUNCHES BY MEANS OF REVEALS ACCUMULATED SEDIMENT OR TRASH IS CLOGGING THE DISCHARGE gFmgo ueeoro Repuee BACKFILL TNEMMNTOFUN@RGUT covER COVER WASN'T USED RODDING, AIR TAMPER, VIBRATORY ROD, OR OTHER EFFECTIVE ORIFICE. METHODS. CONSTRUCTION LOADING EMBANKMENT ro Nuumu� cEeumna° TYPICALLY, THE MINIMUM COVER SPECIFIED FORA PROJECTASBUMES H•20 ACCUMULATED SEDIMENTAND TRASH CAN TYPICALLY BE EVACUATED THROUGH THE MANHOLE OVER THE OUTLET ORIFICE. IF MAINTENANCE IS NOT EMBANKMENT LIVE LOAD. BECAUSE CONSTRUCTION LOADS OFTEN EXCEED DESIGN LIVE PERFORMEDAS RECOMMENDED, SEDIMENTAND TRASH MAYACCUMULATE IN PIPEA Pine PIPED PIPED LOADS, INCREASED TEMPORARY MINIMUM COVER REQUIREMENTS ARE FRONT OF THE OUTLET ORIFICE. MANHOLE COVERS SHOULD BE SECURELY NECESSARY. SINCE CONSTRUCTION EQUIPMENT VARIES FROM JOB TO JOB, SEATED FOLLOWING CLEANING ACTIVITIES. CONTECH SUGGESTS THATALL IT IS BEST TOADDRESS EQUIPMENT SPECIFIC MINIMUM COVER SYSTEMS BE DESIGNED WITH AN ACCESSANSPECTION MANHOLE SITUATED AT OR NEAP THE INLET AND THE OUTLET ORIFICE. SHOULD IT BE NECESSARY TO L ONELLONE SOILS LACE BECDNB ulwurtAUE eolu REQUIREMENTS WITH YOUR LOCAL CONTECH SALES ENGINEER DURING GET INSIDE THE SYSTEM TO PERFORM MAINTENANCE ACTIVITIES, ALL 6°LOOBE LIFTS 3=ING YOUR PRE -CONSTRUCTION MEETING. APPROPRIATE PRECAUTIONS REGARDING CONFINED SPACE ENTRYAND OSHA GRADE THE FOUNDATION SUBGRADE TO A UNIFORM OR SLIGHTLY SLOPING REGULATIONS SHOULD BE FOLLOWED. GRADE. IF THE SUBGRADE IS CLAY OR RELATIVELY NON -POROUS AND THE CONSTRUCTION SEQUENCE WILL LAST FORAN EXTENDED PERIOD OF TIME, ANNUAL INSPECTIONSARE BEST PRACTICE FOR ALL UNDERGROUND SYSTEMS. IT IS BEST TO SLOPE THE GRADE TO ONE END OF THE SYSTEM. THIS WILL IF AASHTO TSS PROCEDURES ARE DETERMINED INFEASIBLE BY THE DURING THIS INSPECTION, IF EVIDENCE OF SALTING/DE-ICING AGENTS IS ALLOW EXCESS WATER TO DRAIN QUICKLY, PREVENTING SATURATION OF THE GECTECHNICAL ENGINEER OF RECORD, COMPACTION IB CONSIDERED ADDITIONAL CONSIDERATIONS OBSERVED WITHIN THE SYSTEM, ITIS BEST PRACTICE FOR THE SYSTEM TO BE SUBGRADE. ADEQUATE WHEN NO FURTHER YIELDING OF THE MATERIAL IS OBSERVED RINSED, INCLUDING ABOVE THE SPRING LINE SOON AFTER THE SPRING THAW UNDER THE COMPACTOR OR UNDER FOOT AND THE GEOTECHNICAL BECAUSE MOST SYSTEMS ARE CONSTRUCTED BELOW -GRADE, RAINFALL AS PART OF THE MAINTENANCE PROGRAM FOR THE SYSTEM. ENGINEER OF RECORD (OR REPRESENTATIVE THEREOF) IS SATISFIED WITH THE LEVEL OF COMPACTION. CAN RAPIDLY FILL THE EXCAVATION; POTENTIALLY CAUSING FLOATATION GEOMEMBRANE BARRIER AND MOVEMENT OF THE PREVIOUSLY PLACED PIPES. TO HELP MITIGATE MAINTAINING AN UNDERGROUND DETENTION OR INFILTRATION SYSTEM IS EASIEST WHEN THERE IS NO FLOW ENTERING THE SYSTEM. FOR THIS A SITE'S RESISTIVITY MAY CHANGE OVERTIME WHEN VARIOUS TYPES OF FOR LARGE SYSTEMS, CONVEYOR SYSTEMS, BACKHOES WITH LONG POTENTIAL PROBLEMS, IT IS BEST TO START THE INSTALLATION AT THE REASON, IT IS A GOOD IDEATO SCHEDULE THE CLEANOUT DURING DRY SALTING AGENTS ARE USED, SUCH AS ROAD SALTS FOR DEICING AGENTS. IF REACHES OR DRAGLINES WITH STONE BUCKETS MAY BE USED TO PLACE DOWNSTREAM END WITH THE OUTLETALREADY CONSTRUCTED TO ALLOW WEATHER. BACKFILL. ONCE MINIMUM COVER FOR CONSTRUCTION LOADING ACROSS A ROUTE FOR THE WATER TO ESCAPE. TEMPORARY DIVERSION MEASURES SALTING AGENTS ARE USED ON OR NEAR THE PROJECT BITE,AGEOMEMBRANE THE ENTIRE WIDTH OF THE SYSTEM IS REACHED, ADVANCE THE EQUIPMENT THE FOREGOING INSPECTION AND MAINTENANCE EFFORTS HELP ENSURE BARRIER IS RECOMMENDED WITH THE SYSTEM. THE GEOMEMBRANE LINER IS TO THE END OF THE RECENTLY PLACED FILL, AND BEGIN THE SEQUENCE MAY BE REQUIRED FOR HIGH FLOWS DUE TO THE RESTRICTED NATURE OF UNDERGROUND PIPE SYSTEMS USED FOR STORMWATER STORAGE CONTINUE INTENDED TO HELP PROTECT THE SYSTEM FROM THE POTENTIAL ADVERSE AGAIN UNTIL THE SYSTEM IS COMPLETELY BACKFILLED. THIS TYPE OF THE OUTLET PIPE. TO FUNCTION AS INTENDED BY IDENTIFYING RECOMMENDED REGULAR EFFECTS THAT MAY RESULT FROM THE USE OF SUCH AGENTS INCLUDING EFFECTTHATMROSIONANFROM CONSTRUCTION SEQUENCE PROVIDES ROOM FOR STOCKPILED BACKFILL INSPECTION AND MAINTENANCE PRACTICES. INSPECTION AND MAINTENANCE DIRECTLY BEHIND THE BACKHOE, AS WELL AS THE MOVEMENT OF cATcx vBlw RELATED TO THE STRUCTURAL INTEGRITY OF THE PIPE OR THE SOUNDNESS EUSEACTUALOFSERVICE LIFE. CONSTRUCTION TRAFFIC. MATERIAL STOCKPILES ON TOP OF THE INLET OF PIPE JOINT CONNECTIONS 19 BEYOND THE SCOPE OF THIS GUIDE. THE PROJECTS ENGINEER OF RECORD 18 TO EVALUATE WHETHER SALTING BACKFILLED DETENTION SYSTEM SHOULD BE LIMITED TO B-TO 10-FEET HIGH MkgEq�� _WATER PAVED PARKING OTT AGENTS WILL BE USED ON OR NEAR THE PROJECT SITE, AND USE HISMER AND MUST PROVIDE BALANCED LOADING ACROSS ALL BARRELS. TO BEST JUDGEMENT TO DETERMINE IF ANY ADDITIONAL PROTECTIVE DETERMINE THE PROPER COVER OVER THE PIPES TO ALLOW THE MEASURES ARE REQUIRED. BELOW IS ATYPICAL DETAIL SHOWING THE MOVEMENT OF CONSTRUCTION EQUIPMENT SEE TABLE I, OR CONTACT YOUR PLACEMENT OF A GEOMEMBRANE BARRIER FOR PROJECTS WHERE SALTING LOCAL CONTECH SALES ENGINEER. AGENTS ARE USED ON OR NEAR THE PROJECT SITE. u�u At —Er" _ `"" µ TPIG4BALKELLSEQUENCE Wm iT EMBANKMENT LWILL 1e T DETENTION SYSTEM GUILETCONTROL " N.o He AEI/ uTCAu® 48"0 UNDERGROUND DETENTION SYSTEM -- PROJECT No: ]aB5 GEC. No.: 12I2B DATE. 1/1]2022 dr—raI '11110m�NTE - .�\` I &� ri DESIGNED: DRAWN: •_�=��^a°�(�"b ENGINEERED SOLUTIONS LLC CMP DETENTION SYSTEMS DISCOUNT TIRE - CHARLOTTESVILLE DYo DY° "" www.ContechES.com 9025 Centre Ponta Dr., Suite 400, West Chester, OR 45089 CONTECH DYODS CHARLOTTESVILLE, VA HEGKE°' DYO APPROVED. DYO u• 80D-338-1122 513-645-70DO 513-6,1 FAX DRAWING SITE DESIGNATION: EETNo DATE REVISION DESCRIPTION BV -7993 1 ALL DETAILS IN THIS BOX ARE PROVIDED BY OTHERS AND ARE FOR INFORMATIONAL PURPOSES, ONLY. BOHLER ENGINEERING SHALL BE HELD HARMLESS IN THE EVENT OF ERRONEOUS INFORMATION CONTAINED WITHIN THESE DETAILS AND/OR STRUCTURAL FAILURE. J m 0 z EE W W W fn z W Z W � Z W > WC72U-U� (!)ZW W1O5:W Zr(DHLU xU) F W'Q2 0 Wz >zcJWrn0 �of<of 0— 1n7 QDO DOZ Q Z U) LU Z F F °zQaa~o z JU' U) U) U) Q W Z J a z aQ j J F U W H REVISIONS REV DATE COMMENT DE"!NBY cxEcxEDBY PER COUNTY BSC 1 01/21/2022 COMMENTS RTY PER COUNTY BSC 2 04/08/2022 COMMENTS RTY PER COUNTY CDH 3 08/09/2022 COMMENTS RTY Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAW NG IS INTENDED FOR MUNICIPAL MD/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DISH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: OCDS -1 PROJECT: V/RGINIA STORMWATER MANAGEMENT PLAN FOR DDgQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLER// I 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com TH MN YAUGER Lie. No. 0402056625 Ol 08/09/2022 4 SHEET TITLE: SWM SYSTEM DETAILS SHEET NUMBER'. C-907 REVISION 3 - 08/09/2022 January 11, 2022 Brandon Campbell Bohler 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 Eco-Cap, LLC - Turning Point Nutrient Bank - Availability Letter Project Reference: Discount Tire Charlottesville This letter is to confirm the availability of Nutrient Credits sufficient to meet your project requirements at the Turning Point Nutrient Bank located in Goochland County, Virginia. The Turning Point Nutrient Bank received its initial release of Nutrient Credits on August 16, 2021 with a release of40.18 lbs. The nutrient reductions resulting from this activity generated nonpoint source Nutrient "Credits" which are transferable to those entities requiring nutrient reductions in accordance with the Chesapeake Bay Watershed Nutrient Credit Exchange Program (VA Code § 62. 1-44. 19:14) and the Virginia Stormwater Credit Program (VA Code § 62. 1-44. 15:35) and will be able to service your project located. Currently the facility has 23_41 pounds of Credits available and will be able to meet your removal requirement of0.66 Credits. Feel free to contact me if you require further assistance. "'f7IT t%Iwv Casey J. Jensen President Eco-Cap, LLC Credit Sales Manager Turning Point Nutrient Bank Phone: 804. 836-6636 Email: ecoca va q) mmLcom website: ecoca va.us N Z Z 3 a a N w Z Z 3 a N Z Z 0 U A� COUNTY OF ALBEMARLE Department of Community Development 1n 1RGINlP Construction Record Drawings (As -built) for VSMP The following is a list of information required on construction record drawings for stotmwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the construction record drawing be prepared by someone other than the designer. Please do not provide design drawings as construction record drawings. A. A signed and dated professional seal of the preparing engineer or surveyor. B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: 1. Inspection Records and photographs for pipe trenches and bedding, including underdrains. 2. Video Pipe Inspection for any pipes which are not accessible or viewable. 3. Updated Location with geo-coordinates of all facilities. 4. Verified Drainage Area maps for the drainage area treated, and for drainage to the facilities. 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey of the pond bottom. Surveys should verify pond volumes are per design. Corrections may be required for alterations from the design. 6. Plants, location and type. 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the installed type of drainage structures, culvert/pipe size, weirs, materials, inlets or end treatment(s), inlet and outlet protection, alignment and invert elevations compared to design. 8. Computations: For significant deviations from design, provide sealed computations verifying that the as -built condition is equivalent or better than design. 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical sections and linings. 10. Easements - Show all platted easements with dead book references labeled. Facilities and drainage must be within platted easements. Provide copies of recorded documents. 11. Guardrail, fences or other safety provisions - Display the constructed location of all safety provisions; fences, guardrail, including the type, length and applied end treatments, compared to design. 12. Material layers — biofilter media, stone layers, sand layers, keyways and cores must be verified as to material types and depths. Include inspection reports, boring or test pit reports and materials certifications. Biofilter media must be an approved state mix. 13. Access roads — show location of access roads, surface treatment, drainage, etc, as applicable. 14. Compaction reports are required to verify fill compaction in dams. 15. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. UJ X O m t, z it W W W fn Z W W C7gU�U� Ur ZW W(n>W zrc9�otYrn F W¢ 2 W Z ><x-J0O cn � 2 ¢ ¢ z ¢ z U 2 W Z F F OUz¢Q¢~O JCn CY co Q W Z CO a z > o J U W H 55 REVISIONS REV I DATE I COMMENT 1 01/21/2022 PER COUNTY COMMENTS BSC RTY 2 04/08/2022 PER COUNTY COMMENTS BSC RTY 3 08/09/2022 PER COUNTY COMMENTS CDH RTY ro Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. APPROVED FOR CONSTRUCTION THIS DRAW NG I$ INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT I$ NOT INTENDED A$ A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V211201 DRAWN BY: DSH CHECKED BY: RTY DATE: 8/27/2021 CAD I.D.: CNDS -1 PROJECT: V/RGINIA STORMWATER MANAGEMENT PLAN FOR — DDgQOMU PROPOSED LOCATION 1636 SEMINOLE TRAIL ALBERMARLE COUNTY CHARLOTTESVILLE, VIRGINIA 22901 BOHLERI 2150 ASHLAND RD. SUITE 200 RICHMOND, VIRGINIA23146 Phone: (804)893-8200 VA@BohlerEng.com TH RYAN YAUGER Lie. No. 0402056625 08/09/2022 SHEET TITLE: VSMP NOTES SHEET NUMBER. C-908 REVISION 3 - 08/09/2022