Loading...
HomeMy WebLinkAboutWPO201100010 Bond Estimates 2011-06-15 (2)BOND ESTIMATE - MITIGATION PROJECT NAME: Old Trail Village Block 23 PROJECT NUMBER: WPO-2011-00010 DATE OF ESTIMATE: 06/15/11 ESTIMATE BY: PBC BASED ON: Plan dated 6/9 ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEEDLING + INSTALLATION EA 488 7.5 3660 subtotal 3660.00 project management 549.00 subtotal 4209.00 CONTINGENCY LS 10% 420.90 TOTAL 4629.90 BOND AMOUNT REQUIRED 4700.00 last revised:12-5-01