HomeMy WebLinkAboutSP202200024 Narrative Special Use Permit 2022-08-11IVY PROPER— WATER CONSUMPTION
PROJECT PROPOSAL
Introduction
Ivy Proper LLC (the "Applicant") is the owner of TMP 58A2-20 (the "Property"). The parcel is currently zoned C-1
but is embedded Albemarle County's Rural Area in the iconic community of Ivy. See Image 1.
Image 1.
58A2
ISO
699
58A2 10A
58A2 8
1147
5894
430YY
P"s1
O Hi<e
4191
4297
58A2 10
Rural Areas
Village Residential
C1 Commercial
Commercial Office
The Applicant requests a Special Use Permit for the rights to use 875 gallons per day of groundwater from a
private well on the Property. The SUP is required under Chapter 18, Article III, Section 22.2.2.11.a because the
ordinance currently limits water consumption for a site not served by public water to 400 gallons per site acre
per day. The Property is .87 acres and; therefore under SDP2021000001, is p Y• P Y approved for only 348 gallons per
day.
1)Page
J
The well was completed on July 7, 2022 and the attached report (Exhibit 1) confirms an approved well 280 feet
deep with a static water level at 30 feet with a flow rate of at least 4 gallons per minute. We have included for
reference the BTEX inspection for the approved well (Exhibit 2). The Virginia Administrative Code does not
specifically mention veterinary hospitals (12VAC5-610-670, Table 5.1) (Exhibit 3); however, The North Carolina
Administrative Code does (15A NCAC 02T .0114) (Exhibit 4). Based on their analysis, we estimate 250
gal/practitioner/shift. In our case, the proposed clinic is for a sole practitioner operating on a single shift;
therefore, the estimated water use for the vet is 250gpd. The remaining available square footage in the building
is unleased as of the date of this memo, but a project tenant mix and associated water usage is represented in
the following table:
Use
Gallons
Per
Units
Total GPD
Veterinary*
250
GPD / practitioner
1
250
Office
35
GPD / person
4
140
Food Prep
15
GPD
1
15
Laundering
15
GPD
1
15
PT Office*
250
GPD / practitioner
1
250
Retail
200
SF floor space
1025
205
TOTAL
875
* Not in VAC. Calculations are based on NCAC.
Factors for Consideration (per 18-33.40)
• Public Need and Benefit
Ivy epitomizes one of Albemarle County's rural communities complete with a full -service garage, a U.S. Post
Office, a four -season nursery and garden center, and an old motel converted to retail and service -oriented
enterprises servicing the community, and, of course, Duner's Restaurant. We propose to add an additional blend
to this mix of services.
• No Substantial Detriment
The development of the Property has been approved under SDP2021000001. The proposed mix of additional
services is a benefit to the community not a detriment.
• Character of the Nearby Area is Unchanged
The contemplated mix of uses does not adversely change the character of the proximate uses, which include a
service station, a post office, a nursery and garden center, offices, a convenience store, and others.
• Harmony
The combination of veterinary hospital, office, food service, and retail is harmonious with other uses designated
on the Comprehensive plan as rural areas, especially considering the C-1 zoning.
CONSISTENCY WITH COMPREHENSIVE PLAN
The subject property for this proposal is 58A2-20 located at the intersection of Route 250/Ivy Rd and Ivy Depot
Rd, between the railroad and 4282 Ivy Rd, across from the Ivy Store. The Comprehensive Plan recognizes that
"traditional crossroads communities" are an essential and vibrant part of our unique fabric. Ivy's origins as a
community village date back to 1826 when it was known as Woodville.
The Rural Area Chapter (Chapter 7) of the Comprehensive Plan designates these parcels for Rural Area land use.
The intent of the Rural Area designation is to allow uses that preserve and protect agricultural, forestal, open
space, and natural, historic and scenic resources; and also to allow residential uses at a density of up to 0.5 acres
per dwelling unit. The proposed uses align with the Rural Area's intent for crossroads communities to provide
support services and opportunities to engage in community life (Objective 5). Providing these services are a
viable aspect of community life.
While this parcel is zoned C-1 Commercial, it is also located in the Rural Area. The Rural Area Chapter of the
Comprehensive Plan states that uses allowed in the RA Zoning District are the uses that are appropriate in the
Rural Area. The RA Zoning District (18-10.2.2(18)) includes Veterinary Services and Animal Hospitals as uses
permitted by Special Use Permit, while offices, food stores, catering, retail shops, etc. are all by -right uses.
IMPACTS ON PUBLIC FACILITIES AND INFRASTRUCTURE
No impacts to the public sanitary sewer or water infrastructure are proposed. This project will utilize a private
well and private septic system. SDP2021000001 includes a septic system with full reserve approved by VDH
capable of handling 875 gallons per day. The "Tier 3 Groundwater Assessment" performed by Virginia
Groundwater LLC for the Property suggests that natural recharge of groundwater on the site, post -development,
is 450 gallons per day while the estimated proportion of daily withdrawal that is consumptive (i.e. not returned
to the groundwater on site) is only 43.8 gallons per day (page 8). In summary: "The proposed withdrawal of 875
GPD, of which roughly 844 GPD are returned to the ground as recharge through the drain field, would have no
foreseeable impacts on regional groundwater resources in the long term" (Tier 3 Groundwater Assessment, p. 9).
The approved SDP2021000001 also included multiple studies with VDOT including a Turn Lane Warrant Analysis,
an Access Management Exception Request, and a Design Waiver Request; all related to the current and
projected increases in traffic and the location of a shared access between the Property and TMP 058A2-00-00-
020A0 to the east. Based on all of these studies and the resultant design modifications, VDOT approved
SDP2021000001 on June 8, 2022 satisfied that traffic concerns related to the Property and its use were
sufficiently addressed.
IMPACTS ON ENVIRONMENTAL FEATURES
The applicant desires to develop the land in an environmentally conscious way. The site in its current condition
is partially covered by asphalt and gravel surface. This owner will make improvements to the management of
stormwater runoff. The site's runoff is currently directed towards Ivy Road, where the runoff follows an
undefined shallow channel just outside of the pavement. Sediment and gravel generated from the erosive
runoff appears to be carried to a nearby inlet, before out -falling directly into Ivy Creek. The approved
stormwater management plan will capture the site's stormwater in drainage inlets onsite, pipe it to an
underground storage facility, and eventually pipe the water to the existing drainage inlet adjacent to Ivy Road.
This approach will greatly reduce the volume of stormwater runoff directed over land towards Ivy Road, and
thus mitigate the sediment load spilling into Ivy Creek. Water quality impacts will be achieved via onsite
stormwater treatment and though the stormwater nutrient credit purchasing program in the Ivy Nutrient Bank.
3)Page
.. EXHIBIT 1
r>1110
i,
!1
Penn GW-2 COMMONWEALTH OF VIRGINIA
Revised 819/2016 UNIFORM WATER WELL COMPLETION REPORT
Page I of APPROVED
'Indicates required field or section
Indicates required field or section, if applicable
I- CtIntnet Infnrmation
DEQ "'ell
USGS Local
VDH HDIN = 101-21-0130
VDH PWSID
Contact:
Name
I Address Phone
Owner
Ivy Proper, LLC
400 Locust Avenue, Ste 3, Chanotteswile. VA 22902
Driller
foster Well 8 Pump Co Inc
PO Box 260. Earlysville. VA 22936
434-973-9079
System Provider
2. Well Location*
Ph\'SIC:II Address: Ivy Road
I Coaltty/Cil\'; Albemarle
Subdivision Name:
Section: Block: Lot:
Tax Nla /GPIN #: 5BA2.20158A2-14
Latitude:
N Longitude:
Datum Source Horizontal: ❑
WGS84 ❑ NAD83 ❑--
L,at/Lon r Source (Check One): ❑
Map ❑ GPS ❑ PPDGPS ❑ Survey ❑ Imagery ❑ WAAS
Location Information Collected By
Physical Location Description:
& Use"
Type
of FacilityCheck One):
Type of Use Check All That Apply):
®
Private®
Drinking'Domestic Use ❑ Agricultural
❑ Food Processing
❑
Waterworks
❑ Manufacturing ❑ Irrigation
❑ Injec6op!L 2 6 2022
❑
Obscrcaiion/%Ioniioring Well
❑ Geothennal R.ndmg ueaungl ❑ Fire Safety
p 1 fined
Charlottesville;koemarle
❑ I,pen'. O Relumal to surl:me
Health Department
o Relumed to \,loch.
By-
J. Well Construction;'
Well designation, Name or Number:
Date Started: 7/612022 Date Completed: 717n022 Type Rig: Air Rotary
Class Well (Check One): ❑ 1 ❑ IIA ❑ IIB ❑ IIIA ® IIIB ❑ HIC ❑ IIID ❑ IIIE O
IV
Construction Tv a (Check One): ® New
❑ Existing -Modified: o weu ❑ pu,np: Date_ _
Well De tit: 280 ft. Total Hole (borehole) Depth: 84 ft. Depth to Bedrock: 15 ft.
Hole Size (Include reamed zones): to inches
from 0 to 54 ft. 6 Inches thorn 54 to 280 ft.
Height of Casing above Land Surface:
2 ft. 0 inches
Casing Size (LD.) and Materials: (below)
"rota) De th of Casin : 56 ft.
61,4 inches from -2 to 54 ft. o .mtu
VCed Material PSDR 27.6
Weight Per ft. or wall thickness
in.
inches from to t1. o mfilled
Material
Wei& per ft. or wall thickness
in.
inches from to li. o ...rued
Material
Weight per ft. or %call thickness
in.
Screen Size & Mesh:
inches from to ft. o u,tiued
Mesh Sizc
TYIC
inches from to ft. ❑ 1111ald I
Mesh Size
Type
inches from to fl. o 1.16ued I
Mesh Size
Type
Water Zones: from 70 to 71 fl,
from to ft.
from to ft.
Gravel Pack: — - ---
Size: Type: front to ft. I Size: fv e:
from to
ft.
Grout Type:
® nenlonite Slum ❑ \gal l'nonn
O l;entomte pellet, chips ❑ Cuncrc I.
I O Ncal t'cmna 161u tentnnilel
from 0
to 50 It.
Grouting Method:
found rmm sudacc
I'nnnd d,mugh trmunle p.ry:
u
Ihnn xd IFum Ixnmm .ward
Type of Seal:
❑ pi0�ss adapte.
❑ ,anN,n icat
from 10 ft.
Camera Survey': ❑ Yes ❑ NO
Date Conducted:
Additional Well Construction Form Information Attached: ❑ Yes ❑ No
Form GW-2
Revised 8/ 19/2016
Page 3 of 4
COMMONWEALTH OF VIRGINIA
UNIFORM WATER WELL COMPLETION REPORT
'Indicates required field or section
°Indicates required field or section, if applicable
10. Driller's Log Use additional sheets if necessary),
DEQ Well #
USGS Local #
VDH HDIN # 101.21•0130
VDH PWSID #
Well designation, Name or Number:
Depth (feel)
Type of Rock or Soil
Remarks
Drilling
Diagram of Well Construction (with
Time
dimensions)
(Min.)
From
To
(Color, material, fossils, hardness, etc.)
( Water, caving,
cavities. etc.)
0
15
red clay, brown schist, brown
sandy schist soil, broken -up
rock, water, hard gray rock
15
54
hard gray rock
set casing
54
70
hard gray rock, quartz
70
71
broken -up brownstone
water
71
280
hard gray rock, quartz
11. Certification
I certiJi, under penalty of law that this document and all attachments were prepared under nqdirection or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the h formation
submitted. Based on my inquiry of the person or persons n•ho manage the sssteni or those persons directly respons•ibleJar
gathering the information, the information submitted is to the best of my knowledge and heligl7rue. accurate, and
complete. 1 ant aware that there are signilic•mt penalties forsubrnirtitig fcdse information including the possibility of fine
and imprisonnnenl lior knowing violations.
Signature'. { Date: 7/7/2022
License Number: 2719000250 / James R Hoa
EXHIBIT 2
J
J
/JANAL.YTICS
August 08, 2022
RICK AMARAL
FRANK SAUL CONSTRUCTION
943 PRESTON AVE
#5
Charlottesville, VA 22903
Account ID:
Purchase Order:
Client ID: IVY PROPER
Work Order: 1060335
Dear RICK AMARAL
Analytics Corporation
10329 Stony Run Lane
Ashland, VA 23005
Phone: (804) 365-3000
Fax: (804) 365-3002
Enclosed are the analytical results for sample(s) received by the laboratory on Thursday, August 04, 2022. The signature
below certifies that the results are based on the referenced methods and applicable certifications or accreditations are noted
for each parameter reported (see key at end of report).
Unless otherwise specified all analyses of solid materials are based on dry weight.
Reported results relate only to the items tested, as received by the laboratory.
On -site analysis (analysis ASAP) is recommended for the following tests: pH, temperature, dissolved oxygen,
residual chlorine and sulfite. When performed off -site, these tests do not meet NELAC standards.
Abbreviations:ug/L = micrograms per Liter, mg/L = milligrams per Liter, ug/g = micrograms per gram, mg/kg =
milligrams per kilogram ug/wp = micrograms per wipe, ug/ml = micrograms per millimeter, uS/cm = microsiemens
per centimeter at 25 degrees Celcius ppb = parts per billion, DF = Dilution Factor.
If you have any questions concerning this report, please feel free to call Client Services at 1-800-888-8061.
Sincerely,
aa'x -A C
Dawn Casto
Technical Director (or designee)
Enclosures
Report ID: 1060335-20220808164949
CERTIFICATE OF ANALYSIS
Page 1 of 3
This report shall not be reproduced, except in full,
without the written consent of Analytics Corporation
/jANALYTICS
Workorder: 1060335 IVY PROPER
Lab ID: 1060335001
Sample ID: 1
Parameters
Analytics Corporation
10329 Stony Run Lane
Ashland, VA 23005
Phone: (804)365-3000
Fax: (908) 365-3002
ANALYTICAL RESULTS
Date Received: 08/04/2022 16:21 Matrix Drinking Water
Date Collected: 08/04/2022 7:00 Sample Type: GRAB
Results Units LOQ OF Prepared By Analyzed
By Qual Certifications
Analytical Method:
EPA 524.2
Benzene
<5.00
ug/L
5.00
1
NA
NA
8/5/2022
13:38
DAC V
Ethylbenzene
<2.00
ug/L
2.00
1
NA
NA
8/5/2022
1338
DAC V
m & p-xylene
<4.00
ug/L
4.00
1
NA
NA
8/5/2022
13:38
DAC
o-Xylene
<2.00
ug/L
2.00
1
NA
NA
8/5/2022
13:38
DAC
Toluene
<2.00
ug/L
2.00
1
NA
NA
8/5/2022
13:38
DAC V
I
.4
j
d Report ID: 1060335-20220808164949
J
CERTIFICATE OF ANALYSIS
This report shall not be reproduced, except in full,
without the written consent of Analytics Corporation
Page 2 of 3
ANALYTICAL RESULTS
Workorder: 1060335 IVY PROPER
Qualifiers
Certification Index:
V = Virginia (NELAC) - 1 VAC 3046 H 1, Laboratory ID: 460160, Certificate #: 11815
Report ID: 1060335-20220808164949
CERTIFICATE OF ANALYSIS
Analytics Corporation
10329 Stony Run Lane
Ashland, VA 23005
Phone: (804) 365-3000
Fax: (9O8)365-3002
Page 3 of 3
This report shall not be reproduced, except in full,
without the written consent of Analytics Corporation
C•,_IRCC=NL��AAIIE___CUC=)Y
GACCOUNT NAME AND ADDRESS
y:�n K 7u J 1 ` �'^ S+✓� c i � 0 i�
q p
l l 3 T✓e A-ie I -
�n q
4 e S J'• � 11I v� dd` / 63
=HIPPF —^ a0---ILES' '---)JEC' -EOR" ',ER `
--
�
A N�ALYTICS
10329 Stony Run Lane
Ashland, VA 23005
Phone (804) 365-3000
Toll Free (800) 888-8061
Fax (804) 365-3002
PURCHASE ORDER NO.
CONTACT
2 rck_
TELEPHONE NUMBER
N lsy
RUSH
❑ Same Da
l Same SISDay
E-MAIL ADDRESS:
� Am A � 4 L ® (+ ^tc 5(+•I1
/t rH fY'at S�Y^uc • d. Cu•,.�
❑ One Day
❑ Two Day
❑ Three Day
ex
SPECIAL INSTRUCTIONS'. q
ATEX Fti• I'Jt Mqr la Cum .1�
CHAIN
MATRIX CODES
OF CUSTODY RECORD
ANALYSIS REQUESTED (Place an "X" in the box below to indicate request)
n
x P'
¢ co
z
0
i
x c
t B
/ `%
`
O
Z
Preservative
Temperature on Arrival
�� i"
A= AQUEOUS 0= OIL
S =SOLID X =OTHER
2
U
2
°
Z
2
_
°
m
Z
L
O
Received on Ice: es ❑ No
DW = DRINKING WATER IN= WIPES
COMMENTS
Lab ID
Sample Identification
Date & Time
I
8/0 7/�NT
pw
3
6
I
TIME
SAMPLED BY (PRINT NAME): --]SAMPLED
BY ISIGNATURE TO INITIATE COCI:
DATE
SAMPLES RELINQUISHED BY:
ISIGNATURE
DATE
TIME
CONDITION
SAMPLES RECEIVED BY:
(SIGNATURE)
DATE
TIME
CONDITION
�I
E N V COC-01 I REV. 412012)
RETAIN BACK COPY FOR PERSONAL RECORDS
/1ANALYTICSS_
Work Order: 1060335
Customer Name: ANALYTICS CORPORATION MIS
CLIENT SAMPLE ID LAB CONTAINER ID TYPE OF
qTY
Temp(C) pH
CONTAINER
1 1060335001-C 40MLG
1
19.1
1 1060335001-A 40MLG
1
19.1
1 1060335001-B 40MLG
1
19.1
Notes
Sample Custodian Signature
Condition Code Definations
WM Received out of </= 6 C range
Sample Container Receipt Form
Version 6-24-2011
Chlorine on I Condition Code Preservative
Arrival (ppm)
NA WM HCL
NA WM HCL
NA WM HCL
COLLIN WOODWARD
Date: Y, / v, 4-
Version 7-10-2015 CML - — - — - Page 1 of 1
EXHIBIT 3
._ a
.-A
.A
.J
Virginia Administrative Code
Title 12. Health
Agency 5. Department of Health
Chapter 610. Sewage Handling and Disposal Regulations
Part V. Design and Construction Criteria
Article 1. General Requirements
12VAC5-610-670. Sewage flows.
Subsurface soil absorption systems shall be designed on the basis of the sewage flows tabulated
in Table 5.1.
Table 5.1.
Sewage Flows.
Flow
Discharg
Design
Flow
BOD
S.S.
Duration(Hour)
e Facility
Unit
(gpd)
(#/day)
(#/day)
Dwellingl
per
person
75
0.2
0.2
24
total
Food
15
--
--
--
preparati
on
Toilet
-
20
--
facilities
Bathing
-
20
--
-
facilities
Handwas
-
5
--
-
hing
facilities
Launderi
--
15
-
-
--
ng
Schools
with
shower
per
16
0.04
0.04
8
and
person
cafeteria
Schools
without
showers
and with
per
10
0.025
0.025
8
person
or
without
cafeteria
j
Boarding
per
75
0.2
0.2
16
schools
person
Motels at
65 gals/
person
per
130
0.26
0.26
24
(rooms
Person
only)
Trailer
per
75
0.2
0.2
24
courts
person
Restaura
per seat
50
0.2
0.2
16
nts
Interstate
or
through
perseat
100-180
0.7
0.7
16
highway
restauran
is
Interstate
per
5
0.01
0.01
24
rest areas
person
Service
Per
stations
vehicle
10
0.01
0.01
16
served
Factories
Per
operating
& office
erson
per
15-35
0.03-0.07
0.03-0.07
Period
buildings
8-hr
shift
per 1,000
Shopping
PP g
ft. of
ultimate
200-300
0.1
0.1
12
centers
floor
space
Hospitals
per bed
300
0.6
0.6
24
Nursing
per bed
200
0.3
0.3
24
homes
Homes
per bed
100
0.2
0.2
24
for the
aged
Doctor's
per 1,000
500
0.1
0.1
12
office in
sq. ft.
medical
center
Laundro
per
500
0.3
0.03
16
mats, 9 to
machine
12#
machines
Communi
per
15
0.03
0.03
12
ty
student
colleges
and
faculty
Swimmin
per
10
0.001
0.001
12
g pools
swimmer
Theaters,
per car
5
0.01
0.01
4
drive-in
type
Theaters,
per seat
5
0.01
0.01
12
auditoriu
m type
Picnic
per
5
0.01
0.01
12
areas
person
Camps,
resort
day and
night
er
campsite
50
0.05
0.05
24
with
limited
plumbing
Luxury
per
100
0.1
0.1
24
camps
campsite
with
flush
toilets
Dump
per
50
0.05
0.05
24
station
campsite
1 For all dwelling units the design shall be based on two persons per
bedroom.
Statutory Authority
§§ 32.1-12 and 32.1-164 of the Code of Virginia.
Historical Notes
Derived from VR355-34-02 § 4.2, eff. February 5, 1986; amended, eff. May 11, 1988; Virginia
Register Volume 16, Issue 16, eff. July 1, 2000.
._j
EXHIBIT 4
15A NCAC 02T .0114 WASTEWATER DESIGN FLOW RATES
(a) This Rule shall be used to determine wastewater flow rates for all systems governed by this Subchapter unless
alternate criteria are provided by a program -specific rule or for flow used for the purposes of 15A NCAC 02H .0105.
Higher flow rates shall be required where usage and occupancy are atypical, including those in Paragraph (e) of this
Rule. Wastewater flow calculations shall take hours of operation and anticipated maximum occupancies and usage
into account when calculating peak flows for design.
(b) In determining the volume of sewage from dwelling units, the flow rate shall be 120 gallons per day per
bedroom. The minimum volume of sewage from each dwelling unit shall be 240 gallons per day and each additional
bedroom above two bedrooms shall increase the volume by 120 gallons per day. Each bedroom or any other room or
addition that can function as a bedroom shall be considered a bedroom for design purposes. When the occupancy of
a dwelling unit exceeds two persons per bedroom, the volume of sewage shall be determined by the maximum
occupancy at a rate of 60 gallons per person per day.
(c) The following table shall be used to determine the minimum allowable design daily flow of wastewater
facilities. Design flow rates for establishments not identified below shall be determined using available flow data,
water -using fixtures, occupancy or operation patterns, and other measured data.
Type of Establishments
Daily Flow For Design
Barber and beauty shops
Barber Shops
50 gal/chair
Beauty Shops
125 gal/booth or bowl
Businesses, offices and factories
General business and office facilities
25 gal/employee/shift
Factories, excluding industrial waste
25 gal/employee/shift
Factories or businesses with showers or food preparation
35 gal/employee/shift
Warehouse
100 gaHoading bay
Warehouse — self storage (not including caretaker residence)
1 gal/unit
Churches
Churches without kitchens, day care or camps
3 gal/seat
Churches with kitchen
5 gal/seat
Churches providing day care or camps
25 gal/person (child & employee)
Fire, rescue and emergency response facilities
Fire or rescue stations without on site staff
25 gal/person
Fire or rescue stations with on -site staff
50 gal/person/shift
Food and drink facilities
Banquet, dining hall
30 gal/seat
Bars, cocktail lounges
20 gal/seat
Caterers
50 gal/100 sq ft floor space
Restaurant, full Service
40 gal/seat
Restaurant, single service articles
20 gal/seat
Restaurant, drive-in
50 gal/car space
Restaurant, carry out only
50 gal/100 sq ft floor space
Institutions, dining halls
5 gaUmeal
Deli
40 gal/100 sq ft floor space
Bakery
10 gal/100 sq ft floor space
Meat department, butcher shop or fish market
75 gal/100 sq ft floor space
Specialty food stand or kiosk
50 gal/100 sq ft floor space
Hotels and Motels
Hotels, motels and bed & breakfast facilities,
without in -room cooking facilities
120 gal/room
Hotels and motels, with in -room cooking facilities
175 gal/room
Resort hotels
200 gal/room
Cottages, cabins
200 gal/unit
Self service laundry facilities
500 gal/machine
Medical, dental, veterinary facilities
Medical or dental offices
250 gal/practitioner/shift
Veterinary offices (not including boarding)
250 gal/practitioner/shift
Veterinary hospitals, kennels, animal boarding facilities
20 gal/pen, cage, kennel or stall
Hospitals, medical
300 gal/bed
Hospitals, mental
150 gal/bed
Convalescent, nursing, rest homes without laundry facilities
60 gal/bed
Convalescent, nursing, rest homes with laundry facilities
120 gal/bed
Residential care facilities
60 gal/person
Parks, recreation, camp grounds, R-V parks and other outdoor activity
facilities
Campgrounds with comfort station, without
water or sewer hookups
75 gal/campsite
Campgrounds with water and sewer hookups
100 gal/campsite
Campground dump station facility
50 gal/space
Construction, hunting or work camps with flush toilets
60 gal/person
Construction, hunting or work camps with chemical or
portable toilets
40 gal/person
Parks with restroom facilities
250 gal/plumbing fixture
Summer camps without food preparation or laundry facilities
30 gal/person
Summer camps with food preparation and laundry facilities
60 gal/person
Swimming pools, bathhouses and spas
10 gal/person
Public access restrooms
325 gal/plumbing fixture
Schools, preschools and day care
Day care and preschool facilities
25 gal/person (child & employee)
Schools with cafeteria, gym and showers
15 gal/student
Schools with cafeteria
12 gal/student
Schools without cafeteria, gym or showers
10 gaVstudent
Boarding schools
60 gal/person (student & employee)
Service stations, car wash facilities
Service stations, gas stations
250 gal/plumbing fixture
Car wash facilities
1200 gal/bay
Sports centers
' Bowling center
50 gal/lane
Fitness, exercise, karate or dance center
50 gal/100 sq ft
Tennis, racquet ball
50 gal/court
Gymnasium
50 gal/100 sq ft
Golf course with only minimal food service
250 gal/plumbing fixture
Country clubs
60 gal/member or patron
Mini golf, putt -putt
250 gal/plumbing fixture
Go-kart, motocross
250 gal/plumbing fixture
Batting cages, driving ranges
250 gal/plumbing fixture
Marinas without bathhouse
10 gal/slip
Marinas with bathhouse
30 gal/slip
Video game arcades, pool halls
250 gal/plumbing fixture
F Stadiums, auditoriums, theaters, community centers
5 gal/seat
Stores, shopping centers, malls and flea markets
Auto, boat, recreational vehicle dealerships/showrooms
with restrooms
125 gal/plumbing fixture
Convenience stores, with food preparation
60 gal/100 sq ft
Convenience stores, without food preparation
250 gal/plumbing fixture
Flea markets
30 gal/stall
Shopping centers and malls with food service
130 gal/1000 sq ft
Stores and shopping centers without food service
100 gal/I000 sq ft
Lj Transportation terminals — air, bus, train, ferry, port and dock
5 gal/passenger
(d) Design daily flow rates for proposed non-residential developments where the types of use and occupancy are not
known shall be designed for a minimum of 880 gallons per acre, or the applicant shall specify an anticipated flow
based upon anticipated or potential uses.
(e) Design daily flow rates for residential property on barrier islands and similar communities located south or east
of the Atlantic Intracoastal Waterway and used as vacation rental as defined in G.S. 42A-4 shall be 120 gallons per
day per habitable room. Habitable room shall mean a room or enclosed floor space used or intended to be used for
living or sleeping, excluding kitchens and dining areas, bathrooms, shower rooms, water closet compartments,
laundries, pantries, foyers, connecting corridors, closets, and storage spaces.
(f) An adjusted daily sewage flow design rate shall be granted for permitted but not yet tributary connections and
future connections tributary to the system upon showing that the capacity of a sewage system is adequate to meet
actual daily wastewater flows from a facility included in Paragraph (b) or (c) of this Rule without causing flow
violations at the receiving wastewater treatment plant or capacity -related sanitary sewer overflows within the
collection system as follows:
(1) Documented, representative data from that facility or a comparable facility shall be submitted by
an authorized signing official in accordance with Rule .0106 of this Section to the Division for all
flow reduction requests, as follows:
(A) dates of flow meter calibrations during the time frame evaluated and indication if any
adjustments were necessary;
(B) a breakdown of the type of connections (e.g. two bedroom units, three bedroom units)
and number of customers for each month of submitted data as applicable. Identification
of any non-residential connections including subdivision clubhouses and pools,
restaurants, schools, churches and businesses. For each non-residential connection,
information identified in Paragraph (c) of this Rule (e.g. 200 seat church, 40 seat
restaurant, 35 person pool bathhouse);
(C) a letter of agreement from the owner or an official, meeting the criteria of Rule .0106 of
this Section, of the receiving collection system or treatment works accepting the
wastewater and agreeing with the adjusted design rate;
(D) age of the collection system;
(E) analysis of inflow and infiltration within the collection system or receiving treatment
plant, as applicable;
(F) if a dedicated wastewater treatment plant serves the specific area and is representative of
the residential wastewater usage, at least the 12 most recent consecutive monthly average
' wastewater flow readings and the daily total wastewater flow readings for the highest
average wastewater flow month per customers, as reported to the Division;
(G) if daily data from a wastewater treatment plant cannot be used or is not representative of
the project area: 12 months worth of monthly average wastewater flows from the
receiving treatment plant shall be evaluated to determine the peak sewage month. Daily
wastewater flows shall then be taken from a flow meter installed at the most downstream
point of the collection area for the peak month selected that is representative of the
project area. Justification for the selected placement of the flow meter shall also be
provided; and
(H) an estimated design daily sewage flow rate shall be determined by calculating the
numerical average of the top three daily readings for the highest average flow month. The
calculations shall also account for seasonal variations, excessive inflow and infiltration,
' r age and suspected meter reading and recording errors.
U(2) The Division shall evaluate all data submitted but shall also consider other factors in granting,
with or without adjustment, or denying a flow reduction request including: applicable weather
conditions during the data period (i.e. rainy or drought), other historical monitoring data for the
particular facility or other similar facilities available to the Division, the general accuracy of
` monitoring reports and flow meter readings, and facility usage, such as whether the facility is in a
resort area.
r (3) Flow increases shall be required if the calculations required by Subparagraph (f)(1) of this Rule
yield design flows higher than that specified in Paragraphs (b) or (c) of this Rule.
Li (4) The permittee shall retain the letter of any approved adjusted daily design flow rate for the life of
the facility and shall transfer such letter to a future permittee.
History Note: Authority G.S. 143-215.1; 143-215.3(a)(1);
Eff. September 1, 2006;
Readopted Eff. September 1, 2018.
EXHIBIT 5
Ivy Proper
TMP58A-14 & 20
Tier 3 Groundwater Assessment
Groundwater Management Plan
Prepared for:
Building Management Company
400 Locust Avenue, suite 3
Charlottesville VA 22902
Draft submitted
September 3, 2020
Nick H. Evans PhD CPG
Virginia Groundwater LLC
PO Box 1424
Charlottesville VA 22902
nick(@virginiagroundwater.com
434-466-1280
.J
Key Findings
Hydrogeologic setting: Located in the valley of Little Ivy Creek just above the
flood plain, the site is underlain by deep and well -drained soils that overlie
fractured crystalline porphyroblastic biotite gneiss bedrock.
Groundwater availability: Soils and bedrock are favorable to water well
construction. Recharge potential from onsite soils is excellent, and there is likely
to be significant recharge from off site. Bedrock fracture potential is favorable.
Are Hydrogeologic conditions favorable to proposed use? Yes.
Contamination threats on record within 2000 feet of parcel? Yes. Due to
the proximity of open LUST cases to the site, it is advisable to test any new well
on the property for possible contaminants.
Additional contaminant threats observed in field reconnaissance? None.
Anticipated impacts of proposed use to existing users of groundwater?
None
Anticipated impacts of proposed use to impact sustainability of
groundwater resources? None
Groundwater management plan: Offset groundwater recharge lost due to
impervious surface created during development by infiltrating runoff on site to the
extent possible.
Project Overview
The proposal is to construct a 6500 square foot office building to include a
veterinary clinic and general office space, on TMP58A-14 & 20, which comprise
0.87 acres on the north side of Ivy Road at Ivy (Figure 1). New impervious
surface area created by the project will total 0.466 acres. A conceptual site plan
showing the project layout and area of land disturbance is provided with this
report.
Figure 1: Site location map
r
m
ViOM S�
O
]]1
G
n
7
85] R
�o
]38
At
organtown Rd
]l9 ��V
L, IvY R-
.assmefe 786
6]9
C
v
� 4 yid Rd
yp� 9,00mr Che,.r
as
scale N T
Langford or 2000 feet
3
Projected maximum water consumption for the facility is 875 gallons per day,
based on usage by the veterinary clinic and office employees using restroom
facilities. Water will be supplied by a well to be drilled on site. Waste water will
be disposed of through an on -site drain field that has a permitted capacity of 875
gallons per day.
Adjoining parcels are in a mix of uses (Figure 2). While all adjoining parcels are
within the Albemarle County Service Authority service area (water only), not all
are connected to the system, and all use on -site drain fields for waste disposal.
Figure 2: location detail with nearby land usage
11
J
• residential
o commercial
O church
100-year
flood plain
4
.Jf
Hydrogeologic Assessment
Topography and hydrology
The parcels to be developed are located within the Little Ivy Creek watershed.
Site elevations range between about 516 feet above sea level on the southeast
edge along Ivy Road, to about 537 feet in the northeast corner at the rear of the
property (Figures 2 and 3). The southern portion of the property slopes gently
south toward the alluvial flood plain Little Ivy Creek. The western edge of the
100-year flood plain is about 100 feet south of the property. Slopes are steeper
along the northern edge of the property. The landscape slopes upward to the
north and west of the site, toward a drainage divide defined by Turners Mountain.
To a first approximation groundwater flow directions within a few hundred feet of
the surface may be predicted to be down a hydraulic gradient that mimics surface
topography. On this basis overall groundwater flow beneath the project site is
predicted to be south to southeast, toward discharge in Little Ivy Creek.
Figure 3: Topography, watershed drainage divides, and predicted groundwater flow
directions in the vicinity of TMP 58A2-14 & 20
l �o
t. r �lt.� /. _✓i' ten'.„ !
t
Mechums River watershed 0
Ivy Creek watershed"
l
TMP 58A2-14 & 20
� � � �., rt�'_'^.--"fie J" "� �� �? • F ���/ � � � 3i
watershed
drainage
`divide
Little Ivy Creek watershed
Ivy Creek wate� hed' r" predicted
f; , r . t w, T r t\ `, s groundwater
��, `�,�4.1
flow direction
scale
® F
2000 feet
5
Hydrogeology
In central Virginia, the physical characteristics of soils and the underlying bedrock
are critical to the suitability of a given site to water well construction. Soils and
weathered rock close to the surface serve as a "sponge" that captures rainwater,
then feeds water downward to recharge fractures in the bedrock. Drinking water
wells are normally constructed to tap water from deep bedrock fractures, while
excluding potentially contaminated water that may exist in soils and weathered
rock close to the surface. Groundwater becomes cleansed by passing downward
through deeper soils and bedrock fissures. While the soils provide an excellent
medium for recharge and groundwater storage, a successful well must intersect
deeper water -bearing fracture networks in the bedrock that are interconnected
with the soils as a source for recharge.
The soils on this site are classified as Yadkin clay loam, deeply eroded. These
are described in the USDA Soil Survey as deep and well -drained, with moderate
water storage capacity and moderate to high capacity to transmit water. These
attributes are favorable for storage and transmission of groundwater. There is
significant acreage up hydraulic gradient from the site to the north and west,
which suggests potential for significant groundwater recharge from off site.
The crystalline bedrock beneath the project site is called porphyroblastic biotite
gneiss. There is an exposure of this rock on the northern edge of the site in an
erosion ditch on the slope leading up to the railroad bed (image left). This type of
rock is very widespread in western Albemarle County.
The bedrock does not contain primary intergranular porosity through which
groundwater might flow. Rather, groundwater flows in fractures and fissures,
where such occur.
The reported yields from drilled
wells are a good proxy for
assessing the degree of bedrock
fracture density, which has a
direct correlation with the
magnitude of yields of wells
drilled into that rock.
Of 1536 database wells
constructed in the
porphyroblastic biotite gneiss
bedrock present on this site, the
average yield is 8.4 gallons per
minute (GPM), and the average
well depth is 218 feet. These
numbers suggest that on
average this type of rock is
favorable in terms of fracture
density.
v
Of 23 database wells in the vicinity of the site (Figure 4) in the County database,
the average yield is 10 GPM, with a low of 0 GPM and a high of 60 GPM.
Although 5 wells are reported as zero yield (dry holes), the numbers imply that
overall bedrock fracture density is favorable to water well productivity in the
vicinity of the project site. The existing well on the property is in the database as
a zero yield well (drilled 1961, 122 feet deep). The applicant plans to abandon
that well.
Figure 4- Existing wells in the County database in the vicinity of
TMP 58A2-14 & 20, also showing ACSA service area extent
J
TMP 58A2-14 & 20
• existing domestic well
15 in County database,
location approximate;
yield, gallons per minute
existing public supply
well in County database
ACSA service area
�I
VA
Water budget analysis of proiect impact
It is instructive to use quantitative water budget analysis to evaluate the proposed
use of groundwater relative to natural groundwater recharge.
(data source: Sanford, W.E. and others, 2011, Quantifying components of
the hydrologic cycle in Virginia using chemical hydrograph
separation and multiple regression analysis: USGS Scientific
Investigations Report 2011-5198)
Annual precipitation, Albemarle County: 46.8 inches --normal year
25.7 inches --drought year (d)
Percentage of precipitation contributing to groundwater recharge,
subtracting runoff and evapotranspiration: 32%
Annual regional groundwater recharge: 14.98 inches
8.39 inches (d)
Average regional daily groundwater recharge:.04104 inches = .00342 feet
.02299 inches = .00192 feet (d)
Daily recharge per acre: (.00342 feet) X (43560 square feet per acre)
= 149 cubic feet recharge per acre
84 (d)
Gallons recharge per day per acre: 149 cubic feet X 7.48 gallons per
cubic foot = 1115 gallons per day per acre
682 (d)
Recharge area available on project site: (0.87 acres) — (0.466 acres new
imoervious surrace) = .4u4 acres
Gallons per day natural recharge to site post development: (1115 gallons
per acre) X (.404 acres) = 450 gallons per day
275 gallons per day (d)
Predicted maximum daily groundwater withdrawal post development: 875
gallons per day
Estimated proportion of daily withdrawal that is consumptive (water not
returned to the ground on site through the drain field, for example
water carried off -site in containers, or water lost to evaporation):
5%, or 43.8 gallons per day.
The proposed consumptive usage of groundwater amounts to about 10% of daily
recharge to the site post development under normal precipitation, and about 16%
during drought years.
Potential for proposed use to affect existing users of groundwater
While the County database contains records for many wells in the vicinity of the
proposed project site (Figure 4), it is not clear which of these are still in service
due to expansion of the ACSA service area. Regardless, TMP58A-14 & 20 is
down hydraulic gradient from all existing wells on record. The water budget
0
analysis, above, suggests that a well drilled on this site and pumped to supply
the modest demands of the proposed use would have no foreseeable impact on
existing users of groundwater on nearby parcels.
Potential for proposed use to impact sustainability of groundwater resources
The proposed withdrawal of 875 GPD, of which roughly 844 GPD are returned to
the ground as recharge through the drain field, would have no foreseeable
impacts on regional groundwater resources in the long term.
Contaminant threats affecting the proposed site
A Phase 1 Environmental Assessment of the property was conducted in 2019 by
ECS Mid -Atlantic LLC (attached to this report). This assessment found four
documented LUST (leaking underground storage tank) cases within 1000 feet of
the site. (Figure 5).
In reviewing these cases, none appear to pose potential impacts to the project
Figure 5: LUST sites on record within 1000 feet of TMP58A-14 & 20
LUST site,
case closed
LUST site,
❑* case open
1 predicted
groundwater
flow direction
site. The two sites listed as "closed" are hydraulically up gradient from the
property. Neither is considered a potential threat to groundwater quality on
TMP58A-14 & 20 because of their "closed" status and relative distance from the
site. The two "open" cases are closer to the site, but both are down gradient
hydraulically from the site, and not likely to impact a well drilled on site.
A comprehensive study was conducted at the Scott's Exxon LUST site, located
300 feet southeast of the project site (Sullivan International Corporation, 2013,
attached to this report). The data from this study confirm that groundwater flow
in the area is toward the south-southeast, which would carry contaminants away
from TMP58A-14 & 20. A domestic well on 58A2-20A, which is between the
Scott's Exxon site and the proposed development site, was tested and found to
be impacted by MBTE contamination from the spill. It is advisable that any well
drilled on the proposed development site be tested for possible contaminants.
Threats of contamination by proposed project
There are no perceived threats to groundwater quality by the proposed use.
Reserve wellfield
The limited size of the property poses potential challenges to siting a
replacement well if the supply well for the project becomes compromised in some
way.
Groundwater management plan
Offset groundwater recharge lost due to impervious surface created during
development by infiltrating runoff on -site to the extent possible.
Submitted by Nicholas H. Evans, CPG # 2801 001041
September 3, 2020
I.U21LNION WEALTII of VIN
uomaEs ow Department of Pwfe monal and Ocwpational
a .%I,I d Dnvc. Sul¢ J . �. VA
08-31-2021 rrkMme. Maui VrTBMp
BOARD FOR PROFESSIONAL SOIL SCIENTISTS, WETLAND PROFESSIONALS R GE2100:S7S
CERTIFIED PROFESSIONAL GEOLOGIST
NICHOLAS H EVANS JUM y M
46D9 BURNLEY STATION ROAD
BARBOURSVILLE. VA 22923
oz
IVY PROPER - FINAL SITE PLAN
LAYOUT PLAN
/ i /
rl
I milt