HomeMy WebLinkAboutWPO202200031 Correspondence 2022-08-23I BARER & ASSOCIATES PLANNERS/ARCHITECTS ENGINEERS/SURVEYORS 104 Industry Way Suite 102 Staunton, VA 24401 540.248.3220 w .balzer.cc Roanoke Richmond New River Valley Shenandoah Valley August 23, 2022 County of Albemarle Attn: Matt Wentland 401 McIntire Road, North Wing Charlottesville, VA 22902 RE: Response to Comments Castle Rock Farm — Phase 1 Balzer Project No: 34210060.00 County Project No: WPO-2022-00031 This letter serves as our written responses to the County comments on the subject project: A. Stormwater Pollution Prevention Plan (SWPPP) 1. Provide a SWPPP, including a completed and signed DEQ Registration Form (though no DEQ permit will be required) and a signed Certification. (Rev. 1) Comment partially addressed. The Registration Statement and the Certification will need to be signed. Once approved, the plans will need to be added to the SWPPP. • A SWPPP, including a completed and signed DEQ Registration Form and a signed Certification has been provided B. Pollution Prevention Plan (PPP) 2. Provide a PPP with the SWPPP. (Rev. 1) Comment addressed. • Noted. C. Stormwater Management Plan (SWMP) 3. Projects disturbing 10,000sf or more and meeting the conditions of 17-302 are subject to the VSMP regulations (17-401-405) and will need to meet both quantity and quality requirements. The sheet flow for quantity appears acceptable. (Rev. 1) See comments below. • Noted. 4. The quality compliance as determined in the DEQ VRRM worksheet will need to be met. If nutrient credits will be purchased, be aware that the site drains to impaired waters as determined by DEQ and the credits will need to be purchased from within the same 8-digit HUC (the Ivy Creek bank and the Rivanna River bank are both acceptable). Please contact Ana Kilmer in our office prior to purchasing credits. (Rev. 1) See comments below. • Noted. I BARER & ASSOCIATES PLANNERS/ARCHITECTS ENGINEERS/SURVEYORS Revision 1 Comments 3. A Stormwater Maintenance Agreement will be needed. Please contact Ana Kilmer in our office to begin this process. • Noted. 4. Label the Forest and Open Space used in the VRRM worksheet as `SWM Forest and Open Space Easement'. The following note will need to be placed on the plan (and on the plat): "The SWM Forest and Open Space Easement is subject to the guidance set forth by DEQ in the Virginia Stormwater Management Program. The areas will remain undisturbed in a natural, vegetated state, except for activities as approved by the local program authority, such as forest management, control of invasive species, replanting and revegetating, passive recreation (e.g., trails), and limited bush hogging to maintain desired vegetative community (but no more than four times a year)." • See Sheet C4.0 for the open space notes. 5. The SWM Forest and Open Space Easement will need to be platted prior to VSMP approval. A deed will also be required with the plat and will be filled out by the County when the plat is nearing approval. • Noted. D. Erosion and Sediment Control Plan (ESCP) 3. The ESC plan appears acceptable at this time, but include a note that additional measures may be required at the request of the County Inspector. This note has been added to the General Notes on Sheet C 1.0. Please do not hesitate to call with any questions. Sincerely, BALZER AND ASSOCIATES, INC. William S. Moore, P.E. Vice President Page 2 of 2