Loading...
HomeMy WebLinkAboutSDP202200033 Checklist - Project Closeout (Administrative) 2022-08-24 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHEC. Please complete this form within 30 da►s of final action,place in folder and forward to CD and status label. CDA will forward to the Imaging.Center for digital closeout. A FOR QC SDP/SUB#519p 2OZZ0003 3 PROJECT TITLE jZ'o 6;<< to 4 fie r P'l.1 I oP" FULL NAME OF LEAD REVIEWER 1<e vl M on cc()l/110) FINAL ACTION DATE: B/2-4f�O2L CountyView- --.----�. _ 0 Application,Page 2 Data Entered 0 Staff Report,Ground Water Assessment,or other documents placed in"Does&Pies" Hardco - py•—File Folder Closeout All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place.an"N/A" next to the check box. The Lead Reviewer.has•the discretion to include anyitem deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document;or;if the document is already in digital format,can be saved to LaserFiche. Please provide location(patb/name)of the document in the space provided. p the digital ❑ Engineering Folder Information/documentation ❑ Scan ❑ Saved location Er Application(signature copy) • ❑ Scan ❑ Saved.location ' ❑ Public Notification records/Abutting Owner correspondence ❑ Scan 0 Saved location Applicant Correspondence(to/from,memos/emailq• • ❑ Scan ❑ Saved location 0 Complete set of printed Review Comments Scan ❑ Saved location. ta Approved plat(signed,or stamped"Approved"wi h Planner/Engineer name) • ig Scan 0 Saved location e a 4' C u 7 'o„id ili ri an ❑ Action Letter(Administrative Approval) ' 0 Scan ❑'Saved location ' ' • ❑ White Envelope-PC/BOS Meeting Package-Staff Report(include plan/plat presented,PC/BOS ❑ Scan El Saved location Action Letter) 0 Ground Water Assessments' ' 0 Scan ❑ Saved location ❑ Other(Please explain—i.e.Studies) 0 Scan, 0 Saved location • El Other(Please explain—i.e. Studies) • ❑: Scan 0 Saved location ❑ At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is.referenced in the staff report or minutes and lends clarity=to the review at a later date. If such plans are included,they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location Additional'Information on this,project: • „ • Planning Commission Minutes—may be obtained online or by contacting PC Recording Secretary• •Board of Supervisor Minutes—maybe obtained online or by contacting the Clerk of BOS • • • Construction Documents—will be added to this folder after completion of project. Prior to completion, - documents maybe obtained by contacting the County Engineer. • NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Folder has a typed status label.(same font&label color as project label)placed under the project label to ;reflect current project status and date; • 3) Documents are.Acco-fastened(except.plats/plans),and in Chronological.order(latest:documents on'top);. • 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche, . ' If the above items are not complete,Imaging Center staff will circle the'incomplete item and return folder to the Chief of.. Planning for corrective action. .. • Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10 29-2012