HomeMy WebLinkAboutWPO201100071-40024-Full Inspection ReportWRITTEN WARNING Hand delivered Project: WP0201100071 RE-Store'n Station Operator/Contractor: JEFFRIES II LLC Issued Date:8/29/2022 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 (434)296-5832 This is your Written Warning in accordance with § 17-900 of the Water Protection Ordinance of Albemarle County and Section 62.1-44.15:37 of the Virginia Stormwater Management Act. This Written Warning is being issued because of the following deficiencies: Deficiency: Sediment basin remains. Woody vegetation on dam and embankments needs to be removed. Verify basin has required design storage volume and remove accumulated sediment if it does not. Corrective Action: convert temporary erosion control measures to permanent stormwater facilities and maintain Filterras. Deficiency: Corrective Action: Deficiency: Sediment basin requires maintenance including removal of all woody vegetation on dam and embankments. Verify basin still has required design storage volume and remove any sediment if it does not. Corrective Action: see comments for Item #33. Deficiency: the project has been partially converted to its permanent stormwater design. Filterras have been installed, but they drain to a sediment basin instead the approved underground detention system. Project is ready for conversion completion. Corrective Action: see Item #33 comments. Deficiency: sediment basin needs to be converted to permanent stormwater management facility noted above, and all Filterras need maintenance and two or more are missing trees. Corrective Action: see Item#33 comments. Deficiency: see previous comments. Corrective Action: see Item #33 comments. Unless subsequently amended in writing by this office, it is expected all corrective measures will be completed by Failure to comply by the required date may subject the owner to penalties and remedies as listed under § 17-900 et -al of the Water Protection Ordinance of the Albemarle County Code. Should you have a legitimate reason you cannot complete your required corrections by the above given date, you must immediately contact your erosion control inspector. Unless you have contacted the inspector and agreed to alternative arrangements, all compliance work is expected to be completed by the above date. County Inspector Name: Dan Ratzlaff County Inspector Phone Number: (434) 296-5832 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP/VESCP PERMIT SITE INSPECTION REPORT Project Name: RE-Store'n Station Project/WPO Number: WP0201100071 Project Address: DEQ Permit Number (if applicable): Project Operator: Operator Telephone #: Project Contact: JEFFRIES II LLC Contact Telephone #: (434) 531-4673 Contact E-Mail: msprouse67@gmail.com Qualified Personnel (QP): Inspector: Dan Ratzlaff Qualified Personnel (QP) Email: Disturbed Acreage: 4 Weather (Wet/Dry/Rain): Single -Family: Inspection Date & Time: 8/29/2022 1:00:00 PM Stage of Construction: Final Stabilization Other Email: musxit@aol.com Re -Inspection: No Other Email: Bond Inspection: No Other Email: COVERAGE & POSTING REQUIREMENTS Compliant? Reviewed during re -inspection? No Comments/Description 1 Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) (9VAC25-870-31 0)(Al b. Co. Code §17-300, 17-302) 2 A copy of the notice of coverage letter is posted conspicuously near the main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Compliant? Reviewed during re -inspection? No Comments/Description 4 The SWPPP is on -site or made available during the inspection? (CGP Part II D.1 & 2)(9VAC25-870-54.G) 5 The SWPPP contains a signed copy of the registration statement? (CGP Part II A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage letter and the CGP? (CGP Part II A.1.b & c) The SWPPP includes a narrative description of the nature of the 7 construction activity, including the function of the project? (CGP Part II A.1.d) 8 The SWPPP includes a legible site plan identifying all appropriate measures and that includes the locations of support activities and the Page 1 of 6 onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7)) 9 The SWPPP contains the name, phone number and qualifications of "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? (9VAC25-870-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria ILB ❑ II.0 ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- 870-54.D)(CGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III K? (CGP Part II A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part II A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Compliant? Reviewed during inspection? No Comments/Description Is the SWPPP being amended whenever there is a change in the design, 16 construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870- 54.G) Has the SWPPP been amended if inspections or investigations by the 17 operator's qualified personnel, or by local, state or federal officials find that existing control measures are ineffective in minimizing pollutants in discharges? (CGP Part II B(2))(9VAC25-870-54.G) 18 Contractor(s) that will implement and maintain each control measure are identified? (CGP Part II B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its implementation have occurred, including a record of dates when major 19 grading activities occur, construction activities temporarily or permanently cease on a portion of the site or stabilization measures are initiated? (CGP Part II B.4(a))(9VAC25-870-54.G) 20 Is there documentation in the SWPPP of replaced or modified controls? (CGP Part II B.4(b))(9VAC25-870-54.G) 21 Is the SWPPP updated to indicate areas that have reached final stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 legal control of the operator and the dates on which the operator no longer had legal control over each property? (CGP Part II B.4(d))(9VAC25-870- 54.G) Does the SWPPP identify the date of any prohibited discharges, the 23 volume released, actions taken to minimize the impact of the release and measures taken to prevent the recurrence of any prohibited discharge? (CGP Part II B.4(e-f)) (9VAC25-870-54.G) 24 mendments, modifications, or updates to the SWPPP are signed in accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS Compliant? Reviewed during inspection? No Comments/Description Inspections required by the SWPPP are conducted at the required 25 frequency, including a modified frequency for impaired water(s), approved TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) Page 2 of 6 26 Inspection reports are completed and signed in accordance with CGP Part II F (3-4)? (CGP Part II F (3-4)) 27 Corrective actions are taken consistent with the requirements of the CGP? (CGP Part II G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description 28 Have stream buffers and steep slopes been protected as shown on the N/A plan? Sequencing of the project is implemented in accordance with the N/A 29 approved erosion and sediment control plan and stormwater management plans? (9VAC25-870-54.B and C) Have all denuded areas requiring temporary or permanent stabilization been stabilized, and have stabilization requirements for impaired waters, 30 approved TMDL(s), pollutants of concern and exceptional waters, when Yes applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25- 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected N/A 31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II A.2(c)) (9VAC25-870-54.B) A permanent vegetative cover has been established that is uniform, Yes 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have sediment trapping facilities been constructed as the first step in land N/A 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have earthen structures been stabilized immediately after installation? Yes 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Sediment basin requires maintenance including Are sediment traps and basins installed in accordance with MS-6 and the removal of all woody vegetation on dam and 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II No embankments. Verify basin still has required design A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) storage volume and remove any sediment if it does not. Are finished cut and fill slopes adequately stabilized to prevent or correct N/A 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1- 2)) (9VAC25-870-54.B) Is concentrated runoff down cut or fill slopes contained in an adequate N/A 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? N/A 38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) he project has been partially converted to its Do all operational storm sewer inlets have adequate inlet protection? permanent stormwater design. Filterras have been 39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- No installed, but they drain to a sediment basin instead 54.13) he approved underground detention system. Project is ready for conversion completion. Are stormwater conveyance channels adequately stabilized with channel Yes 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is in -stream construction conducted using measures to minimize channel N/A 41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are temporary stream crossings of non -erodible material installed where N/A 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) 43 Is necessary restabilization of in -stream construction complete? (9VAC N/A 25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B) Page 3 of 6 Are utility trench operations conducted and stabilized in accordance with NIA 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are soil and mud kept off paved or public roads to minimize the transport Yes 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Have all temporary control structures that are no longer needed been sediment basin needs to be converted to permanent removed and disturbed soil resulting from their removal permanently No stormwater management facility noted above, and all 46 stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2)) Filterras need maintenance and two or more are (9VAC25-870-54. B ) missing trees. Are properties and waterways downstream from development adequately 47 protected from erosion, sediment and damage in accordance with the Yes standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? No see previous comments. (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Compliant? Reviewed during inspection? No Comments/Description Practices are in place to prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part II A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II A.4.e(2))(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, 51 detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds? (CGP Part II A.4.e(3))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle 52 and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4))(9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from 54 storage, handling, and disposal of construction products, materials, and wastes? (CGP Part II A.4.e(6))(9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? (CGP Part II A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) Page 4 of 6 Notes: CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT REQUEST FOR CORRECTIVE ACTION Project Name: Permit Number (if applicable): Date: Regulatory Occurrence Observation/Recommended Corrective Action Checklist # Citation/Legal requirement' Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: 1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Page 5 of 6 Observation: Recommended Corrective Action: Corrective Action Deadline: Re -Inspection Date: Comments: The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for ensuring compliance on the above project. Page 6 of 6 Construction General Permit Site Inspection Report Request for Correction Action Check Regulatory Citation/Legal Occur. Observation Recommended Corrective List # Requirement* Action 33 (9VAC 25-840-40.4) Sediment basin remains. convert temporary erosion (CGP Part II A.2(c)) Woody vegetation on dam control measures to (CGP II E(1-2)) and embankments needs to permanent stormwater (9VAC25-870-54.B) be removed. Verify basin has facilities and maintain required design storage Filterras. volume and remove accumulated sediment if it does not. 33 (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) 35 (9VAC 25-840-40.6) Sediment basin requires see comments for Item #33. (CGP Part II A.2.c (9)) maintenance including (CGP Part II A.2(c)) removal of all woody (CGP II E(1-2)) vegetation on dam and (9VAC25-870-54.B) embankments. Verify basin still has required design storage volume and remove any sediment if it does not. 39 (9VAC 25-840-40.10) the project has been partially see Item #33 comments. (CGP Part II A.2(c)) converted to its permanent (CGP II E(1-2)) stormwater design. Filterras (9VAC25-870-54.B) have been installed, but they drain to a sediment basin instead the approved underground detention system. Project is ready for conversion completion. 46 (9VAC 25-840-40.18) sediment basin needs to be see Item#33 comments. (CGP Part II A.2(c)) converted to permanent (CGP II E(1-2)) stormwater management (9VAC25-870-54.B) facility noted above, and all Filterras need maintenance and two or more are missing trees. 48 (9VAC25-870-54.C) see previous comments. see Item #33 comments. (9VAC25-880-60) (CGP Part II F.1(a)) Recommended 9/5/2022 Corrective Action Deadline: Targeted Re- 9/5/2022 Inspection Date: Comments: *Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Construction General Permit Site Inspection Photo Log Photos for Item 33 20220829_131246.jpg 1.71 MB . �'i•. apt `,, vx� , Photo Description: Sediment basin either needs maintenance, or conversion to the designed stormwater management facility shall occur. Photos for Item 35 20220829_131246.jpg 1.71 MB . �'i•. apt rx� , Photo Description: Sediment basin should be converted to permanent stormwater bmp, or maintenance performed as stated above. Photos for Item 39 20220829_130914.jpg 531.38KB 1W N Photo Description: One of many Filterras already installed that drain to a sediment basin. Photos for Item 46 20220829_131052.jpg Photo Description: Filterras in need of maintenance, two or more are missing trees. 20220829_130720.jpg 775.18KB 1.4 Photo Description: Filterra throats clogged and require maintenance. Other Photos Photo Description: COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 434 296-5832 Inspection Date: 8/29/2022 County Inspector