HomeMy WebLinkAboutSUB202100155 Application 2022-08-30• •
APPLICATION FOR ROAD PLAN APPROVAL
Is this an amendment to an approved plan? Yes ❑ No ❑
Is this a revision or resubmission for review? Yes ❑ No ❑
County File Number: (to be provided by Countyfor new applications)
8 Copies of the Plan to be submitted and distributed by the County as follows:
2 Copies to County Engineering
I Copy to Albemarle Fire and Rescue
I Copy to Planning for Street Trees and other landscaping review
2 Copies to Albemarle County Service Authority
2 Copies to Virginia Department of Transportation
Have you submitted plans separately to any agencies listed above? Yes ❑ No ❑
List Agencies:
Project Name
Tax map and parcels
Zoning
Physical Street Address (if assigned):
Applicant
Street Address
City State Zip Code
Phone Number
Email
Owner of Record
Street Address
City State Zip Code
Phone Number
Email
Contact (who should we contact about this project):
Street Address
City State Zip Code
Phone Number
Email
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
fill; r,r'tf
APPLICATION FOR ROAD PLAN APPROVAL
Owner/Applicant Must Read and Sign
The foregoing information is complete and correct to the best of my knowledge. I have read and understand the
provisions of Chapter 14 Subdivision of Land of the Albemarle County Code, and the Design Manual, and am
consenting to all correspondence from Albemarle County be in any of the following forms in writing; by first
class mail, by personal delivery, by fax or, by email.
Signature of Owner, Contract Purchaser, Agent Date
Print Name
Daytime phone number of Signatory
FOR OFFICE USE ONLY SUB # Fee Amount S Date Paid
By who? Receipt # Ck# Bv:
•111ill hr"t•
APPLICATION FOR ROAD PLAN APPROVAL
FEES
ROAD PLANS FOR PROPOSED SUBDIVISION
*If public and private streets are proposed, pay the higher of the two fees (private street)
8 copies of the road plan are required for all submittals
Public Street Fees
❑ For each review of a submitted plan, including re-
views of revisions after plan approval = $307.84
($296 + $11.84 Technology Surcharge)
+$100 Fire Rescue Fee
Private Street Fees
❑ Authorization of one or more private streets within
a subdivision filed separately from a subdivision appli-
cation = $823.68 ($792 + S31.68 Technology Surcharge)
❑ For each review of a submitted plan, including re-
views of revisions after plan approval = $491.92
($473 + $18.92 Technology Surcharge)
+ $100 Fire Rescue Fee
VARIATIONS OR EXCEPTIONS
BEFORE APPROVAL OF A PRELIMINARY PLAT
❑ Variation to or exception from street interconnection requirements = $664.56
($639 + 25.56 Technology Surcharge)
❑ Variation to or exception from one or more street standards = $664.56
($639 + 25.56 Technology Surcharge)
❑ Variation to or exception from curb and/or gutter requirements = $664.56
($639 + 25.56 Technology Surcharge)
AFTER PRELIMINARY PLAT APPROVAL AND
BEFORE FINAL SUBDIVISION PLAT APPROVAL
❑ Variation to or exception from any requirement of Chapter 14 for which a variation to or exception from is au-
thorized after approval of a preliminary plat and before approval of a final plat = $1,021.28 ($982 + $39.28 Technology
Surcharge) Attach written justification
AFTER FINAL PLAT APPROVAL
❑ Variation to or exception from any requirement of Chapter 14 for which a variation to or exception from is au-
thorized after approval of a final plat = $1,021.28 ($982 +$39.28 Technology Surcharge) Attach written justification
SURETY/BONDING
If required to construct a street, the subdivider shall pay to the county a fee equal to the cost of the inspection of the con-
struction of any such street. These fees shall be paid prior to completion of all necessary inspections and shall be deemed a
part of the cost of construction of the street for purposes of section 14-435(B).
The bond process and forms can be found at the forms library under bonds. After a plan is approved, a bond estimate re-
quest form must be submitted to the Community Development office with the required fee. The owner signatures will be
verified for each parcel affected, and estimates will be prepared by the engineering reviewer. A bond amount will be pro-
vided to the owner. Bond agreements will be prepared by the county, and when properly completed by the owner, will be
reviewed and signed by the County Attorney and County Engineer. Please allow a few weeks for this process.