Loading...
HomeMy WebLinkAboutWPO202200024 Study 2022-08-30ME Em 4 11 ME ve r 441 or t A LeaenJ Flow Profile Lines Site Boundary tL• c I D K. , 4 '4o soa BJERRA OVERHZAD ANALYTICS Su, OveffieMAna"m,im M 41141&7558 Ro Box 1716 (F)20921599 9 T—n Haft CA 9S"3 InbaelenaoueBwaJ.Com PROJECT NAME Rivanna PROURMADDRESS 37.967 N, 78.401 W SEAL IN2-08-09 A W cNECNEB Br. S Owen Ransom —1. —ML Flow Profile Lines 0 140 280 Feet SHEET NUMBER REV I Figure Coadnat SyMm: HAD 19M M11 SMW!aneV ima S-M BPS H US Bmemp Swn ESNI LaW C—p aM PLAN An —BIM . So —a ,Na4 l l!AomWq E F G I H I I I i 15 14 13 12 Line 0 Peak flow (cfs) ITime of peak ITime of concentation TOC (minutes) Existing conditions 1 1.498 44562.49583 0 0 Post -construction 1 1.8449144562.495831 01 0 Line 1 Peak flow (cfs) ITime of peak ITime of concentation TOC (minutes) Existing conditions 1 19.807 44562.49514 -0.000694444 -1.000000003 Post -construction 1 19.1131144562.495831 0 0 Line 2 Peak flow (cfs) ITime of peak ITime of concentation TOC (minutes) Existing conditions 1 19.422 44562.49583 0 0 Post -construction 1 16.2077144562.495831 0 0 Line 3 Peak flow (cfs) ITime of peak ITime of concentation TOC (minutes) Existing conditions 1 17.155 44562.49583 0 0 Post -construction 1 14.5433144562.495831 01 0 Line 4 Peak flow (cfs) ITime of peak ITime of concentation TOC (minutes) Existing conditions 1 46.335 44562.49583 0 0 Post -construction 1 38.1188144562.495831 0 0 Line 5 Peak flow (cfs) ITime of peak ITime of concentation TOC (minutes) Existing conditions 1 30.669 44562.49583 0 0 Post -construction 1 25.194144562.495831 0 0 Line 6 Peak flow (cfs) ITime of peak ITime of concentation TOC (minutes) Existing conditions 1 195.202 44562.49583 0 0 Post -construction 1 151.2723144562.495831 01 0 Line 7 Peak flow (cfs) ITime of peak ITime of concentation TOC (minutes) Existing conditions 1 370.273 44562.49722 0.001 2.00 Post -construction 1 239.1713144562.497921 0.002 3.00 Line 8 Peak flow (cfs) ITime of peak ITime of concentation TOC (minutes) Existing conditions 1 679.723144562.497921 0.002083333 2.999999999 Post -construction 1 540.0963144562.499311 0.003472222 4.999999995 Line 9 Peak flow (cfs) ITime of peak Time of concentation TOC (minutes) Existing conditions 1 446.307144562.497221 0.001388889 1.9919999996 Post -construction 1 349.9106144562.497921 0.0020833331 2.999999999