HomeMy WebLinkAboutWPO201900039 Certified Engineer's Report 2022-01-130*0 4oltteverde
1/13/2022
Seth Roderick, PE
Monteverde Engineering & Design Studio
250 E Elizabeth St, Suite 114
Harrisonburg, VA 22801
Albemarle County Community Development Department
Attn: John Anderson
401 McIntire Road
North Wing
Charlottesville, VA 22902
RE: Hillcrest Vineyard Tasting & Venue WPO 2019-00039 - AS-BUILTS
Mr. Anderson,
This letter and accompanying calculations are being in order to properly certify that
discrepancies found between the referenced as -built survey and the original design file are
satisfactory in relation to the functionality of associated stormwater management practices.
Discrepancies noted and comparative testing results are described as follows:
A. POND 1 (top of hill, POA A)
Pond 1 was found to be graded bigger than originally prescribed on the plans, with a
drainage area that included more impervious area than assumed in the original design, but
less acreage overall. Portions of the original DA for Pond 1 were determined to drain
instead towards Pond 2 / POA B, with another portion draining offsite as uncontrolled sheet
flow to neither pond (retains overland sheet flow characteristics until landing at bottom of
hill in existing farm pond). To account for these discrepancies, the additional area draining
to POA B was added to the Pond 2 analysis (described below), while the POA A drainage
was broken into uncontrolled and controlled subgroups.
The 0.29 acres draining uncontrolled was determined to have a CN of 80 and a TC of 6 min.
As stormwater travel distance is minimal and evenly spread across the perimeter of the area,
it can be viewed as sheet flow. As such, no further efforts are needed in examination of
channel protection requirements, while the areas hydrograph will be added to the analysis
for total areas 10-Yr flood protection analysis. Note that due to differing times of
Hillcrest Vineyard Tasting & Venue WPO 2019-00039 - AS-BUILTS
January 13, 2022
concentration, the vast majority of the uncontrolled flows peak will have come and gone
well before the pond's peak, so the uncontrolled aspect has little impact on total conditions.
The remaining area draining to Pond 1, originally analyzed at 5.75 acres, was found to
include 5.21 acres with a CN of 87 and a TC of 25.1 min. As the primary orifice to Pond 1
was drilled as directed after further analysis (6" orifice added at elevation 1072.2), and the
riser top was cut to an elevation just above the 10-yr max elevation, the pond was found to
handle the contributing drainage exceedingly well.
Post -development runoff rates and pond analysis for as -built conditions are summarized
below, while supporting calculations / hyrdrographs are attached.
10-Yr Pre -Development: 4.39 CFS
10-Yr Post -Development, Uncontrolled 1.70 CFS
10-Yr Post -Development, Pond (Actual) 2.38 CFS
10-Yr Post -Development, Total Combined 3.06 CFS
100-yr Elev = 1078.70
Top of Embankment = 1081.00 (2.30' of freeboard)
B. LEVEL SPREADER
The level spreader was found to be constructed at an approximate length of 69 LF, which is
in excess of the originally prescribed 56 LF. As the extra length will provide a greater area to
distribute the contributing storm event, which is now reduced with the 6" orifice, this
discrepancy is deemed beneficial to the downstream conditions. No further analysis is
required.
C. POND 2 (bottom of hill, POA B)
Similarly to Pond 1, Pond 2 was found to be constructed larger than prescribed on the plans,
but also with a slightly larger contributing watershed (including some area originally
designed for Pond 1, with other assumed to drain offsite to the north; 0.64 ac total increase in
area toward Pond 2). Through analysis of the pond, it was found that the allowable
discharge rate per energy balance dropped slightly due to an increase in post -development
RV associated with the larger drainage area, but the additional volume in the pond slows the
analyzed release rate sufficiently to meet requirements. No further modifications to the
outlet riser or orifices are deemed necessary.
' h,
Page 2 of 3
Hillcrest Vineyard Tasting & Venue WPO 2019-00039 - AS-BUILTS
January 13, 2022
It was also noticed that the emergency spillway may not be properly functional, due to a low
point existing elsewhere on the embankment. As more than 2.0' of freeboard was calculated
to exist during the 100-yr event, however, this design still meets minimum standards for
such facilities (i.e., no emergency outlet is required). It is recommended, but not required,
that the embankment be modified to properly direct overflow directly to the spillway (note
that the Owner has agreed to remedy this, but no further as -built verification is deemed necessary due
to minimum standards already having been met).
Post -development runoff rates and pond analysis for as -built conditions are summarized
below, while supporting calculations / hyrdrographs are attached.
Qa = 0.8 (Q-pre.site x RV-pre.site)/ RV-post.site + Offsite bypass
Qa = 0.8 (0.515 x 4046) / 10,873 + (3.858 cfs)
Qa = 4.01 cfs
1-Yr Allowable, Pond
4.01 CFS
1-Yr Post -Development, Pond
3.79 CFS
10-Yr Pre -Development
32.01 CFS
10-Yr Post -Development, Pond
28.59 CFS
100-Yr Elev = 1002.13
Top of Embankment = 1004.30 (2.27 of freeboard)
In sum, while the facilities were not constructed to the original spec, they were analyzed to be
more than sufficient to accommodate the anticipated storm events as required by code. I am
comfortable certifying such with my seal, as stamped below, given the survey data presented.
Any questions to this matter, please feel free to let me know.
Si cerely,
Seth Roderick, PE
Managing Partner
Monteverde Engineering & Design Studio
0 h,
Page 3 of 3
H
GETH . R DERICK 9
d Lic. o. 04145404
O� Jqn 13, 2022 ��
10 AL ���~
Pond Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020
Thursday, 01 113 / 2022
Pond No. 1 - Detention Basin (As -Built)
Pond Data
Contours -User-defined contour areas. Conic method used for volume calculation. Begining
Elevation - 1071.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sgft)
Incr. Storage (cult)
Total storage (cuft)
0.00 1071.00 200
0
0
1.00 1072.00 4,204
1,773
1,773
2.00 1073.00 5,540
4,856
6,630
3.00 1074.00 6,226
5,879
12,509
4.00 1075.00 6,942
6,580
19,089
5.00 1076.00 7,710
7,322
26,411
6.00 1077.00 8,432
8,068
34,478
7.00 1078.00 9,179
8,802
43,280
8.00 1079.00 9,950
9,561
52,841
9.00 1080.00 10,765
10,354
63,195
10.00 1081.00 11,607
11,182
74,377
Culvert / Orifice Structures
Weir Structures
[A]
[B]
[C]
[PrfRsr]
[A]
[B]
[C]
[D]
Rise (in)
= 18.00
2.00
M
0.00
Crest Len (ft)
= 9.42
Inactive
29.00
0.00
Span (in)
= 18.00
2.00
M
0.00
Crest El. (ft)
_ -
0.00
1079.80
0,00
No. Barrels
= 1
1
1
0
Weir Coeff.
= 2.60
3.33
3.33
3.33
Invert El. (ft)
= 1068.90
1071.00
I-
0.00
Weir Type
= 1
Rect
Broad
--
Length (ft)
= 75.00
0.00
0.00
0.00
Multistage
= Yes
Yes
No
No
Slope I%)
= 3.00
0.00
0.00
n/a
N-Value
= .012
.012
.013
n/a
Orifice Coeff.
= 0.60
0.60
0.60
0.60
EAL(inlir"
= 0.000 (by Contour)
Multistage
= n/a
Yes
Yes
No
TW Elev. (ft)
= 0.00
Stage (ft)
10.00
6.00
4.00
2.00
0.00 '
0.0 20.0
Total 0
Note: CulwrtfOnfice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for onfice conditions (ic) and submergence (s).
40.0
60.0
Stage / Discharge
80.0
100.0
120.0
140.0
Elev (ft)
1081.00
1079.00
1077.00
1075.00
1073.00
' 1071.00
160.0
Discharge (cis)
Hydrograph Report
HydraBovi Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2020
Hyd. No. 7
Post Dev DA to Det Basin #1(As-Built)
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 1 min
Drainage area
= 5.210 ac
Basin Slope
= 0.0 %
Tc method
= TR55
Total precip.
= 5.38 in
Storm duration
= 24 hrs
*Composite (Area/CN) = [(3.630 x 98) + (1.580 x 61)] / 5.210
Q (cfs)
21.00
111IM1111
15.00
12.00
• rr
JIM
3.00
0.00
0 2 4
Hyd No. 7
6 8
Thursday, 01 / 13 / 2022
Peak discharge
= 20.52 cfs
Time to peak
= 12.13 hrs
Hyd. volume
= 74,258 cuft
Curve number
= 187-
Hydraulic length
= 991 ft
Time of conc. (Tc)
= 25.10 min
Distribution
= Type II
Shape factor
= 484
Post Dev DA to Det Basin #1
Hyd. No. 7 -- 10 Year
Q (cfs)
21.00
18.00
15.00
12.00
• rr
lllll. rr
3.00
0.00
10 12 14 16 18 20 22 24 26
Time (hrs)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2020
Hyd. No. 8
Det Basin #1 Rot (As -Built)
Hydrograph type = Reservoir Peak discharge
Storm frequency = M0 yrs Time to peak
Time interval = 1 min Hyd. volume
Inflow hyd. No. = 7 - Post Dev DA to Det Basin Max. Elevation
Reservoir name = Detention Basin Max. Storage
Storage Indication method used.
Det Basin #1 Routed
Thursday, 01/13/2022
= 2.378 cfs
= 12.83 hrs
= 74,246 tuft
= 1077.45 ft
= 38,397 cuft
Q (Cfs) Hyd. No. 8 -- 10 Year Q (cfs)
21.00 21.00
18.00 18.00
15.00 15.00
12.00 12.00
9.00 9.00
6.00 6.00
3.00 3.00
0.00 0.00
0 4 8 12 16 20 24 28 32 36
Time (hrs)
— Hyd No. 8 —Hyd No. 7 ®Total storage used = 38,397 cult
Hydrograph Report
Hydraflovi Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2020
Hyd. No. 15
As -Built Uncontrollef
Hydrograph type
= SCS Runoff
Storm frequency
= T0-779
Time interval
= 1 min
Drainage area
= 0.290 ac
Basin Slope
= 0.0 %
Tc method
= User
Total precip.
= 5.38 in
Storm duration
= 24 hrs
Composite (Area/CN) _ [(0.150 x 98) + (0.140 x 61)] / 0.290
Q (Cfs)
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
As -Built Uncontrolled
Hyd. No. 15 -- 10 Year
Thursday, 01/13/2022
= 11.95 hrs
= 3,503 cult
= 80"
= Oft
= 6.00 min
= Type II
= 484
2 4 6 8 10 12 14 16 18 20 22
Hyd No. 15
Q (ofs)
2.00
1.00
� 0.00
24
Time (hrs)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Thursday, 01 / 13 / 2022
Hyd. No. 17
Uncontrolled + l�
Hydrograph type = Combine Peak discharge = 3.062 cfs
Storm frequency = — Time to peak = 11.97 hrs
Time interval = 1 min Hyd. volume = 77,750 cuft
Inflow hyds. = 8, 15 Contrib. drain. area = 0.290 ac
4 (cfs)
4.00
S 11
2.00
1.00
Uncontrolled + Pond 1
Hyd. No. 17 -- 10 Year
0.00
0 4 8 12 16 20 24
Hyd No. 17 — Hyd No. 8 — Hyd No. 15
28 32
Q (cfs)
4.00
3.00
2.00
1.00
111111106- 0.00
36
Time (hrs)
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020
Thursday, 01 / 13 / 2022
Hyd. No. 8
Det Basin #1 Route(
Hydrograph type
= Reservoir
Peak discharge
= 24.45 cfs
Storm frequency
= 100 yrs
Time to peak
= 12.30 hrs
Time interval
= 1 min
Hyd. volume
= 134,696 cuft
Inflow hyd. No.
= 7 - Post Dev DA to Det Basin
Max. Elevation
= -ft
Reservoir name
= Detention Basin
Max. Storage
= 49,969 cuft
Storage Indication method used
Q (cfs)
40.00
30.00
20.00
10.00
0.00
0 3
— Hyd No. 8
Det Basin #1 Routed
Hyd. No. 8 -- 100 Year
6 9 12 15 18 21 24
Hyd No. 7 ® Total storage used = 49,969 cult
Q (cfs)
40.00
30.00
20.00
10.00
WN-i- 0.00
27
Time (hrs)
Pond Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020
Friday, 12 13 12021
Pond No. 5 - -
Pond Data
Contours -User-defined contour areas. Conic method used for volume
calculation. Begining
Elevation = 990.00 ft
Stage / Storage Table
Stage (ft) Elevation (ft)
Contour area (sgft)
Incr. Storage (cult)
Total storage (cuft)
0.00 990.00
25
0
0
1.00 991.00
86
52
52
2.00 992.00
310
186
239
3.00 993.00
1,526
841
1,080
4.00 994.00
3,711
2,539
3,619
5.00 995.00
5,671
4,656
8,275
6.00 996.00
7,550
6,587
14,862
7.00 997.00
9,349
8,433
23,295
8.00 998.00
11,230
10,274
33,569
9.00 999.00
12,990
12,098
45,667
10.00 1000.00
14,760
13,864
59,531
11.00 1001.00
16,628
15,683
75,214
12.00 1002.00
18,676
17,640
92,855
13.00 1003.00
20,918
19,784
112,639
14.00 1004.00
23,304
22,098
134,737
Culvert / Orifice Structures
Weir Structures
[A]
[B] [C] [PrtRsr]
[A] [B]
[C]
[D]
Rise (in) = 24.00
8.00 0.00 0.00
Crest Len (ft)
= 12.56 0.00
0.00
0.00
Span (in) = 24.00
8.00 0.00 0.00
Crest EI. (ft)
_ - 0.00
0.00
0.00
No. Barrels = 1
2 0 0
Weir Coeff.
= 3.33 3.33
3.33
3.33
Invert El. (ft) = 990.00
990.7.Q 0.00 0.00
Weir Type
= 1 --
--
--
Length (ft) = 112.00
0.00 0.00 0.00
Multi -Stage
= Yes No
No
No
Slope I%) = 7.90
0.00 0.00 n/a
N-Value = .012
.013 .013 n/a
Orifice Coeff. = 0.60
0.60 0.60 0.60
Exfil.(in/hr)
= 0.000 (by Wet area)
Multi -Stage = n/a
Yes No No
TW Elev. (ft)
= 0.00
Note: Culvert/Onfice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for onfice conditions (ic) and submergence (s).
Stage I Storage I Discharge
Table
Stage Storage Elevation
CIvA CIvB CIvC
PrtRsr WrA
WrB WrC
WrD
Exfil User Total
It cuft It
cfs cfs cfs
cfs cfs
cfs cfs
cfs
cfs cfs cfs
0.00 0 990.00
0.00 0.00 ---
--- 0.00
--- --
--
-- --- 0.000
1.00 52 991.00
0.60 is 0.57 is ---
--- 0.00
--- --
--
-- --- 0.573
2.00 239 992.00
3.39 is 3.30 is ---
--- 0.00
--- --
--
-- - 3.305
3.00 1,080 993.00
4.72 is 4.71 is ---
--- 0.00
--- --
--
-- - 4.713
4.00 3,619 994.00
5.78 is 5.78 is ---
--- 0.00
--- --
--
-- - 5.782
5.00 8,275 995.00
6.69 is 6.62 is ---
--- 0.00
--- --
--
-- - 6.616
6.00 14,862 996.00
7.36 is 7.36 is ---
--- 0.00
--- --
--
-- - 7.363
7.00 23,295 997.00
8.12 is 8.05 is ---
--- 0.00
--- --
--
-- - 8.050
8.00 33,569 998.00
8.76 is 8.68 is ---
--- 0.00
--- --
--
-- - 8.684
9.00 45,667 999.00
9.38 is 9.28 is ---
--- 0.00
--- --
--
-- - 9.276
10.00 59,531 1000.00
9.84 is 9.84 is --
--- 0.00
--- --
--
-- -- 9.842
11.00 75,214 1001.00
45.26 is 3.44 is --
-- 41.82
--- --
--
-- -- 45.26
12.00 92,855 1002.00
49.86 is 1.23 is --
-- 48.62
s --- --
--
-- -- 49.85
13.00 112,639 1003.00
52.29 is 0.73 is --
-- 51.52
s --- --
--
-- -- 52.25
14.00 134,737 1004.00
54.48 is 0.51 is --
-- 53.96
s --- --
--
-- -- 54.47
Hydrograph Report
Hydraflovi Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2020
Hyd. No. 10
Post Dev Project Area
Hydrograph type
= SCS Runoff
Storm frequency
= 1 yrs
Time interval
= 1 min
Drainage area
= 3.790 ac (prev 3.15)
Basin Slope
= 0.0 %
Tc method
= TR55
Total precip.
= 2.97 in
Storm duration
= 24 hrs
* Composite (Area/CN) = [(3.150 x 71) + (0.260 x 98) + (0.380 x 61)] / 3.790
Q (cfs)
3.00
2.00
1.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Post Dev Project Area
Hyd. No. 10 -- 1 Year
120 240 360 480 600 720 840 960
Hyd No. 10
Friday, 12 / 3 / 2021
= 2.161 cfs
= 736 min
= 10,873 cult
= 72*
= Oft
= 35.50 min
= Type II
= 484
Q (cfs)
3.00
2.00
1.00
0.00
1080 1200 1320 1440 1560
Time (min)
Hydrograph Report
Hydraflm Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2020
Hyd. No. 20
pond 2 as -built
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 1 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Inflow hyd. No.
= 13 - Total Drainage to B
Max. Elevation
Reservoir name
= Pond 2 - As -built
Max. Storage
Storage Indication method used
Q (cfs)
6.00
5.00
4.00
S 11
r 11
1.00
pond 2 as -built
Hyd. No. 20 -- 1 Year
Friday, 12 / 3 / 2021
= 3.791 (<4.06 CFS)
= 759 min
= 38,689 cuft
= 994.1Oft
= 3,539 cuft
Q (cfs)
6.00
5.00
4.00
3.00
2.00
1.00
I I I I I I I I I 1 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 20 —Hyd No. 13 ®Total storage used = 3,539 cuff Time (min)
Hydrograph Report
Hydraflovi Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2020
Hyd. No. 10
Post Dev Project Area
Hydrograph type
= SCS Runoff
Storm frequency
= 10 yrs
Time interval
= 1 min
Drainage area
= 3.790 ac (prev 3.15)
Basin Slope
= 0.0 %
Tc method
= TR55
Total precip.
= 5.38 in
Storm duration
= 24 hrs
* Composite (Area/CN) = [(3.150 x 71) + (0.260 x 98) + (0.380 x 61)] / 3.790
Q (Cfs)
8.00
. M
4.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Post Dev Project Area
Hyd. No. 10 -- 10 Year
120 240 360 480 600 720 840 960
Hyd No. 10
Friday, 12 / 3 / 2021
= 7.665 cfs
= 735 min
= 34,318 cult
= 72*
= Oft
= 35.50 min
= Type II
= 484
Q (cfs)
8.00
lllll.1(
4.00
2.00
0.00
1080 1200 1320 1440 1560
Time (min)
Hydrograph Report
Hydraflm Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2020
Hyd. No. 20
pond 2 as -built
Hydrograph type
= Reservoir
Peak discharge
Storm frequency
= 10 yrs
Time to peak
Time interval
= 1 min
Hyd. volume
Inflow hyd. No.
= 13 - Total Drainage to B
Max. Elevation
Reservoir name
= Pond 2 - As -built
Max. Storage
Storage Indication method used
Q (cfs)
35.00
30.00
25.00
15.00
10.00
5.00
pond 2 as -built
Hyd. No. 20 -- 10 Year
Friday, 12 / 3 / 2021
= 28.59 Cfsl (<32.01 CFS)
= 746 min
= 164,583 cuft
= 997.71 ft
= 30,012 tuft
Q (Cfs)
35.00
30.00
25.00
20.00
15.00
10.00
5.00
I I i i i, I I I I I 1 0.00
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Time (min)
Hyd No. 20 —Hyd No. 13 ®Total storage used = 30,012 cult
Hydrograph Report
Hydraflovi Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2020
Hyd. No. 10
Post Dev Project Area
Hydrograph type
= SCS Runoff
Storm frequency
= 100 yrs
Time interval
= 1 min
Drainage area
= 3.790 ac (prev 3.15)
Basin Slope
= 0.0 %
Tc method
= TR55
Total precip.
= 8.69 in
Storm duration
= 24 hrs
* Composite (Area/CN) = [(3.150 x 71) + (0.260 x 98) + (0.380 x 61)] / 3.790
Q (cfs
18.00
15.00
12.00
M
. ��
3.00
Peak discharge
Time to peak
Hyd. volume
Curve number
Hydraulic length
Time of conc. (Tc)
Distribution
Shape factor
Post Dev Project Area
Hyd. No. 10 -- 100 Year
0.00 -
0
Friday, 12 / 3 / 2021
= 16.51 cfs
= 734 min
= 72,983 cult
= 72*
= Oft
= 35.50 min
= Type II
= 484
Q (cfs)
18.00
15.00
12.00
M
3.00
rasa
120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Hyd No. 10 Time (min)
Hydrograph Report
Hydraflm Hydrographs Extension for Autodesk® Civil 3136 by Autodesk, Inc. v2020
Hyd. No. 20
pond 2 as -built
Hydrograph type
= Reservoir
Storm frequency
= 100 yrs
Time interval
= 1 min
Inflow hyd. No.
= 13 - Total Drainage to B
Reservoir name
= Pond 2 - As -built
Storage Indication method used.
Peak discharge
Time to peak
Hyd. volume
Max. Elevation
Max. Storage
Friday, 12 / 3 / 2021
= 45.51 cfs
= 757 min
= 399,715 cult
= 94,889 tuft
pond 2 as -built
Q (cfs) Q (cfs)
Hyd. No. 20 -- 100 Year
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
000
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
000
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Time (min)
Hyd No. 20 —Hyd No. 13 ®Total storage used = 94,889 cult