Loading...
HomeMy WebLinkAboutSDP202200047 Review Comments Final Site Plan and Comps. 2022-09-02c or nt 401 McIntire Road, North Wing Charlottesville,VA22902-4579 County of Albemarle Telephone: 434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG Memorandum To: Scott Collins, PE; Collins Engineering (scottncollins-en ing eering com) From: Andy Reitelbach, Senior Planner II, Planning Division Date: September 2, 2022 Subject: SDP2022-00047 — Victorian Heights — Final Site Plan The Planner for the Planning Services Division of the Albemarle County Department of Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) Comments — First Review of Victorian Heights — Final Site Plan (SDP2022-00047): 1. [32.5.2(a)] The application number for this project is SDP2022-00047. Revise the cover sheet to include this number. 2. [30.2.61 This development will require review by the Planning Commission to determine anticipated impacts of the cluster development and bonus density provisions and regulations on the Airport Impact Area overlay district. Provide a narrative justifying why this proposed development will not have a negative impact on the AIA requirements. 3. [2.2] The calculations for open space and the bonus density appear to be incorrect. For more information, see comments from Zoning (near the end of this memo) regarding the calculation of the bonus density provisions and the open space requirements. 4. [4.19] The setback note will need to be updated if the Board of Supervisors approves the special exception request for modifying the setback regulations. 5. [4.19] The five-foot side setback on Lot 18 does not appear to be met. The building is encroaching within that setback. 6. [32.5.2(a)] As a condo community, the requirements of Sec. 18-4.5 will need to be met. 7. [4.12.16] Widen the parallel parking spaces. They must be at least nine feet in width. 8. [32.5.2(a)] Provide the percentage amounts for the impervious areas and the paved circulation areas. 9. [32.5.2(a)] Revise the building sites note on the cover sheet. There are more lots than what is stated in that note. 10. [32.5.2(a)] There should be at least 36 building lots, as opposed to the 35 identified in the table on the plan layout sheet. Building 1 will be on a different parcel from Buildings 2 and 3 because Review Comments Page 2 of 4 of the open space area separating them. Or it intended that these buildings and the open space will all be on the same parcel? 11. [4.16] Provide a substitution waiver request for the recreational facilities, as there is a note on the cover sheet indicating one would be provided. However, one was not submitted with this application. Staff cannot fully analyze the recreational facilities without knowing what is proposed to be provided. The facilities as currently proposed do not meet the requirements. 12. [32.5.2(a)] Provide the width of the proposed planting strip on the site plan. 13. [32.5.2(a)] An interconnection needs to be provided to TMP 45-68D1 on the north side of this project. 14. [32.5.2(a)] Provide the limits of the managed steep slopes on the layout plan (sheet 3). 15. [32.7.91 Landscaping Plan a. Street trees need to be provided in front of Lots 10-18 and Lots 28-34. The trees must be of an even spacing along the street right-of-way. b. An easement will be required for any landscaping located on private lots. c. Add a note stating: "All landscaping shall be installed by the first planting season following the issuance of the first certificate of occupancy within the development, or a phase thereof." d. Add a note stating: "All landscaping and screening shall be maintained in a healthy condition by the current owner or a property owners' association, and replaced when necessary. Replacement material shall comply with the approved landscape plan." 16. [32.5.26), 32.5.2(k)] An easement plat will be required. This easement plat must be recorded prior to approval of the site plan. Provide a separate easement plat. 17. [32.5.20), 32.5.2(k)] An easement appears to overlap with the comer of the building on Lot 27. Revise the location of either the building or the easement. Comments — First Review of SE2022-00043 — Victorian Heights — Special Exception: 1. Provide exhibits depicting the proposed modifications to the stepbacks and setbacks for this property, including what is required and what is being proposed. Please contact Andy Reitelbach in the Department of Community Development at areitelbach@albemarle.org or 434-296-5832 ext. 3261 for further information. Comments from Other Reviewing Departments, Divisions, and Agencies Albemarle County Engineering Services (Engineer) Emily Cox, ecox2 agalbemarle.org — Requested changes; see the attached comment memo. Review Comments Page 3 of 4 Albemarle County Information Services (E911) Andy Slack, aslack@albemarle.org — No objections at this time. Albemarle County Zoning Division Francis MacCall, fmaccaUL&albemarle.org— Requested changes; see the comments below: Zoning has no objection to the setback or stepback SEs. What Zoning does object to is the bonus density calculations. I don't think you take out ROW dedication when making the calculation. The open space calculation is off as well. Albemarle County Building Inspections Betty Slough, bslough@albemarle.org — Review pending; comments will be forwarded to applicant upon receipt by Planning staff. Albemarle County Department of Fire -Rescue Howard Lagomarsino, hlagomarsino@albemarle.org — Requested changes; see the comments below: 1) During demolition and/or construction, the following fire prevention steps are required, so please note them on the plan: a) Smoking shall be prohibited in areas where smoking makes conditions such as to make smoking a hazard and these areas shall be designated with no smoking signs per Virginia Statewide Fire Prevention Code. b) Areas where smoking can occur, shall have appropriate receptacles for discarded smoking materials per Virginia Statewide Fire Prevention Code. c) Per the Virginia Statewide Fire Prevention Code, vehicular access for firefighting shall be provided at all construction and demolition sites, including access to within 100 ft. of temporary or permanent fire department connections, and have no overhead wiring or other overhead obstructions lower than 13 ft. 6 inches; this access may be via permanent or temporary road, but shall be capable of supporting fire apparatus in all weather conditions. d) Contractor shall ensure the street numbers are always plainly visible from the frontage street during construction per the Virginia Statewide Fire Code. e) An approved water supply for firefighting operations shall be in place and available as soon as combustible materials arrive on site. f) Waste and combustible debris shall be removed from the building at the end of each day and disposed of in accordance with the Virginia Statewide Fire Code g) Fire extinguishers shall be provided, with not less than one approved fire extinguisher at each stairwell, on all floor levels where combustible materials have accumulated, in every storage and construction shed and in areas of special; hazards, such as where flammable and combustible liquids are stored or used, in accordance with the Virginia Statewide Fire Code. Review Comments Page 4 of 4 h) Operations involving the use of cutting and welding shall comply with the Virginia Statewide Fire Prevention Code and shall require a permit from the Albemarle County Fire Marshal's Office. Albemarle County Service Authority (ACSA) Richard Nelson, melson@serviceauthority.org —Requested changes; seethe comments below: Submit utility plan to ACSA for review. RWSA to be included as a reviewer and recommend approval. Water meters are to be a minimum 2-feet away from driveways and curbs. Provide fixture counts for the multi family buildings. Typical easement dimensions extend 10-feet beyond ACSA utilities. Relocate blow off assembly and meter vault, near Lot 34, away from retaining wall. ACSA has concerns about the depth of the sewer behind Bldg 2. Explore running the sewer along the pavement. Separate the connections for the meter vaults and fire lines for Bldg 1 and 2. Relocate MHS10 into the pavement. Offsite sewer easements will need to be obtained prior to final approval. Test pits of RWSA's water main should be done during the design phase to ensure there are no conflicts with the sanitary sewer. Sections of sanitary sewer greater than 15-feet deep should be DIP. Virginia Department of Transportation (VDOT) Doug McAvoy, dou as.mcavoykn,vdot.vir ig nia.gov — Requested changes; see the attached comment memo. �$ County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT Memorandum To: Andy Reitelbach From: Emily Cox Date: 08/04/2022 Subject: Victorian Heights Final Site Plan (SDP202200047) 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone: 434-296-5832 WWW.ALBEMARLE.ORG The Victorian Heights Final Site Plan has been reviewed by engineering. The following comments will need to be addressed before approval: 1. Easement plat must be recorded before final site plan can be approved. 2. The plan does not match the approved WPO. WPO amendment must be submitted and approved before final site plan can be approved. 3. Ensure the maximum proposed slope is 2:1. Please add a note showing the maximum 2:1 slope. 4. Engineered signed and sealed retaining wall plans will be necessary before final site plan approval. 5. Sheet 5 appears to show public drainage easements that are not shown on Sheet 3A. 6. Please show all proposed easements on the landscaping sheet. 7. Please ensure County Code 18-4.12.17.b is met. This code states that entrances should not exceed a 4% grade for a distance of 40 ft. from the intersected street. 8. [Sheet 6] Please show cross -slopes on typical road cross section details. . COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 August 25, 2022 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Bill Fritz Re: Victorian Heights — Final Site Plan SUB-2021-00047 Review # 1 Dear Mr. Fritz: (804) 7862701 Fax: (804) 7862940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 27 June 2022, and offers the following comments: 1. Please change labeling of dedication of right of way from VDOT, to County of Albemarle. 2. Please refer to VDOT's Road Design Manual, appendix F-pg., F-120, for commercial entrance designs along Highways with curb & gutter. The propose entrance width on Berkmar drive, needs to be a min., of 30'11. Berkmar drive is a major collector road. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Willis Bedsaul at 434-422-9866. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, John Wilson, P.E. Assistant Resident Engineer -Land Use Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING