HomeMy WebLinkAboutWPO201300032 Plan - As-built 2022-08-05 (2)PLANTING SCHEDULE TABLE
VICINITY MAP
WEIR
Impervious
Core*
SCALE: 1 "=2000'
F
•a pP•-anklin +'W'nd
$ AREA OF
AS BUILT
wnm camvy'°'ona' �\,J
Horne, °^•�r
'"arn°. �pe Fonuna e� -y'P;m,ano w.v 8
w
eP�e 6 Rd ® ® -..Rtl
O .� O ROMm Ra 6 ♦,F^" VemW Or
Mo E 9 9p 9 e 9�,yyQ Jn NOeMCN Or
R
F a SY H. en Rd
aH Rmren.
canape co-comoa
a HiY Centlo4
CLEAN —OUT
W/WATERTIGHT
R' , CAP
'TOP OF BERM
B10FILTER
EARTHFILL
L 4" NON —PERFORATED
PVC PIPE @ 1% MIN,
SLOPE
*Impervious core shown for
informational purposes only. Final
design to be provided by
geotechnical engineer.
R51 SEE
TOP 431.5Y BERM WEIF D� ETAIL
ELEV= �
01
N
O
PROVIDE PIPES
ACROSS ENTIRE WIDTH
AT 20 FT O.C.
Bio—Filter Sizing Calculations:
DA—BF #1 Impervious Area: 22,500 sf.
Bio—Filter Area Required: 22,500 X 5% = 1,125
sf.
Area Provided = B&5 a� 1,248 sf•
Bio—Filter Weir Sizing Calculations:
DA—BF #1 Drainage Area = 1.145 Acres
c=0.57; Tc=7 Min; 1(10)=6.5; 1(100)=8.4
Q(10)=4.24 cfs; 0(100)=5.48 cfs
Weir Calculation (Weir Length = 4'):
10 Year: 4.24 cfs=3.33(4')(H^J) —> H= 0.47'
100 Year: 5.48 cfs=3.33(4')(H" J) —> H= 0.55'
3'S
\— LOAM OR GRANULAR
4" PERFORATED PVC
PIPE O 1% MIN, SLOPE
Note: For BF-1, Extend 4' wide by 1' deep
rip —rap
channel to stream. Refer to sheet SP8
of the site plan for final grading.
50% SAND/30% TOPSOIL/
20% LEAF MULCH
(SAND: 0.02"-0.04",
ASTM C33 FINE)
\` FILTER FABRIC
UNDERDRAIN GRAVEL (AASHTO M43,
1/2"-1") WRAPPED IN FILTER FABRIC
APPROVED
by the Albemarle County
Community Development Department
Date 08/10/2022
File WP0201300032
2 BIO-FILTER SCHEMATIC
SW15 NOT TO SCALE
BLANDSCAPING�P
MEN
- ed Maple
(Acer
oil
rubrum)
moll
Njy �
�J�i ■
•
•
Y• -•- - - - -•-
WFA
LT SHRUBS &
FS-
LATE BONESET
EUPATORIUM SEROTINUM
JOHNSON GRASS
(SORGHUM HALEPENSE)
CHINESE BUSHCLOVER
(LESPEDEZA CUNEATA)
COMMON MUGWORT
(ARTEMISIA VULGARIS)
YELLOW CROWNBEARD
(VERBESINA OCCIDENTALIS)
FIELD THISTLE
(CIRSIUM DISCOLOR)
BEEFSTEAK PLANT
(PERILLA FRUTESCENS)
WINTER JASMINE
(JASMINUM NUDIFLORUM)
UNDERDRAIN
4" NON —PERFORATED
PVC PIPE
BERM
Grass Weir
1.
THE ORIGINAL DESIGN PLANS AND PROFILES USED FOR THIS AS -BUILT SOURCED
FROM'FINAL EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT
PLAN FOR CASCADIA BLOCKS 4-7" BY MICHAEL MYERS, P.E., DOMINION
ENGINEERING, DATED SEPTEMBER 9, 2014.
2.
FIELD WORK WAS COMPLETED ON JULY 29, 2022.
3.
DENOTES AS -BUILT INFORMATION
4.
THIS REVIEW DOES NOT IMPLY IN ANY WAY;
a.
THAT INSPECTIONS WERE MADE DURING CONSTRUCTION,
UNDERDRAIN
b.
TO THE QUALITY OF THE WORK, OR
4" PERFORATED
C.
TO ANY ELEMENT OR STRUCTURE NOT VISIBLE OR DEPICTED ON THE
PVC PIPE
PHYSICAL SURVEY.
CLEAN —OFF
(TYP)
TYPICAL PLANTING SCHEMATIC
NOT TO SCALE
I, DUSTIN GREENE, HEREBY CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THIS
AS -BUILT PLAN REPRESENTS THE ACTUAL CONDITION OF THE STORMWATER FACILITY,
AND THAT ALL ASPECTS OF THE STORMWATER FACILITY WERE CONSTRUCTED
SUBSTANTIALLY IN ACCORDANCE WITH THE APPROVED DESIGN PLANS, UNLESS NOTED
OTHERWISE.
T°rya
r°°n C/
UU
I�1
C)
U�z
rn rn �
�w wNo0
" a : Q� U Q o 2 a.z �>
°N 0 r n
W o�Pm
z O N M o
05 (N H Z �
LU rn_1a
�L v
a w
N
0
W
z
0
cn
U
Lu
w
0
Ln
Z
O
Ln
w
m
w
0
0
Z
o}4$SVTa of y�+c
iy
Dustin E. Greene
Lic. No. Q
A,o 55833
�g8lopeti. 6�
I� a
� z
Cn
z�C��
a
a V U w m
O m
~ J a a
J w
TD O
m m 00 —
z
LLJ
a Q J
0 LL
cn Q x O
>U�o m
v� a
z
Qz
U
DRAFTER:
CS
DESIGNER:
DG
PRODUCTION
ZD
DATE:
08/05/2022
SCALE:
AS SHOWN
JOB:
CASCADIA
FILE:
12.0065
SHEET:
� OF 1