Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP200400062 Review Comments Site Plan Waiver 2004-09-15
OF ALg.,r 1 11 i 11111U 9,p �� �C 1 US 14 t COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 Project: Clifton Inn Plan preparer: B Aubrey Huffman&Associates,LTD. (fax 434.979.1681) Owner or rep.: Country Inns Extraordinaire,Allan Burnley(fax 434.971.7098) Date received: 27 August 2004 Date of Comment: 15 September 2004 Lead Engineer: NA A. Final site plan comments: (Mark Chambers) 1. All comments were addressed with previous submittal. B. Stormwater management plan comments: (Mark Chambers) 2. All comments have been addressed. The Stormwater management portion of the water protection Bond is$10,000.00;please contact Pam Shifflett for additional information concerning the bond 296-5832 ext. 3246. C.Erosion and sediment control plan comments: (Mark Chambers) 3. All comments have been addressed. The erosion&sediment control portion of the water protection bond is$14,000.00;please contact Pam Shifflett for additional information concerning the bond 296-5832 ext. 3246. A grading permit will be issued when the following items have been completed: a. The Water Protection bond must be posted.For more information concerning the bond please contact Pam Shifflett at 296-5832 ext. 3246; b. A preconstruction meeting must be held,attendees to include,the owner, contractor and erosion and sediment control inspector.Please contact Mike Frazier on or after September 17,2004 to schedule the pre-construction meeting(296-5832 ext. 3245). The bond must be posted before scheduling the preconstruction meeting(recent policy); Copy: files WP0200400046,WP0200400047 and SDP200400062 File:2004 Template for fsp reviews 4Of AL@ COUNTY OF ALBEMARLE ?`.r ,,;17t Plan Review Comments Department of Engineering&Public Works ©�-� (434)296-5861 Fax(434)972-4035frinciro www.albemarle.org/engineer Project: Clifton Inn Plan preparer: B. Aubrey Huffman&Associates, LTD (fax, 979-1681) Owner or rep.: Country Inns Extraordinaire Inc. Plan received date: 08 Aug 2004 Date of comments: 19 August 2004 Lead Engineer: Glenn Brooks A. Final site plan and drainage computation comments: (Mark Chambers,Water Resources Plan Reviewer) All comments have been addressed. B. Stormwater management plan comments: (Mark Chambers, Water Resources Plan Reviewer) 1. Please provide hydrology and hydraulic computations in accordance with County Code 17-314 and County Design Standards Manual 503.2A and 503.2B. 2. A Stormwater Management Facilities Maintenane Agreement is required. Please submit the latest version, dated August 1999,typed and signed in black ink by the owner, along with the$16 recordation fee. Note: The plan cannot be approved until the Maintenance Agreement has been received, approved and recorded. C. Erosion and sediment control plan comments: (Mark Chambers, Water Resources Plan Reviewer) 1. Please provide calculation for the design of the temporary sediment basin. Engineering Department approval of the construction plans will be given when"all comments have been addressed"for items A-C above. A grading permit will be issued when approvals have been granted from all applicable departments and agencies, an erosion control bond has been posted, and a pre-construction conference held with the contractor, certified responsible land disturber, owner and county staff. Attachment: (none) Copy: file WP0200400046 and WP0200400047 File: Plan Review/Final Plan Review Form Letter.doc COUNTY OF ALBEMARLE AD Department Community Development Zoning & Current Development 401 McIntire Road,Room 227•Charlottesville,Virginia 22902-4596 Phone: (434)296-5823 •Fax: (434)972-4035 Transmittal From: Francis H. MacCall Date: 08/18/04 To: HIMark Chambers - CD Engineer ii*Jay Schlothauer-Building i* JOB #/FILE NAME:SDP-2004-062 Clifton Inn Site Plan Waiver We are sending you the following items: X Attached or n Under separate cover , Copy of Letter Prints Fl Plans n Plats n Specifications n Other #Of.Copies Date Description 1 l 8/16/04 revised plan These are transmitted as checked below: FlFor review and comments Fl For approval Other Remarks: Comments are due in CityView or email by: 8/25/04 Signature: Francis MacCall pF AI II/ . COUNTY OF ALBEMARLE Plan Review Comments Department of Engineering&Public Works ® ong (434)296-5861 Fax(434)972-4035 ��. www.albemarle.org/engineer Project: Clifton Inn Nan preparer: B. Aubrey Huffman&Associates,LTD(fax, 979-1681) Owner or rep.: Country Inns Extraordinaire Inc. Plan received date: 13 July 2004 Date of comments: 30 July 2004 Lead Engineer: Glenn Brooks A.Final site plan and drainage computation comments: (Mark Chambers,Water Resources Reviewer) 1. Please include the Albermarle County general construction notes on the plan. 2. Please show the existing under ground LPG tank and the existing cross pipes under the entrance road on the plan. Attachment: (none) Copy: file SDP200400062 File:Plan Review/Final Plan Review Form Letter.doc AX 1:1 Nt,:C