HomeMy WebLinkAboutSDP199500094 Plan - Approved Minor Amendment 1995-11-16GENERAL CONSTRUCTION NOTES ` 1. PRIOR TO OF ANY CONSTRUCTION WITHIN ANY EXISTING PUBW RIGHT OF WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT FOR SAID CONSTRUCTION SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (HEREAFTER ABBREVIATED V.D.O.T. ). Z ALL PAVING AND DRAINAGE RELATED MATERIALS AND CONSTRUCTION METHODS SMALL CONFORM TO CURRENT SPECIPICAT IONS AND STANDARDS OF V.D.O.T. UNLESS OTHERWISE NOTED. 8. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED IN ACCORDANICE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL YE INSTALLED PRIOR TO ANY CLEARING. GRADING 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED AND MULCHED. MAXIMUM ALLOWABLJE FILL OR CUT SLOPE IS 2:1. WHERE REASONABLY OiiTAINAW.E LESSER SLOPES OF 4:1 OR BETTER ARE TO BE ACHIEVED. 6. ALL DRAINAGE INLETS SHALL HAVE A Z INCH LOCAL DEPRESSION UNLESS OTHERWISE SHOWN. 8. PAVED OR RIP RAP UNED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF THE DiREG"TOR OF ENGINEERING, OR His ofie ass. IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL 7. ALL TRAFFIC CONTROL SIGNS SHALL CONFORM WITH THE VOW" MANUAL. FOR UNIFORM TRAFFIC CONTROL DEVICES. LATEST EDITION. 0. UNLESS OTHERWISE NOTED ALL CONCRETE PIPE SMALL BE REINFORCED CONCRETE PIPE CLAM III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION SMALL COMPLY WITH 0" STANDARDS FOR THE CONSTRUCTION INDUSTRY (20 CFR PART 1 Mi 8 ). 10. THE CONTRACTOR SHALL CHECK ALL DON$ AND CONDITIONS AT THE JOY SITE AND REPORT ALL INCONSISTANCIAS TO THE ENGINEER ANDMA ARCHITECT. 11. OUTDOOR LIGHTING SHALL. BE DIRECTED AWAY FROM ROADWAYS AND ADJACENT PROPERTIES AND SHIELDED WHERE NECESSARY. 1Z. ALL SERVICE UTILITIES ARE TO BE PLACED UNDERGROUND. I& IN LIEU OF CONCRETE STORM DRAIN PIPE ADS N.12 CORRUGATED POLYETYLENE PIPE MAY BE USED IN CONJUNCTION WITH BEDDING TYPE PB.1. WATER AND SEWER GENERAL PLAN NOTES 1. WORK SMALL BE SUBJECT TO INSPECTION BY ALBEMARLE COUNTY SERVICE AUTHORITY INSPECTORS. THE CONTRACTOR WILL BE RESPONSIBLE FOR NOTIFYING THE PROPER SERVICE AUTHORITY OFFICIALS AT THE START OF WORK. Z. THE LOCATION OF EXISTING UTILITIES ACROSS OR ALONG THE LINE OF THE PROPOSED WORK ARE NOT NECIEBOARILY SHOWN ON THE PLANS AND WHERE SHOWN ARE ONLY APPROXIMATELY CORRECT. THE CONTRACTOR SHALL ON HIS OWN INITIATIVE LOCATE ALL LINES AND STRUCTURES AS NficisSARY. * ALL MATERIALS AND CONSTRUCTION SMALL COMPLY WITH GENERAL WATER AND SEWER CONSTRUCTION SPECIFICATIONS AS ADOPTED BY THE Al BEMARLE COUNTY SERVICE AUTHORITY ON JANUARY 20,1M8, AS AMENDED JULY 1. 1M8. 4. ALL ELEVATIONS ARE BASED ON U.S.C. AND G.S. DIATUAL. 6. THE CONTRACTOR SHALL U FOR NOTIFYING ' MISS UTILITY • (1 8i00 "2 7001). • ALL WATER AND SEWER PIPES SMALL HAVE A MINIMUM OF 3 FEET OF COVER MEASURED FROM THE TOP OF PIPE. OVER THE CENT'ERLJNE OF PIPE. THIS 06CL.UDES ALL FIRE HYDRANT Lb" SERVICE LATERALS AND WAS ETC. 7. W WIDE EASEMENTSt CENTERED ON THE PIPELINE AND APPURTENANCES SHALL BE DEDICATED TO THE ALBEMARLE COUNTY SERVICE AUTHORITY. EXCEPT WHERE THE UNE 18 IN A PUBLIC ROAD RIGHT OF WAY OR AN ACCEM EASEMENT. IN WHICH CASE THE ACCESS EASEMENT SHALL ALSO BE DEDICATED AS A UTILITY EASEMENT. i. I MIN. SEPARATION REQUIRED BETWEEN WATERLINE AND STORM SEWER CULVERTS OR s' SEPARATION WHEN WATERLINE W INSULATED. USE 1f2' THICK THERAIA CEL PIPE INSULATION IN 9 X W SHEETS AS MANUFACTURED BY NOMACA, INC. OR EQUAL APPROVED BY ALBEMARLE COUNTY SERVICE AUTHORITY. INSULATION TO EXTEND 8 BEYOND CENTERLINE OF CULVERT IN BOTH DIRECTIONS OR F BEYOND ENDS OF CULVERT WHEN PARALLEL 8. TOUCH READ METERS ARE BE" USED BY THE ALBEMARLE COUNTY SERVICE AUTHORITY. TO ATE THESE METERS, METER UDS WILL REQUIRE A 1 3/4' HOLE TAPPED INTO THE CENTER OF THE LID. BOND TAPS OR PLUGS SHALL BE PROVIDED TO PREVENT DEBRIS FF40M ENTERING THE BOX PRIOR TO METER INSTALLATION. 10. ALL WATER AND SEWER APPURTENANCES ARE TO SE LOCATED OUTSIDE OF ROADSIDE DITCHES. 11. CERTIFICATION THAT 86 PER CENT COMPACTION IS OBTAINED SHALL BE PROVIDED FOR ALL FILL AREAS UNDER WATER AND SEWER LINES AND APPURTENANCES. THIS CERTIFICATION SHALL BE SIGNED BY A PROFESSIONAL GEOLOGIST. THE CERTIFICATION SHALL STATE THE EXACT AREA THAT THE CERTIFICATION APPLIES TO. 1Z. VALVES ON DEAD END LINES SHALL BE ROOM TO PROVIDE ADEQUATE RESTRAINT FOR TIME VALVE DURING A FUTURE EXTENSION OF THE LINE. SITE TOTALS AND LAND USE DATA NOTES OWNER VIRGINIA LAND TRUST W CNUWLES W. HURT P. O. BOX 8147 DEVELOPER C.W. HURT, CONTRACTORS CIO STEVE MELTON 1" RIVERBEND DRIVE CHARL.OTTESVILLE , VIRGINIA 22901 PRESENT ZONING: PDMC PROPOSED USE: FINANCIAL INSTITUTION TOTAL SITE AREA : 2.153 ACRES 93,791 S.F. TOTAL BUILDING COVERAGE $0,600 S.F. 221/9 TOTAL IMPERVIOUS COVIMA" 48,306 S.F. 52% TOTAL OPEN SPACE 24,808 S.F. 26•/. coor AFPKoV6D Am"V`MI✓14'r K,y AF COSY w/ ZomN6 V67r. 0 MINOR SITE PLAN AMENDMENT SHOWING kPvzv� I 195 GUARANTY SAVINGS AND LOAN PANTOPS TAX MAP 78 PARCEL 72 RIVANNA MAGISTERIAL DISTRICT ALBEMARLE COUNTY, VIRGINIA ciaI . OCK 8 ¢RO t Nf� I\ wJf�J `lt,N/ `T. � (1 �.�''" �Vi !•aejJ3- i. I/ ��� � e �� VeleAns F �c% Mew: In - �.` 44 r`�j\\ ,' 5,� \, ,� y� \fir RI��J�11J6� } K FRANKLIN ?" I Z �4t All vfN� 4' `�•;- 000on rOM� lt' Sf't rn •fl / P C! plN PANfOPS 3 i �,artF� ft� fill +jJelf 5 H' J IG 5 S rOlr .wrry r N �+, ��firf►rii. hi(=�>>r- ASH ROFT� ",,%WESTMINS Rig / J11h'/icp Tr. a Dt �} � GLENORCH f �� II �h�.�✓ E � Jr � % r � 6: r �+ ;y���+r•; ARLTO� ° pq • CARLTO I e s�5 M H P E 3 Exit• 124EC� rNT 4, LL Rivas Vill LL0 ;:'*� Archieoi / Mkt el I`\ [ ri r - LabNrI efy MONTIC "� he weer f C a HOME •� hbl. *Di OF THOLIA car. Howe JEFFERSON) 91ue R"je //.53 ti Ica F Toms PARKING SCHEDULE: 1 SPACE PER I" S.F. GROSS FLOOR AREA AND 3 DRIVE-IN AISLES AT 26 S.F. CREDIT PER AISLE : 76 S.F. 140 S.F. GAO$$ . 76 S.F. CREDIT = 226 s.F. PARK040 RiOUIiiED 1 SPACE PER 226 6.F. GROSS FLOOR AREA GROSS FLOOR AREA s 20,600 S.F. 20,900 S.F. 1226 S.F. s 92 SPACES NARKING PROVIDED s 108 SPACES LOA9IN4 S►ACES ►ROV'I"D. ■ 8 SPACES BOUNDARY SURVEY BY : B. AUBREY HUFFMAN AND ASSOC$. LTD. TOPOGRAPHIC SURVEY BY: B. AUSJIWY HUFFMAN AND ASSOC& LTD. VICINITY MAP SCALE : 1' : 2,000 ZONING DEPARTMENT i ALBEMARLE COUNTY SERVICE AUTHORITY PLANNING DEPARTMENT ENGINEERING DEPARTMENT VIRGINIA DEPARTMENT OF TRANSPORTATION VIRGINIA DEPARTMENT OF HEALTH WE THE UNDERSIGNED DEVELOPER (S) UNDERSTAND THIN APPROVAL OF THIS PLAN BY THE COUNTY OF ALBEMARLE DOES NOT NECESSARILY INDICATE VIRGINIA DEPARTMENT OF THANSPOIHTATION ( VDOT ) APPROVAL OF THE PLAN. APPROVAL OF THE PLAN BY THE COUNTY DOES NOT IN ANY WAY RELIEVE ME OF MY RESPONSIBILITY IN OBTAINING FINAL VDOT APPROVAL PRIOR TO THE ISSUANCE OF BUILDING PERMITS AND / OR CERTIFICATES OF OCCUPANCY. ti Tux Map 78 Parce / 61 Jefferson National Bank D. B. 68 3 - 70 8 Z o n e d P D M C T a x Ma p 78 P a! c e 1 72 '//, ///, //// \\\♦♦ \ ♦♦�\ Hurt Investment Compon y // / / / \♦ D. B. 99 6 - 12 6 Z o n e d P D M C ACCESS TO THE ADJOINING PARCEL /S FOR — //// / a AUXILIARY ACCESS ONLY AND THAT THE - — — — — — — — — — — — — — — — — — — — f PRIMARY ACCESS TO THE ADJOINING PARCEL WILL BE' FROM HICKMAN ROAD. //// N49°5r?'`/7'E 65. 39 `� / \\♦♦♦ I N 40007 43 W 9.00 - 411"90 1 \ 1 I t / 1 ♦ 1 1 \I / i I / ♦♦♦ N 4 9 0 5 2 / 7 E 2 8 2. 00 j \\ \ T O O O O O 3 T-1 / \ T_t C G- 2 _ - --- O 12 ' x 25 ' ' ♦♦ \ Loading Spaces 25 Spaces 9 x 16 // ,I / ♦♦ /0'x 20' Durnpster �. /' �� / l Pavement Material s / / ♦\ '; ' Pad Screened w/ 7' / „ .:: \ 6 Aggr. Base Materi a / // // // \♦ �, \ :... High Solid Privacy _ \ ��\ \♦ ;„:; Fence \\\ 165 /b s Type SM2A Asphalt \\\ s3? , \♦♦ .t ,t,Y;�;r. ;.H�,, , .r •, •r..i''•f• / t 'di; / T/ / l \\♦ O =� \ r ` r: l 8 •: Sid ��:' I S _ ';• : 1-1 r� /3 R - F \ to \�� ►♦ ^ / _ •� // / � \\ ° 7. 3 3 IF AC ---------------- \ X �n 24 / - 47. 33 O1 N — ---- --- Q'— W — — — — — — — — — — — — — — N. N v M ,) \ \ 0 w J \O w V \- h h h) z o Q � W — rt) \ Sewer Lot. - �— — — — --——-- -- v Sewer Lot. — - — — -- 30 ' Building Setback Line Exist. S 12 " San. Sewer S S 20 Wide San. Sewer Ease. —� R/W Margin P'T 7 33 / t 2 / / '•.! \NRI\� Ir to �4 o t O ?A- --------------' ONE S TiOR Y BU/LOING // ..; '':, e CO - 1 \I to jGA ( P Y Max. Bui/din g He i g h t 35 I \ V I M // // O '• •' _ice' -- Bui/din g to be sprinklered // /// rn ;:• // 2 j W i 2 5. 67 �- �� 25. 6 7 ''� / 5`R 5R \ \\ rs �����'� ////// k) '-' ` c .11 - - 30. 0 3 O .O ----------- - - - v / ;::• , a / / 1 3 /r \ \ W \\ Q \ O 1 h Q l h) \ N 0 / \\\ `-.I � 0/ t / O �: \ Qz O / o ° \ / r- \ 0/ \ ko O N � V r // 1. .r• t r }•.1h'.'t''•i.' '.a't',,i; :r:.ty., ,.•.;r�-i:•' `'•'J' ti'' r }.- ✓,tip+ !r'/.j', r. T /4R EX is "q• 6 Side walk i a R �� ; 5 R 'tee // fbo 4 a, / \` / / ` 0t° _ Premoved\ �0 0 s° j /,/ v `\\ NO GRADE ADJUSTMENTS ARE ?p !`;a, °j //•� 1 �V NECESSARY AT EX/STING / S/or,n N = 3: `�� 5 30 ff- 0 32'R �/ \• / � r 3 SANITARY SEWER MANHOLES I / ��o/,� __ 0 t P/ F�s� I pE A a h to h r G'� / - 2 10 D o r-! � T,J =� �� a a Ex/s/. MN „ 6 Exist . MH 30 Ent ron ce Top, 0.87 C �/ l6 Spaces 9 x / 6 SExisl.�l Sv Sewer_ S W 77,5 Top 524.57 Exist. /2" San. Sewer �h Inv.5/6.17 / - / 6_2 2�2i�� Exisl.W.V. I 3 _ __ ___ B �r-3 r'.s � Exist. 8 W:L. int"C"� Exist.Fire � -5`R Q C - 0 4 �-�" - - , ?o ° Hydrant - _ 1 \\ —� 15 PECorr. Pipe 32 J.59 WM- CG- p r u r t u � x/st. Gas Line \ V xis /. Firr Hydrant ——,�� ♦� _4 Va/w \ Ex/ s1. 8 We Line Exist. WV. to�Jloe/o ca /e d Exist. Edge of \\ 8x 4 �aping-� �\ Porn / A \ Sleeve 9 Va/ SITE B E N C H M A R K Relocated Po v e me r► 1 \ \\� Entrance location 0\ � Water meter tobi \ t Exist. CB FireHydrrant established as per VDOT �� \ r I y \ \ \sired by ACSA \ 1 Point B , Top 522.70 �.• l Top of Fire Hydrant „ field inspection \ \� \\ \ 1 \� Inv. 520.70\/ 6'- 0 walk 1 /00' U.S. Turn Lane 42 Toper \ \ ., 527. 5' - 0" walk yS. G.S. Daatt um \� Class A3 v slope,)/4"perft. S T A T E F A R M B 0 U L E V A R D Concrete 2 ��2"R art'•4r,::';•:i;:';:•:�.•r.�•:.ry••...,,•• _ ....:.,.•., ,:,::•1'•.•;::.'�•:;.�t =� paving slope Top of finished PAVEMENT DES/GN SPEC/FICA T/ON FOR THE / 0 0 ' �/ W \/ �\ ''.�•'• .� ENTRANCE AND DECELERATION LANE: `` ►` 8 1/2" 21 A aggregate Compacted fill or undisturbed earth 4 //2" BM-3 asphalt concrete \�1 //2" SM - 2A asphalt concrete 6 TY P I CAL SE C T I ON lo'- o" STORM DRAINAGE STRUCTURES S I D E W A L K Class A3 slope I/4 '� per ft. N0. TYPE L TOP iNV. IN INV. OUT I Concrete j 2"t 1 • • 2 R DI-26 4 429.41 621.66 621.66 l�`�/%%7�\������`� •���•••' •�;s;.-�`�:,-.. .:�::•'+•� _Top of finished Z DI-3A 2}6 iZ7:36 622.67 622.47 h e e t N o . October 391995 // /\ �\ /%/ ,� Pavi nq slope i D1-30 6 629.0 623.61 Compacted fill or undisturbed earth r- - 4 DI-3A 2.5 931.46 622.99 6" LL:' W IL V) < J O z V. V• - 01 O N 0) O N V N d' O < to 00 O W— M.. O Z ~• � ~ z a0 to W t` , tr) N V• CO to r C LL L` LL 0" O < 4. O (n co U) rn 6 O 1DtO 2 41 z — 0) W ,r, °° 0) 0 0C < < U — V V• m _ V• 1h o a -< W ' 0 J tD L0 to O z0 !- r V• N N V OD — H = — N — r r V � r ...rt W < J N r F- o V- N - t` - m to - - - N O = N N (f) N GD W �- L v o =ro v CX t � U 3 N L � W c -� c o t v c a W . 4 _ -oo o 0 t o a J N N N N N — :.i — — — — t ; a :� o Ih rn to N N = V a V• X 0 Q z _ O 0 O u- zr ¢ Q I- > 0 V O _ QZ cc W 0: Y W D 0 m -. Z — J O— cc Q a: J t1J Q O m — O Q } J W N H U. y Z Q 2 W cn N Z 0 LU 0 O U t 0 J O Q X O _ 0 < z U U O a a� a a U U_Z X a LL1 v z V) z W > w z U) rc V)Ld w O " 0 a — cr r.J _ O . z_ W X~ O z _ W z X Cr O z -. w V) O O W U W cc Q X T J w a Q 0 V) w¢ 4 0 O J W J W D 0 x Q o 0 a co U_ 3 N U W w _ m a- u- _ ,.MA V Y O~ J t T Y P I C A L S E C T 1 O N D U AA P S T E R P A D P L A IV S C A L E / = 20 contour Inter V a / = / /