HomeMy WebLinkAboutSUB201600144 Checklist - Project Closeout (Administrative) 2017-06-19 SUBDIVISION/SITE PLAN
FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS
CHECKLIST
Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC
and status label. CDA will forward to the Imaging Center for digital closeout. 11
SDP U$�6 -illy Y PROJECT TITLE 1ieSl kt Hi 1IS SVIAO i Al o.%EftS ilve Cri �
/ UB
FULL NAME OF LEAD REVIEWER 1FA.-1-4 CUP, Sabesfyi FINAL ACTION DATE: G/I /2017
Co View— —_— —---- ----
lication,Page 2 Data Entered
1
LStaff Report, Ground Water Assessment, or other documents placed in"Docs&Pies"
----------- --- ---- ---------------------------
Hardcopy—File Folder Closeout: All items listed should be placed in project folder, in reverse
chronological order(latest on top).
Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A"
next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide
clarity to the file,please indicate that item on the"Other" lines provided.
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital
location(path/name)of the document in the space provided.
Engi eering Folder Information/documentation
E Scan ❑ Saved location
Application(signature copy)
❑ Scan aved location 144,41-re kt
.-B-Publi otification records/Abutting Owner correspondence
ElScan El Saved to ation
Appl'cant Correspondence(to/fro , memos/emails) /�
❑ Scan Saved location ]�,yLrt, �
Complete set of printed Review C ments �:
❑ Scan aved location IAce.t rtlw"-
-B-Approved plan/plat(signed, or stamped"Approved"with Planner/Engineer name)
❑ Scan ❑ Saved location
^B--Action Letter(Administrative Approval)
❑ Scan E Saved location
'El-White Envelope-PCBOS Meeting Package- Staff Report(include plan/plat presented,PCBOS Action Letter)
❑ Scan ❑ Saved location
`-E-Ground Water Assessments
❑ Scan ❑ Saved location
-5-Other(Please explain-i.e. Studies)
❑ Scan El Saved location
1-D--0ther(Please explain-i.e. Studies)
❑ Scan ❑ Saved location
Ii 1 At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the
staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be
clearly marked as unapproved and contain a note clarifying why it was included.
❑ Scan Saved location
PIRA—Cott °"`b I& f- iv. Rte.No Kecd 4, Sc'u"C2•40 1),
Additional Information on this project:
• Planning Commission Minutes-may be obtained online or by contacting PC Recording Secretary
♦ Board of Supervisor Minutes-may be obtained online or by contacting the Clerk of BOS
• Construction Documents-will be added to this folder after completion of project. Prior to completion,
documents may be obtained by contacting the County Engineer. - -------
NOTES: S project folders will be accepted by the Imaging Center when the following items are complete:
Checklist is completed and included in folder;
2) F er has a typed status label(same font&label color as project label)placed under the project label to
ect current project status and date;
ocuments are Acco-fastened(except plats/plans),and in chronological order(latest documents on top);
Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche.
If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the Chief of
Planning for corrective action.
Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012