HomeMy WebLinkAboutWPO201400101 Bond Release 2022-08-11 kept r"
oyA �Il► I�z
(„mijoirL`ti
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone (434)296-5832 Fax (434)972-4126
EROSION CONTROL PERFORMANCE BOND RELEASE
❑ MITIGATION PERFORMANCE BOND RELEASE
❑ STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE
PROJECT NAME: CASC4DiA 61-04
PLAN/PERMITNO.: ‘A.1P0 02 OI l' ICA
Date As-built plan was approved by Engineering Division: IU/A or N/A 4,74
/L� NoYE = woo 2064-10% �S RA
DEQ Termination Date _or N/A ,v cgsc 4A,A, S M. Is
EAY� e1 v402.011-37- A
DEQ Permit No.: rll/r9
�f?
or N/A
vAgSoCo9q. oQ 8�y-zZ
If townhomes in a Common Plan,list Common Plan DEQ Permit No.: PM
This project h been satisf rily completed and the performance bond may be released at this time if
all r insp n and an maintenance fees invoiced have been paid.
_DATE: -4'�ZZ
Erosio t ector
Community Development Department
All fees invoiced on the above project have been collected.
Director of Community Development MEM
.023/1//Z- 2—
Date
Cc: Ana Kilmer
Revised:04/11/2022
WPO FILE CLOSEOUT CHECKLIST
wpo#- .10l4/--eo1 Ggso4 p�A 6 Lo cK S
BIR Inspections
✓ BIESC performed with approved plan. 8-z-a7-
N/11 BISWM performed with As-Built plan.
Required Docs(either in CV or paper copy)
__ I CGP VAR10 for this project: ND c6e P 2 jEc,i -po C6f io '"AT .
CGP VAR10 that treats SWM for this project: V4Ck t0 6 O 9?
✓ Albemarle County Application
NONE General VPDES Permit Registration Statement
✓ Approved E&SC and SWM lans 8 Z4-/5
✓ SWPPP (6v07i4PPRoVEZ )
Approved Bond Estimate 'ysc °i^ `1 -
eV Nutrient Credit Purchase Affidavit
,flow Fovs..A Recorded Documents:SWM Maintenance Agreement, Easements W �— �oM� A�
,v1A As-Built Construction Record Drawings/Certification stjo rperr4
-
Manufacturing and Installation records Max,,'rEsrop. t c30'�
Pipe video J ARsp 6°99
Current survey
XVII General VPDES Permit N.O.T.C N/A ()CR FPA,k 8-14-22>
Verify all fields;verify still active; reference other VAR10"comments" for swm
✓ Inspections: 2 minimum with photos. Photos of all swm bmps
BIR release/reduction form
Erosion Control,or SWM Performance Bond Release:
For releases: Update CV review status to "approved/complete".
For reductions: Update CV review status to "denied/complete", and enter reasons for denial in
the comments box.
p o i E _3 A Co-Et2F.0 f3 �sr"1
Cbvf.R I46-�OF APf V-"LD 11"tj "TES S41
c4
.0'11
Q L s11-47 A c-c'c-K