Loading...
HomeMy WebLinkAboutSUB202100155 Bond 2022-09-13Internet Use Onb A Date Received: Fee Paid: Received by: Intake: Forward to Program Adminismabr y 1'/Rc1N�P REQUEST TO ESTABLISH A BOND APPROVED PLAN # SU92021001557 PROJECT NAME: (As listed on the All parcels in the project, including any off -site work if easements are not provided, and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct, and plans must be approved prior to bond estimates being prepared. TAX MAPS / PARCELs: S6 - S %81 OWNER'S NAdy,<'� : T ml •, LLC SIGNATURE:date: V IS- 21 TAX MAPS / PARCELs: 56-570 OWNER'S NAME: I LLC SIGNATURE: date: TAX MAPS / PARCELS: OWNER'S NAME: U SIGNATURE: date: TAX MAPs / PARCELs: 7 `— S%D OWNER'S NAME: G(trrG mL Ut, TAX MAPs / PARCELs: SIGNATURE: OWNER'S NAME: SIGNATURE: date: NOTE: If ownership of the property is in the name of any type of legal entity or organization including, but not limited to the name of corporation, partnership, limited liability company, trust, association, etc., documents acceptable to the County must be submitted certifying that the person signing above has the authority to do so. The requested estimates are; (Fees include 4% Technology Fee) ❑ VESCP Erosion & Sediment Control per Water Protection Ordinance section 17-207; $0 fee ❑ VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water Protection Ordinance section 17-208; $294.32 fee required Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14-435; & Water & Sewer per Subdivision Ordinance section 14-435; $307.84 fee required A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide contact information. EMAIL: Tiwkeir Lard �' Cfwa.(. nowt OR REGULAR MAIL ADDRESS: Revised 711/21 Inecroal line Onl. Date Received: Received by: Intake: Forward to Management Analyse SCHEDULE OF COMPLETION FOR BONDED IMPROVEMENTS PROJECTNAME: Glelabveok At Fod-14JIs - More III - Piro[ Roan[ flan SU620ZI15�5 (as on bond estimate request form and approved plan) This form is intended to facilitate the completion of bonded improvements in a timely manner by assuring the developer has a schedule in place, and by providing this Department a means to assess the developer's ability to meet the completion date stated in the bond agreement. The developer must provide a completion date for each milestone listed below. Date Milestone Public Roads 5 2.2 Start of construction. g ( 2rj Submit all paperwork in accordance with the County's "Public Road Acceptance Procedure" (certificate of completion, as -built plans, recorded plats, professional engineer certification for completed improvements, etc.). 26 VDOT documentation of acceptance (request to Board of Supervisors to adopt resolution to accept road(s) into secondary road system). Private Roads 9/15/22 Start of construction. 8� i 25 Submit all paperwork in accordance with County's "Private Road Acceptance Procedure" (compiled report of CBR tests, stone depth inspections, and fill compaction tests, certified by a professional engineer, certificate of completion, as -built plans, recorded plats, professional engineer certification for completed improvements, etc.). 15 LS Request 45-day inspection from County. I l LG Request final inspection from County. Water & Sewer Imnrovements I Q Improvements dedicated and "acceptance" letter issued by the Albemarle County Service Authority. Additional Bonded Subdivision Improvements (landscaping, Pedestrian Paths, sidewalks, etc.) �1 u Submit signed and sealed letter from a professional engineer listing and certifying that completed improvements are built according to approved plans and request inspection from County. Revised 11/10/2010 Page I of 2 SCHEDULE OF COMPLETION FOR BONDED IMPROVEMENTS By signing below, the owner/developer agrees to complete the bonded improvements in accordance with the above schedule. If, during the course of construction, the owner/developer finds they will be unable to meet the schedule, they must provide written justification to the County Engineer of the reasons preyenting completion along with a revised completion schedule. SCHEDULE OF COMPLETION ACCEPTED: County Engineer Subdivision/Road Performance Bond ComDletion Date Revised 11/10/2010 2 of 2 sb I b' -Wir Date Date 9/7/22, 4:16 PM Payments Payment Receipt Your transaction has been successfully coompletedil Your Confirmation number is : 1000199519 Transaction ID: 22090715151908F2FC6B622090715151 09/07/2022 16:17:56 [EST] Account Information Payment Type: Tax Payment Bill Payer Details Ashley Davies 455 2nd street se suite 201 charlottesville, VA22902 Payment Details Payment Amount: $307.84 Convenience Fee: $7.70' Total Amount: $315.54 Payment Method: Card Number: XXXXXXXXXXXXX1376 Expiration date: 06/2024 https:/Mw.albemarlecountytaxes.org/payments/default.aspx ill