Loading...
HomeMy WebLinkAboutSUB201900170 Bond Reduction 2022-09-13COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 Subdivision Bond Inspection Bond Title: Belvedere Phase 5A File Number: SUB201900170 Date of inspection: 2 Sep 2022 Reviewer: John Anderson, PE Original Bond Amount: $1,180,980 Phone: (434) 296-5832, x3069 Current Bond Amount: $ 354,294 Your bond inspection request has been processed. This list contains an update on items received and approved; bond Amt. covers: Fowler Street Ext. (Sta. 10-+00 — 18+34); Fowler Circle (Sta. 10+00 — 15+73); Fire Access Road (Sta. 10+00 — 22+85). Received Approved Y N Y N N/A vDoT ■ ❑ Completed inspection request and fee ■ ❑ ❑ ❑ ■ ❑ As -built plan, updated, sealed to current date, per As -built policy ■ ❑ ❑ ❑ ■ ❑ Copies of recorded plats for right-of-way, easements ■ ❑ ❑ ❑ ❑ ■ VDOT approval AM-4.3, or partial completion via punchlist ❑ ❑ ■ ❑ ❑ ■ Letter from P.E. certifying improvements are built to plan ❑ ■ ❑ ❑ ❑ ■ Current certification form completed by owner/developer ❑ ■ ❑ ❑ ■ ❑ CBR test reports for each road ■ ❑ ❑ ❑ ■ ❑ Stone depth and material inspection reports (or core tests) ■ ❑ ❑ ❑ ■ ❑ Pavement depth and material inspection reports (or core tests) ■ ❑ ❑ ❑ ■ ❑ Compaction test reports for fill areas under road ■ ❑ ❑ ❑ ❑ ■ Pipe trench inspection reports ❑ ❑ ■ ❑ ■ ❑ Pipe interior inspections reports and video ■ ❑ ❑ ❑ ■ ❑ Concrete test reports for structural concrete, curbing, aprons, etc. ■ ❑ ❑ ❑ ❑ ■ Structural inspection reports for any bridges or box culverts ❑ ❑ ■ ❑ ❑ ■ county road name signs and posts, or a sign agreement for alt. posts ❑ ■ ❑ Updated bond amount based on completed work: $126,708 Please refer to on-line content https://www.albemarle.org/govemment/community-development/applv- for/en ing eeringgpplications/road-plans for checklists and procedures. For ROAD plan bond release, items required: 1. Updated As -built drawing showing items, below, as needed 2. Updated pipe inspection video 3. County street name signs 4. Traffic control signs 5. Surface asphalt placement 6. Street Landscaping 7. All drains inlets clear of debris, stone, etc. 8. VDOT accpetance 9. Developer certification 10. PE -certification Notes: 1. Provide As -built final surface pavement inspection depth report, and update As -built drawing to include final surface asphalt pavement depth. 2. Provide As -built pavement section, Fowler Street, Sta. 13+50, since Stephenson Consulting, Inc., CBR test report d. 5/3/22 indicates CBR value =0.7 @0.1 in and 0.9 @ 0.2 in. Ref. VDOT 2018 Pavement Design Guide for Subdivision and Secondary Roads in Virginia [CBR value to calc. SSV; SSV to calculate DP]. CBR Values 0.7 and 0.9 must be evaluated in context of As -built pavement section, vis-a-vis Pavement design guide, Dr, ADT. 3. Provide update and video re -inspection of items identified as `need(s) to be repaired,' or `needs to be cleaned before inspections can be performed.' Items listed don graphic (Belvedere 5A Storm Pipe Exhibit) submitted with insp. video files on flash drive hand -delivered to Engineering week of 29-Aug [ J. Taggart to J. Anderson]. Representative photos, 9/2/22