HomeMy WebLinkAboutSUB201900170 Bond Reduction 2022-09-13COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Subdivision Bond Inspection
Bond Title: Belvedere Phase 5A
File Number: SUB201900170
Date of inspection: 2 Sep 2022
Reviewer: John Anderson, PE Original Bond Amount: $1,180,980
Phone: (434) 296-5832, x3069 Current Bond Amount: $ 354,294
Your bond inspection request has been processed. This list contains an update on items received and approved;
bond Amt. covers: Fowler Street Ext. (Sta. 10-+00 — 18+34); Fowler Circle (Sta. 10+00 — 15+73); Fire Access
Road (Sta. 10+00 — 22+85).
Received
Approved
Y
N
Y
N
N/A vDoT
■
❑
Completed inspection request and fee
■
❑
❑
❑
■
❑
As -built plan, updated, sealed to current date, per As -built policy
■
❑
❑
❑
■
❑
Copies of recorded plats for right-of-way, easements
■
❑
❑
❑
❑
■
VDOT approval AM-4.3, or partial completion via punchlist
❑
❑
■
❑
❑
■
Letter from P.E. certifying improvements are built to plan
❑
■
❑
❑
❑
■
Current certification form completed by owner/developer
❑
■
❑
❑
■
❑
CBR test reports for each road
■
❑
❑
❑
■
❑
Stone depth and material inspection reports (or core tests)
■
❑
❑
❑
■
❑
Pavement depth and material inspection reports (or core tests)
■
❑
❑
❑
■
❑
Compaction test reports for fill areas under road
■
❑
❑
❑
❑
■
Pipe trench inspection reports
❑
❑
■
❑
■
❑
Pipe interior inspections reports and video
■
❑
❑
❑
■
❑
Concrete test reports for structural concrete, curbing, aprons, etc.
■
❑
❑
❑
❑
■
Structural inspection reports for any bridges or box culverts
❑
❑
■
❑
❑
■
county road name signs and posts, or a sign agreement for alt. posts
❑
■
❑
Updated bond amount based on completed work: $126,708
Please refer to on-line content https://www.albemarle.org/govemment/community-development/applv-
for/en ing eeringgpplications/road-plans for checklists and procedures.
For ROAD plan bond release, items required:
1. Updated As -built drawing showing items, below, as needed
2. Updated pipe inspection video
3. County street name signs
4. Traffic control signs
5. Surface asphalt placement
6. Street Landscaping
7. All drains inlets clear of debris, stone, etc.
8. VDOT accpetance
9. Developer certification
10. PE -certification
Notes:
1. Provide As -built final surface pavement inspection depth report, and update As -built drawing to include final
surface asphalt pavement depth.
2. Provide As -built pavement section, Fowler Street, Sta. 13+50, since Stephenson Consulting, Inc., CBR test report
d. 5/3/22 indicates CBR value =0.7 @0.1 in and 0.9 @ 0.2 in. Ref. VDOT 2018 Pavement Design Guide for
Subdivision and Secondary Roads in Virginia [CBR value to calc. SSV; SSV to calculate DP]. CBR Values 0.7
and 0.9 must be evaluated in context of As -built pavement section, vis-a-vis Pavement design guide, Dr, ADT.
3. Provide update and video re -inspection of items identified as `need(s) to be repaired,' or `needs to be cleaned
before inspections can be performed.' Items listed don graphic (Belvedere 5A Storm Pipe Exhibit) submitted
with insp. video files on flash drive hand -delivered to Engineering week of 29-Aug [ J. Taggart to J. Anderson].
Representative photos, 9/2/22