HomeMy WebLinkAboutWPO202200038 Calculations 2022-09-14 (20)1992 TEMPORARY SEDIMENT BASIN DESIGN DATA SHEET (with or without an emergency spillway) Project Breezy Hill Basin # 1 Location Total area draining to basin: 13.8 acres. Basin Volume Desien Wet Storage: 3.14 1. Minimum required volume = 67 cu. yds. x Total Drainage Area (acres). 67 cu. yds. x 13.8 acres = 925 cu. yds. 2. Available basin volume = 925 cu. yds. at elevation 374.98 . (From storage - elevation curve) 3. Excavate cu. yds. to obtain required volume*. * Elevation corresponding to required volume = invert of the dewatering orifice. 4. Available volume before cleanout required. 33 cu. yds. x 13.8 acres = 455 cu. yds. 5. Elevation corresponding to cleanout level = 372.99 (From Storage - Elevation Curve) 6. Distance from invert of the dewatering orifice to cleanout level = 1.99 ft. (Min. = 1.0 ft.) Dry Storage: 7. Minimum required volume = 67 cu. yds. x Total Drainage Area (acres). 67 cu. yds. x 13.8 acres = 925 cu. yds. 1992 3.14 8. Total available basin volume at crest of riser* = 1,849 cu. yds. at elevation 377.86 . (From Storage - Elevation Curve) * Minimum = 134 cu. yds./acre of total drainage area. 9. Diameter of dewatering orifice = 6 in. 10. Diameter of flexible tubing = 8 in. (diameter of dewatering orifice plus 2 inches). Preliminary Design Elevations, 11. Crest of Riser = 377.86 Top of Dam = 380 Design High Water = Upstream Toe of Dam = Basin Shane 378.17 370 12. Length of Flow L = Effective Width We If > 2, baffles are not required If < 2, baffles are required _ Runoff 13. Q2 = 19.37 cfs (From Chapter 5) 14. Q25 = 31.06 cfs (From Chapter 5) Principal SDillwav Design 15. With emergency spillway, required spillway capacity QP = Q2 = 19.37 cfs. (riser and barrel) Without emergency spillway, required spillway capacity QP = Q25 = cfs. (riser and barrel) 1992 3.14 16. With emergency spillway: Assumed available head (h) = 1.14 ft. (Using QZ) It = Crest of Emergency Spillway Elevation - Crest of Riser Elevation Without emergency spillway: Assumed available head (h) = ft. (Using Q25) h = Design High Water Elevation - Crest of Riser Elevation 17. Riser diameter (Dr) = 60 in. Actual head (h) = 1.14 ft. (From Plate 3.14-8.) Note: Avoid orifice flow conditions. 18. Barrel length (1) = 44 ft. Head (H) on barrel through embankment = 9 ft. (From Plate 3.14-7). 19. Barrel diameter = 24 in. (From Plate 3.14-B [concrete pipe] or Plate 3.14-A [corrugated pipe]). 20. Trash rack and anti -vortex device Diameter = 90 inches. Height = 29 inches. (From Table 3.14-D). Emergencv SDillwav Design 21. Required spillway capacity Qe = Qu - Qp = 11.69 cfs. 22. Bottom width (b) = 12 ft.; the slope of the exit channel (s) _ 3 ft./foot; and the minimum length of the exit channel (x) _ 51 ft. (From Table 3.14-C). 1992 3.14 Anti -Seep Collar Design 23. Depth of water at principal spillway crest (Y) _ _ ft. Slope of upstream face of embankment (Z) _ :1. Slope of principal spillway barrel (Sb) _ % Length of barrel in saturated zone (LS) = ft. 24. Number of collars required = dimensions = (from Plate 3.14-12). Final Design Elevations 25. Top of Dam = 380 Design High Water = 378.17 Emergency Spillway Crest = 379 Principal Spillway Crest = 377.86 Dewatering Orifice Invert = 374.98 Cleanout Elevation = 372.99 Elevation of Upstream Toe of Dam or Excavated Bottom of "Wet Storage Area" (if excavation was performed) = 370