Loading...
HomeMy WebLinkAboutWPO202200038 Calculations 2022-09-14 (21)1992 TEMPORARY SEDIMENT BASIN DESIGN DATA SHEET (with or without an emergency spillway) Project Breezy Hill Basin # 2 Location Total area draining to basin: 8.23 acres. Basin Volume Desien Wet Storage: 3.14 1. Minimum required volume = 67 cu. yds. x Total Drainage Area (acres). 67 cu. yds. x 8.23 acres = 551 cu. yds. 2. Available basin volume = 551 cu. yds. at elevation 348.30 (From storage - elevation curve) 3. Excavate cu. yds. to obtain required volume*. * Elevation corresponding to required volume = invert of the dewatering orifice. 4. Available volume before cleanout required. 33 cu. yds. x 8.23 acres = 272 cu. yds. 5. Elevation corresponding to cleanout level = 347.2 (From Storage - Elevation Curve) 6. Distance from invert of the dewatering orifice to cleanout level = 1.10 ft. (Min. = 1.0 ft.) Dry Storage: 7. Minimum required volume = 67 cu. yds. x Total Drainage Area (acres). 67 cu. yds. x 8.23 acres = 551 cu. yds. 1992 3.14 8. Total available basin volume at crest of riser* = 1,103 cu. yds. at elevation 350.19 . (From Storage - Elevation Curve) * Minimum = 134 cu. yds./acre of total drainage area. 9. Diameter of dewatering orifice = 4 in. 10. Diameter of flexible tubing = 6 in. (diameter of dewatering orifice plus 2 inches). Preliminary Design Elevations, 11. Crest of Riser = 350.00 Top of Dam = 353.00 Design High Water = _ Upstream Toe of Dam = Basin Shane 350.89 346.00 12. Length of Flow L = Effective Width We If > 2, baffles are not required If < 2, baffles are required _ Runoff 13. Q = 10.23 z cfs (From Chapter P 5 ) 14. Q = 16.65 zs cfs (From Chapter P 5 ) Principal SDillwav Design 15. With emergency spillway, required spillway capacity QP = Qz = cfs. (riser and barrel) Without emergency spillway, required spillway capacity QP = Q25 = 16.65 cfs. (riser and barrel) 1992 3.14 16. With emergency spillway: Assumed available head (h) = ft. (Using QZ) It = Crest of Emergency Spillway Elevation - Crest of Riser Elevation Without emergency spillway: Assumed available head (h) = 2.11 ft. (Using Q25) h = Design High Water Elevation - Crest of Riser Elevation 17. Riser diameter (Dr) = 36 in. Actual head (h) = 2.11 ft. (From Plate 3.14-8.) Note: Avoid orifice flow conditions. 18. Barrel length (1) = 70 ft. Head (H) on barrel through embankment = 13 ft. (From Plate 3.14-7). 19. Barrel diameter = 18 in. (From Plate 3.14-B [concrete pipe] or Plate 3.14-A [corrugated pipe]). 20. Trash rack and anti -vortex device Diameter = 54 inches. Height = 17 inches. (From Table 3.14-D). Emergencv SDillwav Design 21. Required spillway capacity Qe = Qu - Qp = cfs. 22. Bottom width (b) = ft.; the slope of the exit channel (s) _ ft./foot; and the minimum length of the exit channel (x) _ ft. (From Table 3.14-C). 1992 3.14 Anti -Seep Collar Design 23. Depth of water at principal spillway crest (Y) _ _ ft. Slope of upstream face of embankment (Z) _ :1. Slope of principal spillway barrel (Sb) _ % Length of barrel in saturated zone (LS) = ft. 24. Number of collars required = dimensions = (from Plate 3.14-12). Final Design Elevations 25. Top of Dam = 353.00 Design High Water = 350.89 Emergency Spillway Crest = N/A Principal Spillway Crest = 350.00 Dewatering Orifice Invert = 348.30 Cleanout Elevation = 347.2 Elevation of Upstream Toe of Dam or Excavated Bottom of "Wet Storage 340 Area" (if excavation was performed) _