Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP201300012 Application 2013-02-20
Albemarle Cot, t y Community Development Department 401■Pritlntire Road Charlottesville, VA 22902 -4596 t ' U Planning Application Voice : (434) 296 -5832 Fax : (434) 972 4126 (PARCEL / OWNER INFORMATION TMPI 076M1-00-00-002A0 I Owner(s): NEW ERA PROPERTIES LLC Application # SDP201300012 PROPERTY INFORMATION Legal Description ACREAGE Magisterial Dist. Scottsville Land Use Primary Forest Current AFD Not in A/F District Current Zoning Primary Planned Development Shopping Center APPLICATION INFORMATION Street Address Entered By Todd Shifflett Application Type Site Development Plans 102/20/2013 Project Fifth Street Station - Initial Received Date 02/19/13 Received Date Final I Submittal Date 02/19/13 Total Fees 7750 Closing File Date Submittal Date Final Total Paid 7750 Revision Number Comments Legal Ad SUB APPLICATION(s) Type Sub APPlicati Comment Initial Site Plan 02/19J13 (APPLICANT / CONTACT INFORMATION ContactType ( Name 1 Address I CityState Zip Phone PhoneCell a trwn 46 ei /Applit nt 1NEW ERA PROPERTIES LLC. p, BOX 17 .. a.. ........._ ....... ..................._.......a - Ch1ARL0!TTESVILL. � 22902 ' Primary Contact DANIEL R. HINES, P.E. 28 BLACKWELL PARK LANE WARRENTON, VA 20186 5403494500 Applicant DAN TUCKER, Si. . COLLINS ENTERPRISE 5B SOUTHWEST BROAD ST., FAIRBURN, GA 30213 7706928300 Signature of Contractor or Authorized Agent Date '.-Application for Pp `" z Initial Site Plan or Final Site Plan or Site Plan Exception Project Name: Fifth Street Station 0076M1- 00- 00- 002A0, 0076M1- 00- 00- 00280, Tax map and parcel(s): nnmM1 nn - nn - nnaan Zoning: PD -SC Contact Person (Who should we call /write concerning this project ?): Daniel R. Hines, P.E. Address 28 Blackwell Park Lane Ci Warrenton State VA Zi 20186 Daytime Phone (540) 349 -4500 Fax # (540) 349 -0321 E -mail dhines @bohlereng.com Owner of Record: New Fra Properties! 1 I C Address PO Box 1467 City Charlottesville State VA Zip 22902 Daytime Phone (434) 245 - 4932 Fax # (434) 245 -4909 E -mail alan.taylor©redlightmanagement.com Applicant (Who is the Contact person representing ?): Dan Tucker. S.J. Collins Enterprises, LLC Address 5B Southwest Broad St., Suite B city Fairburn State GA Zip 30213 Daytime Phone (770) 692 -8300 Fax # (434) 692 -8302 E -mail dan @sjcollinsent.com Type of Development ❑ Residential IQ Non - residential Type of unit(s): .l Commercial ❑ Industrial # of building(s): Cl Quasi - Public Sq. ft. of building(s): Sq. ft. of building(s): 470,000 sf # of units per building: 65.64 AC Acreage of site: Total # of units: Acreage in open space: 17.5 AC Resulting density: Acreage in roads: 4.64 AC Acreage of site: Average gallons of water used per day: 80,000 Gal Acreage in open space: Acreage in roads: Average gallons of water used per day: Intended use or justification for request: Shopping center use with associated parking and infrastructure. Bent Creek Parkway is also proposed to serve the development and link 5th Street to Avon Street. FOR OFFICE USE ONLY SDP # Fee Amount $ ' h 1 ./ Date Paid L I') f"-? By Wvho? 6- 5 C b1 tr 9 ec i # 1 ° 12 8 Ck# 3' By: County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 Revised 1/1/2013 Page 1 of 2 Comments /Attachments: FEES SITE DEVELOPMENT PLAN SITE PLAN EXCEPTION Initial Site Plan Final Site Plan Exception to drawing of site plan under section 32.3.5(a) Approved No Preapplication plan Preapplication plan ® $700 plus $15 /dwelling ❑ $1,200 plus $15 /dwelling Cl $1,500 ❑ $1,500 unit and/or $0.015 per unit and/or $0.015 per square foot of square foot of nonresidential structure nonresidential structure $7,750 nn $ 16 folded copies of the plan 2 folded copies of the plan in blue or black ink, and 8 folded copies of the plan plus an additional 6 copies if within an Entrance Corridor 1 reduced copy of the plan no larger than 11 by 17 in. ❑ The initial site plan has a parking structure. ❑ The final site plan has a parking ❑ Included are architectural elevations, drawings, structure. photographs or other visual materials showing any ❑ Included are revised architectural elevations, parking structure proposed on the site and surrounding drawings, photographs or other visual structures and land uses. materials submitted with the initial site plan. The elevations shall be part of the approved final site plan. GROUNDWATER ASSESSMENT (Required for all non - residential site plans not serviced by public water) ❑ If the plans show a use using less than 2,000 gallons /day (average) Tier 3 Groundwater Review = $510 ❑ If the plans show a use using greater than 2,000 gallons /day (average) Tier 4 Groundwater Review = $1,100 ❑ Relief from conditions of approval; modification or waiver of requirements = $425 Notices required by Section 32.4.2.1 (f) Preparing and mailing or delivering up to fifty (50) notices = $200.00 plus the actual cost of first class postage. Preparing and mailing or delivering, per notice more than fifty (50) = $1.00 plus the actual cost of first class postage. Owner /Applicant Must Read and Sign This site plan as submitted contains all of the information required by Section 32.5 (Initial Site Plan) or Section 32.6 (Final Site Plan) of Chapter 18 of the Code of the County of Albemarle. 1 understand that plans which lack information required by said sections shall be deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1 of Chapter 18 of the Code as the case may be. For Final Plans Only: To the best of my knowledge, 1 have complied with Section 32.4.3.1(a) of Chapter 18 of the Code. ❑ I am consenting to all correspondence from Albemarle County be in any of the following forms in writing, by first class mail, by personal delivery, by fax or, by email. ❑ 1 am not cons• sting to all orrespondence from Albemarle County in the form of fax or email. I , - Z /,1 /1_ cd Signature of Owner, Contract Purchaser, Agent Date Print Name Daytime phone number of Signatory Revised 1/1/2013 Page 2 of2 Ir itial Site Plan — Checklist Project Name: nth .�ta�GT SLAT +oN Firm: $0lil.Cit ENG1NE1rgiNG This checklist must be completed, signed and submitted with the application. The information contained in this checklist reflects the contents of the Section 32 of Chapter 18 of the Code of the County of Albemarle also known as the Site Plan Ordinance as of January 1, 2013. The applicant is responsible for insuring that no revisions to the Ordinance have occurred since preparation of this document. Plans which lack the information required by this checklist shall be deemed to be incomplete and shall be denied by the agent with ten (10) calendar days after the applicable submittal deadline [Section 32.4.21. An Initial Site Plan shall contain the following: • [32.5.1 a] Number of copies. 1. Sixteen (16) clearly legible copies in blue or black ink of the plan shall be submitted. • [32.5.2 lb] Scale and size. 2' The plan shall be prepared to the scale of one (1) inch equals twenty (20) feet or to another scale approved by the agent in a particular case. No sheet shall exceed forty-two (42) inches by thirty-six (36) inches in size. [11' The plan may be prepared on one (1) or more sheets. If prepared on more than one (1) sheet, match lines shall clearly indicate where the several sheets join. CSI' The top of the sheet shall be approximately either north or east. a [32.5.1c] Dimensions. g The plan shall be dimensioned to at least the following standards for accuracy: Cif Boundary, setback and zoning lines: One foot in one thousand (1:1,000) feet. 0" Existing contours: One -half (1/2) of the contour interval required in section 32.5.2(d). L Proposed contours: Within five (5) feet horizontally and vertically. L ' Existing structures, utilities and other topographic features: Within five (5) feet. Proposed structures, roads, parking lots and other improvements: Within five (5) feet. C'I' [32.5.2 a] General information. d The name of the development; 0' names of the owner, 0' developer and individual who prepared the plan; d tax map and parcel number; 0' boundary dimensions; 0' zoning district; 0' descriptions of all proffers, special use permits and conditions thereof, special exceptions and conditions thereof, variances and conditions thereof, application plans, codes of development and bonus factors applicable to the site; • magisterial district; Gif county and state; 0' north point; 2' scale; one datum reference for elevation (where section 30.3, flood hazard overlay district, is involved, United States Geological Survey vertical datum shall be shown and /or correlated to plan topography); d the source of the topography; 0' departing lot lines; 2 minimum setback lines, yard and building separation requirements; CSI' the source of the survey; d sheet number and total number of sheets; and 0' the names of the owners, zoning district, tax map and parcel numbers and present uses of abutting parcels. County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 Revised 1/1/2013 Page 1 of 4 County of Albemarle - Initial Site Plan Checklist [32.5.2 b] Information regarding the proposed use. a' Written schedules or data as necessary to demonstrate that the site can accommodate 0' the proposed uses, 0' including proposed uses and maximum acreage occupied by each use; 2' maximum number of dwelling units by type including the number of bedrooms for multifamily dwellings; j gross residential density; % square footage of recreational areas; 0' the percentage and acreage of open space; Q' maximum square footage for commercial and industrial uses; G3' maximum floor area ratio and lot coverage for industrial use 0' maximum height of all structures; 4 schedule of parking including the maximum amount required and the amount provided; 2' the maximum amount of impervious cover on the site; and Gd' if a landscape plan is required, the maximum amount of paved parking and other vehicular circulation areas. C# [32.5.2 c] Phase lines. 0 If phasing is planned, phase lines and the proposed timing of development. g [32.5.2 d] Topography and proposed grading. Q Existing topography (up to twenty [20] percent slope, maximum five [5] foot contours, over twenty [20] percent slope, maximum ten [ 10] foot contours) for the entire site with sufficient offsite topography to describe prominent and pertinent offsite features and physical characteristics, but in no case less than fifty (50) feet outside of the site unless otherwise approved by the agent; Gi proposed grading (maximum five [5] foot contours) supplemented where necessary by spot elevations; 0' areas of the site where existing slopes are critical slopes. Cl [32.5.2 e] Landscape features. L The existing landscape features as described in section 32.7.9.4(c). [32.5.2 Watercourses and other bodies of water. 0' The name and location of all watercourses and other bodies of water adjacent to or on the site; U indicate whether the site is located within the watershed of a public water supply reservoir. Cl [32.5.2 g] Onsite sewage system setback lines. 0` The location of onsite sewage system setback lines from watercourses including intermittent streams and other bodies of water. 0' [32.5.2 h] Flood plain. 0' The one hundred year flood plain limits as shown on the official flood insurance maps for Albemarle County. 3' [32.5.2 iJ Streets, easements and travelways. Car The existing and proposed streets, including C9' proposed bike lanes, 0 access easements, L alley easements and rights -of -way, and travelways, L together with street names, r3' state route numbers, Oa right -of -way lines and widths, 0" centerline radii and pavement widths. Revised 1/1/2013 Page 2 of 4 • County of Albemarle - Initial Site Plan Checklist C3' [32.5.2 jJ Existing sewer and drainer facilities. C3' The location and size of 2' existing water and sewer facilities and easements, C3' the storm drainage system, 0' ' drainage channels, and C3 drainage easements. C4 [32.5.2 k] Proposed sewer and drainage facilities. 21 The proposed conceptual layout for C� water and sewer facilities and C/ the storm drainage system, indicating the direction of flow in all pipes and watercourses with arrows. Q [32.5.2 IJ Existing and proposed utilities. a The location of other existing and proposed utilities and utility easements, 2' including existing telephone, C?' cable, IY electric and CY gas easements. C3' [3 2.5.2 n1J Ingress and egress. a The location of existing and proposed ingress to and egress from the property, C3' Show the distance to the centerline of the nearest existing street intersection from the proposed ingress and egress. '' [32.5.2 n] Existing and proposed improvements. C3 The location and dimensions of all existing and proposed improvements including C9' buildings (maximum footprint and height) and other structures; lar walkways; Ca' fences; C/ walls; C3' trash containers; 2 outdoor lighting; C3' landscaped areas and open space; a recreational areas and facilities; a parking lots and other paved areas; 1 ' loading and service areas; '' signs; and '' the proposed paving material types for all walks, parking lots and driveways. 0' [3 2.5.2 of Areas to be dedicated or reserved. ❑ All areas intended to be dedicated or reserved for public use under sections 32.7.1.1, 32.7.1.2 and 32.7.1.3, and L' shall include a note on the plan stating that the land is to be dedicated or reserved for public use. Cif [32.5.2 pJ Landscape plan. Er A landscape plan that complies with section 32.7.9, if it is required to be submitted with the initial site plan. C7 /32.5.2 qJ Traffic generation figures. a If deemed appropriate by the agent due to the intensity of the development, estimated traffic generation figures for the site based on current Virginia Department of Transportation rates; 2 indicate the estimated number of vehicles per day and the direction of travel for all connections from the site to a public street. C3 [32.5.2 rJ Symbols and abbreviations. C3' A legend showing all symbols and abbreviations used on the plan. [32.5.2 s] Additional information. C' The agent may require additional information to be shown on the initial site plan as deemed necessary to provide sufficient information for the agent and the site review committee to adequately review the plan. Revised 1/1/2013 Page 3 of4 County of Albemarle - Initial Site Plan Checklist Grading Permit Requirements — If you will be looking to obtain a grading permit and the initial plan is approved and you have satisfied the conditions of approval identified by the agent in the letter required by section 32.4.2.5(c) then a separate Water Protection Ordinance Application for an Erosion and Sediment Control Plan must be submitted for review and approval In addition to the items required by the ordinance, Albemarle County Engineer, Groundwater Program Authority, the Virginia Department of Transportation, the Albemarle County Service Authority, and the Thomas Jefferson Health District require these items on plans submitted for initial approval. Plans will not be rejected if these items are not present, but they are required for approval. These items are provided in an effort to communicate all initial comments. Cdr 1. Reference the benchmarks used for surveys. (Albemarle County Engineering Policy) a 2. Indicate the available sight distance for entrances and left turn lanes. (Albemarle County Engineering Policy) Ue 3. Label the maximum height of all retaining walls. (Albemarle County Engineering Policy) Cl 4. Provide copies of off -site easements, or letters of intent to grant them from off -site property owners. (Albemarle 4.1 County Engineering Policy) 5. Show and label stream buffer limits. (WRPA Ordinance) GY 6. Indicate the deed book and page reference for all existing utility easements located on the property. (Albemarle County Service Authority) ❑ 7. Tier 3 - Draft Groundwater Management Plan (17 -403) Nl.4 ❑ 8. Tier 4 — Aquifer testing work plan (17 N/A Read and Sign In representing the above referenced firm submitting this plan for initial approval, I hereby sate that, to the best of my knowledge, the attaches :. contains all inf* ation required by this checklist. IP/ sl Z1 ?/3 • ature o Owner, Contract Purchaser, / gent Dat 1�IitJIEL l�. f41N &S r f�C 5110 - 34 /S00 Print Name Daytime phone number of Signatory PROvecr / j�Dttlx r/VG{Na721 J[__ Revised I/1/2013 Page 4 of 4 3 Blackwell Park Lane, Suite 201 B O H L.,.. R �' Warrenton, VA 20186 LE PHONE 540.349.4500 E N G I N E E R I N G FAX 540.349.0321 February 19, 2013 Via Hand Delivery County of Albemarle Department of Community Development 401 Mclntire Road, North Wing Charlottesville, VA 22902 -4596 Attn: Megan Yaniglos Re: Pre - Application Plan 1 Review Comments SDP -2013 -003 5 Street Station 5th Street SW & Avon Street Ext. Charlottesville, VA 22902 Albemarle County BE # V 1 22001 Dear Ms. Yaniglos: Bohler Engineering is pleased to submit on behalf of S.J. Collins, the Initial Site Plan for 5 Street Station in Charlottesville, VA. The following is our comment response letter addressing comments received from Megan Yaniglos dated January 17, 2013. Each comment is addressed and responded to as follows: Comment 1: [Proffer #8] — Submit a Landfill Work Plan to DEQ. Provide the County a copy of both the submitted and approved Landfill Work Plan, as a condition of approval of the initial site plan. Also, the grading permits may be issued pending the completion of the work described within the Landfill Work Plan. If early grading is sought, Zoning will determine how much work will need to be completed from the Work Plan prior to issuing grading permit. Response 1: A Landfill Work Plan was recently submitted to the County for our review by Draper Aden & Associates. Comment 2: [32.5.2(n)] Existing and proposed improvements. Show the greenway trail that was shown on the application plan Also, provide the overall square footage of recreational areas, percentage and acreage of all open space. Response 2: Per approved Proffer # 3, the Owner will make a $250,000 contribution to the County. The County will be responsible for the construction and layout of the greenway trail, as well as putting together a master plan for the development and constructing the park and bike pedestrian system. At this time, the overall square footage of recreational areas is unknown. Please refer to the Zoning and Site Tabulations for the percentage and acreage of all open space 011 site. Comment 3: [32.5.2(b)] Inforvnutlon reg‘trIirrg /he proposed use. Break dogs n the schedule of parking, show the amount required s s provided. Also. include how man. loaLlino and handicap spaces are being prosidcd. OTHER OFFICE LOCATIONS: • Southborough, MA • Albany, NY • Ronkonkoma, NY • Warren, NJ • Center Valley, PA • Chalfont, PA 508.480.9900 518.438.9900 631.738.1200 908.668.8300 610.709.9971 215.996.9100 • Philadelphia, PA • Towson, MD • Bowie, MD • Sterling, VA • Fort Lauderdate, FL • Tampa, FL 267.402.3400 410.821.7900 301.809.4500 703.709.9500 954.202.7000 813.379.4100 CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS www.BohlerEngineering.com BOH LER Megan Yaniglos E N G I N E E R I N G 5` Street Station Initial Site Plan - I" Submission 2/19/13 Page 2 of 4 Response 3: Parking tabulations have been provided in the Zoning and Site Tabulations shown on Sheet 3 and includes the parking spaces required versus the amount provided. The number of handicap spaces and loading spaces are also provided. Comment 4: [32.5.2(s)] Acid/tie/7u/ in/or/nation. Please label existing 100' WPO buffer for Moore's Creek. Response 4: The existing 100' WPO buffer for Moore's Creek has been labeled on Sheets 5A -- 5J. Comment 5: [32.5.2(n)] Existing and proposed improvements. Please include safety railing or guardrail for all retaining walls of height greater than 4'. Response 5: Safety railing and /or guardrail for all retaining walls taller than 4' have been provided. Please see Sheets 8A — 8J & 9A — 9J. Comment 6: [32.5.2(k)] Proposed sewer and drainage facilities. Please label all proposed drainage and stormwater management access easements. Response 6: All proposed drainage and stormwater management access easements have been labeled. Please see Sheet 9A — 9J & 10A — 10J. Comment 7: [32.5.2(s)] Additional information. Please label intersection sight distance lines at all proposed road intersections. Response 7: Sight distance lines have been provided and labeled at all proposed road intersections. Please see Sheet I IA — 11K. Comment 8: [32.5.2(s)] Additional information. Please label proposed road horizontal curve radii for all proposed roads including Bent Creek Parkway. Response 8: All proposed road horizontal curve radii have been labeled. Please see Sheets 8A — 8J. Comment 9: [32.5.2(i)] Streets, easements, and travelways. Please label proposed access road widths and entrance radii and sidewalk widths. Response 9: All proposed access road widths, entrance radii, and sidewalk widths have been labeled. Please see Sheets 8A — 8J. Comment 10: [32.5.2(s)] Additional information. Please include Albemarle County general construction notes. Response 10: Albemarle County general construction notes have been added to Sheet 3. Comment 11: [32.5.2(k)] Proposed sc'u'er and drainage facilities. Please include all proposed pipe diameters or a statement indicating minimum proposed pipe diameter shall be I S'. Response 11: Proposed pipe diameters have been added to the plan on Sheet I — 101. Comment 12: [32.5.2(r)1 Symbols' and abbreviations. Provide a legend for all the sN ntbols. "There are some that are missing. buy some of the buildings labeled restaurants. on sheet i' and 9. appearing that there are patios. but it is unclear of N\ hat the hatching there is shoeing. Response 12: Legends have been prop ided for all the symbols including, hatching. Please see Sheet 2. CIVIL AND CONSULTING ENGINEERS • SURVEYORS • PROJECT MANAGERS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS BOH LER `' Megan vaniglos E N G I N E E R I N G 5 Street Station Initial Site Plan - I'` Submission 2/19/13 Page 3 of 4 Comment 13: [32.5.2(1)] Existing WO proposed utilities. Show the proposed easements across public right of ways /within the right of way. Response 13: Proposed easements have been shown across public right -of -way and /or within the right - of -way on Sheets 10A — 10J. Comment 14: [ 32.5.2(n)] Existing and proposed improvements. a. Show the location and dimensions of all the walkways. Some dimensions are missing for the walkways in front of buildings, be sure all dimensions are shown on all sheet. b. Dimension out the maximum height for all of the proposed retaining walls. c. Provide a typical enclosure detail for all the dumpster locations. Response 14: a. The location and dimensions of all the walkways and sidewalks have been shown on Sheets 8A — 8J. b. The maximum height for all proposed retaining walls have been dimensioned on Sheets 8A — 8J. c. A typical enclosure detail has been added to Sheet 3 for all dumpster locations. Comment 15: [32.4.2(b)] The special use permit for Fill in the Floodplain (SP2012 -029) is currently under review. This permit will need to be approved before the initial site plan can be approved. Response 15: Noted. The SUP is on the March 6 Board of Supervisors agenda. We anticipate approval prior to Initial Site Plan approval. Comment 16: [Proffer #9] If early grading will be sought, a Water Protection Ordinance plan and application will need to be submitted and approved. Also, Proffer #9 will require a Phase I Historic Resources Survey before commencing land disturbance. Response 16: Acknowledged. Comment 17: [Proffer #3] Show the Passive Open Space and Trailhead Park on the initial plans. Response 17: Per approved Proffer #3, the Owner will make a $250,000 cash contribution to the County for the purpose of funding a Master Plan for the development of the greenway park and bike pedestrian system and also the construction of this system by the County. The Passive Open Space and Trailhead Park will be coordinated at another time with the County. Comment 18: [Proffer #5] Change " - Free Preservation" to "Tree Conservation` Pro\ ide a forest stewardship plan in accordance with this proffer. Response 18: 'free Preservation plan has been changes to -- Free Conservation" Plan to be in accordance with Proffer #5. Comment 19: [Proffer #10(D)] Provide a description of the proposed use of Rainfall l lar\ esting for the property. Response 19: A Rainfall harvesting narrative has been prepared and provided on Sheet 2 which provides a description for the proposed use of the collected rainfall. CIVIL AND CONSULTING ENGINEERS • SURVEYORS • PROJECT MANAGERS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS BOH LER `' Novo ale an vaniglo E N G I N E E R I N G 5- Street Station Initial Site flan - I '` Subntis ion Pa <fe 4 or 4 Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at (540) 349-4500. Sincerely, Bohler ne r' el 1 Daniel R. Hines, P.E. cc: Dan Tucker, S.J. Collins DRII /ly 1- 1:\ 12\ V122001 \Permitting\Jurisdictional Letters \Pre - Application 1st Review Comments \130219 Pre - Application Plan 1st Review CRL doc CIVIL AND CONSULTING ENGINEERS • SURVEYORS • PROJECT MANAGERS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS