HomeMy WebLinkAboutARB201300092 Application 2013-07-08 Albemarle Cotir y Community Development Department
401 Itlier6tire Road Charlottesville, VA 229024596
d. Planning Application Voice : (434) 296-5832 Fax : (434) 972-4126
PARCEL / OWNER INFORMATION
TMPI 04500 -00 -00 -10080 1 Owner(s):
GREEN, CLARENCE WILLIAM
Application # ARB201300092
PROPERTY INFORMATION
Legal Description ACREAGE
Magisterial Dist. Rio Land Use Primary Commercial
Current AFD Not in A/F District Current Zoning Primary C1 Commercial
APPLICATION INFORMATION
Street Address 660 RIO RD W CHARLOTTESVILLE, 22901 Entered By
Todd Shiflett
Application Type Architectural Review Board 107/08/2013
Project Cole's Import Specialists - Initial
Received Date 07/08/13 Received Date Final I Submittal Date 07/08/13 Total Fees
Closing File Date Submittal Date Final Total Paid
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type 1 Sub Applicati Comment
Initial Site Plan 07/08/13 s
(APPLICANT / CONTACT INFORMATION
ContactType 1 Name Address 1 CityState 1 Zip J Phone PhoneCell
Owner /Applicant ;GREEN, CLARENCE WILLIAM ; 300 CAMELLIA DRIVE . CHARLOTTESVILL 22903 -42
Primary Contact TIM MILLER 1413 SACHEM PLACE, STE 1 CHARLOTTESVILL 22901 4348820121
Signature of Contractor or Authorized Agent Date
v v+ o-F ca c 60 eS
e ,L 1/ 17 27
w \
NNW "ONO
Architectural Review Board Application
ot
U.04
/.
Part A: Applicant, Contact and Parcel Information
Project Name: L"� J 'r(( �'
Tax map and parcel(s): 1 60 `7 Physical Street Address: 6L 6 ZiN3 V) V
Contact Person: (, Ge?
Business Name: 1 t. ' � o
Address 25 ( r t. Lt (C 2 City l V 31 E State Zip2Z9f) I
Daytime Phone 4✓4 D(, `Z 7V 2 —Fax # ( ) E -mail (C{,k'6 (�' }pi /�l ( cc -4
Owner of Record: jj"
Address ( T -.1 C1 r 6 L'v t ,L U∎ ` State ' " Zip
— L', � ``
Daytime Phone ( � Si � "��� Fax # ( ) 2�„C..4` n� �` E -mail j n �N
� '' " ��C 1.[ yM`)
Part B: Review Type and Fee
Select review type
Review by the Architectural Review Board
Conceptual Plan /Advisory Review (for a Special Use Permit or a Rezoning) No Fee
r Preliminary Review of a Site Development Plan No Fee
Final Review of a Site Development Plan $1000.00
Amendment to an approved Certificate of Appropriateness $ 225.00
Building Permit Review $ 590.00
County -wide Certificate of Appropriateness
Structures 750' or more from the EC, no taller than 5 stories No Fee
Structures located behind a structure that fronts the EC No Fee
Personal wireless service facilities No Fee
Fencing or Equipment or Lighting No Fee
Additions to ARB- approved buildings No Fee
Minor amendments to site or architectural plans No Fee
Building permits where the change is 50% or less of the altered elevation No Fee
NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS.
FOR OFFICE USE ONLY BP# ARB#
Fee Amount $ Date Paid By who? Receipt # Check # By
County of Albemarle Dept of Community Development, 401 McIntire Rd, Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126
11/2010 Page 1 of 2
OVER —.
Part C: Description of Proposal
Describe your proposal. Attach a separate sheet if necessary.
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted. Only
(1) set of building material samples is required. All submittal items, including building material samples,
become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all
submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this
application. *See submittal requirements below. I also certify that the information provided on this application
and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached
plans contain all information required by the appropriate checklist.
t - �. 4(■(< ,� —7 / / 1___3
Signature of owner, owner's repre entative Date
or contract purchaser
4)1 1 s " L 2D 9 — E /3 --/p ct
Printed name, Title M 46/\_ „ic 0c- Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
• If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
• If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency. Attach the owner's written consent.
11/2010 Page 2 of 2
OVER —>
Nor "war
6 ,� ;. - Architectural Review Board
Y
`' ;
1 ir. }`
Concept 'Ian/Ad'tary w list
riAlita
Submittal Requirements Check
[rtA: Applicant Contact and Parcel Information
Project name: 2- °f ('" G'G
Tax map and parcel t: t +5 r l d Q R
Street address /location: 6 (p �( C) +-Z d N v -f- j '1k4 v )i U
Location of property (landmarks, intersections, or other): `ZSt -S f Q ' D "0 <s r-, 9f- : Z-1 41)
Part B: Advisory Review Requirements Checklist c,*,' 6
Submittal packages must contain (8) collated copies of all information unless otherwise
indicated.
A. Written description of the proposal
Ei Provide a general description of all proposed work.
Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Sketch plan showing the following (drawn to the scale of 1 " =20; clearly legible and folded):
n Location(s) of proposed building(s) on the site.
❑ Schematic layout of parking, travelways, and other improvements.
❑ Location of existing and proposed tree lines. Individually identify trees of 6 -inch caliper or greater.
❑ Existing and proposed topography and conceptual grading drawn with contour intervals of 5 -feet or
Tess, and with sufficient offsite topography to describe prominent and pertinent off -site features and
physical characteristics, but in no case less than 50 -feet outside of the site.
[ Sheet number, total number of sheets, date of the drawings, date and description of the latest
revision, and contact information for the firm preparing the drawings in the title block on all drawings.
C. Appearance of the proposed building(s)
igi Show a representation of the appearance of the proposed building(s). This may include architectural
elevations, perspective sketches, or photos of the proposed building(s). These documents should
provide a basic understanding of:
The size, form and scale of the building.
[,f,The architectural style of the building.
LI The proposed building materials and color(s).
D. Additional material
O Provide labeled, color, 8 -W x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
❑ The applicant is welcome to submit any additional material that will make the conceptual review more
productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping,
or other unique or unusual conditions are welcome.
1
Revised 7128110
Part C: Applicant Agreement van__ _._—_
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files.
• All information in this checklist is required, unless specifically waived by the ARB, prior to processing •
an advisory or concept plan review by the ARB. Additional submittal materials may be required,
depending on the proposal.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, t hereby state that the
information provided on this application, and all accompanying information, is accurate, true and correct
to the best of my knowledge, and that the attached plans contain all information required by this checklist.
J$/_/3
Signature of person completing checklist Date
. . +N vn <Ala c 3 (6 C)
Printed Name / Title le.sS . Daytime phone number of Signatory
4-41 County of Albemarle Department of Planning and Community Development
401 McIntire Road. Charlottesville, VA 22902 -4596
(434) 296 -5832 Tel, (434) 972 -4126 Fax
YJ1Y�Y 31f)C 11ilfIE; O(Cj
2
Revised 7/28/10