Loading...
HomeMy WebLinkAboutARB201300092 Application 2013-07-08 Albemarle Cotir y Community Development Department 401 Itlier6tire Road Charlottesville, VA 229024596 d. Planning Application Voice : (434) 296-5832 Fax : (434) 972-4126 PARCEL / OWNER INFORMATION TMPI 04500 -00 -00 -10080 1 Owner(s): GREEN, CLARENCE WILLIAM Application # ARB201300092 PROPERTY INFORMATION Legal Description ACREAGE Magisterial Dist. Rio Land Use Primary Commercial Current AFD Not in A/F District Current Zoning Primary C1 Commercial APPLICATION INFORMATION Street Address 660 RIO RD W CHARLOTTESVILLE, 22901 Entered By Todd Shiflett Application Type Architectural Review Board 107/08/2013 Project Cole's Import Specialists - Initial Received Date 07/08/13 Received Date Final I Submittal Date 07/08/13 Total Fees Closing File Date Submittal Date Final Total Paid Revision Number Comments Legal Ad SUB APPLICATION(s) Type 1 Sub Applicati Comment Initial Site Plan 07/08/13 s (APPLICANT / CONTACT INFORMATION ContactType 1 Name Address 1 CityState 1 Zip J Phone PhoneCell Owner /Applicant ;GREEN, CLARENCE WILLIAM ; 300 CAMELLIA DRIVE . CHARLOTTESVILL 22903 -42 Primary Contact TIM MILLER 1413 SACHEM PLACE, STE 1 CHARLOTTESVILL 22901 4348820121 Signature of Contractor or Authorized Agent Date v v+ o-F ca c 60 eS e ,L 1/ 17 27 w \ NNW "ONO Architectural Review Board Application ot U.04 /. Part A: Applicant, Contact and Parcel Information Project Name: L"� J 'r(( �' Tax map and parcel(s): 1 60 `7 Physical Street Address: 6L 6 ZiN3 V) V Contact Person: (, Ge? Business Name: 1 t. ' � o Address 25 ( r t. Lt (C 2 City l V 31 E State Zip2Z9f) I Daytime Phone 4✓4 D(, `Z 7V 2 —Fax # ( ) E -mail (C{,k'6 (�' }pi /�l ( cc -4 Owner of Record: jj" Address ( T -.1 C1 r 6 L'v t ,L U∎ ` State ' " Zip — L', � `` Daytime Phone ( � Si � "��� Fax # ( ) 2�„C..4` n� �` E -mail j n �N � '' " ��C 1.[ yM`) Part B: Review Type and Fee Select review type Review by the Architectural Review Board Conceptual Plan /Advisory Review (for a Special Use Permit or a Rezoning) No Fee r Preliminary Review of a Site Development Plan No Fee Final Review of a Site Development Plan $1000.00 Amendment to an approved Certificate of Appropriateness $ 225.00 Building Permit Review $ 590.00 County -wide Certificate of Appropriateness Structures 750' or more from the EC, no taller than 5 stories No Fee Structures located behind a structure that fronts the EC No Fee Personal wireless service facilities No Fee Fencing or Equipment or Lighting No Fee Additions to ARB- approved buildings No Fee Minor amendments to site or architectural plans No Fee Building permits where the change is 50% or less of the altered elevation No Fee NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS. FOR OFFICE USE ONLY BP# ARB# Fee Amount $ Date Paid By who? Receipt # Check # By County of Albemarle Dept of Community Development, 401 McIntire Rd, Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 11/2010 Page 1 of 2 OVER —. Part C: Description of Proposal Describe your proposal. Attach a separate sheet if necessary. Part D: Applicant Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist, completed, signed, and included with the required submittal materials indicated on the checklist. I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. *See submittal requirements below. I also certify that the information provided on this application and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached plans contain all information required by the appropriate checklist. t - �. 4(■(< ,� —7 / / 1___3 Signature of owner, owner's repre entative Date or contract purchaser 4)1 1 s " L 2D 9 — E /3 --/p ct Printed name, Title M 46/\_ „ic 0c- Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of legal entity or organization including, but not limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious name, a document acceptable to the County must be submitted certifying that the person signing above has the authority to do so. • If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. • If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scope of the agency. Attach the owner's written consent. 11/2010 Page 2 of 2 OVER —> Nor "war 6 ,� ;. - Architectural Review Board Y `' ; 1 ir. }` Concept 'Ian/Ad'tary w list riAlita Submittal Requirements Check [rtA: Applicant Contact and Parcel Information Project name: 2- °f ('" G'G Tax map and parcel t: t +5 r l d Q R Street address /location: 6 (p �( C) +-Z d N v -f- j '1k4 v )i U Location of property (landmarks, intersections, or other): `ZSt -S f Q ' D "0 <s r-, 9f- : Z-1 41) Part B: Advisory Review Requirements Checklist c,*,' 6 Submittal packages must contain (8) collated copies of all information unless otherwise indicated. A. Written description of the proposal Ei Provide a general description of all proposed work. Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. Sketch plan showing the following (drawn to the scale of 1 " =20; clearly legible and folded): n Location(s) of proposed building(s) on the site. ❑ Schematic layout of parking, travelways, and other improvements. ❑ Location of existing and proposed tree lines. Individually identify trees of 6 -inch caliper or greater. ❑ Existing and proposed topography and conceptual grading drawn with contour intervals of 5 -feet or Tess, and with sufficient offsite topography to describe prominent and pertinent off -site features and physical characteristics, but in no case less than 50 -feet outside of the site. [ Sheet number, total number of sheets, date of the drawings, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. C. Appearance of the proposed building(s) igi Show a representation of the appearance of the proposed building(s). This may include architectural elevations, perspective sketches, or photos of the proposed building(s). These documents should provide a basic understanding of: The size, form and scale of the building. [,f,The architectural style of the building. LI The proposed building materials and color(s). D. Additional material O Provide labeled, color, 8 -W x 11" photographs of the site as seen from both directions on the Entrance Corridor. ❑ The applicant is welcome to submit any additional material that will make the conceptual review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. 1 Revised 7128110 Part C: Applicant Agreement van__ _._—_ Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • All information in this checklist is required, unless specifically waived by the ARB, prior to processing • an advisory or concept plan review by the ARB. Additional submittal materials may be required, depending on the proposal. • Only complete application packages will be scheduled for ARB review. The application package is not complete without this checklist, completed, signed, and included with the required submittal materials indicated on the checklist. In representing the above referenced firm submitting this application for review, t hereby state that the information provided on this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. J$/_/3 Signature of person completing checklist Date . . +N vn <Ala c 3 (6 C) Printed Name / Title le.sS . Daytime phone number of Signatory 4-41 County of Albemarle Department of Planning and Community Development 401 McIntire Road. Charlottesville, VA 22902 -4596 (434) 296 -5832 Tel, (434) 972 -4126 Fax YJ1Y�Y 31f)C 11ilfIE; O(Cj 2 Revised 7/28/10