COUNTY OF ALBEMARLE
Dept. of Planning & Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
(804) 296-5823
March 20, 1996
Steve Melton
Post Office Box 8147
Charlottesville, Virginia 22906
RE: SDP 95-115 - Montessori School Preliminary Site Plan
Dear Mr. Melton:
The above-referenced preliminary site plan dated 12/11/95 and revised through 2/29/96 has been
reviewed and is administratively approved. Please note that this approval is subject to the
following conditions:
1. The Planning Department shall not accept submittal of the final site plan for signature
until tentative approvals for the following conditions are obtained. The final plat shall
not be signed until the following conditions are met:
a. Albemarle County Engineering and Planning Dept. approval of entrance design.
b. Albemarle County Engineering approval of grading and drainage plans and
computations.
c. Planning Dept. approval of subdivision plat to modify property lines as shown
on site plan.
d. VDOT approval of road plans and drainage computations.
e. Albemarle County Engineering approval of an Erosion and Sediment Control
Plan.
f. Albemarle County Engineering approval of detention plans and computations.
g. Albemarle County Service Authority approval of final construction drawings for
the water and sewer extensions.
h. Inspections Dept. and Fire/Rescue Division approval that adequate fireflow is
available. Required fireflow is 1,400 gpm @ 20psi;
i. Planning Dept. approval of landscape plan.
•
Page 2
March 20, 1996
In order to be eligible for administrative approval by the agent, a final site development plan
shall be submitted on a submittal deadline with the appropriate fee within six (6) months of the
approval of the preliminary plan. In any case, the final site development plan shall be
submitted within one (1) year of the approval of the preliminary plan or the approval shall
expire. If the final plan is submitted after six (6) months, but within one (1) year, adjacent
owners will be renotified and the plan will be reviewed through the Site Review Committee
and, if necessary, the Planning Commission.
During the above time period, the applicant shall work to satisfy the conditions of preliminary
site development plan approval. The applicant shall have the appropriate agency notify this
Department in writing that the applicable conditions have been met.
To obtain tentative approvals for the final site development plan from the agencies represented
on the Site Review Committee, the applicant shall submit the appropriate plans and materials
to each agency, individually, for their review. Please note that a separate submission to the
Engineering Department for review of the Erosion Control Plan is necessary.
Once the plans have been tentatively approved by each agency, the final plan shall be
submitted to this Department, as stated above. The final plan mylar can be signed at the
scheduled Site Review Meeting if after staff review, the final plan meets all ordinances and
conditions of approval.
If you should have any questions regarding this action, please do not hesitate to contact me.
Sincerely,
Claudia L. Paine
Senior Planner