Loading...
HomeMy WebLinkAboutSDP202200052 Approval - County 2022-09-16County of Albemarle _ Community Development Department Memorandum To: Jessica Denko, lessica.denko(aitimmons.com Date: September 16, 2022 Re: SDP202200052 Berkmar Self Storage - Initial Site Plan — Review Comments Ben Holt Senior Planner, Planning bholt(rDalbemarle. org Telephone: (434) 296-5832 ext. 3443 The Agent for the Board of Supervisors hereby grants administrative approval to the initial site plan. All comments in the attached letter must be addressed prior to Final Site Plan approval. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan. In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following approvals are received: 1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of all easements for facilities for stormwater management and drainage control. The Final Site Plan must satisfy all requirements of section 32.6 of Chapter 18 of the County Code. Fees for the Final Site Plan are required prior to review. Digital plan applications may be submitted on the County website. Albemarle County Planning Services (Planner) — Ben Holt, bholt(a2albemarle.org [32.5.2.13, 4.12.6] — Parking. Hotel use does not meet parking requirement with 92 required spaces and 83 spaces provided. If the 9 overflow spaces located east of the proposed boundary line are intended for hotel use, an easement or boundary adjustment will be required. [ZMA2016-9] — Proffer items 1.0 and 9. Cemetery treatment. Staff has confirmed presence of at least one burial site on the property. Prior to approval of final site plan, the owner shall delineate boundaries of cemetery and submit a treatment plan for County approval. Cemetery area shall be cleared by hand and the location preserved with protective fencing or the burial site shall be relocated in accordance with State laws of Virginia. Please contact Ben Holt in the Planning Division by using bholt(a)albemarle.org or 434-296-5832 ext. 3443 for further information. Comments from Other Reviewers: Albemarle County Engineering Division — John Anderson, landerson2oalbemarle.org — requested changes, attached Albemarle County E911 Services — Andy Slack, aslackCDalbemarle.org — no objection Albemarle County Building Inspections — Betty Slough, bsloughoalbemarle.org — pending, comments will be forwarded upon receipt Albemarle County Department of Fire & Rescue — Howard Lagomarsino, hlagomarsinooalbemarle.org — requested changes, attached WWW.ALBEMARLE.ORG 401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579 Albemarle County Service Authority (ACSA) — Richard Nelson, rnelsonna.serviceauthority.org — recommendation attached Rivanna Water & Sewer Authority (RWSA) — Dyon Vega, dvega(cDrivanna.org — requested changes, attached Virginia Department of Transportation (VDOT) — Doug McAvoy, douglas.mcavoV(a_vdot.virginia.gov - requested changes, attached Albemarle County Planning — Transportation — Alberic Karina-Plun, akplunoalbemarle.org — requested changes, attached Virginia Department of Health (VDH) — Alan Mazurowski, alan.mazurowskiovdh.virginia.gov — no objection WWW.ALBEMARLE.ORG 401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579 qoa nt 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 o County of Albemarle � � Telephone:434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG Site Plan review Project title: Berkmar Self Storage —Initial Project file number: SDP2022-00052 Plan preparer: Jessica Denko, PE / Timmons Group [ Jessica.denkoAtimmons.coml 608 Preston Ave., Suite 200 / Charlottesville, VA 22903 Owner or rep.: Berkmar Holdings, LLC — Frank Stoner [fstoneramilestonepartners.com ] 411 East Franklin Street, Suite 400 Richmond, VA 23219 Plan received date: 21 Jul 2022 Date of comments: 29 Aug 2022 Plan Coordinator: Ben Holt Reviewer: John Anderson, PE Engineering has reviewed the initial site plan and offers these review comments for Final Site Plan approval. SDP2022-00052 1. General a. WPO202200032 approval is required prior to FSP approval. b. A public drainage easement plat must be recorded prior to WPO plan approval since Berkmar Dr. runoff transits site. If an on -site SWM facility is proposed, then easement with deed is also required for SWM prior to WPO plan approval. c. A SWM facility maintenance agreement exists for existing dry detention (Kegler's parcel); items concerning ex. detention basin discussed at length w/25-Aug WP0202200032 review comments. 2. C4.0 a. Retaining wall ht. > 4-ft. requires PE -sealed retaining wall design. Wall ht.>3-ft. requires building permit. b. Provide stop sign (also, recommend stop bar) at development entrance at Berkmar Drive. c. Provide typ. dimensions (L x W) for the 9 parking spaces along 40' pvt. R/W and 3 spaces at N end of parking lot, east of hotel. d. Provide stop or yield sign for outbound traffic on self -storage loop at N end of storage building, to establish r/w and limit potential conflict. Note: Not needed if lift gate located at this location. e. Recommend convex mirrors at NE, SE corners of self -storage since curve radii at building comers are tight and sight distance impeded by structure, especially given truck wheelbase of vehicles that are likely anticipated to use this facility. Alternatively, move loop road away from structure and increase curve radii at NE /SE comers of self -storage building. Note: Not needed if one-way traffic around storage building is proposed. f. If one-way traffic proposed, please provide pavement markings /signs indicating one-way traffic. g. Design of sidewalk/striped pavement on west side of storage is somewhat ambiguous: please clarify via line revision, line -type /weight or comment response where 9.5' w sidewalk ends, which appears to be at south end of tapered striped pavement, which, if true, indicates sidewalk narrows to 2.0' at that point. 2.0' sidewalk presents risk /should be eliminated as a pedestrian facility (let sidewalk end, and striped pavement flare to 9.0' w/CG-2, or 9.5' with grading that prevents storm runoff touching building's west face). h. Recommend CG-6 along drive aisle /sidewalk along building's west face. Runoff concentrates against curbing, especially at sidewalk. Gutter minimizes winter icing /pavement fracture issues which may occur at edge of pavement /FC if runoff concentrates against curb, or structure. Engineering Review Comments Page 2 of 2 i. Provide CG-6 for 9 parking spaces at N end of storage building since grade concentrates runoff against curb at this location. j. Please label typ. parking space length for spaces facing 5' sidewalk facing proposed hotel. k. Please revise dumpster pad shading to match heavy duty concrete section line -type (dbl.-diagonal). 1. Dedicate portion of existing parcel to public r/w, as shown, via easement plat for ESP approval. 3. C5.0 a. Eliminate proposed grading on Kegler's (bowling alley) parcel. Any off -site grading requires permanent easement and /or temporary construction easement. Alternative: Notarized written agreement of same may be substituted and submitted for review in lieu of recorded easement. b. Show, label, dimension riprap outlet protection at Str. 100, pipe outfall (LxWxD). c. Show Aabel roof leader lines from storage building. d. Provide ditch calculations and ditch lining label for ditch leading to inlet grate structure 106. e. Provide top spot elevation for Str. 106. f. Provide TC spot elevation for Str. 114. g. Provide TC spot elevation for Str. 126. 4. CZO a. Label proposed public drainage easement which transits property, Berkmar Drive to Str. 100. b. Easement plat is a separate application and public drainage easement plat must be recorded prior to WPO plan approval /prior to ESP approval. Also, item Lb. above. 5. C8.0 a. Show riprap outlet protection in Str 100 to Str 110 profile. b. Show roof leader lines from storage building, as storm profile/s. c. Str. 104 to Str. 108 caption does not match profile Str. labels. Please revise for consistency. d. Str. 102 to Str. 112 caption does not match profile Str. labels. Please revise for consistency. e. Storm 400 profile caption does not match profile Str. labels. Please revise for consistency. Please feel free to call if any questions: 434.296-5832 -x3069 Thank you I Anderson SDP202200052_Berkmar Self Storage _ISP_082922.docx SDP2022-52 Berkmar Self Storage — Initial Site Plan Albemarle Co Fire & Rescue — Howard Lagomarsino hlaeomarsino@albemarle.org 08/8/22 1) Acknowledge the available fire data noted on cover page on the plan, but did not locate a note indicated the needed fire flow for the buildings indicated on the layout page of the plan. Please provide a note on the plan indicating the needed fire flow for the buildings. 2) Based on the proposed heights (over 30 ft tall) of the buildings on the plan, an aerial fire apparatus access road is necessary. This road must provide access to at least one side of the building that is a minimum of 15 feet from the building and a maximum of 30 feet from the building, arranged so that access is not restruicted when the aerial apparatus is in place and in use. The plan provides this for the storage building. Since it is indicated on this plan, the hotel does not provide this. The best location for this is on the west (parking lot side of the hotel. 3) Each building, hotel and storage facility, show an FDC. There needs to be a hydrant within 100 ft of the FDC, measured by travel way, and arranged so that when in use, does not obstruct the travel way in a manaer so additional fire apparatus is impeded. FDC's on both buildings, though they have hydrants, do not meet this criteria. 4) Place a note on the plan indicating the threads for the fire department use must be C & O threads (a good place to place this is as an additional line under the fire prevention notes). From: Richard Nelson To: Ben H21S Cc: Riki van Niekerk; Jessica Denko Subject: RE: TRANSMITTAL: SDP2022-52 Berkmar Self Storage - Initial Date: Friday, September 2, 2022 4:16:56 PM CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Ben, I recommend for approval with the following conditions: The sanitary sewer connection should be made in an existing manhole. Provide Fixture counts. Submit utility drawings to ACSA. RWSA approval will be required. Show proposed meter for hotel. Relocate FHA 40-feet min from hotel. Proposed water main to be 8-inch minimum. Plantings are to be outside of ACSA easements. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 From: Won Veaa To: Ben Hol Cc: devreviewCalHvanna.ora; Richard Nelson Subject: Berkmar Self Storage Comments Date: Tuesday, August 16, 2022 2:57:49 PM Attachments: imaae001.ona RWSA General Notes.doc RWSA - Acceotable Plantinas for Water and Sewer Fasements.odf CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Ben, RWSA has reviewed the Berkmar Self Storage initial Site plan dated 07/18/2022 by Timmons group and has the following comments. General comments: 1. Please include RWSA General water and sewer notes. 2. Include RWSA Water connection notes pasted below. Sheet C2.0: 1. Show RWSA waterline easement. 2. How do you plan on removing the fire hydrant? Sheet C4.0: 1. Retaining wall may impact the zone of influence for the RWSA waterline. An analysis is to be done for retaining wall and its impact on the RWSA water line. Please send the depths of the footing for the retaining wall. 2. RWSA will need to maintain access to the WL and need a minimum of 3' of coverage. 3. Test pits required to determine depth of RWAS 12" WL. Sheet 1-1.0 1. No trees permitted within RWSA easement. Please see planting list attached. Wet Tap on RWSA Waterline Add the following note to the utility plan sheet that shows the proposed connection: "Contractor shall coordinate with RWSA and ACSA for the connection to the existing RWSA 12" waterline. Contractor shall use due diligence to protect the RWSA XX" waterline during construction and tapping. Contractor shall verify the horizontal and vertical location, the outside diameter and the pipe material of the 12" waterline prior to ordering the tapping sleeve. RWSA shall be contacted 3 business days in advance of the test pit and shall be present during the test pit. The tapping sleeve shall be approved by RWSA prior to being ordered. The tapping contractor shall be approved by RWSA prior to the tap. A minimum of 3 business days notice shall be given prior to installation of the tapping sleeve. The 12"x6" tapping sleeve and valve shall be installed plumb. Following the placement and testing of the 12"x6" tapping sleeve and valve, a concrete pad and thrust block shall be placed under and behind the tapping sleeve and allowed to set prior to making the tap. No permanent connections to the potable water system are allowed until the new waterlines are tested, disinfected, and ready for service. See RWSA General Notes on Sheet" Add the following note to the waterline profile sheet that shows the proposed connection: "A minimum of 3 business days notice shall be given to RWSA prior to installation of the tapping sleeve. Please see the note on sheet "XX- reference utility plan sheet" for more information regarding the connection to the RWSA waterline' Let me know if you have any questions. Thanks, Dyon Vega Civil Engineer _ � ANNA �� WAi9t i sEWEIIAU�ROAITf Rivanna Water & Sewer Authority (434) 977-2970, Ext. 170 695 Moores Creek Lane Charlottesville, VA 22902 www.rivanna.org Please use our DevReview(a)Rivanna.org email for all development review related Items, Thank you. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 August 1, 2022 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Ben Holt Re: Berkmar Self Storage — Initial Site Plan SDP-2022-00052 Review # 1 Dear Mr. Holt: (804) 7862701 Fax: (804) 7862940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as prepared by Timmons Group, dated 18 July 2022, and offers the following comments: 1. Ensure the entrance radii conform to Table 4-3 in Appendix F of the Road Design Manual. 2. Entrance width is too narrow. Redesign entrance to conform to Section 4, Appendix F of the Road Design Manual. 3. The proposed entrance should align with the entrance to Berkmar Overlook across the street. 4. Provide a vertical profile for the entrance. 5. The proposed shared -use path (SUP) does not conform with ADA because it's termini are not logical sources or destinations for pedestrian traffic. According to Appendix A(1) (pg A(1)-51), the right-of-way should be dedicated, and the area graded. a. The proposed SUP should still be shown on the site plan, but be marked "future construction by others." b. CG-12 ramps must "... be in -line with the direction of pedestrian travel and the receiving curb ramp." (Appendix A(1), page A(1)-58). Please revise. c. The Shared Use Path appears to cross onto the neighbor's property (TMP 45- 112G). This must remain within the right-of-way. 6. Provide turn lane warrants for Route 1403 (Berkman Dr.) 7. A portion of the right-of-way to be dedicated appears to be within a cemetary zone. All graves must be moved out of the area being dedicated and the cemetary zone must be vacated in the area being dedicated before VDOT will approve the plat. 8. Show stop signs and stop bar for the entrance. VirginiaDOT.org WE KEEP VIRGINIA MOVING August 1, 2022 Attn: Ben Holt 9. Note that the final plan must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. Please provide a digital copy in PDF format of the revised plan along with a comment response letter. If further information is desired, please contact Doug McAvoy Jr. at (540) 718-6113. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Doug McAvoy Jr., P.E. Area Land Use Engineer Charlottesville Residency SDP2022-52 Berkmar Self Storage — Initial Site Plan Albemarle Co CDD Planning (Transportation Div.) — Alberic Karina-Plun akplun@albemarle.ore 08/22/22 At the entrance from Berkmar Drive, a crosswalk across there connecting the shared -use path is recommended, to provide both people using that path a designated place to cross, and it would indicate to drivers entering or leaving the property to be aware of pedestrian crossings. Nue Edge NedM Dlshtcf VIRGINIA DEPARTMEW Of HENTH Ben Holt, Senior Planner II Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Berkmar Self Storage Initial Site Plan SDP202200052 Tax Map #s: 45-112& 112E Mr. Holt: CharblhrsNN/Albemarle Neagh DepaAm@W 1138 Rose Hil Drive Chorlolfesvile, VA 22903 ofte 434-972-6200 1 tax 434-972-4310 September 2, 2022 As requested, I've reviewed the subject application, dated 7/18/2022, for the proposed development referenced above. Since both water and sewer services are provided by public systems, and there does not appear to be any existing onsite septic systems or wells, I have no objection and recommend approval. If there are any questions or you wish to discuss, please give me a call, 434-972-4306. Sincerely, Alan Mazurowski Environmental Health Supervisor Blue Ridge Health District alan.mazurowski@vdh.vir ig nia. og_v