Loading...
HomeMy WebLinkAboutSP202200027 Checklist 2022-09-19SPECIAL USE PERMIT CHECKLIST for (Reviewer Initials) PREAPP202200059 Wakefield Kennel SP Amendment / TMP 31-47A KM PreApp Number and Project Name / Tax Map Parcel Number After the mandatory pre -application meeting, county staff will mark this checklist appropriately so that it is clear to the applicant the information from Section 33.4 (c) that must be submitted with the official application Required for Provided with application? Staff) application SECTION 33.4(c) (County (Applicant) X X YES NO X x A narrative of the project proposal, including its public need or benefit; X A narrative of the proposed projects consistency with the comprehensive plan, x including the land use plan and the master plan for the applicable development area; X A narrative of the proposed projects impacts on environmental features. x X A narrative that addresses the impacts of the proposed development on public x transportation facilities, public safety facilities, public school facilities, and public parks. X One or more maps showing the proposed project's regional context and existing natural x and manmade physical conditions; X A conceptual plan showing, as applicable: X 1) the street network, including circulation within the project and connections to x existing and proposed or planned streets within and outside of the project; 2) typical cross -sections to show proportions, scale and streetscape/cross- sections/ci rcu I ation; 3) the general location of pedestrian and bicycle facilities; X 4) building envelopes; x X 5) parking envelopes; x 6) public spaces and amenities; 7) areas to be designated as conservation and/or preservation areas; X 8) conceptual stormwater detention facility locations; x SPECIAL USE PERMIT CHECKLIST 09-2020 Page 1 of 2 9) conceptual grading; X Other special studies or documentation, if applicable, and any other information x identified as necessary by the county on the pre -application comment form. • Include information on the proposed redevelopment of the site. In the pre-app it was discussed that the existing building will remain in operation while the new building is constructed. Please confirm this. • Provide additional information on the modern facilities. Include imaging/materials for soundproofing • May be helpful to show the multiple buildings on the conceptual plan • Clarify if any graywater will be stored on site Please note: There are additional submittal requirements outlined on the official application for a Special Use Permit. Read and Sign I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on this checklist as required for application. 09/19/2022 Signature of person completing this checklist Date Kendra G. Moon Print Name 540-660-5744 Daytime phone number of Signatory SPECIAL USE PERMIT CHECKLIST 09-2020 Page 2 of 2