HomeMy WebLinkAboutSP200700047 Action Letter
L
. - ?
C-
Phone (434) 296-5832
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Fax (434) 972-4012
March 11, 2008
Judith Baker
1400 Owensville Road
Charlottesville, Va 22901
RE: SP2007-00047 Graceworks Expansion (Sign # 56)
Tax Map 58, Parcels 82, 76B and 77
Dear Ms. Baker:
On February 13, 2008, the Albemarle County Board of Supervisors took action on SP #2007-
00047 to allow an amendment of SP 2001-24 to expand after school care from two (2)
days/week to four (4) days/week and increase enrollment on three parcels totaling 58.469
acres, Tax Map Parcels 58-82, 58-76B and 58-77, in the Samuel Miller District. This special
use permit was approved based on the following conditions:
1. A maximum of fourteen (14) children shall be allowed on the site at any time;
2. A minimum of two (2) adults shall supervise the children at all times;
3. The children shall be transport~d to and from the property as a group. The pick up and
drop off of individual children shall not be permitted except for medical, family and
weather-related emergencies;
4. The days of operation shall be limited to four (4) days per week, Monday through
Thursday, and the hours of operation shall be limited to 2:30 P.M. to 5:30 P.M. on the
days of operation;
5. Expansion of the facilities for the private school shall require an amendment to this
special use permit; and
6. Within thirty (30) days after the date of approval of Special Use Permit 2007-00047, the
applicant shall submit a schematic concept plan of the property (the "Plan") in a form
acceptable to the Director of Planning that shows the existing and proposed locations of
the improvements and activity areas of the school. The improvements, scale and
location of the improvements, and activity areas authorized by Special Use Permit 2007-
00047 shall be in general accord with the Plan. However, the Zoning Administrator may
approve revisions to the Plan to allow compliance with the Zoning Ordinance.
Please be advised that although the Albemarle County Board of Supervisors took action
on the project noted above, no uses on the property as approved above may lawfully
begin until all applicable approvals have been received and conditions have been met.
This includes:
· compliance with conditions of the SPECIAL USE PERMIT; and
· approval of a ZONING COMPLIANCE CLEARANCE.
'. .
In the event that the use, structure or activity for which this special use permit is issued is not
commenced within twenty-four (24) months from the date of Board approval, it shall be deemed
abandoned and the permit terminated. The term "commenced" means "construction of any
structure necessary to the use of the permit." .
If you have questions or comments regarding the above-noted action, please do not hesitate to
contact Sherri Proctor at 296-5832.
Sincerely,
:~=
Director of Planning
Cc: T ex Weaver
Chuck Proctor
Sherri Proctor
File