Loading...
HomeMy WebLinkAboutWPO202100049 Plan - VSMP 2022-09-20V C U N O Q a C O C O S T N Y O T O 7 O S 3 N 0 s vi 0 U O N Q 0 O S T Y 0 0 0 0 0 0 0 N O 3 3 . 0 0 Y E > �o o Q 0 c a ao as / E Q� �o �o n` m L w a �o a a T F a m o � 3 o .- L I U o m C U � o Sl m no � a _ a > V > w J o I m a Y O /s Y o a E a o N Sl � 2 J '> �w _o �E n o Y � F � s a J � a a� a° Y � 0 n a 0 0 � V n � �s Q 3 n L 0 n E a os PROJECT CONTACT LIST APPLICANT/DEVELOPER RENAUD CONSULTING 8605 WESTWOOD CENTER DRIVE, SUITE 410 VIENNA, VA 22182 TEL: (571) 765-4436 CONTACT: MARK FONTAINE, CCIM EMAIL: MFONTAINE@RENAUDCONSULTING.NET OWNER CHARLOTTESVILLE GREENBRIER LLC RENAUD CONSULTING 8605 WESTWOOD CENTER DRIVE, SUITE 410 VIENNA, VA 22182 CIVIL ENGINEER Kimley*Horn KIMLEY—HORN AND ASSOCIATES, INC. 1700 WILLOW LAWN DRIVE, SUITE 200 RICHMOND, VA 23230 TEL: (804) 673-3882 CONTACT: RYAN PERKINS, P.E. EMAIL: RYAN.PERKINS@KIMLEY—HORN.COM ARCHITECT CUHACI & PETERSON 930 WOODCOCK ROAD, SUITE 101 ORLANDO, FL 32803 TEL: (407) 661— 9100 CONTACT: MARY ROSARIO EMAIL: MARY.ROSARIO@C—P.COM SURVEYOR JENNINGSTEPHENSON P.C. LAND SURVEYORS n,e & PLANNERS JENNING STEPHENSON, P.C. 10160 STAPLES MILL ROAD SUITE 103 GLEN ALLEN, VA 23060 TEL: (804) 545-6235 CONTACT: KENNETH R. BLAYLOCK JR. WAWA CONTACT INFORMATION Wawa WAWA, INC. 260 W. BALTIMORE PIKE WAWA, PA 19063 TEL: (267) 273-3575 CONTACT: JEB BELL EMAIL: JEB.BELL@WAWA.COM MISS UTILITY OF VIRGINIA CALL BEFORE YOU DIG 811 VICINITY MAP PLANNING/ZONING PLANNING COMMISSION 401 MCINTIRE ROAD CHARLOTTESVILLE, VA 22902 TEL: (804) 677-0463 CONTACT: COREY CLAYBORNE STORMWATER FACILITIES AND ENVIRONMENTAL SERVICES 401 MCINTIRE ROAD 4TH FLOOR CHARLOTTESVILLE, VA 22902 TEL: (434) 296-5816 PUBLIC UTILITIES PUBLIC WORKS 401 MCINTIRE ROAD 4TH FLOOR CHARLOTTESVILLE, VA 22902 TEL: (434) 296-5816 FIRE MARSHAL DEPARTMENT OF FIRE RESCUE 460 STAGECOACH ROAD CHARLOTTESVILLE, VA 22902 TEL: (434) 296-5833 CONTACT: SHAWN MADDOX ONLY THE COMPLETE AND APPROVED PAPER COPY OF THE PLAN SET INCLUDING ALL SUBSEQUENT REVISIONS WILL SERVE AS THE OFFICIAL CONSTRUCTION PLANS. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY—HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY—HORN AND ASSOCIATES, INC. WP0202100049 VSMP PLAN FOR PROJECT LOCATION VICINITY SCALE: 1 " = MAP 500' 1215 SEMINOLE TRAIL RIO MAGISTERIAL DISTRICT ALBEMARLE, VA 22901 DATE: 07/15/2022 EV2 SHEET INDEX SHEET LIST TABLE SHEET NUMBER SHEET TITLE CA-100 COVER SHEET CA-101 GENERAL NOTES CA-102 ALBEMARLE COUNTY GENERAL NOTES CA-103 SPECIAL USE PERMIT AND ACCESS MANAGEMENT EXCEPTION CV-101 EXISTING CONDITIONS CE-101 DEMOLITION, PHASE I E&SC PLAN, AND PPP EXHIBIT CE-102 PHASE II E&SC PLAN CE-501 E&SC NOTES & DETAILS CE-502 E&SC NOTES & DETAILS CS-101 SITE PLAN CS-201 SIGHT DISTANCE PLAN & PROFILE CS-501 SITE DETAILS CS-502 SITE DETAILS CS-503 SITE DETAILS CG-101 GRADING PLAN CG-201 STORMWATER QUANTITY CG-202 STORMWATER QUALITY CG-203 DRAINAGE AREA MAP CG-501 STORMWATER PROFILES & CALCULATIONS CG-502 STORMWATER DETAILS CG-503 STORMWATER ROUTING REPORT CG-504 STORMWATER ROUTING REPORT CG-505 R-TANK DETAILS CG-506 R-TANK DETAILS CU-101 UTILITY PLAN CU-501 UTILITY PROFILES & DETAILS CU-502 UTILITY DETAILS CL-101 LIGHTING PLAN CL-501 LIGHTING DETAILS CL-502 LIGHTING DETAILS CP-101 PLANTING PLAN CP-501 PLANTING DETAILS SITE PLAN REVIEW STATUS SUBMIT DATE INITIALS REMARKS 04/05/2021 CBB 1ST ARB SUBMITTAL TO ALBEMARLE COUNTY 04/05/2021 CBB 1STISP SUBMITTAL TO ALBEMARLE COUNTY 09/14/2021 CBB 1ST VSMP SUBMITTAL TO ALBEMARLE COUNTY 09/14/2021 CBB 2ND ARB SUBMITTAL TO ALBEMARLE COUNTY 09/14/2021 CBB 1ST FSP SUBMITTAL TO ALBEMARLE COUNTY 11/19/2021 CBB 3RD ARB SUBMITTAL TO ALBEMARLE COUNTY 11/19/2021 CBB 2ND FSP SUBMITTAL TO ALBEMARLE COUNTY 11/19/2021 CBB 2ND VSMP SUBMITTAL TO ALBEMARLE COUNTY 12/10/2021 STM 4TH ARB SUBMITTAL TO ALBEMARLE COUNTY 12/29/2021 CBB 3RD FSP SUBMITTAL TO ALBEMARLE COUNTY 12/29/2021 CBB 3RD VSMP SUBMITTAL TO ALBEMARLE COUNTY 03/17/2022 STM 4TH VSMP SUBMITTAL TO ALBEMARLE COUNTY TOTAL NUMBER OF SHEETS: 32 BUILDING AREA: 6,049 SF BUILDING TYPE: W50 FB I VA CANOPY CONFIGURATION TRIPLE STACKED CANOPY TYPE: FLAT # OF MPD'S: 9 TYPE OF MPD'S: (9) 4+1 S.F. OF ASPHALT: 74,923 S.F. S.F. OF LAWN AREA: 20,380 S.F. S.F. OF MULCH AREA: 9,930 S.F. PROJECT DATA SITE STATISTICS PARCEL ID: 061WO-02-OA-00100 SITE ADDRESS: 1215 SEMINOLE TRAI L, CHARLOTTESVILLE, VA 22901 ZONED: C- 1, COMMERCIAL MAGISTERIAL DISTRICT: RIO APPLICABLE OVERLAY DISTRICTS: ENTRANCE CORRIDOR AIRPORT IMPACTAREA STEEP SLOPES- MANAGED SPECIAL USE PERMIT: SP1991-00069 EXISTING USE: SERVICE REPAIR GARAGE PROPOSED USE: CONVENIENCE FOOD STORE WITH SERVICE STATION BUI LDI NG SIZE: 6,049 SF BUILDING HEIGHT: 33 FT± TOTAL SITE AREA: 2.26 AC. TOTAL DISTURBED AREA: 2.62 AC. TOTAL IMPERVIOUS COVER: 1.74AC. ±(77%) OPEN SPACE: 0.52 AC. ± (23%) STEEP SLOPES: DISTURBED FLOOD ZONE: THIS PROPERTY APPEARS TO LIE IN FLOOD ZONE "X" AS SHOWN ON THE FLOOD I NSURANCE RATE MAP, MAP COMMUN ITY- PAN EL N UMBER 51003CO278D EFFECTIVE DATE: FEBRUARY 4,2005 WATER: ACSA- MECHLINKCREEK-RIVANNARIVERWATERSUPPLYWATERSHED SEWER: ACSA SOURCE OFTOPOGRAPHY: TOPOGRAPHIC SURVEYWAS PERFORMED BYJENNING STEPHENSON, P.C. ON NOVEMBER 13, 2020 DATUM: HORIZONTAL CONTROL BASED UPON VIRGINIASTATE PLANE COORDINATE SYSTEM, SOUTH ZONE, NAD 1983 THE VERTICAL DATUM SHOWN HEREON IS BASED ON NAVD 1988 LATITUDE: 38°04'11" N LONGITUDE: 78 °29'03" W RECEIVINGWATER(S): RIVANNARIVER- MEADOWCREEK VAHU6CODE: JR14 BUILDING SETBACKS FRONT (SEMINOLE TRAIL): 10' MIN., NO MAX. FRONT(GREENBRIER DRIVE): 10' MIN., NO MAX. SIDE: NONE BACK: NONE PARKING SCHEDULE PARKING REQUIRED: 1 SPACE PER 100SQUARE FEET OF RETAILSALES AREA FOR THE FIRST 5,000SF (RETAILSALES AREA IS 80% OF GFA) PARKING CALCULATION: (6,049SFx0.80)/100SF=48SPACES WAWA PARKING PROVIDED: 48 SPACES HANDICAP SPACES PROVIDED: 2 SPACES REAR PARKING LOTTO BENEFIT 061WO-02-00-002BO 20SPACES 061WO-02-00-002BO EXISTING PARKING 56 SPACES 061WO-02-00-002BO MAX. PARKING 78 SPACES 061WO-02-00-002BO PROPOSED PARKING 56SPACES +20SPACES=76SPACES TRAFFIC DATA AM PEAK HOUR TRIP (ENTER/EXIT) 252/251 APPROVED PM PEAK HOURTRIP (ENTER/EXIT) 210/209 by the Albemarle County VEHICLE TRIPS PER WEEKDAY 5,068 Communityy Developpment Department 09/20/22 Date File WP0202100049 APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNER/ZONING ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION HEALTH DEPARTMENT W Q 0 Z 0 cn w Df 0 N i� M N LU< O U)Z W <o Q:�i = OU 00 � � r U r 0 00 0 - 0 ZN cD S <� '0'- 0 } 00 J O O WLLj Y r� O 0 0 0 N� 0 0 RYA PERKINS LIC. No. 046565 07/15/2-0Z2 ~ N 0 0 U cn � Li 0CD CD w N v 0 0o Q Ln > > m o n a o m 0 Q" Z z w _ Ir w 0 � Y o Q Q w W W U/ L.L W 0 U 0 0� Z w I..L N m W ZW ~ W z z D O� N L. f O n/ LL w � Q w m Q SHEET NUMBER CA-100 C N v O 0 0 a - 0 `0 T E O T a 0 D 0 L_ 3 a 0 0 0 0 0 a - 0 0 T E a 0 0 v v 0 O 0 N `0 C v r 3 w N O Z s J 3 Q Y w 0 z w 5 0 0 B N 1 r Q j c ate+ " 0 C o O d 0 w a Q E J L , W o n` 0 0 v 0 v v w D c -o 0 0 1 0 N 0 v a D N 0 ° t 3 1 0 s Z) 3 D 0 D - 0 c I m L T 1 v C )o 0 n v ') N O _ a . a U N Y a Y s `0 0 = h N 0 ri � 't o C w C N .N N .4 v v 0 � C v n E w 0 C z c J o Q N r w 0 z w 'F N L C Q 0 v I 0 0 0 C m J .0 0 0 c - .. C 0 0 n n N 0 N c v O � 0 n v 5 c 0 y a 3 m « I A s v 0 0 J 0 .% 2 0 E n 0 p o o i CONSTRUCTION STANDARDS 1. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM WITH THESE DRAWINGS, PROJECT SPECIFICATIONS, WITH ALL CURRENT APPLICABLE CODES, AND, UNLESS OTHERWISE SPECIFIED, WITH THE LATEST REVISIONS OF THE FOLLOWING REFERENCE DOCUMENTS: A. ALBEMARLE COUNTY CONSTRUCTION STANDARDS AND SPECIFICATIONS B. ACSA GENERAL WATER AND SEWER CONSTRUCTION SPECIFICATIONS C. VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD & BRIDGE SPECIFICATIONS D. VDOT ROAD AND BRIDGE STANDARDS E. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) F. VIRGINIA WORK AREA PROTECTION MANUAL. G. VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH) H. VIRGINIA DEPARTMENT OF HEALTH (VDH) SPECIFICATIONS CONSTRUCTION NOTES 1. ALL CONSTRUCTION SHALL CONFORM WITH APPLICABLE STATE (INCLUDING VDOT) AND LOCAL CONSTRUCTION STANDARDS AS IDENTIFIED IN THESE PLANS. THE CONTRACTOR SHALL OBTAIN ALL APPLICABLE PERMITS AND LICENSES AND MAINTAIN COPIES OF THEM ON -SITE AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL MAINTAIN A SET OF CONSTRUCTION DOCUMENTS, SPECIFICATIONS, AND A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) ON -SITE AT ALL TIMES DURING CONSTRUCTION. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH LOCAL REGULATIONS AND CODES. 3. ALL DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. 4. ALL PAINT STRIPING, PAVEMENT MARKINGS, AND SIGNAGE SHALL CONFORM TO THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES," MOST CURRENT REVISION OR AS OTHERWISE SPECIFIED. ALL REFERENCED SIGN STANDARDS ARE TAKEN FROM THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". ALL NEW SIGNS SHALL BE MOUNTED ON GALVANIZED POSTS AND IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS. 5. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES ASSOCIATED WITH THE PROJECT WORK SCOPE DURING CONSTRUCTION. AT LEAST 48 HOURS PRIOR TO ANY DEMOLITION, GRADING, OR CONSTRUCTION ACTIVITY THE CONTRACTOR SHALL NOTIFY "MISS UTILITY" OF VIRGINIA ® 811 FOR PROPER IDENTIFICATION OF EXISTING UTILITIES WITHIN THE PROJECT SITE. 6. ANY DAMAGE OCCURRING TO THE EXISTING SITE INFRASTRUCTURE ON THIS OR THE ADJACENT SITE DURING THE CONSTRUCTION OPERATIONS AND/OR MOBILIZATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL EXISTING DAMAGED ITEMS INCLUDING CONCRETE AND/OR PAVEMENT SECTIONS SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS PRIOR TO PROJECT COMPLETION AT THE EXPENSE OF THE CONTRACTOR. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING WITH MATCHING MATERIALS ANY PAVEMENT, DRIVEWAYS, WALKS, CURBS, ETC. THAT MUST BE CUT OR THAT ARE DAMAGED DURING CONSTRUCTION INSIDE AND OUTSIDE OF THE LIMITS OF CONSTRUCTION. 8. ANY AND ALL UTILITIES AND/OR OBSTRUCTIONS (POWER POLES, TELEPHONE PEDESTALS, GUY WIRES, WATER METERS, ETC.) THAT ARE REQUIRED TO BE RELOCATED OR ADJUSTED DUE TO CONSTRUCTION SHALL BE DONE SO AT THE OWNERS/DEVELOPERS EXPENSE. 9. SLOPES WITHIN THE LIMITS OF THE HANDICAPPED PARKING AREAS SHALL NOT EXCEED 1.5% IN ANY DIRECTION. CROSSWALKS AND SIDEWALKS SHALL HAVE A MAXIMUM CROSS SLOPE OF 1.5% AND A MAXIMUM LONGITUDINAL SLOPE OF 5% IN DIRECTION OF TRAVEL. SLOPES IN HANDICAP RAMPS SHALL BE BUILT IN CONFORMANCE WITH ILATEST ADA CRITERIA AND LOCAL DESIGN STANDARDS. 10. THE CONTRACTOR IS RESPONSIBLE TO REMOVE ALL THE REMOVED/DEMOLISHED MATERIAL FROM THE PROJECT SITE AND DISPOSE OF SAME IN A LEGAL MANNER. 11. TYING TO EXISTING PAVEMENT: EXISTING PAVEMENT SHALL BE NEATLY SAW CUT TO A STRAIGHT LINE AND ALL PAVING ON THE NEW PAVEMENT SIDE OF THE CUT SHALL BE COMPLETELY REMOVED AND REPLACED WITH SPECIFIED MATERIALS. THE CUT LINE SHALL BE FULL -DEPTH AND COATED WITH A TACK COAT TO FURNISH A BOND BETWEEN THE EXISTING SURFACE COURSE AND THE NEW SURFACE COURSE. VDOT GENERAL NOTES 1. ALL MATERIALS AND CONSTRUCTION WITHIN THE PUBLIC RIGHT OF WAY SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION'S ROAD AND BRIDGE SPECIFICATIONS, ROAD AND BRIDGE STANDARDS AND VIRGINIA WORK AREA PROTECTION MANUAL. 2. LAND USE PERMITS (LUP) SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO BEGINNING ANY CONSTRUCTION WITHIN THE EXISTING STATE MAINTAINED RIGHT-OF-WAY (INCLUDING ACCESS). 3. VDOT REQUIRES NOTIFICATION 48 HOURS PRIOR TO COMMENCING WITH INITIAL CONSTRUCTION ACTIVITIES. PLEASE CONTACT THE APPROPRIATE PERMIT OFFICE IN WHICH YOUR PROPOSED ACTIVITIES ARE TO OCCUR. 4. APPROVAL OF A DETAILED CONSTRUCTION SEQUENCING AND MAINTENANCE OF TRAFFIC PLAN FOR THE WORK ZONE IS A PREREQUISITE FOR ISSUANCE OF A LAND USE PERMIT. THE PLAN SHALL ACCOMMODATE ACCESS TO AND CONSTRUCTION WITHIN VDOT MAINTAINED RIGHT-OF-WAY. 5. WORK ZONES - THE DEPARTMENT SHALL BE NOTIFIED 48 HOURS IN ADVANCE OF ANY ANTICIPATED LANE/SHOULDER CLOSURES ON ROADWAYS CLASSIFIED AS COLLECTOR ROADS OR HIGHER. YOU DO NOT NEED TO CALL TO ACTIVATE YOUR WORK ZONE UNTIL YOU PLACE THE FIRST CONE OR SIGN IN YOUR WORK ZONE. REQUESTS FOR THE IMPLEMENTATION OF TEMPORARY LANE AND SHOULDER CLOSURES MUST BE ENTERED INTO THE VDOT LANE CLOSURE ADVISORY MANAGEMENT SYSTEM (LCAMS) AND VATRAFFIC A MINIMUM OF ONE WEEK PRIOR TO THE PLANNED EXECUTION OF LANE OR SHOULDER CLOSURE ACTIVITIES ON STATE MAINTAINED ROADWAYS. THE PERMITTEE OR THEIR CONTRACTOR MAY ENTER THEIR REQUESTS DIRECTLY OR PROVIDE WRITTEN REQUESTS TO THE CENTRAL REGION TRAFFIC OPERATIONS CENTER (TOC), 804-796-4520, APRIL DABNEY, LANE CLOSURE COORDINATOR, OR MAILTO: APRIL.DABNEYOVDOT.VIRGINIA.GOV WITH 'LANE CLOSURE REQUEST" IN THE SUBJECT LINE. 6. PERMITTEE MUST NOTIFY VIRGINIA DEPARTMENT OF TRANSPORTATION TOC WHEN THERE IS A CRASH IN A WORK ZONE AT 804-796-4520. 7. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL CONSULT THE DEVELOPER'S ENGINEERING CONSULTANT AND VERIFY THE APPROVAL OF THE PLANS BY ALL APPLICABLE FEDERAL STATE AND LOCAL AGENCIES. 8. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT THE DEVELOPER'S ENGINEERING CONSULTANT IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON PLAN. IF THERE APPEARS TO BE A CONFLICT, OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THIS PLAN, CALL 'MISS UTILITY" AT 811. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE RELOCATION OF ANY UTILITY WITHIN EXISTING AND PROPOSED RIGHT OF WAY REQUIRED BY THE DEVELOPMENT. 9. THE PERMITTEE OR THEIR AGENT MUST CONTACT THE VDOT CUSTOMER SERVICE CENTER AT 1-800-367-7623 A MINIMUM OF 48 HOURS PRIOR TO INITIATING ANY PLANNED EXCAVATION WITHIN 1,000 FEET OF A SIGNALIZED INTERSECTION AND/OR NEAR VDOT ITS INFRASTRUCTURE. EXCAVATION MAY PROCEED ONLY AFTER THE VDOT REGIONAL UTILITY LOCATION AGENT HAS NOTIFIED THE PERMITTEE THAT THE UTILITY MARKING HAS BEEN COMPLETED. ADDITIONAL INFORMATION CAN BE FOUND AT: UTILITY LOCATION.PDF 'MISS UTILITY" DOES NOT LOCATE VDOT UTILITIES. 10. THE CONTRACTOR SHALL VERIFY THE ELEVATIONS OF ALL POINTS OF CONNECTION OR PROPOSED WORK TO EXISTING CURBS SANITARY LINES WATER LINES ETC., PRIOR TO CONSTRUCTION. 11. DESIGN CHANGES, SPECIFIED MATERIALS CHANGES AND FIELD CHANGES FROM THE APPROVED PLANS SHALL BE RE -SUBMITTED TO VDOT FOR APPROVAL PRIOR TO PROCEEDING WITH THE WORK. A LETTER OF EXPLANATION SHALL ACCOMPANY THE PROPOSED REVISION ALONG WITH DRAINAGE CALCULATIONS WHEN APPROPRIATE. 12. VDOT APPROVAL OF CONSTRUCTION PLANS DOES NOT PRECLUDE THE RIGHT TO REQUIRE ADDITIONAL FACILITIES AS DEEMED NECESSARY FOR ACCEPTANCE OF THE ROADS INTO THE VDOT SECONDARY ROAD SYSTEM BASED ON FIELD CONDITIONS OR UNAPPROVED PLAN CHANGES. 12. TYING TO EXISTING CURB/GUTTER: THE EXISTING PAVEMENT SHALL BE NEATLY SAW CUT AND REMOVED FOR A DISTANCE OF 2'0" FROM FACE OF THE CURB AND 2'0" FROM THE EDGE OF CURB AND GUTTER AND THE SUBGRADE, BASE COURSE, AND PAVING REPLACED WITH NEW PRODUCTS. 13. THESE PLANS ARE BASED ON INFORMATION PROVIDED TO KIMLEY-HORN & ASSOCIATES, INC. AT THE TIME OF PLAN PREPARATION. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND NOTIFY KIMLEY-HORN & ASSOCIATES, INC. IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLAN, OR IF THE PROPOSED WORK WOULD BE INHIBITED BY ANY OTHER SITE FEATURES. 14. ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN ARE TO BE MADE WITHOUT PRIOR APPROVAL OF THE OWNER AND NOTIFICATION TO THE ENGINEER. NO CONSIDERATION WILL BE GIVEN TO CHANGE ORDERS FOR WHICH THE OWNER AND ENGINEER WERE NOT CONTACTED PRIOR TO CONSTRUCTION OF THE AFFECTED ITEM. 15. ALL DIMENSIONS SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY ENGINEER AND OWNER IN WRITING IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR WORK HAVING TO BE REDONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 16. CONTRACTOR SHALL REFER TO THE ARCHITECTURAL/BUILDING PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRY/EXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, EXACT BUILDING UTILITY LOCATIONS. 17. IF THE CONTRACTOR DEVIATES FROM THE PLANS AND SPECIFICATIONS, INCLUDING THE NOTES CONTAINED THEREON, WITHOUT FIRST OBTAINING WRITTEN AUTHORIZATION FOR SUCH DEVIATIONS FROM THE OWNER AND ENGINEER, IT SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL COSTS TO CORRECT ANY WORK DONE, ALL FINES OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM. THE CONTRACTOR SHALL INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ALL SUCH COSTS TO CORRECT ANY SUCH WORK AND FROM ALL SUCH FINES AND PENALTIES, COMPENSATION AND PUNITIVE DAMAGES AND COSTS OF ANY NATURE RESULTING THEREFROM. 18. BRACING OF UTILITY POLES MAY BE REQUIRED BY UTILITY COMPANIES WHEN TRENCHING OR EXCAVATION IS IN CLOSE PROXIMITY TO THE POLES. THE COST OF BRACING POLES WILL BE BORNE BY THE CONTRACTOR. THERE IS NO SEPARATE PAY ITEM FOR THIS WORK. THE COST IS INCIDENTAL TO THE VARIOUS PAY ITEMS FOR INSTALLATION OF PIPE. 19. ALL EXISTING TRAFFIC AND STREET SIGNS DISTURBED SHALL BE REINSTALLED WHERE APPLICABLE BY THE CONTRACTOR. 20. UNLESS THE PLANS SPECIFICALLY DICTATE TO THE CONTRARY, ON -SITE AND OTHER DIRECTIONAL SIGNS SHALL BE LOCATED OUT OF THE PEDESTRIAN AND AUTOMOBILE ROUTES AND SHALL BE LOCATED BETWEEN THREE TO FIVE FEET BEHIND THE NEAREST BACK OF CURB. SIGN HEIGHT, LOCATION, AND STRUCTURE SHALL BE SUCH THAT THE SIGNS POSE NO THREAT TO PUBLIC SAFETY. DEMOLITION / LAND DISTURBANCE NOTES 1. PRIOR TO STARTING ANY DEMOLITION CONTRACTOR IS RESPONSIBLE FOR/TO: A. ENSURING THAT COPIES OF ALL APPLICABLE PERMITS AND APPROVALS ARE MAINTAINED ON SITE AND AVAILABLE FOR REVIEW. B. INSTALLING THE REQUIRED SOIL EROSION AND SEDIMENT CONTROL AND/OR TREE PROTECTION MEASURES PRIOR TO SITE DISTURBANCE. C. LOCATING (VERTICALLY AND HORIZONTALLY) ALL UTILITIES AND SERVICES, INCLUDING, BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE. THE CONTRACTOR SHALL USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES. D. FAMILIARIZING THEMSELVES WITH THE APPLICABLE UTILITY SERVICE PROVIDER AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION REQUIRED FOR THE PROJECT. THE CONTRACTOR SHALL PROVIDE THE OWNER WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH JURISDICTION AND UTILITY COMPANY REQUIREMENTS. E. COORDINATION WITH UTILITY COMPANIES & ADJACENT LANDOWNERS/BUSINESSES REGARDING WORKING "OFF-PEAK" HOURS OR ON WEEKENDS AS MAY BE REOUIRED TO MINIMIZE THE IMPACT ON THE AFFECTED PARTIES. 2. NEITHER KIMLEY-HORN & ASSOCIATES, INC. NOR THE OWNER IS RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. CONTRACTOR IS TO PROCEED WITH THE DEMOLITION IN A SYSTEMATIC AND SAFE MANNER, FOLLLOWING ALL OSHA REQUIREMENTS, TO ENSURE PUBLIC AND CONTRACTOR SAFETY. 13. VDOT APPROVAL OF THESE PLANS WILL EXPIRE FIVE (5) YEARS FROM THE DATE OF APPROVAL FOR SITE PLANS AND SUBDIVISION PLANS IF CONSTRUCTION HAS NOT STARTED. 14. PRELIMINARY DESIGN OF THE PAVEMENT STRUCTURE FOR ALL SUBDIVISION STREETS SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE PAVEMENT DESIGN GUIDE FOR SUBDIVISION AND SECONDARY ROADS IN VIRGINIA. THE COMPLETED DESIGN WORKSHEET APPENDIX IV SHALL BE INCLUDED WITH THE INITIAL PLAN SUBMITTAL FOR EACH PROPOSED PAVEMENT SECTION UTILIZING THE PREDICTED SOIL SUPPORT VALUE SHOWN IN APPENDIX I OF THE PAVEMENT DESIGN GUIDE OR AS REPORTED IN A GEOTECHNICAL ANALYSIS OF THE ON -SITE SOILS. 15. A COPY OF THE COMPLETE CBR REPORT SHALL BE SUBMITTED TO VDOT IN CONJUNCTION WITH FINAL PAVEMENT DESIGNS. ALL PAVEMENT DESIGN RECOMMENDATIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT EDITION OF PAVEMENT DESIGN GUIDE FOR SUBDIVISION AND SECONDARY ROADS IN VIRGINIA. 16. ALL VEGETATION AND ORGANIC MATERIAL SHALL BE REMOVED FROM THE RIGHT OF WAY LIMITS PRIOR TO CONDITIONING OF THE SUBGRADE. 17. UPON DISCOVERY OF SOILS THAT ARE UNSUITABLE FOR FOUNDATIONS, SUBGRADES, OR OTHER ROADWAY CONSTRUCTION PURPOSES, THE DEVELOPER OR HIS DESIGNEE, WHICH MAY BE THE CONTRACTOR, SHALL IMMEDIATELY ENGAGE A GEOTECHNICAL ENGINEER AND NOTIFY VDOT. THESE AREAS SHALL BE EXCAVATED BELOW PLAN GRADE AS DIRECTED BY THE GEOTECHNICAL ENGINEER, BACKFILLED WITH SUITABLE MATERIAL AND COMPACTED IN ACCORDANCE WITH CURRENT VDOT SPECIFICATIONS. 18. THE NECESSITY AND LOCATIONS FOR ADDITIONAL VDOT STANDARD UNDERDRAINS SHALL BE DETERMINED AT TIME OF SUBGRADE INSPECTION. VIDEO INSPECTION OF ACCESSIBLE OUTLET LOCATIONS, MAINLINE LONGITUDINAL CONNECTIONS, AND LONGITUDINAL PIPE FOR ALL PAVEMENT UNDERDRAINS, CROSS DRAINS, EDGEDRAINS AND PREFABRICATED GEOCOMPOSITE PANEL DRAINS SHALL BE CONDUCTED IN ACCORDANCE WITH SECTION 501 OF THE ROAD AND BRIDGE SPECIFICATIONS AND VIRGINIA TEST METHOD 108 - POST INSTALLATION INSPECTION OF UNDERDRAINS, CROSSDRAINS, AND EDGEDRAINS. 19. VDOT SHALL HAVE PERFORMED THE REQUIRED FIELD INSPECTION (PROOF ROLL) PRIOR TO PLACEMENT OF THE AGGREGATE BASE COURSE(S). CONTACT VDOT FOR SUBGRADE INSPECTION 48 HOURS PRIOR TO SCHEDULING PLACEMENT OF AGGREGATE BASE COURSE(S). 20. THE SCHEDULING OF AGGREGATE BASE INSTALLATION AND SUBSEQUENT PAVING ACTIVITIES SHALL ACCOMMODATE FORECASTED WEATHER CONDITIONS PER SECTION 315 OF THE ROAD AND BRIDGE SPECIFICATIONS. 21. VDOT SHALL HAVE APPROVED THE AGGREGATE BASE COURSE(S) FOR DEPTH, TEMPLATE AND PERFORMED THE REQUIRED FIELD INSPECTION PROOF ROLL PRIOR TO PLACEMENT OF ANY ASPHALT CONCRETE SURFACE COURSE(S). CONTACT VDOT FOR INSPECTION OF THE AGGREGATE BASE COURSE(S) 48 HOURS PRIOR TO APPLICATION OF THE SURFACE COURSE(S). 22. A LICENSED GEOTECHNICAL ENGINEER OR HIS DESIGNEE SHALL ASCERTAIN CAUSE AND CERTIFY RECOMMENDED METHOD OF REPAIR FOR ALL PAVEMENT STRUCTURAL FAILURES PRIOR TO STATE ACCEPTANCE. 23. VDOT SHALL BE PROVIDED DOCUMENTATION BY A LICENSED GEOTECHNICAL ENGINEER, CERTIFYING THAT ALL IN -PLACE PAVEMENTS MEET OR EXCEED THE APPROVED PAVEMENT DESIGN THICKNESS PRIOR TO STATE ACCEPTANCE OF THE STREET. CORES ARE TO BE OBTAINED VERIFYING PAVEMENT THICKNESS UNLESS OTHERWISE DIRECTED BY VDOT. THE PERMIT'S INSPECTOR SHALL BE CONTACTED 24 HOURS PRIOR TO THE CORE SAMPLES BEING TAKEN. 24. ALL STORM SEWER DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH LATEST VDOT DRAINAGE MANUAL, ROAD AND BRIDGE STANDARDS, AND IIMS. 25. ALL PRE -CAST UNITS SHALL BE VDOT APPROVED. CERTIFICATION AND VDOT STAMP IS REQUIRED ON ALL UNITS. 26. ALL CONCRETE SHALL BE CLASS A3-AE (AIR ENTRAINED 3,000 PSI) UNLESS OTHERWISE SPECIFIED. 27. ALL ROADSIDE DITCHES SHOWN AS PAVED ON PLANS ARE TO BE PAVED IN ACCORDANCE WITH THE STANDARD TYPICAL SECTION AS SHOWN ON THE PLANS. ANY ADDITIONAL PAVING OF THE DITCHES, 3. THE CONTRACTOR SHALL PROVIDE ALL THE "MEANS AND METHODS" NECESSARY TO PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF EXISTING STRUCTURES, AND ANY OTHER IMPROVEMENTS THAT ARE REMAINING ON OR OFF SITE. THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS OF DAMAGE TO ALL ITEMS THAT ARE TO REMAIN AS A RESULT OF HIS ACTIVITIES. 4. IN THE ABSENCE OF SPECIFICATIONS, THE CONTRACTOR SHALL PERFORM EARTH MOVEMENT ACTIVITIES, DEMOLITION AND REMOVAL OF ALL FOUNDATION WALLS, FOOTINGS, AND OTHER MATERIALS WITHIN THE LIMITS OF DISTURBANCE WITH DIRECTION BY OWNER'S STRUCTURAL OR GEOTECHNICAL ENGINEER. 5. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE WITH: THE "MANUAL ON UNIFORM TRAFFIC CONTROL," AS WELL AS FEDERAL, STATE, AND LOCAL REGULATIONS WHEN DEMOLITION RELATED ACTIVITIES IMPACT ROADWAYS OR ROADWAY RIGHTS - OF - WAY. 6. CONDUCT DEMOLITION ACTIVITIES IN SUCH A MANNER TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, SIDEWALKS, WALKWAYS, AND OTHER ADJACENT FACILITIES. STREET CLOSURE PERMITS MUST BE RECEIVED FROM THE APPROPRIATE GOVERNMENTAL AUTHORITY. 7. USE DUST CONTROL MEASURES TO LIMIT AIRBORNE DUST AND DIRT RISING AND SCATTERING IN THE AIR IN ACCORDANCE WITH FEDERAL, STATE, AND/OR LOCAL STANDARDS. AFTER THE DEMOLITION IS COMPLETE, ADJACENT STRUCTURES AND IMPROVEMENTS SHALL BE CLEANED OF ALL DUST AND DEBRIS CAUSED BY THE DEMOLITION OPERATIONS. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL ADJACENT AREAS TO THEIR "PRE -DEMOLITION" CONDITION. 8. CONTRACTOR IS RESPONSIBLE TO SAFEGUARD SITE AS NECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE ENTRY OF UNAUTHORIZED PERSONS AT ANY TIME. 9. THIS DEMOLITION PLAN IS INTENDED TO IDENTIFY THOSE EXISTING ITEMS/CONDITIONS WHICH ARE TO BE REMOVED. IT IS NOT INTENDED TO PROVIDE DIRECTION OTHER THAN THAT ALL METHODS AND MEANS ARE TO BE IN ACCORDANCE WITH STATE, FEDERAL, LOCAL, AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OSHA AND OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE. 10, DEBRIS SHALL NOT BE BURIED ON THE SUBJECT SITE. ALL DEMOLITION WASTES AND DEBRIS (SOLID WASTE) SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND APPLICABLE CODES. DRAINAGE / STORMWATER NOTES 1. ALL STORM SEWER PIPES, MANHOLES, AND CURB INLETS SHALL BE CLEANED OF DEBRIS AND ERODED MATERIALS AT THE LAST STAGES OF CONSTRUCTION. 2. STORM DRAIN PIPE AND FLARED END SECTIONS ARE TO BE FURNISHED AND INSTALLED IN ACCORDANCE WITH SECTION 302 OF VDOT ROAD AND BRIDGE SPECIFICATIONS AND SHALL CONFORM TO THE REQUIREMENTS OF ASTM DESIGNATION C-76 FOR REINFORCED CONCRETE CULVERT AND STORM DRAIN PIPE. ALL PIPE FOR STORM DRAINS SHALL BE REINFORCED CONCRETE CLASS III UNLESS INDICATED OTHERWISE ON THE PLANS. THE CONTRACTOR SHALL USE A PREFORMED FLEXIBLE PLASTIC SEALING COMPOUND OF BUTYL MASTIC ROPE SEALER - 1" SIZE, "EZ STICK" AS MANUFACTURED BY CONCRETE PRODUCTS SUPPLY OR AN APPROVED EQUAL FOR SEALING WATER -TIGHT JOINTS. VERTICAL CLEARANCE OF 12" BETWEEN STORM AND OTHER UTILITIES IS REQUIRED UNLESS OTHERWISE NOTED. 3. ALL EXISTING STORM SEWER PIPES, DROP INLETS, AND CURB INLETS BEING UTILIZED BY A PART OF THE DRAINAGE SYSTEM SHALL BE CLEANED OF ERODED MATERIAL AT ALL STAGES OF CONSTRUCTION, AS DIRECTED BY THE ENGINEER. THE COST INCIDENTAL TO THIS IS TO BE INCLUDED IN THE CONTRACT PRICE FOR THE OTHER DRAINAGE ITEMS. 4. STORM SEWER PIPES AS SHOWN ON THE PLANS ARE MEASURED FROM THE CENTERLINE OF EACH STRUCTURE AND INVERT ELEVATIONS ARE ESTABLISHED BASED ON THIS CENTER LINE DISTANCE. LENGTH CALL OUTS FOR PIPES WITH FLARED END SECTIONS WILL BE MEASURED TO THE JOINT. CONTRACTOR SHALL LOCATE ALL END SECTIONS TO MATCH THE BANK SLOPE AND THE PIPE SLOPE SHALL BE ADJUSTED AS NECESSARY. 5. BOOT CONNECTIONS SHALL BE PROVIDED FOR ALL PLASTIC PIPES THAT TIE INTO A CONCRETE STRUCTURE. 6. GENERAL CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES HAVING UNDERGROUND UTILITIES ON SITE OR IN RIGHT-OF-WAY PRIOR TO EXCAVATION. CONTRACTOR SHALL CONTACT UTILITY LOCATING COMPANY AND LOCATE ALL UTILITIES PRIOR TO GRADING START. SEE EXISTING CONDITIONS SHEET FOR UTILITY CONTACT INFORMATION. 7. SITE GRADING SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND APPROVED BY APPLICABLE AUTHORITY. 8. ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK, AND THIS MUST BE VERIFIED AND LOCATED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 9. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE SO THAT RUNOFF WILL DRAIN BY GRAVITY FLOW ACROSS NEW PAVEMENT AREAS TO NEW OR EXISTING DRAINAGE INLETS OR SHEET FLOW OVERLAND. 10. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE GENERAL V.S.M.P. PERMIT FOR STORMWATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES. 11. ALL DRAINAGE STRUCTURES AND STORM SEWER PIPES SHALL MEET HEAVY DUTY TRAFFIC (H20) LOADING AND BE INSTALLED ACCORDINGLY. OTHER THAN THOSE SHOWN ON THE ROAD PLANS WILL BE DETERMINED PRIOR TO ACCEPTANCE OF THE ROADS INTO THE MOOT SECONDARY ROAD SYSTEM. 28. ROAD & BRIDGE SPECIFICATIONS SECTION 302, DRAINAGE STRUCTURES ADDRESSES POST INSTALLATION VISUAL/VIDEO CAMERA INSPECTION OF STORM SEWER PIPES AND PIPE CULVERTS. INSPECTION FREQUENCY SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS AND/OR AS NECESSITATED BY THE ENGINEER. VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VIRGINIA TEST METHOD (VTM) 123, POST INSTALLATION INSPECTION OF BURIED STORM SEWER PIPE AND PIPE CULVERTS. 29. A CONSTRUCTION ENTRANCE SHALL BE INSTALLED ON EACH INDIVIDUAL LOT PRIOR TO ANY LOT GRADING OR HOME CONSTRUCTION ACTIVITIES AND SHALL BE ADEQUATELY MAINTAINED UNTIL ALL CONSTRUCTION TRAFFIC AREAS WITHIN THE LOT HAVE BEEN STABILIZED. 30. ALL ENTRANCES SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH CURRENT VDOT STANDARDS. RESIDENTIAL LOT ACCESS SHALL BE PROVIDED PER THE FOLLOWING CRITERIA: • ALL DRIVEWAY ENTRANCES AND ENTRANCE CULVERTS SHALL CONFORM TO PE-1 PRIVATE ENTRANCE STANDARDS UNLESS OTHERWISE APPROVED BY VDOT. NO ENTRANCE CULVERTS ARE TO BE INSTALLED WITHIN FIVE (5) FEET OF A PROPERTY CORNER. • VDOT STANDARD CG-9D ENTRANCES SHALL BE USED WHEN AN ENTRANCE IS REQUIRED IN CURB AND GUTTER NEIGHBORHOODS UNLESS OTHERWISE APPROVED BY VDOT. 31. DRY GUTTER IS NOT ALLOWED IN VDOT RIGHT OF WAY EXCEPT AS SHOWN ON VDOT'S ENTRANCE STANDARD DETAILS. 32. THE DEVELOPER SHALL FURNISH AND INSTALL STOP SIGNS AND STOP BARS AT STREET INTERSECTIONS AND ALL REGULATORY SIGNAGE PER THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. ALL SIGNS MUST BE INSTALLED ON VDOT STANDARD STP-1 SIGN POSTS. 33. INSTALLATION, MAINTENANCE AND OPERATION OF STREET LIGHTING SHALL BE PROVIDED BY AND AT THE SOLE EXPENSE OF OTHERS. VDOT WILL ALLOW LIGHTING WITHIN THE RIGHT OF WAY BY LUP ONLY. LIGHTING ON CURB SECTIONS SHALL BE PLACED BEHIND THE CURB AND PREFERABLY BEHIND THE SIDEWALK. FOR SHOULDER SECTIONS, THE POLE SHALL BE PLACED A MINIMUM OF 10' FROM EDGE OF PAVEMENT AND BEHIND THE DITCH LINE. ALL LIGHTING PROPOSED WITHIN THE RIGHT OF WAY MUST BE DESIGNED IN ACCORDANCE WITH THE AASHTO GUIDE FOR ROADWAY LIGHTING AND SHALL MEET THE CURRENT ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA (IESNA) STANDARDS. 34. TRAFFIC SIGNALS REQUIRE AN INDIVIDUAL LAND USE PERMIT. THE APPLICANT SHALL BE RESPONSIBLE FOR THE DESIGN COSTS OF ANY TRAFFIC SIGNAL INSTALLATION OR MODIFICATION OF EXISTING SIGNALS. DESIGN PLANS MUST BE PREPARED AND SUBMITTED TO VDOT BY A LICENSED PROFESSIONAL ENGINEER FOR REVIEW AND APPROVAL. THIS INCLUDES THE FOUNDATION DESIGN AND ANY EQUIPMENT ASSOCIATED WITH THE COMPLETED TRAFFIC SIGNAL. ALL EQUIPMENT MUST BE APPROVED BY VDOT. SHOP DRAWINGS MUST BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO FABRICATING ANY SIGNAL STRUCTURAL COMPONENTS. 35. SOIL STABILIZATION IS REQUIRED WITHIN 7 DAYS FOR ALL AREAS WHERE CLEARING GRADING EXCAVATION OR OTHER LAND DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED OR WHERE LAND DISTURBANCE ACTIVITIES HAVE BEEN TEMPORARILY SUSPENDED FOR AN ANTICIPATED DURATION OF GREATER THAN 7 DAYS, OR UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIED AREA. SOIL STABILIZATION SHALL BEGIN AS SOON AS PRACTICABLE, BUT NOT LATER THAN THE SEVEN DAYS FOLLOWING THE DAY WHEN LAND DISTURBING ACTIVITIES TEMPORARILY OR PERMANENTLY CEASED. 36. NO STRUCTURE SHALL BE CONSTRUCTED ON STATE MAINTAINED RIGHTS OF WAY, OR ON RIGHT OF WAYS INTENDED TO BE MAINTAINED BY VDOT UNLESS SAID STRUCTURES ARE SHOWN ON CONSTRUCTION PLANS APPROVED BY VDOT OR SUCH STRUCTURES ARE COVERED BY A VDOT LAND USE PERMIT (OR BY A LETTER OF INTENT FROM THE RESIDENT ADMINISTRATOR/RESIDENT ENGINEER TO ISSUE SAID PERMIT AT THE TIME OF STATE ACCEPTANCE). 12. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 13. AFTER PLACEMENT OF SUBGRADE AND PRIOR TO PLACEMENT OF PAVEMENT, CONTRACTOR SHALL TEST AND OBSERVE PAVEMENT AREAS FOR EVIDENCE OF PONDING. ALL AREAS SHALL ADEQUATELY DRAIN TOWARDS THE INTENDED STRUCTURE TO CONVEY STORM RUNOFF. CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND ENGINEER IF ANY DISCREPANCIES ARE DISCOVERED. UTILITY NOTES 1. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES OR UTILITIES BY OTHERS AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 2. THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR PROJECT. THE CONTRACTOR SHALL PROVIDE THE OWNER WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH JURISDICTION AND UTILITY COMPANY REQUIREMENTS. 3. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF SITE PLAN DOCUMENTS AND ARCHITECTURAL DESIGN FOR EXACT BUILDING UTILITY CONNECTION LOCATIONS, DOOR ACCESS, AND EXTERIOR GRADING. THE UTILITY SERVICE SIZES ARE TO BE DETERMINED BY THE ARCHITECT. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF UTILITIES/SERVICES WITH THE INDIVIDUAL COMPANIES, TO AVOID CONFLICTS AND ENSURE PROPER DEPTHS ARE ACHIEVED. THE JURISDICTION UTILITY REQUIREMENTS SHALL ALSO BE MET, AS WELL AS COORDINATING THE UTILITY TIE-INS/CONNECTIONS PRIOR TO CONNECTING TO THE EXISTING UTILITY/SERVICE. WHERE CONFLICTS EXIST WITH THESE SITE PLANS, ENGINEER IS TO BE NOTIFIED PRIOR TO CONSTRUCTION TO RESOLVE. 4. THE CONTRACTOR SHALL PERFORM WHATEVER TEST EXCAVATION OR OTHER INVESTIGATION IS NECESSARY TO VERIFY TIE-IN INVERTS, LOCATIONS AND CLEARANCES, AND SHALL REPORT IMMEDIATELY ANY DISCREPANCIES TO KIMLEY- HORN AND ASSOCIATES, INC. AT (804) 673-3882. 5. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES TO REMAIN IN PLACE. 6. MAINTAIN A MINIMUM OF 18" OF VERTICAL CLEARANCE BETWEEN STORM SANITARY AND ALL UTILITIES UNLESS OTHERWISE NOTED). 7. CROSS CONNECTION CONTROL AND BACK FLOW PREVENTION SHALL BE IN ACCORDANCE WITH THE UNIFORM STATEWIDE BUILDING CODE. 8. CONTRACTOR SHALL COORDINATE WITH THE FIRE MARSHAL BEFORE INSTALLING FIRE LANE SIGNS AND MARKINGS. 9. ALL CLEANOUTS WITHIN VEHICULAR AREAS SHALL BE TRAFFIC BEARING. 10. CONTRACTOR SHALL SAW CUT, REMOVE, AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO INSTALL UNDERGROUND ELECTRIC, TELEPHONE, SANITARY SEWER, WATER, AND COMMUNICATION CONDUITS. 11. UNDERGROUND UTILITIES INSTALLED ON PRIVATE PROPERTY OR IN PRIVATE UTILITY EASEMENTS AND BUILDING RELATED STORM DRAINS SHALL BE DESIGNED AND INSTALLED PER THE CURRENT EDITION OF THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE. 12. PROPOSED CROSSINGS WITH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PIT PRIOR TO COMMENCEMENT OF CONSTRUCTION. 13. THE RIM ELEVATIONS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT TOPS SHALL BE ADJUSTED, IF REQUIRED, TO MATCH PROPOSED GRADES IN ACCORDANCE WITH ALL APPLICABLE STANDARDS. 14. ALL WATER, SEWER AND FIRE LINES REQUIRE NEW INSPECTION AND TESTING PROCEDURES. THE ACSA PERFORMS ANY TESTING AND INSPECTIONS OF THE PUBLIC SEWER AND WATER MAIN(S). THE ALBEMARLE COUNTY BUILDING INSPECTIONS DEPARTMENT (ACBID) DOES A VISUAL INSPECTION AND WITNESSES THE TESTING OF THE BUILDING DRAIN, WATER SERVICE PIPE AND THE SPRINKLER LEAD-IN CONNECTION. THE DEVELOPER/CONTRACTOR IS RESPONSIBLE TO RETAIN A SPECIAL INSPECTOR AS OUTLINED IN THE UPDATED ALBEMARLE COUNTY POLICY FOR SITE UTILITIES TO PERFORM THE VISUAL INSPECTION AND TESTING OF ALL UTILITIES NOT COVERED BY THE ACSA OR ACBID. THIS INCLUDES BUILDING SEWERS, WATER AND FIRE LINE BRANCHES BETWEEN THE MAIN AND THE METER(S)/BUILDING(S). THE SPECIAL INSPECTOR'S REPORT MUST BE SUBMITTED AND APPROVED BY THE ALBEMARLE COUNTY ENGINEERING DEPARTMENT PRIOR TO A CERTIFICATE OF OCCUPANCY BEING ISSUED. TRAFFIC CONTROL NOTES 1. WHENEVER CONSTRUCTION OPERATIONS ENCROACH ON THE RIGHT -OF WAY OF ADJACENT ROADWAYS, TRAFFIC CONTROL SHALL BE PROVIDED IN ACCORDANCE WITH LOCAL AND STATE STANDARDS. 2. NO MATERIALS OR EQUIPMENT SHALL BE STORED OR STOCKPILED WITHIN THE RIGHT-OF-WAY OF ADJACENT ROADWAYS. 3. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR COMPLETING AND IMPLEMENTING TRAFFIC CONTROL PLAN. BUILDING INSPECTION NOTES: 1. ACCESSIBLE PARKING SPACES, ACCESS ISLES, AND ACCESSIBLE ROUTE SHALL BE INSTALLED IN ACCORDANCE WITH ICC ANSI A117.1-09 AND THE 2015 VIRGINIA CONSTRUCTION CODE. 2. ALL WATER, SEWER LINES, AND FIRE LINES FROM THE MAIN TO THE STRUCTURE LOCATED ON PRIVATE PROPERTY MUST HAVE A VISUAL INSPECTION PERFORMED BY THE BUILDING DEPARTMENT. 3. BUILDINGS OR STRUCTURES BUILT BEFORE JANUARY 1, 1985 MUST HAVE AN ASBESTOS SURVEY PERFORMED IN ORDER TO APPLY FOR A DEMOLITION PERMIT. ASBESTOS REMOVAL PERMITS ARE REQUIRED IF POSITIVE FOR SUCH FROM ALBEMARLE COUNTY AND VDOLI. CONTACT VDOLI FOR THEIR ADDITIONAL REQUIREMENTS AND PERMITS FOR DEMOLITION PROJECTS AT 540-562-3580 X131. ALL CONSTRUCTION METHODS AND MATERIAL SHALL CONFORM TO THESE DRAWINGS, PROJECT SPECIFICATIONS, STANDARDS WITH ALL CURRENT APPLICABLE CODES, AND, UNLESS OTHERWISE SPECIFIED, WITH THE CURRENT EDITIONS AND LATEST REVISIONS OF THE FOLLOWING REFERENCE DOCUMENTS: • VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD & BRIDGE SPECIFICATIONS • VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT) ROAD & BRIDGE STANDARDS • MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) VIRGINIA SUPPLEMENT TO THE MUTCD • INSTRUCTIONAL AND INFORMATIONAL MEMORANDA (IIM) VIRGINIA WORK AREA PROTECTION MANUAL SPECIFIC STANDARDS AND DETAILS FROM THE CURRENT AND OR REVISED VERSION OF THE 2016 VDOT ROAD AND BRIDGE STANDARDS INCLUDE: WP-2 (ASPHALT PAVEMENT WIDENING FOR WIDENING SUBJECT TO TRAFFIC) - CC-11 (METHOD OF TREATMENT CONNECTION FOR STREET INTERSECTIONS AND COMMERCIAL ENTRANCES) - CG-12 (DETECTABLE WARNING SURFACE - TYPE B (PARALLEL) APPLICATION) - CG-6 (COMBINATION 6" CURB AND GUTTER) - MH-1 (STANDARD MANHOLE FRAME AND COVER) - MH-1 (MANHOLE FOR 12"-48" PIPE CULVERTS) - IS-1 (STANDARD METHOD OF SHAPING MANHOLE & INLET INVERTS) - DI-3A, 3B, 3C (STANDARD CURB DROP INLET - 12"-30" PIPE: MAXIMUM DEPTH (H)=8') - DI-1 (STANDARD DROP INLET - 12"-24" PIPE: MAXIMUM DEPTH (H)=10') - PB-1 (INSTALL. OF PIPE CULVERTS AND STORM SEWERS CIRC. PIPE BEDDING AND BACKFILL - METHOD "A") - ST-1 (STANDARD STEP) - DI-2A, 2B, 2C (STANDARD CURB DROP INLET - 12"-24" PIPE: MAXIMUM DEPTH (H)=9') - GR-2, 2A (STANDARD BLOCKED -OUT W-BEAM GUARDRAIL (STRONG POST SYSTEM)) - GR-2, 2A (STANDARD BLOCKED -OUT W-BEAM GUARDRAIL (STRONG POST SYSTEM, POST AND BLOCKOUT DETAILS)) w Q 0 cn z O clo w 0-1 61 z O N N LZQ z< 0 U�o Wo �z a U= N � OO co co (D U a o z z o0�0 ZN CD = ^ a � , r ct_ c J ON � S0 = 1j w0 O �j - a Y Q J N N 3: 00 N J O� le 0 O RYA PERKINS LiC. No. 046565 07/15/2022 � U N N O m U V � O w Ln O co �,-� cn > r m a,� c L_ a o m 0 Q _ - J z U z w V Y V w � S U O O U W W 0 Z J N< 0. W Z ////W Z I11 IN-..LI T V J 0. N m W Z ~ w W D=) 0 ry z O u /� � 1 / li (D W J Q� Q Ld m -i Q SHEET NUMBER CA-101